Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “MORTARS”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 397 records · Page 22

Making High-Tensile-Strength Amalgam Components

Structural components made of amalgams can be made to have tensile strengths much greater than previously known to be possible. Amalgams, perhaps best known for their use in dental fillings, have several useful attributes, including room-temperature fabrication, corrosion resistance, dimensional stability, and high compressive strength. However, the range of applications of amalgams has been limited by their very small tensile strengths. Now, it has been discovered that the tensile strength of an amalgam depends critically on the sizes and shapes of the particles from which it is made and, consequently, the tensile strength can be greatly increased through suitable choice of the particles. Heretofore, the powder particles used to make amalgams have been, variously, in the form of micron-sized spheroids or flakes. The tensile reinforcement contributed by the spheroids and flakes is minimal because fracture paths simply go around these particles. However, if spheroids or flakes are replaced by strands having greater lengths, then tensile reinforcement can be increased significantly. The feasibility of this concept was shown in an experiment in which electrical copper wires, serving as demonstration substitutes for copper powder particles, were triturated with gallium by use of a mortar and pestle and the resulting amalgam was compressed into a mold. The tensile strength of the amalgam specimen was then measured and found to be greater than 10(exp 4) psi (greater than about 69 MPa). Much remains to be done to optimize the properties of amalgams for various applications through suitable choice of starting constituents and modification of the trituration and molding processes. The choice of wire size and composition are expected to be especially important. Perusal of phase diagrams of metal mixtures could give insight that would enable choices of solid and liquid metal constituents. Finally, whereas heretofore, only binary alloys have been considered for amalgams, ternary additions to liquid or solid components should be considered as means to impart desired properties to amalgams.

Grugel, Richard↗

Understanding the Reactivity of Lunar Dust for Future Lunar Missions

During the Apollo missions, dust was found to cause numerous problems for various instruments and systems. Additionally, the dust may have caused momentary health issues for some of the astronauts. Therefore, the plan to resume robotic and manned missions to the Moon in the next decade has led to a renewed interest in the properties of lunar dust, ranging from geological to chemical to toxicological. An important property to understand is the reactivity of the dust particles. Due to the lack of an atmosphere on the Moon, there is nothing to protect the lunar soil from ultraviolet radiation, solar wind, and meteorite impacts. These processes could all serve to activate the soil, or produce reactive surface species. On the Moon, these species can be maintained for millennia without oxygen or water vapor present to satisfy the broken bonds. Unfortunately, the Apollo dust samples that were returned to Earth were inadvertently exposed to the atmosphere, causing them to lose their reactive characteristics. In order to aid in the preparation of mitigation techniques prior to returning to the Moon, we measured the ability of lunar dust, lunar dust simulant, and quartz samples to produce hydroxyl radicals in solution[1]. As a first approximation of meteorite impacts on the lunar surface, we ground samples using a mortar and pestle. Our initial studies showed that all three test materials (lunar dust (62241), lunar dust simulant (JSC-1Avf), and quartz) produced hydroxyl radicals after grinding and mixing with water. However, the radical production of the ground lunar dust was approximately 10-fold and 3-fold greater than quartz and JSC-1 Avf, respectively. These reactivity differences between the different samples did not correlate with differences in specific surface area. The increased reactivity produced for the quartz by grinding was attributed to the presence of silicon- or oxygen-based radicals on the surface, as had been seen previously[2]. These radicals may also play a part in the reactivity of the lunar dust and lunar simulant. However, other factors would seem to be required to account for the greatly increased reactivity of the lunar soil. It was proposed that nanometer-size Fe 0 (zero valent) particles in the lunar soil might play a role, as they are not present in quartz or lunar dust simulant. The present work has been performed with the aim of understanding the origin of the considerable reactivity of lunar dust[3]. We have ground 8 lunar soils of varying maturity and source (highland or mare) and measured the hydroxyl-radical production and decay of the reactivity. It was determined that there is a direct correlation between the reactivity and the amount of nanophase metallic iron particles (as a function of soil maturity, I s/FeO, in which Is is the amount of iron present as nanophase iron particles present and FeO is the total iron content) in the samples; thus, the highland soils, with their lesser total FeO content, are less reactive than ground mare soils. Additionally, grinding of nanophase iron simulant [4] showed reactivity in line with the lunar soils and much greater than lunar dust simulant or quartz. Studies aimed at determining the time required to deactivate the reactive soils in a habitable environment showed that the average time to reach 50% of the initial reactivity was approximately 3.5 hours. However, even after one week, none of the soils had returned completely to its unground level of reactivity. In contrast to the reactivity results, there was no obvious correlation between the maturity of the soil and its deactivation time. These results provide the first chemical reactivity and persistence values as an important property of lunar soils, data that is paramount as mankind prepares to return to the Moon.

Wallace, William↗

Methods and apparatus for handling or treating particulate material

An improved draft tube spout fluid bed (DTSFB) mixing, handling, conveying, and treating apparatus and systems, and methods for operating are provided. The apparatus and systems can accept particulate material and pneumatically or hydraulically conveying the material to mix and/or treat the material. In addition to conveying apparatus, a collection and separation apparatus adapted to receive the conveyed particulate material is also provided. The collection apparatus may include an impaction plate against which the conveyed material is directed to improve mixing and/or treatment. The improved apparatus are characterized by means of controlling the operation of the pneumatic or hydraulic transfer to enhance the mixing and/or reacting by controlling the flow of fluids, for example, air, into and out of the apparatus. The disclosed apparatus may be used to mix particulate material, for example, mortar; react fluids with particulate material; coat particulate material, or simply convey particulate material.

Littman, Howard↗

Space Shuttle Program (SSP) Shock Test and Specification Experience for Reusable Flight Hardware Equipment

As commercial companies are nearing a preliminary design review level of design maturity, several companies are identifying the process for qualifying their multi-use electrical and mechanical components for various shock environments, including pyrotechnic, mortar firing, and water impact. The experience in quantifying the environments consists primarily of recommendations from Military Standard-1540, Product Verification Requirement for Launch, Upper Stage, and Space Vehicles. Therefore, the NASA Engineering and Safety Center (NESC) formed a team of NASA shock experts to share the NASA experience with qualifying hardware for the Space Shuttle Program (SSP) and other applicable programs and projects. Several team teleconferences were held to discuss past experience and to share ideas of possible methods for qualifying components for multiple missions. This document contains the information compiled from the discussions

Larsen, Curtis E.↗

Antenna Measurements: Test & Analysis of the Radiated Emissions/Immunity of the NASA/Orion Spacecraft Dart Parachute Simulator & Prototype Capsule - The Crew Exploration Vehicle

For future NASA Manned Space Exploration of the Moon and Mars, a blunt body capsule, called the Orion Crew Exploration Vehicle (CEV), composed of a Crew Module (CM) and a Service Module (SM), with a parachute decent assembly is planned for reentry back to Earth. A Capsule Parachute Assembly System (CPAS) is being developed for preliminary prototype parachute drop tests at the Yuma Proving Ground (YPG) to simulate high-speed reentry to Earth from beyond Low-Earth-Orbit (LEO) and to provide measurements of position, velocity, acceleration, attitude, temperature, pressure, humidity, and parachute loads. The primary and secondary (backup) avionics systems on CPAS also provide mission critical firing events to deploy, reef, and release the parachutes in three stages (extraction, drogues, mains) using mortars and pressure cartridge assemblies. In addition, a Mid-Air Delivery System (MDS) is used to separate the capsule from the sled that is used to eject the capsule from the back of the drop plane. Also, high-speed and high-definition cameras in a Video Camera System (VCS) are used to film the drop plane extraction and parachute landing events. Intentional and unintentional radiation emitted from and received by antennas and electronic devices on/in the CEV capsule, the MDS sled, and the VCS system are being tested for radiated emissions/immunity (susceptibility) ~ (RE/RS). To verify Electromagnetic Compatibility (EMC) of the Orion capsule, Electromagnetic Interference (EMI) measurements are being made inside a semi-anechoic chamber at NASA/JSC on the components of the CPAS system. Measurements are made at 1m from the components-under-test (CUT). In addition, EMI measurements of the integrated CEV system are being made inside a hanger at YPG. These measurements are made in a complete circle, at 30◦ angles or less, around the Orion Capsule, the spacecraft system under-test (SUT). Near-field B-Dot probe measurements on the surface of the Orion capsule are being extrapolated outward to the 1m standard distance for comparison to the MIL-STD radiated emissions limit, and far-field hybrid antenna measurements at 3m are being extrapolated inward to the 1m distance for similar comparisons.

Norgard, John D.↗

Antenna Measurements: Test & Analysis of the Radiated Emissions from the NASA/Orion Spacecraft - Parachute System Simulator

For future NASA Manned Space Exploration of the Moon and Mars, a blunt body capsule, called the Orion Crew Exploration Vehicle (CEV), composed of a Crew Module (CM) and a Service Module (SM), with a parachute decent assembly is planned for reentry back to Earth. A Capsule Parachute Assembly System (CPAS) is being developed for preliminary parachute drop tests at the Yuma Proving Ground (YPG) to simulate high-speed reentry to Earth from beyond Low-Earth-Orbit (LEO) and to provide measurements of landing parameters and parachute loads. The avionics systems on CPAS also provide mission critical firing events to deploy, reef, and release the parachutes in three stages (extraction, drogues, mains) using mortars and pressure cartridge assemblies. In addition, a Mid-Air Delivery System (MDS) is used to separate the capsule from the sled that is used to eject the capsule from the back of the drop plane. Also, high-speed and high-definition cameras in a Video Camera System (VCS) are used to film the drop plane extraction and parachute landing events. To verify Electromagnetic Compatibility (EMC) of the CPAS system from unintentional radiation, Electromagnetic Interference (EMI) measurements are being made inside a semi-anechoic chamber at NASA/JSC at 1m from the electronic components of the CPAS system. In addition, EMI measurements of the integrated CPAS system are being made inside a hanger at YPG. These near-field B-Dot probe measurements on the surface of a parachute simulator (DART) are being extrapolated outward to the 1m standard distance for comparison to the MIL-STD radiated emissions limit.

Norgard, John D.↗

Forward Bay Cover Separation Modeling and Testing for the Orion Multi-Purpose Crew Vehicle

Spacecraft multi‐body separation events during atmospheric descent require complex testing and analysis to validate the flight separation dynamics model and to verify no recontact. NASA Orion Multi‐Purpose Crew Vehicle (MPCV) teams examined key model parameters and risk areas to develop a robust but affordable test campaign in order to validate and verify the Forward Bay Cover (FBC) separation event for Exploration Flight Test‐1 (EFT‐1). The FBC jettison simulation model is highly complex, consisting of dozens of parameters varied simultaneously, with numerous multi‐parameter interactions (coupling and feedback) among the various model elements, and encompassing distinct near‐field, mid‐field, and far‐field regimes. The test campaign was composed of component‐level testing (for example gas‐piston thrusters and parachute mortars), ground FBC jettison tests, and FBC jettison air‐drop tests that were accomplished by a highly multi‐disciplinary team. Three ground jettison tests isolated the testing of mechanisms and structures to anchor the simulation models excluding aerodynamic effects. Subsequently, two air‐drop tests added aerodynamic and parachute parameters, and served as integrated system demonstrations, which had been preliminarily explored during the Orion Pad Abort‐1 (PA‐1) flight test in May 2010. Both ground and drop tests provided extensive data to validate analytical models and to verify the FBC jettison event for EFT‐1, but more testing is required to support human certification, for which NASA and Lockheed Martin are applying knowledge from Apollo and EFT‐1 testing and modeling to develop a robust but affordable human spacecraft capability.

Ali, Yasmin↗

Forward Bay Cover Separation Modeling and Testing for the Orion Multi-Purpose Crew Vehicle

Spacecraft multi-body separation events during atmospheric descent require complex testing and analysis to validate the flight separation dynamics models used to verify no re-contact. The NASA Orion Multi-Purpose Crew Vehicle (MPCV) architecture includes a highly-integrated Forward Bay Cover (FBC) jettison assembly design that combines parachutes and piston thrusters to separate the FBC from the Crew Module (CM) and avoid re-contact. A multi-disciplinary team across numerous organizations examined key model parameters and risk areas to develop a robust but affordable test campaign in order to validate and verify the FBC separation event for Exploration Flight Test-1 (EFT-1). The FBC jettison simulation model is highly complex, consisting of dozens of parameters varied simultaneously, with numerous multi-parameter interactions (coupling and feedback) among the various model elements, and encompassing distinct near-field, mid-field, and far-field regimes. The test campaign was composed of component-level testing (for example gas-piston thrusters and parachute mortars), ground FBC jettison tests, and FBC jettison air-drop tests that were accomplished by a highly multi-disciplinary team. Three ground jettison tests isolated the testing of mechanisms and structures to anchor the simulation models excluding aerodynamic effects. Subsequently, two air-drop tests added aerodynamic and parachute elements, and served as integrated system demonstrations, which had been preliminarily explored during the Orion Pad Abort-1 (PA-1) flight test in May 2010. Both ground and drop tests provided extensive data to validate analytical models and to verify the FBC jettison event for EFT-1. Additional testing will be required to support human certification of this separation event, for which NASA and Lockheed Martin are applying knowledge from Apollo and EFT-1 testing and modeling to develop a robust human-rated FBC separation event.

Ali, Yasmin↗

Waste Water Treatment Apparatus and Methods

An improved draft tube spout fluid bed (DTSFB) mixing, handling, conveying, and treating apparatus and systems, and methods for operating are provided. The apparatus and systems can accept particulate material and pneumatically or hydraulically conveying the material to mix and/or treat the material. In addition to conveying apparatus, a collection and separation apparatus adapted to receive the conveyed particulate material is also provided. The collection apparatus may include an impaction plate against which the conveyed material is directed to improve mixing and/or treatment. The improved apparatus are characterized by means of controlling the operation of the pneumatic or hydraulic transfer to enhance the mixing and/or reacting by controlling the flow of fluids, for example, air, into and out of the apparatus. The disclosed apparatus may be used to mix particulate material, for example, mortar; react fluids with particulate material; coat particulate material, or simply convey particulate material.

Littman, Howard↗

Rigging Test Bed Development for Validation of Multi-Stage Decelerator Extractions

The Low Density Supersonic Decelerator project is developing new decelerator systems for Mars entry which would include testing with a Supersonic Flight Dynamics Test Vehicle. One of the decelerator systems being developed is a large supersonic ringsail parachute. Due to the configuration of the vehicle it is not possible to deploy the parachute with a mortar which would be the preferred method for a spacecraft in a supersonic flow. Alternatively, a multi-stage extraction process using a ballute as a pilot is being developed for the test vehicle. The Rigging Test Bed is a test venue being constructed to perform verification and validation of this extraction process. The test bed consists of a long pneumatic piston device capable of providing a constant force simulating the ballute drag force during the extraction events. The extraction tests will take place both inside a high-bay for frequent tests of individual extraction stages and outdoors using a mobile hydraulic crane for complete deployment tests from initial pack pull out to canopy extraction. These tests will measure line tensions and use photogrammetry to track motion of the elements involved. The resulting data will be used to verify packing and rigging as well, as validate models and identify potential failure modes in order to finalize the design of the extraction system.

Low Density Supersonic Decelerator (LDSD)↗

Findings from the Supersonic Qualification Program of the Mars Science Laboratory Parachute System

In 2012, the Mars Science Laboratory Mission (MSL) will deploy NASA's largest extra-terrestrial parachute, a technology integral to the safe landing of its advanced robotic explorer on the surface. The supersonic parachute system is a mortar deployed 21.5 m disk-gap-band (DGB) parachute, identical in geometric scaling to the Viking era DGB parachutes of the 1970's. The MSL parachute deployment conditions are Mach 2.3 at a dynamic pressure of 750 Pa. The Viking Balloon Launched Decelerator Test (BLDT) successfully demonstrated a maximum of 700 Pa at Mach 2.2 for a 16.1 m DGB parachute in its AV4 flight. All previous Mars deployments have derived their supersonic qualification from the Viking BLDT test series, preventing the need for full scale high altitude supersonic testing. The qualification programs for Mars Pathfinder, Mars Exploration Rover, and Phoenix Scout Missions were all limited to subsonic structural qualification, with supersonic performance and survivability bounded by the BLDT qualification. The MSL parachute, at the edge of the supersonic heritage deployment space and 33% larger than the Viking parachute, accepts a certain degree of risk without addressing the supersonic environment in which it will deploy. In addition, MSL will spend up to 10 seconds above Mach 1.5, an aerodynamic regime that is associated with a known parachute instability characterized by significant canopy projected area fluctuation and dynamic drag variation. This aerodynamic instability, referred to as "area oscillations" by the parachute community has drag performance, inflation stability, and structural implications, introducing risk to mission success if not quantified for the MSL parachute system. To minimize this risk and as an alternative to a prohibitively expensive high altitude test program, a multi-phase qualification program using computation simulation validated by subscale test was developed and implemented for MSL. The first phase consisted of 2% of fullscale supersonic wind tunnel testing of a rigid DGB parachute with entry-vehicle to validate two high fidelity computational fluid dynamics (CFD) tools. The computer codes utilized Large Eddy Simulation and Detached Eddy Simulation numerical approaches to accurately capture the turbulent wake of the entry vehicle and its coupling to the parachute bow-shock. The second phase was the development of fluid structure interaction (FSI) computational tools to predict parachute response to the supersonic flow field. The FSI development included the integration of the CFD from the first phase with a finite element structural model of the parachute membrane and cable elements. In this phase, a 4% of full-scale supersonic flexible parachute test program was conducted to provide validation data to the FSI code and an empirical dataset of the MSL parachute in a flight-like environment. The final phase is FSI simulations of the full-scale MSL parachute in a Mars type deployment. Findings from this program will be presented in terms of code development and validation, empirical findings from the supersonic testing, and drag performance during supersonic operation.

EDL↗

Low Temperature Regolith Bricks for In-Situ Structural Material

Current technology for producing in-situ structural materials on future missions to Mars or the moon relies heavily on energy-intensive sintering processes to produce solid bricks from regolith. This process requires heating the material up to temperatures in excess of 1000 C and results in solid regolith pieces with compressive strengths in the range of 14000 to 28000 psi, but are heavily dependent on the porosity of the final material and are brittle. This method is currently preferred over a low temperature cementation process to prevent consumption of precious water and other non-renewable materials. A high strength structural material with low energy requirements is still needed for future colonization of other planets. To fulfill these requirements, a nano-functionalization process has been developed to produce structural bricks from regolith simulant and shows promising mechanical strength results. Functionalization of granular silicate particles into alkoxides using a simple low temperature chemical process produces a high surface area zeolite particles that are held together via inter-particle oxygen bonding. Addition of water in the resulting zeolite particles produces a sol-gel reaction called "inorganic polymerization" which gives a strong solid material after a curing process at 60 C. The aqueous solution by-product of the reaction is currently being investigated for its reusability; an essential component of any ISRU technology. For this study, two batches of regolith bricks are synthesized from JSC-1A; the first batch from fresh solvents and chemicals, the second batch made from the water solution by-product of the first batch. This is done to determine the feasibility of recycling necessary components of the synthesis process, mainly water. Characterization including BET surface area, SEM, and EDS has been done on the regolith bricks as well as the constituent particles,. The specific surface area of 17.53 sq m/g (average) of the granular regolith material was obtained from nitrogen adsorption isotherm measurement. The size, shape and textures of regolith from SEM shows that the particles are 25-50 micrometers in size and mostly irregular in shape (Figure 1a). The elemental composition of regolith was identified from EDS analysis showed the presence of Si, Al, Fe, Na, Mg, Ca, Ti, O and C (see figure 1b). Each set of cylindrical brick samples were prepared by low energy process, and cured for 21 and 28 days, respectively to compare their compressive strength. Figure 1c, and d shows the JSC-1A brick and the compressive strength measurements. The results from the 21 day cured bricks (2 bricks) have been done and yielded an aver-age strength of 3050 psi, considerably higher than Portland cement mortars (Type IV and V). This promising technology provides the benefits of construction material similar to concrete, with a low complexity, low energy synthesis process and the likelihood of complete reusability of precious resources. Compressive strength using this method can be improved by increasing the surface area of the particles, using bi-modal particle size distribution, and adding certain additives to increase inter-particle forces.

ISRU↗

Mobile/Modular BSL-4 Facilities for Meeting Restricted Earth Return Containment Requirements

NASA robotic sample return missions designated Category V Restricted Earth Return by the NASA Planetary Protection Office require sample containment and biohazard testing in a receiving laboratory as directed by NASA Procedural Requirement (NPR) 8020.12D - ensuring the preservation and protection of Earth and the sample. Currently, NPR 8020.12D classifies Restricted Earth Return for robotic sample return missions from Mars, Europa, and Enceladus with the caveat that future proposed mission locations could be added or restrictions lifted on a case by case basis as scientific knowledge and understanding of biohazards progresses. Since the 1960s, sample containment from an unknown extraterrestrial biohazard have been related to the highest containment standards and protocols known to modern science. Today, Biosafety Level (BSL) 4 standards and protocols are used to study the most dangerous high-risk diseases and unknown biological agents on Earth. Over 30 BSL-4 facilities have been constructed worldwide with 12 residing in the United States; of theses, 8 are operational. In the last two decades, these brick and mortar facilities have cost in the hundreds of millions of dollars dependent on the facility requirements and size. Previous mission concept studies for constructing a NASA sample receiving facility with an integrated BSL-4 quarantine and biohazard testing facility have also been estimated in the hundreds of millions of dollars. As an alternative option, we have recently conducted an initial trade study for constructing a mobile and/or modular sample containment laboratory that would meet all BSL-4 and planetary protection standards and protocols at a faction of the cost. Mobile and modular BSL-2 and 3 facilities have been successfully constructed and deployed world-wide for government testing of pathogens and pharmaceutical production. Our study showed that a modular BSL-4 construction could result in approximately 90% cost reduction when compared to traditional construction methods without compromising the preservation of the sample or Earth.

Calaway, M. J.↗

Verification and Validation Testing of the Parachute Decelerator System Prior to the First Supersonic Flight Dynamics Test for the Low Density Supersonic Decelerator Program

The Parachute Decelerator System (PDS) is comprised of all components associated with the supersonic parachute and its associated deployment. During the Supersonic Flight Dynamics Test (SFDT), for the Low Density Supersonic Decelerators Program, the PDS was required to deploy the supersonic parachute in a defined fashion. The PDS hardware includes three major subsystems that must function together. The first subsystem is the Parachute Deployment Device (PDD), which acts as a modified pilot deployment system. It is comprised of a pyrotechnic mortar, a Kevlar ballute, a lanyard actuated pyrotechnic inflation aid, and rigging with its associated thermal protection material (TPS). The second subsystem is the supersonic parachute deployment hardware. This includes all of the parachute specific rigging that includes the parachute stowage can and the rigging including TPS and bridle stiffeners for bridle management during deployment. The third subsystem is the Supersonic Parachute itself, which includes the main parachute and deployment bags. This paper summarizes the verification and validation of the deployment process, from the initialization of the PDS system through parachute bag strip that was done prior to the first SFDT.

Gallon, John C.↗

NASA's Centennial Challenge for 3D-Printed Habitat: Phase II Outcomes and Phase III Competition Overview

The 3D-Printed Habitat Challenge is part of NASA's Centennial Challenges Program. NASA's Centennial Challenges seek to accelerate innovation in aerospace technology development through public competitions. The 3D-Printed Habitat Challenge, launched in 2015, is part of the Centennial Challenges portfolio and focuses on habitat design and development of large-scale additive construction systems capable of fabricating structures from in situ materials and/or mission recyclables. The challenge is a partnership between NASA, Caterpillar (primary sponsor), Bechtel, Brick and Mortar Ventures, and Bradley University. Phase I of the challenge was an architectural concept competition in which participants generated conceptual renderings of habitats on Mars which could be constructed using locally available resources. Phase II asked teams to develop the printing systems and material formulations needed to translate these designs into reality. Work under the phase II competition, which concluded in August 2017 with a head to head competition at Caterpillar's Edward Demonstration Facility in Peoria, Illinois, is discussed, including the key technology development outcomes resulting from this portion of the competition. The phase III competition consists of both virtual and construction subcompetitions. Virtual construction asks teams to render high fidelity architectural models of a habitat and all the accompanying information required for construction of the pressure retaining and load bearing portions of the structure. In construction phase III, teams are asked to scale up their printing systems to produce a 1/3 scale habitat on-site at Caterpillar. The levels of the phase III construction competition (which include printing of a foundation and printing and hydrostatic testing of a habitat element) are discussed. Phase III construction also has an increased focus on autonomy, as these systems are envisioned for robotic precursor missions which would buildup infrastructure prior to the arrival of crew. Results of the phase III competition through July 2017 (which includes virtual construction level 1) are discussed. This Centennial Challenge enables an assessment of the scaleability and efficacy of various processes, material systems, and designs for planetary construction. There are also near-term terrestrial applications, from disaster response to affordable housing and infrastructure refurbishment, for these technologies.

Prater, T. J.↗

Reconstructed Parachute System Performance During the Second LDSD Supersonic Flight Dynamics Test

NASA’s Low-Density Supersonic Decelerators project (LDSD) has developed and tested four new aerodynamic decelerator technologies for future Mars missions: two attached toroidal inflatable decelerators, a ballute, and a large supersonic parachute. On June 8, 2015, the project conducted a high-altitude, supersonic flight test of a 30.5-meter supersonic Ringsail (SSRS) canopy at the US Navy’s Pacific Missile Range Facility (PMRF) on Kauai, HI. This test, the second in a series of Supersonic Flight Dynamics Tests (SFDT-2), allowed the LDSD project to test the deployment and performance of its parachute decelerator system in the wake of a representative test vehicle (a 4.7-meter aeroshell and 6-meter toroidal inflatable aerodynamic decelerator) at conditions relevant to Mars entry for the second time. The parachute decelerator system consisted of the SSRS main parachute and a 4.4-meter ballute (called the parachute deployment device, or PDD) for its extraction. The ballute was mortar-deployed at a Mach number of 2.78 and a dynamic pressure of 493 Pa, and inflated with the aid of a water-methanol based gas generator. After flying in the wake of the test vehicle for ten seconds, the PDD was released and allowed to extract the main parachute pack. The SSRS reached line-stretch at a Mach number of 2.37 and dynamic pressure of 602 Pa. Following full inflation, the propagation of a tear in the canopy led to the failure of the parachute skirt band and to the subsequent failure of the vent band. The test vehicle was instrumented with load sensors, inertial sensors, and high-speed and high resolution cameras that provided data on the performance of the PDD and SSRS through deployment, inflation, and flight. This paper describes the resulting reconstructed behavior of the PDD and SSRS during deployment and inflation, their aerodynamic performance on SFDT-2, the failure of the SSRS shortly after full inflation, and the LDSD project’s investigation into its underlying causes.

O'Farrell, Clara↗

NASA Centennial Challenge: 3D Printed Habitat, Phase 3 Final Results

NASA's Centennial Challenges program uses prize competitions with the goal of accelerating innovation in the aerospace industry. Competitions in the Centennial Challenges portfolio have previously focused on advancements in space robotics, regolith excavation, bio-printing, astronaut suit design, small satellites, and solar-powered vehicles. NASA's Three Dimensional (3D) Printed Habitat Centennial Challenge represents a partnership between NASA and the non-profit partner: Bradley University, with co-sponsors Caterpillar, Bechtel, Brick and Mortar Ventures, the American Concrete Institute, and the United States Army Corps of Engineers (USACE) Engineer Research and Development Center (ERDC) to spur development in automated additive construction technologies. The challenge asks teams to design and construct a scaled and simulated Martian habitat using indigenous materials and large scale 3D automated printing systems. Phase 1 of the competition, held in 2015, was an architectural design competition for habitat concepts that could be 3D printed. Phase 2, completed in 2017, asked teams to develop feedstocks from indigenous materials and hydrocarbon polymer recyclables, and demonstrate automated printing systems to manufacture these feedstocks into test specimens to assess mechanical strength. This paper will discuss the Phase 3 competition, focusing on technology outcomes that can potentially be infused into both terrestrial and planetary construction applications. The Phase 3 competition was divided into two sub-competitions: 1) virtual construction, where teams created a high fidelity building information model (BIM) of their 3D-printed habitat design and 2) the construction competition, which required teams to 3D print a structural foundation and subject materials samples to freeze/thaw testing and impact testing (level 1), produce a habitat element and complete a hydrostatic test (level 2), and additively manufacture a 1:3 scale habitat onsite in a head to head competition at Caterpillar, inc.'s Edwards Demonstration & Learning Center near Peoria, Illinois over the course of three days (level 3). While the Phase 2 competition focused primarily on the development of novel feedstocks and robotic printing systems, Phase 3 emphasized the scale-up of these systems and autonomous operation (demonstrating the capability to operate systems on precursor missions prior to the arrival of crew, or terrestrially in field operation settings where human tending of a manufacturing system may be limited). The Phase 3 virtual construction levels yielded a number of novel habitat designs, including both modular habitats and vertically-oriented habitat concepts. The Phase 3 construction competition also challenged teams to autonomously place penetrations and interfacing elements in additively manufactured structures. The paper will emphasize potential applications for the new materials and technologies developed under the umbrella of the competition within NASA's portfolio and in Earth-based applications such as disaster response and infrastructure improvement.

Construction↗

Nasa Centennial Challenge: Three Dimensional (3d) Printed Habitat, Phase 3

NASA's Centennial Challenges program uses prize competitions with the goal of accelerating innovation in the aerospace industry. Competitions in the Centennial Challenges portfolio have previously focused on advancements in space robotics, regolith excavation, bio-printing, astronaut suit design, small satellites, and solar-powered vehicles. NASA's Three Dimensional (3D) Printed Habitat Centennial Challenge represents a partnership between NASA and the non-profit partner: Bradley University, with co-sponsors Caterpillar, Bechtel, Brick and Mortar Ventures, the American Concrete Institute, and the United States Army Corps of Engineers (USACE) Engineer Research and Development Center (ERDC) to spur development in automated additive construction technologies. The challenge asks teams to design and construct a scaled and simulated Martian habitat using indigenous materials and large scale 3D automated printing systems. Phase 1 of the competition, held in 2015, was an architectural design competition for habitat concepts that could be 3D printed. Phase 2, completed in 2017, asked teams to develop feedstocks from indigenous materials and hydrocarbon polymer recyclables, and demonstrate automated printing systems to manufacture these feedstocks into test specimens to assess mechanical strength. This paper will discuss the Phase 3 competition, focusing on technology outcomes that can potentially be infused into both terrestrial and planetary construction applications. The Phase 3 competition was divided into two sub-competitions: 1) virtual construction, where teams created a high fidelity building information model (BIM) of their 3D-printed habitat design and 2) the construction competition, which required teams to 3D print a structural foundation and subject materials samples to freeze/thaw testing and impact testing (level 1), produce a habitat element and complete a hydrostatic test (level 2), and additively manufacture a 1:3 scale habitat onsite in a head to head competition at Caterpillar, inc.'s Edwards Demonstration & Learning Center near Peoria, Illinois over the course of three days (level 3). While the Phase 2 competition focused primarily on the development of novel feedstocks and robotic printing systems, Phase 3 emphasized the scale-up of these systems and autonomous operation (demonstrating the capability to operate systems on precursor missions prior to the arrival of crew, or terrestrially in field operation settings where human tending of a manufacturing system may be limited). The Phase 3 virtual construction levels yielded a number of novel habitat designs, including both modular habitats and vertically-oriented habitat concepts. The Phase 3 construction competition also challenged teams to autonomously place penetrations and interfacing elements in additively manufactured structures. The paper will emphasize potential applications for the new materials and technologies developed under the umbrella of the competition within NASA's portfolio and in Earth-based applications such as disaster response and infrastructure improvement.

Centennial challenge↗