Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Mars campaign”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 397 records · Page 22

A Deep Search for the Release of Volcanic Gases on Mars Using Ground-Based High-Resolution Infrared and Submillimeter Spectroscopy: Sensitive Upper Limits for OCS and SO2

Recent volcanic activity has long been considered a distinct possibility that would place major constraints on the evolution of Mars’ interior. Volcanic activity would result in the outgassing of sulfur-bearing species. As part of our multi-band search for active release of volcanic gases on Mars, we looked for carbonyl sulfide (OCS) at its combination band (v1 + v3) at 3.42 micrometers (2924 cm(exp -1), and sulfur dioxide (SO2) at 346.652 GHz, in two successive Mars years during its late Northern spring and mid Northern summer seasons (L(sub)s= 43 deg - 44 deg). The targeted volcanic districts, Tharsis and Syrtis Major, were observed during the two intervals, 15 Dec. 2011 to 6 Jan. 2012 in the first year, and 23 May 2014 to 12 June 2014 in the second year using the high resolution infrared spectrometer CSHELL on the NASA Infrared Telescope Facility, and the high resolution heterodyne receiver HARP at the James Clerk Maxwell Telescope atop Maunakea, Hawaii. No active release of such gases was detected, and we report 2 sigma upper limits of 1.8 ppbv and 3.1 ppbv for OCS and SO2, respectively, compared to 0.3 ppbv for SO2 (Encrenaz, T. et al. [2011] Astron. & Astrophys. 530, A37; Krasnopolsky, V.A. [2012] Icarus 217, 144-152) over the disk of Mars. Our retrieved upper limit on the SO2 outgassing rate of 156 tons/day (1.8 kg/s), corresponds to a mass rate of magma that is able to degas the SO2 of 104 kilotons/day (1200 kg/s), or 40,000 cu m/day (0.46 cu m/s). Our campaign places stringent limits on the concentration of sulfur-bearing species into the atmosphere of Mars.

Khayat, A. S. J.↗

Expressing Campaign Intent to Increase Productivity of Planetary Exploration Rovers

Achieving consistently high levels of productivity has been a challenge for Mars surface missions. While the rovers have made major discoveries and dramatically increased our understanding of Mars, they often require a great deal of effort from the operations teams and achieving mission objectives can take longer than anticipated. Missions have begun investigating ways to enhance productivity by increasing the amount of decision-making performed onboard the rovers. Our work focuses on the use of goal-based commanding as a means of more productively operating rovers. In particular, we are working on ways to convey the intent that operations team use to conduct science campaigns to the rover so that it can guide the rover in creating high quality plans and in identifying its own goals based on operator guidance. In addition to informing future surface exploration missions, this work is relevant for a wide range of applications in which operators must interact with limited communication opportunities.

Gaines, Daniel↗

Lunar and Planetary Science XXXVI, Part 3

Topics discussed include: Characterization of Non-Organized Soils at Gusev Crater with the Spirit Rover Data; Searching for Life with Rovers: Exploration Methods & Science Results from the 2004 Field Campaign of the "Life in the Atacama" Project and Applications to Future Mars Missions; Analysis of the Lunar Surface with Global Mineral and Mg-Number Maps ALH77005: The Magmatic History from Rehomogenized Melt Inclusions; New 70-cm Radar Mapping of the Moon; Cryptomare Deposits Revealed by 70-cm Radar; Construction of a PZT Sensor Network for Low and Hypervelocity Impact Detection; Palmer Quest: A Feasible Nuclear Fission "Vision Mission" to the Mars Polar Caps; Physical Properties of Volcanic Deposits on Venus from Radar Polarimetry; Science Alert Demonstration with a Rover Traverse Science Data Analysis System; Earth and Mars, Similar Features and Parallel Lives? Didactic Activities; Expected Constraints on Rhea s Interior from Cassini; Microbially Induced Precipitates: Examples from CO3, Si-, Mn- and Fe-rich Deposits; Li, B - Behavior in Lunar Basalts During Shock and Thermal Metamorphism: Implications for H2O in Martian Magmas; Evaluation of CO Self-Shielding as a Possible Mechanism for Anomalous Oxygen Isotopic Composition of Early Solar System Materials; Effect of Ground Ice on Apparent Thermal Inertia on Mars; Utah Marbles and Mars Blueberries: Comparative Terrestrial Analogs for Hematite Concretions on Mars; Newly Discovered Meteor Crater Metallic Impact Spherules: Report and Implications; and Evidence of Very Young Glacial Processes in Central Candor Chasma, Mars.

Source record↗

A Simple Analytic Model for Estimating Mars Ascent Vehicle Mass and Performance

The Mars Ascent Vehicle (MAV) is a crucial component in any sample return campaign. In this paper we present a universal model for a two-stage MAV along with the analytic equations and simple parametric relationships necessary to quickly estimate MAV mass and performance. Ascent trajectories can be modeled as two-burn transfers from the surface with appropriate loss estimations for finite burns, steering, and drag. Minimizing lift-off mass is achieved by balancing optimized staging and an optimized path-to-orbit. This model allows designers to quickly find optimized solutions and to see the effects of design choices.

Woolley, Ryan C.↗

Mars Hand Lens Imager (MAHLI) Efforts and Observations at the Rocknest Eolian Sand Shadow in Curiosity's Gale Crater Field Site

The Mars Science Laboratory (MSL) mission is focused on assessing the past or present habitability of Mars, through interrogation of environment and environmental records at the Curiosity rover field site in Gale crater. The MSL team has two methods available to collect, process and deliver samples to onboard analytical laboratories, the Chemistry and Mineralogy instrument (CheMin) and the Sample Analysis at Mars (SAM) instrument suite. One approach obtains samples by drilling into a rock, the other uses a scoop to collect loose regolith fines. Scooping was planned to be first method performed on Mars because materials could be readily scooped multiple times and used to remove any remaining, minute terrestrial contaminants from the sample processing system, the Collection and Handling for In-Situ Martian Rock Analysis (CHIMRA). Because of this cleaning effort, the ideal first material to be scooped would consist of fine to very fine sand, like the interior of the Serpent Dune studied by the Mars Exploration Rover (MER) Spirit team in 2004 [1]. The MSL team selected a linear eolian deposit in the lee of a group of cobbles they named Rocknest (Fig. 1) as likely to be similar to Serpent Dune. Following the definitions in Chapter 13 of Bagnold [2], the deposit is termed a sand shadow. The scooping campaign occurred over approximately 6 weeks in October and November 2012. To support these activities, the Mars Hand Lens Imager (MAHLI) acquired images for engineering support/assessment and scientific inquiry.

Edgett, K. S.↗

Maven Orbital Trajectory Analysis: Design and Implementation of Lander Relay Support

NASA’s successful Mars Atmosphere and Volatile Evolution Mission (MAVEN), currently engaged in a survey of the Martian atmosphere and its evolution over time, has successfully completed a series of orbit changes, including a two-month aerobraking campaign, to satisfy additional mission roles. Launched on 18 November 2013, it entered Martian orbit on 22 September 2014. Having finished its primary one-year mission, the NASA Mars Program Office (MPO) started discussions with the MAVEN project on feasible options for extending the mission lifetime along with providing support for various Mars lander functions. MAVEN is the latest of the three active NASA Mars orbiters, with no others planned for the foreseeable future. Given that the landers need orbital relay support for years to come, and the MRO and Odyssey orbiters are aging, MAVEN’s role in providing critical orbital relay support has become increasingly important. After several years of studies, MPO directed the MAVEN project in 2018 to reduce its orbit size to provide better telecommunications relay support for Martian surface landers and to support Mars 2020 EDL under the constraint that MAVEN will have enough fuel to operate until 2030. As a part of this effort, the recent aerobraking campaign was one of several steps crucial to accomplishing this goal. This paper discusses the challenges of the entire mission design and its distillation into a concrete set of targeted objectives. With the successful orbit change, MAVEN will be able to provide support for the Mars 2020 relay activities from EDL through surface operations beyond 2030. This effort can serve as an excellent example for future missions having similar needs and requirements.

Jakosky, B. M.↗

Habitability Insights from Selected NASA Habitat Mockup Testing Campaigns

In 2004, President Bush announced his Vision for Space Exploration, causing NASA to look beyond Low Earth Orbit. While the resulting Constellation Program was cancelled, a focus on expanding beyond LEO has continued to this day. Since 2005, multiple habitat concepts have been developed for the Moon, Mars, or deep space. Some of these concepts were mocked up in virtual or physical form and used in habitability testing campaigns. This paper provides an understanding of the value of two decades of habitability testing and highlights key insights obtainable only through human interaction with a vehicle concept design. The focus of this paper will be limited to primarily habitation work conducted primarily at or by the Johnson Space Center in support of active space habitat development programs or studies and is further limited to fixed habitats and will not discuss mobile habitats such as pressurized rovers.

Lunar Surface Habitation↗

NASA's Human Lunar Landing Strategy

In response to the 2018 White House Space Policy Directive-1 to lead an innovative and sustainable lunar exploration, and to the Vice President’s March 2019 direction to do so by 2024, NASA is working to establish humanity's presence on and around the Moon by: 1) sending payloads to its surface, 2) assembling the Gateway outpost in orbit, and 3) conducting the first human lunar landings since 1972. NASA’s Artemis program is implementing a multi-faceted and coordinated agency-wide approach with a focus on the lunar South Pole. The Artemis missions will demonstrate new technologies, capabilities and business approaches needed for future exploration, including Mars. Assessing options to accelerate development of systems, NASA is utilizing public-private engagements to develop and demonstrate capabilities that meet the agency’s human space exploration objectives while stimulating the commercial space industry. Utilizing efforts across mission directorates, the Artemis effort will benefit from programs such as the Science Mission Directorate’s Commercial Lunar Payloads Services program and the Space Technology Mission Directorate’s Tipping Point partnerships for Moon and Mars technologies. This paper will discuss the strategic landscape for NASA's exploration campaign, the agency's approach to accessing the lunar surface with an affordable human-rated landing system, current status and role of U.S. industry, and future plans.

Human landing system↗

Parametric Cost Estimates of Four 20 Ton Payload Mars EDL Vehicle Concepts

Cost is one of the biggest obstacles to sending humans to Mars. Many studies have examined various vehicles and/or technologies which could be used to send humans to Mars. However, nearly all of these studies have either ignored cost or have used the mass of the vehicles as a surrogate for cost. This work presents parametric cost estimates of four Mars Entry, Descent, and Landing vehicle concepts capable of landing 20 tons of payload on the surface of Mars. The concepts are the Co-Optimization Blunt-body Re-entry Analysis-Mid lift to drag ratio Rigid Vehicle (Cobra–MRV), Adaptive Deployable Entry and Placement Technology (ADEPT), Hypersonic Inflatable Aerodynamic Decelerator (HIAD), and Capsule concepts. Two variants of the HIAD concept are studied, one with a single HIAD heatshield and one with two HIADs. The study presents the development and production cost of each vehicle and the total cost to build five flight units and fifteen flight units. Five flight units is representative of a single mission, or a "Flags and Footprints" style campaign, whereas fifteen flight units is representative of multiple missions going to multiple sites on Mars. All costs presented in this work are normalized to the average of the first unit production cost of the lander concepts. There is a large amount of uncertainty both in the design of the vehicles and the cost of the vehicles and it is impossible to claim with certainty which vehicle will cost the least. However, it is likely that the total cost to produce five flight units will be in the following ranking from least costly to most costly, Single HIAD, Capsule, Dual HIAD, Cobra, ADEPT. The ranking for fifteen units is similar but with the positions of the Dual HIAD and Cobra reversed. This study only considers the cost of the entry vehicle and does not take into account the effect of the entry vehicle’s mass on the cost of the in-space propulsion stage or launch vehicle.

Paul D Friz↗

Building a lifeboat: MSL’s uplink and installation campaign to restore a failing backup computer

Flight software updates are among the hardest andmost dangerous activities for the Mars Science Laboratory(MSL) Curiosity team. While danger is often mitigated bybackups, fallback strategies, and incremental installation withground-in-the-loop cycles which provide a safety net for theinstallation process, the software update described in this paperwas unable to use many of the common practices due to thenature of the fault addressed by the update. The MSL rover(landed August 2012) encountered a problem with one of itscomputer’s non-volatile storage chips in 2019, requiring a swapto its backup computer and an urgent software upgrade calledR-Hope. R-Hope, a lifeboat to be used in the event of primarycomputer issues, was written, tested, and sent to the rover inlightning speed of just 19 months. Multi-mission and teamcoordination allowed the 49 flight software image files to beuplinked to the rover over a 6-week period, using multiple pathsand backup options for speedy delivery. In the end, the RHopesoftware upgrade returned the computer to operation asa backup flight computer. The flight software transition wasdesigned to impact science return as little as possible, and installationplans included science activities for the majority of MSLinstruments. This paper describes the uplink and installationcampaigns for R-Hope, and discusses the notable lessons learnedby the operations team.

Byrne, DJ↗

Artemis CubeSats Help Advance Exploration of the Moon, Mars, and Beyond

On April 1, NASA launched the Artemis II mission – the first crewed mission of the Artemis campaign. The nine-day lunar flyby launched on the agency’s SLS (Space Launch System) rocket and had four astronauts test the Orion spacecraft in high Earth orbit and in deep space. Four 12U CubeSats also launched on the mission, housed within the SLS’s Orion stage adapter (OSA). The spacecraft were deployed approximately five-and-a-half hours into the flight, following Orion separation and departure from SLS, as the SLS interim cryogenic propulsion stage (ICPS) and the attached OSA were in a high Earth orbit on an atmospheric disposal trajectory. All four CubeSats were successfully deployed from the launch vehicle. Deployment statuses of the spacecraft, along with updates about the SLS rocket and Artemis missions, are reported in this paper. The paper will also discuss opportunities for CubeSat payloads on future Artemis missions.

Russell Lane↗

Artemis CubeSats Help Advance Exploration of the Moon, Mars, and Beyond

On April 1, NASA launched the Artemis II mission – the first crewed mission of the Artemis campaign. The nine-day lunar flyby launched on the agency’s SLS (Space Launch System) rocket and had four astronauts test the Orion spacecraft in high Earth orbit and in deep space. Four 12U CubeSats also launched on the mission, housed within the SLS’s Orion stage adapter (OSA). The spacecraft were deployed approximately five-and-a-half hours into the flight, following Orion separation and departure from SLS, as the SLS interim cryogenic propulsion stage (ICPS) and the attached OSA were in a high Earth orbit on an atmospheric disposal trajectory. All four CubeSats were successfully deployed from the launch vehicle. Deployment statuses of the spacecraft, along with updates about the SLS rocket and Artemis missions, are reported in this paper. The paper will also discuss opportunities for CubeSat payloads on future Artemis missions.

David Hitt↗

COMBLE-ISLAS water isotopes in precipitation (COMBLEISLASISO)

During the measurement period, precipitation was sampled on daily to sub-daily basis with a sampling kit consiting of a clear plastic box (60x40x40 cm) mounted to a ground structure. Daily sampling lasted from 22 Feb to 24 Mar 2020. At a fixed time of day (10 UTC), samples were collected and the sampling box cleaned for the next sample. Additionally, during intense observations periods (IOPs) announced by ISLAS, ARMS scientists increased sampling frequency to sub-daily sampling. During the campaign period, 2 IOPs were conducted, with in total 12 samples taken. IOP1 lasted from 27 Feb 10 to 02 Mar 2020, and IOP2 lasted from 12 Mar to 14 Mar 2020. Solid precipitation in the box was then melted, transferred to an 8 ml glass vial, sealed and shipped to FARLAB (University of Bergen, Norway) for stable water isotope analysis. Measured stable isotope composition of precipitation samples will be related to conditions at other sampling locations, and at the evaporation site to inform about conservation of water isotope quantities. In the period from 22 Feb to 24 Mar, 23 daily samples were collected at 10 UTC for stable water isotope analysis. During the entire sampling period, a high variability of precipitation phase was encountered. Most samples were recovered in the form of graupel/snow (12 samples), as rain (7 samples), and the remaining samples fell as graupel, snow, rain or frozen rain. Precipitation amounts varied between <1 mm (26 Feb) and 140 mm (25 Feb) within the sampling box. Furthermore, higher-resolution sampling was conducted during 2 intense observation periods (IOPs). During IOP1, lasting from 27 Feb 10 UTC to 02 Mar 10 UTC, 7 samples were collected, all of them as solid phase precipitation. IOP2 lasted from 12 Mar 10 UTC to 14 Mar 09 UTC, and 5 samples (all as graupel/snow) were collected. Samples were processed according to FARLAB standard measurement procedures. In short, samples were transferred to 1.5 ml glass vials with rubber/PTFE septa (part #548-0907, VWR, USA). An autosampler (A0325, Picarro Inc) transferred ca. 2&micro;l per injection into a high-precision vapourizer (A0211, Picarro Inc, USA) heated to 110&deg;C. After blending with dry N2 (< 5 ppm H2O) the gas mixture was directed into the measurement cavity of a Cavity-Ring Down Spectrometer (L2140-i, Picarro Inc) for about 7 min with a typical water concentration of 20 000 ppm. Memory effects were reduced by two times measuring a vapour mixture at a mixing ratio of 50 000 ppm, obtained from 2 injections of 2 &micro;l for 5 min at the beginning of each new sample vial. Thereafter, another 6 injections of 2 &micro;l per sample were measured individually as described above, and averages of the last 5 injections were used for further processing. Three standards were measured at the beginning and end of each batch, including a drift standard DI2 (&delta;D: -50.72&plusmn;0.73 permil, &delta;18O: -7.63&plusmn;0.10 permil), and for calibration the laboratory standards GLW (&delta;D: -307.79&plusmn;0.75 permil, &delta;18O: -40.02&plusmn;0.07 permil) and EVAP2 (&delta;D: 9.52&plusmn;0.65 permil, &delta;18O: 1.81&plusmn;0.13 permil). A detailed calibration report is included with the final uploaded data set.

54 ENVIRONMENTAL SCIENCES↗

Environmental Test Program for the Mars Exploration Rover Project

On June 10 and July 7, 2003 the National Aeronautics and Space Administration (NASA) launched two spacecraft from Cape Canaveral, Florida for a six (6) months flight to the Red Planet, Mars. The two Mars Exploration Rover spacecraft landed safely on the planet in January 2004. Prior to the successful launch, both of the spacecraft were involved in a comprehensive test campaign that included development, qualification, and protoflight test programs. Testing was performed to simulate the environments associated with launch, inter-planetary cruise, landing on the planet and Mars surface operations. Unique test requirements included operating the spacecraft while the chamber pressure was controlled to simulate the decent to the planet from deep space, high impact landing loads and rover operations on the surface of the planet at 8 Torr and -130 C. This paper will present an overview of the test program that included vibration, pyro-shock, landing loads, acoustic noise, thermal vacuum and solar simulation testing at the Jet Propulsion Laboratory (JPL) Environmental Test Laboratory facilities in Pasadena, California.

Fisher, Terry C.↗

KCG Baseline Air Pollution Station LIFSO2 v1 Data from December 2024 to March 2025

Sulfur Dioxide is a key precursor to the formation of new particles within the marine environment, yet commercial instrumentation lack sufficient precision or sensitivity to resolve the levels present in these environments. As such, the LIFSO2, a custom built fibre laser from the University of York, UK, was developed (based on the one developed by Rollins et al 2016). We are able to resolve down to the ppt level with this instrument. We present version 1 (v1) data for Dec 2024 to Mar 2025 for SO2 (1min time average) from the Cape-k precursors field campaign.

Sulfur dioxide (SO2) mixing ratio↗

Mars Sample Return Mission Concept Status

This paper will provide an overview of current concepts and options for the architecture and design of a Mars Sample Return Mission, including the Sample Retrieval Lander (SRL) (developed by NASA) and the Earth Return Orbiter (ERO) (developed by ESA) . Key mission objectives and the overall campaign will be described, including the mission’s concept of operations and a notional timeline from launch to entry, through surface operations, to delivery of the samples to Mars orbit and return to Earth. The overall SRL lander vehicle concept will be described, including current options being evaluated. Key lander element options that have been studied will be discussed, including the Mars Ascent Vehicle (MAV), Sample Fetch Rover (provided by ESA), Orbiting Sample container (OS), and sample tube transfer robotics systems. For the ERO the vehicle concept will be described including key interfaces with the Capture/Containment and Return System (CCRS). Specific challenges and approaches for addressing those challenges will be discussed, including key technical margins and backward planetary protection. The information provided about possible Mars sample return architectures is for planning and discussion purposes only. NASA has made no official decision to implement Mars sample return.

Muirhead, Brian K↗

Analysis of Shroud Options in Support of the Human Exploration of Mars

In support of the Mars Design Reference Architecture (DRA) 5.0, the NASA study team analyzed several shroud options for use on the Ares V launch vehicle.1,2 These shroud options included conventional "large encapsulation" shrouds with outer diameters ranging from 8.4 to 12.9 meters (m) and overall lengths of 22.0 to 54.3 meters, along with a "nosecone-only" shroud option used for Mars transfer vehicle component delivery. Also examined was a "multi-use" aerodynamic encapsulation shroud used for launch, Mars aerocapture, and entry, descent, and landing of the cargo and habitat landers. All conventional shroud options assessed for use on the Mars launch vehicles were the standard biconic design derived from the reference shroud utilized in the Constellation Program s lunar campaign. It is the purpose of this paper to discuss the technical details of each of these shroud options including material properties, structural mass, etc., while also discussing both the volume and mass of the various space transportation and surface system payload elements required to support a "minimum launch" Mars mission strategy, as well as the synergy, potential differences and upgrade paths that may be required between the Lunar and Mars mission shrouds.

Feldman, Stuart↗

Navigation Challenges of the Mars Phoenix Lander Mission

The Mars Phoenix Lander mission was launched on August 4th, 2007. To land safely at the desired landing location on the Mars surface, the spacecraft trajectory had to be controlled to a set of stringent atmospheric entry and landing conditions. The landing location needed to be controlled to an elliptical area with dimensions of 100km by 20km. The two corresponding critical components of the atmospheric entry conditions are the entry flight path angle (target: -13.0 deg +/-0.21 deg) and the entry time (within +/-30 seconds). The purpose of this paper is to describe the navigation strategies used to overcome the challenges posed during spacecraft operations, which included an attitude control thruster calibration campaign, a trajectory control strategy, and a trajectory reconstruction strategy. Overcoming the navigation challenges resulted in final Mars atmospheric entry conditions just 0.007 deg off in entry flight path angle and 14.9 sec early in entry time. These entry dispersions in addition to the entry, descent, and landing trajectory dispersion through the atmosphere, lead to a final landing location just 7 km away from the desired landing target.

Portock, Brian M.↗