Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Integration Sites”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 397 records · Page 22

Real-Time Simulation Clock

Fiber-optic network delivers time signals to widely separated simulator sites. Real-time digital flight simulation used to support variety of research programs. Majority of research involves man-in-the-loop simulation requiring interconnection of digital computers, simulation cockpits, control consoles, graphics subsystems, and related equipment. Real-time simulation subsystem consists of several CYBER(R) computers and over 20 simulation sites. Allows for several simultaneous simulation jobs on one CYBER(R) as well as any combination of sites in each integrated simulation job.

Bennington, Donald R.↗

Potential roles for EVA and telerobotics in a unified worksite

Although telerobotics and extravehicular activity (EVA) are often portrayed as competitive approaches to space operations, ongoing research in the Space Systems Laboratory (SSL) has demonstrated the utility of cooperative roles in an integrated EVA/telerobotic work site. Working in the neutral buoyancy simulation environment, tests were performed on interactive roles or EVA subjects and telerobots in structural assembly and satellite servicing tasks. In the most elaborate of these tests to date, EVA subjects were assisted by the SSL's Beam Assembly Teleoperator (BAT) in several servicing tasks planned for Hubble Space Telescope, using the high-fidelity crew training article in the NASA Marshall Neutral Buoyancy Simulator. These tests revealed several shortcomings in the design of BAT for satellite servicing and demonstrated the utility of a free-flying or RMS-mounted telerobot for providing EVA crew assistance. This paper documents the past tests, including the use of free-flying telerobots to effect the rescue of a simulated incapacitated EVA subject, and details planned future efforts in this area, including the testing of a new telerobotic system optimized for the satellite servicing role, the development of dedicated telerobotic devices designed specifically for assisting EVA crew, and conceptual approaches to advanced EVA/telerobotic operations such as the Astronaut Operations Vehicle.

Akin, David↗

A Collection of Technical Papers

Papers presented at the 6th Space Logistics Symposium covered such areas as: The International Space Station; The Hubble Space Telescope; Launch site computer simulation; Integrated logistics support; The Baikonur Cosmodrome; Probabalistic tools for high confidence repair; A simple space station rescue vehicle; Integrated Traffic Model for the International Space Station; Packaging the maintenance shop; Leading edge software support; Storage information management system; Consolidated maintenance inventory logistics planning; Operation concepts for a single stage to orbit vehicle; Mission architecture for human lunar exploration; Logistics of a lunar based solar power satellite scenario; Just in time in space; NASA acquisitions/logistics; Effective transition management; Shuttle logistics; and Revitalized space operations through total quality control management.

Source record↗

Virtual Manufacturing Techniques Designed and Applied to Manufacturing Activities in the Manufacturing Integration and Technology Branch

One of the identified goals of EM3 is to implement virtual manufacturing by the time the year 2000 has ended. To realize this goal of a true virtual manufacturing enterprise the initial development of a machinability database and the infrastructure must be completed. This will consist of the containment of the existing EM-NET problems and developing machine, tooling, and common materials databases. To integrate the virtual manufacturing enterprise with normal day to day operations the development of a parallel virtual manufacturing machinability database, virtual manufacturing database, virtual manufacturing paradigm, implementation/integration procedure, and testable verification models must be constructed. Common and virtual machinability databases will include the four distinct areas of machine tools, available tooling, common machine tool loads, and a materials database. The machine tools database will include the machine envelope, special machine attachments, tooling capacity, location within NASA-JSC or with a contractor, and availability/scheduling. The tooling database will include available standard tooling, custom in-house tooling, tool properties, and availability. The common materials database will include materials thickness ranges, strengths, types, and their availability. The virtual manufacturing databases will consist of virtual machines and virtual tooling directly related to the common and machinability databases. The items to be completed are the design and construction of the machinability databases, virtual manufacturing paradigm for NASA-JSC, implementation timeline, VNC model of one bridge mill and troubleshoot existing software and hardware problems with EN4NET. The final step of this virtual manufacturing project will be to integrate other production sites into the databases bringing JSC's EM3 into a position of becoming a clearing house for NASA's digital manufacturing needs creating a true virtual manufacturing enterprise.

Shearrow, Charles A.↗

Overview of the NASA Wallops Flight Facility Mobile Range Control System

The NASA GSFC's Wallops Flight Facility (WFF) Mobile Range Control System (MRCS) is based on the functionality of the WFF Range Control Center at Wallops Island, Virginia. The MRCS provides real time instantaneous impact predictions, real time flight performance data, and other critical information needed by mission and range safety personnel in support of range operations at remote launch sites. The MRCS integrates a PC telemetry processing system (TELPro), a PC radar processing system (PCDQS), multiple Silicon Graphics display workstations (IRIS), and communication links within a mobile van for worldwide support of orbital, suborbital, and aircraft missions. This paper describes the MRCS configuration; the TELPro's capability to provide single/dual telemetry tracking and vehicle state data processing; the PCDQS' capability to provide real time positional data and instantaneous impact prediction for up to 8 data sources; and the IRIS' user interface for setup/display options. With portability, PC-based data processing, high resolution graphics, and flexible multiple source support, the MRCS system is proving to be responsive to the ever-changing needs of a variety of increasingly complex missions.

Davis, Rodney A.↗

Pre-Flight Testing of Spaceborne GPS Receivers using a GPS Constellation Simulator

The NASA Goddard Space Flight Center (GSFC) Global Positioning System (GPS) applications test facility has been established within the GSFC Guidance Navigation and Control Center. The GPS test facility is currently housing the Global Simulation Systems Inc. (GSSI) STR2760 GPS satellite 40-channel attitude simulator and a STR4760 12-channel navigation simulator. The facility also contains a few other resources such as an atomic time standard test bed, a rooftop antenna platform and a radome. It provides a new capability for high dynamics GPS simulations of space flight that is unique within the aerospace community. The GPS facility provides a critical element for the development and testing of GPS based technologies i.e. position, attitude and precise time determination used on-board a spacecraft, suborbital rocket balloon. The GPS simulation system is configured in a transportable rack and is available for GPS component development as well as for component, spacecraft subsystem and system level testing at spacecraft integration and tests sites. The GPS facility has been operational since early 1996 and has utilized by space flight projects carrying GPS experiments, such as the OrbView-2 and the Argentine SAC-A spacecrafts. The SAC-A pre-flight test data obtained by using the STR2760 simulator and the comparison with preliminary analysis of the GPS data from SAC-A telemetry are summarized. This paper describes pre-flight tests and simulations used to support a unique spaceborne GPS experiment. The GPS experiment mission objectives and the test program are described, as well as the GPS test facility configuration needed to verify experiment feasibility. Some operational and critical issues inherent in GPS receiver pre-flight tests and simulations using this GPS simulation, and test methodology are described. Simulation and flight data are presented. A complete program of pre-flight testing of spaceborne GPS receivers using a GPS constellation simulator is detailed.

Kizhner, Semion↗

Pre-Flight Testing of Spaceborne GPS Receivers Using a GPS Constellation Simulator

The NASA Goddard Space Flight Center (GSFC) Global Positioning System (GPS) applications test facility has been established within the GSFC Guidance Navigation and Control Center. The GPS test facility is currently housing the Global Simulation Systems Inc. (GSSI) STR2760 GPS satellite 40-channel attitude simulator and a STR4760 12-channel navigation simulator. The facility also contains a few other resources such as an atomic time standard test bed, a rooftop antenna platform and a radome. It provides a new capability for high dynamics GPS simulations of space flight that is unique within the aerospace community. The GPS facility provides a critical element for the development and testing of GPS based technologies i.e. position, attitude and precise time determination used on-board a spacecraft, suborbital rocket or balloon. The GPS simulator system is configured in a transportable rack and is available for GPS component development as well as for component, spacecraft subsystem and system level testing at spacecraft integration and test sites. The GPS facility has been operational since early 1996 and has been utilized by space flight projects carrying GPS experiments, such as the OrbView-2 and the Argentine SAC-A spacecrafts. The SAC-A pre-flight test data obtained by using the STR2760 simulator and the comparison with preliminary analysis of the GPS data from SAC-A telemetry are summarized. This paper describes pre-flight tests and simulations used to support a unique spaceborne GPS experiment. The GPS experiment mission objectives and the test program are described, as well as the GPS test facility configuration needed to verify experiment feasibility. Some operational and critical issues inherent in GPS receiver pre-flight tests and simulations using this GPS simulator, and test methodology are described. Simulation and flight data are presented. A complete program of pre-flight testing of spaceborne GPS receivers using a GPS constellation simulator is detailed.

Kizhner, Semion↗

Pre-Flight Testing of Spaceborne GPS Receivers Using a GPS Constellation Simulator

The NASA Goddard Space Flight Center (GSFC) Global Positioning System (GPS) test facility has been established within the GSFC Guidance Navigation and Control Center. The GPS test facility is currently housing the STR2760 GPS satellite 40-channel attitude simulator and an STR4760 12-channel navigation simulator. The facility also contains a few other Goddard resources such as an atomic time standard test bed, a rooftop antenna platform and a radome. It provides a new capability of high dynamics GPS simulations for space flight that is unique within the aerospace community. The GPS facility gives a significant advantage in the development and support of GPS based technologies for position, attitude and precise time determination on-board a spacecraft, sounding rocket or balloon. The GPS simulator system is configured in a transportable rack and is available for GPS applications' component development as well as for spacecraft subsystem and system level testing at spacecraft integration and test sites. The GPS facility has been operational since early 1996 and has been already utilized by a few successful flight projects carrying GPS experiments, such as USA Seastar satellite and the first Argentine satellite SAC-A. The experience in the SAC-A pre-flight testing using the STR2760 simulator is summarized as well as the comparison with preliminary analysis of the GPS data from SAC-A telemetry.

Kizhner, Semion↗

Desert Research and Technology Study 2003 Trip Report/ICES Paper

The Advanced Extra-vehicular Activity (EVA) team of the National Aeronautics and Space Administration (NASA) Johnson Space Center (JSC) Crew and Thermal Systems Division (CTSD) participated in the Desert Research and Technology Study (RATS) in September 2003, at Meteor Crater, AZ. The Desert RATS is an integrated remote field site te t with team members from several NASA centers (Johnson Space Center; Glenn and Ames Research Centers) and universities (Bowling Green State University, University of Cincinnati, Massachusetts Institute of Technology) participating. Each week of the two-week field test had a primary focus. The primary test hardware for the first week was the I-Gravity Lunar Rover Training Vehicle, or Grover, which was on loan to NASA from the United States Geological Survey (USGS) Astrogeology Research Program. The 2003 Grover driving test results serve as a rover performance characterization baseline for the Science, Crew, Operation and Utility Testbed (SCOUT) project team, which will be designing and fabricating a next generation roving vehicle prototype in Fiscal Year (FY) 2004. The second week of testing focused on EVA geologic traverses that utilized a geologic sample field analysis science trailer and also focused on human-robotic interaction between the suited subjects and the EVA Robotic Assistant (ERA). This paper will review the Advanced EVA team's role in the context of the overall Desert RATS, as well as the EVA team results and lessons learned. For information regarding other test participants' results, the authors can refer interested parties to the test reports produced by those Desert RATS teams.

Ross, Amy↗

10 Megawatts Electric Coal Direct Chemical Looping Large Pilot Plant - Pre-Front End Engineering and Design Study

The Peer Review presentation covered the following items: Perform pilot studies to obtain design information. Perform a pre-FEED study of a modular 10 MWeCDCL pilot plant. Provide Functional specifications for integration with host site. Provide risk assessment, schedule and cost estimate for fabrication, construction and testing. Update commercial 550 MWeCDCL plant design and economic analysis

20 FOSSIL-FUELED POWER PLANTS↗

Assessing Cumulative Impacts from Source Units within Hanford's Inner Area - 16546

The Central Plateau area at the Hanford Site has a complex mix of waste sites in several operable units, with many co-mingled source contamination and groundwater plumes. A key component of the evaluation process involves a planned assessment of the potential cumulative impacts resulting from co-mingled plumes and potential contribution from waste sites sources throughout the Inner Area, about 26 million square meters (10 square miles) area located in the middle of the Central Plateau. This assessment will evaluate the fate and transport of contamination at each waste site and remedial actions at those waste sites, providing an integrated vadose zone and groundwater fate and transport assessment. Although DOE's goal is to remediate the entire Inner Area to meet standard requirements in the National Contingency Plan (NCP), the complexity of the contamination including continuing contaminant sources in the Inner Area may not allow restoration of groundwater in a reasonable timeframe. DOE and regulatory agencies may need to evaluate the technical practicability of remedial actions and the potential for establishment of one or more waste management areas where drinking water standards can be obtained and maintained. The cumulative impacts evaluation is the tool to evaluate remedial action effects across source and groundwater operable units, contribute to technical impracticability evaluations, support remedial design and remedial process optimization efforts, identify additional monitoring requirements, and evaluate standard and conditional points of compliance for use considering all contaminant sources and groundwater plumes. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Thermal Energy Storage in Commercial Buildings

Space heating and cooling account for as much as 40% of energy used in commercial buildings. Aligning this energy consumption with renewable energy generation through practical and viable energy storage solutions will be pivotal in achieving 100% clean energy by 2050. Integrated on-site renewable energy sources and thermal energy storage systems can provide a significant reduction of carbon emissions and operational costs for the building owner.

buildings energy storage↗

Comparison of Greenhouse Gas Emission Assessments of Solar and Energy Efficiency Improvements at Small Water Resource Recovery Facilities

Small water resource recovery facilities (WRRFs) account for the majority of centralized systems in the world and have higher energy intensities than large facilities. This study compares potential greenhouse gas emission reductions based on on-site solar energy and energy efficiency (E2) improvements made at small WRRFs. Case study data from 31 existing small WRRFs in Nebraska were collected and included 35 site-specific energy efficiency (E2) recommendations and on-site solar renewable energy systems integrated at three facilities, and the data were used to compare the benefits of on-site solar energy and E2 improvements made at small WRRFs. Improvements in E2 (e.g., improved aeration control) presented the largest reduction in emissions per dollar invested. They often exhibited shorter paybacks, with operational changes in aeration strategies showing the highest impact (up to 0.2 kg CO2eq/m3 treated water). On-site solar systems showed the largest net potential for reducing environmental footprint (0.35 kg CO2eq/m3) but often showed the smallest emissions reduction per cost. While the use of both E2 improvements and the integration of on-site solar renewable energy can significantly improve the sustainability of small WRRFs, on-site solar has advantages for small facilities in that it often requires less operational involvement, allows for greater facility resiliency, and presents less uncertainty in terms of environmental benefit.

Thompson, Matthew↗

Integrated Salt Waste Processing at the Savannah River Site - 17413

Treatment and disposition of salt waste is the critical path to completion of the Savannah River Site (SRS) Liquid Waste (LW) Disposition and Cleanup Program. The new Salt Waste Processing Facility (SWPF) is a critical link in the pre-treatment chain and will process high-curie salt waste removed from various SRS liquid waste storage tanks. Significant infrastructure modifications are underway throughout the existing LW facilities to integrate the SWPF into the LW system. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Integrated salt waste processing at the Savannah River Site - 15301

Treatment and disposition of salt waste is the critical path to completion of the Savannah River Site Liquid Waste (LW) Disposition and Cleanup Program. The new Salt Waste Processing Facility (SWPF) is a critical link in the pre-treatment chain and will process high curie salt waste removed from various SRS liquid waste storage tanks. Significant infrastructure modifications are needed in the existing LW facilities in order to integrate the SWPF into the LW system. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Secure Communications Concept and API Concept for Integrating XENDEE Positronix with TESLA PowerPack System at Site 300 (Final Deliverable)

The CleanStart DERMS project focuses on the management of Distributed Energy Resources (DER) for enhanced distribution grid resilience. The demonstration site has changed from Riverside Public Utility to the LLNS Site 300 DERS demonstration site. This project has so far focused only on device level controllers and local area controllers. These controllers potentially lack the ability to perform supervisory control and grid interactive control functions, essential for grid-level optimal DER management. This project seeks to close that gap in development of secure communication concept and appropriate Application Programming Interfaces (API) to enable integration with DERs, device level and local area controllers, such as Distributed Energy Resources Management System (DERMS).

24 POWER TRANSMISSION AND DISTRIBUTION↗

Small footprint optoelectrodes using ring resonators for passive light localization

The combination of electrophysiology and optogenetics enables the exploration of how the brain operates down to a single neuron and its network activity. Neural probes are in vivo invasive devices that integrate sensors and stimulation sites to record and manipulate neuronal activity with high spatiotemporal resolution. State-of-the-art probes are limited by tradeoffs involving their lateral dimension, number of sensors, and ability to access independent stimulation sites. Here, we realize a highly scalable probe that features three-dimensional integration of small-footprint arrays of sensors and nanophotonic circuits to scale the density of sensors per cross-section by one order of magnitude with respect to state-of-the-art devices. For the first time, we overcome the spatial limit of the nanophotonic circuit by coupling only one waveguide to numerous optical ring resonators as passive nanophotonic switches. With this strategy, we achieve accurate on-demand light localization while avoiding spatially demanding bundles of waveguides and demonstrate the feasibility with a proof-of-concept device and its scalability towards high-resolution and low-damage neural optoelectrodes.

42 ENGINEERING↗

Site participation in the small community experiment

The Small Community Solar Thermal Experiment, planned to test a small, developmental solar thermal power plant in a small community application, is assessed. The baseline plan is to install a field of parabolic dishes with distributed generation to provide 1 MWe of experimental power. Participation by the site proposer is an integral element of the experiment; the proposer will provide a ten-acre site, a connection to the electrical distributional system serving the small community, and various services. In addition to the primary participant, site study efforts may be pursued at as many as five alternative sites.

Holbeck, H. J.↗