Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “In Space Assembly”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 397 records · Page 22

Overcoming two significant hurdles to space power generation Transportation and assembly

The design of large, space-based power generation satellites is strongly influenced by the transportation modes available and the assembly methods adopted. Flight plans for assembly are explored using the Space Shuttle as the transport vehicle. Future heavy-lift launch systems are postulated, and their impact on assembly cost of operational Solar Satellite Power Stations (SSPS) presented. Sensitivity to various levels of ground detail parts prefabrication are compared to corresponding levels of orbital fabrication. Assumptions concerning the degree of human skills are outlined, and related to the method of assembly. Cost comparisons and recommendations for continued studies are developed.

Kline, R.↗

Technical Oversight of the Nancy Grace Roman Space Telescope Optical Telescope Assembly (OTA) Element Procurement: Opportunities, Challenges, & Lessons Learned (2024 Update)

Nancy Grace Roman Space Telescope Optical Telescope Assembly (OTA) is an out-of-house procurement from L3Harris currently being integrated and tested in Rochester, NY. Building upon L3Harris’s decades of success producing world-class optical systems for government and commercial customers offers NASA a proven partner and a tremendous opportunity for high performance and value. Inheriting significant portions of the telescope (including the primary and secondary mirror, composite metering structures and alignment drives) from a previous program presents the opportunity to save cost and schedule but constrains the design space for the unique challenges of the Roman mission. This seminar will cover a brief description of the OTA and its history, some of the challenges posed by incorporating an established product line and inherited hardware into a Class A mission, and some approaches and lessons learned that may be helpful for those structuring new missions or providing technical oversight of out-of-house procurements.

Joshua Abel↗

Human Space Flight and Future Major Space Astrophysics Missions: Servicing and Assembly

Some concepts for candidate future "flagship" space observatories approach the payload limits of the largest launch vehicles planned for the next few decades, specifically in the available volume in the vehicle fairing. This indicates that an alternative to autonomous self-deployment similar to that of the James Webb Space Telescope will eventually be required. Moreover, even before this size limit is reached, there will be significant motivation to service, repair, and upgrade in-space missions of all sizes, whether to extend the life of expensive facilities or to replace outworn or obsolete onboard systems as was demonstrated so effectively by the Hubble Space Telescope program. In parallel with these challenges to future major space astronomy missions, the capabilities of in-space robotic systems and the goals for human space flight in the 2020s and 2030s offer opportunities for achieving the most exciting science goals of the early 21st Century. In this paper, we summarize the history of concepts for human operations beyond the immediate vicinity of the Earth, the importance of very large apertures for scientific discovery, and current capabilities and future developments in robot- and astronaut-enabled servicing and assembly.

Hubble Space Telescope↗

Go for Assembly: Building the International Space Station

An overview of the improvements made on the spacewalking suits and equipment used to assemble the International Space Station (ISS) while in orbit is presented. Details are given on the adjustable heaters and helmet lights. The tools used are shown, and the safety equipment, such as space life jackets and stiff tethers, are described. Astronaut training in the Neutral Buoyancy Laboratory (NBL) and shuttle simulators also are seen.

Source record↗

Tests of an alternate mobile transporter and extravehicular activity assembly procedure for the Space Station Freedom truss

Results are presented from a ground test program of an alternate mobile transporter (MT) concept and extravehicular activity (EVA) assembly procedure for the Space Station Freedom (SSF) truss keel. A three-bay orthogonal tetrahedral truss beam consisting of 44 2-in-diameter struts and 16 nodes was assembled repeatedly in neutral buoyancy by pairs of pressure-suited test subjects working from astronaut positioning devices (APD's) on the MT. The truss bays were cubic with edges 15 ft long. All the truss joint hardware was found to be EVA compatible. The average unit assembly time for a single pair of experienced test subjects was 27.6 sec/strut, which is about half the time derived from other SSF truss assembly tests. A concept for integration of utility trays during truss assembly is introduced and demonstrated in the assembly tests. The concept, which requires minimal EVA handling of the trays, is shown to have little impact on overall assembly time. The results of these tests indicate that by using an MT equipped with APD's, rapid EVA assembly of a space station-size truss structure can be expected.

Heard, Walter L., Jr.↗

Space Nuclear Thermal Propulsion Critical Assembly Boron Worth Experiments

The Space Nuclear Thermal Propulsion (SNTP) project was an attempt to create a more powerful and more efficient rocket engine utilizing nuclear technologies. As part of this project a zero-power critical assembly referred to as SNTPCX was designed and installed at Sandia National Laboratories. The SNTP-CX was a light water moderated particle bed reactor utilizing highly enriched uranium fuel in the form of UC particles. The SNTP-CX performed 142 runs covering numerous experiments from the year 1989 to 1992. The program was canceled in 1994 as the nation’s priorities shifted. Now these experiments are being evaluated for use as criticality safety benchmarks. Nineteen of the 142 reactor runs were dedicated to a series of experiments to calculate the worth of the boron used in the light water moderator. This series of experiments has been selected for further evaluation as a critical benchmark for the International Criticality Safety Benchmark Evaluation Project (ICSBEP).

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Assessment of Sensor Data Accuracy within Gazebo/ROS for High-Precision Autonomous In-Space Robotic Operations

Modeling high-precision in-space servicing, assembly, and manufacturing operations in a simulated environment is a critical step in the development of robotic systems that will be used to autonomously assemble large-scale structures in space. Limited facility size and high costs for manufacturing prototypes make it challenging to conduct full-scale operational testing under appropriate environmental conditions; therefore, testing in a modular, high-fidelity simulation environment is necessary for verification and validation of technology and architecture designs prior to launch. Several modeling and simulation environments exist both within NASA and industry that can be used to test robotic system design and operations, including the widely used commercial tool Gazebo integrated with Robotic Operating System software. Because the performance of autonomous robotic systems relies heavily on the quality of sensor input data, this paper focuses on assessing the accuracy of pose data from an optical sensor model in the Gazebo environment against the behavior of real hardware. The results of the tests will help developers using Gazebo for large-scale, high-precision simulation to account for modeling inaccuracies within their robotic control system algorithms.

simulation↗

NASA Space Launch System Completes Green Run Testing, Begins Assembly

NASA’s Space Launch System (SLS) Program is poised in 2021 to shift its focus to the launch site with the completion of its last major integrated hardware and software test. SLS is NASA’s evolvable super heavy-lift launch vehicle for deep space exploration. Using proven propulsion technologies, SLS will be the most powerful launch vehicle in the world. That capability translates not only into more mass and volume to destinations but also simplified payload design and mission operations and greater opportunity for mission success. These capabilities will be important for the Artemis program, NASA’s plan to return humans to the Moon to stay in a sustainable way in order to develop and test technologies and operations needed for human missions to Mars and other destinations. SLS will anchor the transportation leg of an innovative, sustainable program of lunar exploration with commercial and international partners as the first step of human exploration of deep space. While all major hardware and software efforts made significant progress in 2020 and 2021, the most visible was the Green Run test series of the Artemis I core stage conducted at NASA’s Stennis Space Center (SSC) on the B-2 test stand. The series validated core stage design, performance, workmanship, and readiness for shipment to NASA Kennedy Space Center (KSC) for final processing, integration and launch. The core stage provides the backbone for SLS’ main propulsion system, consisting of two five-segment solid rocket boosters and four RS-25 liquid hydrogen (LH2)/liquid oxygen (LOX) engines. SLS also includes an Interim Cryogenic Propulsion Stage (ICPS) that will insert the Orion crew spacecraft into a lunar trajectory.

John Honeycutt↗

TriTruss Strut-to-Joint Bond Test: Analysis and Setup

The TriTruss is a novel structural module developed by researchers at NASA Langley Research Center (LaRC) that can be used in space to assemble large backing structures for a variety of applications. One such application is the metering truss or primary mirror backbone support structure of an in-space assembled telescope (iSAT). For the iSAT application, the TriTruss will be supporting mirror segments, payloads and instruments, all of which require them to have robust structural integrity. Structural proof tests are needed to ensure the integrity of the bonded interface between the joint and structural struts that make up a TriTruss module. For the first phase of the analysis and test setup effort, described in this paper, a series of analyses were performed to determine the optimal setup for applying a single set of loads to a module to verify the integrity of the bonds. This paper describes all the test setup configurations and loads considered and summarizes the final set of loading states that were selected for proof testing each module.

TriTruss↗

Testing of Bonds in a TriTruss Module

The TriTruss is a novel structural module developed by researchers at NASA Langley Research Center (LaRC) that can be used in space to assemble large backing structures for a variety of applications. One such application is the metering truss or primary mirror backbone support structure of an in-space assembled telescope (iSAT). For the iSAT application, the TriTruss will be supporting mirror segments, payloads, and instruments, all of which require the TriTruss to have robust structural integrity. Structural proof tests are needed to ensure the integrity of the bonded interface between the joint and struts that make up a TriTruss module. The test setup configurations and loads to be applied to the TriTruss module will be described in this paper. Also, the results obtained from tests will be summarized, including a comparison with analytical results.

TriTruss, Finite Element Analysis, Testing, Design↗

Elastic Modulus Testing for TriTruss Struts

The TriTruss is a novel structural module developed by researchers at NASA Langley Research Center (LaRC) that can be used in space to assemble large backing structures for a variety of applications. One such application is the metering truss and primary mirror backbone support structure of an in-space assembled telescope(iSAT). For the iSAT application, the TriTruss will be supporting mirror segments, payloads, and instruments, all of which require the TriTruss to have robust structural integrity. An accurate elastic modulus value is crucial to the finite element analysis(FEA) of the structure. Initial testing indicated that the equivalent elastic modulus provided by the manufacturer and used in the analyses did not accurately predict the behavior of the structure. In this paper, the in-house testing method developed at LaRC to accurately measure the equivalent elastic modulus of the composite struts for use in the analyses is described. A tensile and compressive equivalent elastic modulus was computed from the data obtained in this test. The testing resulted in a tensile equivalent elastic modulus of 24.6 Msi (standard deviation of 0.888 Msi) or 169 GPa (standard deviation of 6.20 GPa) and a compressive equivalent elastic modulus of 22.8 Msi (standard deviation of 0.780 Msi) or 157 GPa(standard deviation of 5.38 GPa) for the single wall thickness struts. For double wall thickness struts, the testing resulted in a tensile equivalent elastic modulus of32.1 Msi (standard deviation of 1.003 Msi) or 221 GPa (standard deviation of 6.91GPa) and a compressive equivalent elastic modulus of 31.9 Msi (standard deviation of 1.123) or 220 GPa (standard deviation of 7.74 GPa).1

TriTruss↗

Structural Characterization of a TriTruss Module

The TriTruss is a novel structural module developed by researchers at NASA Langley Research Center (LaRC) that can be used in space to assemble large support structures for a variety of applications. One such application is the metering truss or primary mirror backbone support structure of an In-Space Assembled Telescope (iSAT). For the iSAT application, the TriTruss will be supporting mirror segments, payloads, and instruments, all of which require the TriTruss to have a high stiffness. Structural characterization from testing and analysis is needed to ensure the integrity of the struts that make up a TriTruss module is maintained when subjected to loads representative of the application. The test setup and loads applied to the TriTruss module as well as the analytical methods used to predict the response of the structure under conditions representative of those implemented during testing will be discussed. Also, the results obtained from testing and analysis will be summarized. The goal for the characterization study was to achieve a correlation within 10% between the test data and the analysis. Overall, the correlation varied for the struts with a few struts still having a larger error margin after further studies were conducted to improve the correlation through additional analysis.

Characterization↗

The assembly of large structures in space

Techniques developed for orbital assembly of the support structure for a 1000 meter diameter microwave power transmission system antenna are described. The operation is performed in two phases using the shuttle remote manipulator system in low earth orbit, and a mobile assembler in geosynchronous orbit.

Smith, G. W.↗

Assembly and integration of the Space Station Freedom ECLSS

The assembly and integration of the SSF elements and systems throughout the build-up sequence are addressed focusing on ECLSS hardware interfaces and stage performance. The ECLSS encompasses six subsystems which provide temperature and humidity control, atmospheric control and supply, atmospheric revitalization, water recovery and management, waste management, and the fire detection and protection.

Gould, M. J.↗

Shuttle demonstration of large space structure fabrication and assembly

This paper describes a program aimed at the early on-orbit demonstration of a large-space-structure fabrication and assembly capability. Requirements for the demonstration concept have been formulated. The concept selected to meet these requirements is a Large Space Structure Platform consisting of a triangular prism of 31.5 m length. Sensors can be mounted on this platform to perform earth-observation measurements from space. Structural elements of the platform are fabricated using an automated beam builder in the Shuttle Orbiter payload bay. Special fixtures are designed to assemble the structure with the aid of the remote manipulator system and two astroworkers in an EVA mode. Results of the platform preliminary design are presented in terms of a design layout with related structural, thermal, mass-properties, and control-dynamics data. The assembly scenario is described. Estimates of the total construction time and Orbiter support requirements are also presented.

Fleisig, R.↗

Space Telescope optical telescope assembly

The optical quality and stability requirements of the Space Telescope optical design rely on state-of-the-art developments in optics, structures, and sensors. This paper describes key elements of the design implementation of the Space Telescope's performance requirements.

Mccarthy, D. J.↗

Assessment of mixed fleet potential for space station launch and assembly

Reductions in expected STS flight rates of the Space Shuttle since the 51-L accident raise concerns about the ability of available launch capacity to meet both payload-to-orbit and crew rotation requirements for the Space Station. In addition, it is believed that some phases of Station build-up could be expedited using unmanned launch systems with significantly greater lift capacity than the STS. Examined is the potential use of expendable launch vehicles (ELVs), yet-to-be-developed unmanned shuttle-derived vehicles (SDVs), and international launch vehicles for meeting overall launch requirements to meet Space Station program objectives as defined by the 1986 Critical Evaluation Task Force (CETF). The study concludes that use of non-STS transportation can help meet several important program objectives as well as reduce the total number of STS flights. It also finds, however, that reduction of Space Station-dedicated STS flights below 8 per year forces a reduction in Station crew size assuming the CETF 90 day crew stay time baseline and seriously impairs scientific utilization of the Station.

Deryder, L. J.↗

Damage Control Plan for International Space Station Recharge Tank Assembly Composite Overwrapped Pressure Vessel

As NASA has retired the Space Shuttle Program, a new method of transporting compressed gaseous nitrogen and oxygen needed to be created for delivery of these crucial life support resources to the International Space Station (ISS). One of the methods selected by NASA includes the use of highly pressurized, unprotected Recharge Tank Assemblies (RTAs) utilizing Composite Overwrapped Pressure Vessels (COPVs). A COPV consists of a thin liner wrapped with a fiber composite and resin or epoxy. It is typically lighter weight than an all metal pressure vessel of similar volume and therefore provides a higher-efficiency means for gas storage. However COPVs are known to be susceptible to damage resulting from handling, tool drop impacts, or impacts from other objects. As a result, a comprehensive Damage Control Plan has been established to mitigate damage to the RTA COPV throughout its life cycle. The DCP is intended to evaluate and mitigate defined threats during manufacturing, shipping and handling, test, assembly level integration, shipment while pressurized, launch vehicle integration and mission operations by defining credible threats and methods for preventing potential damage while still maintaining the primary goal of resupplying ISS gas resources. A comprehensive threat assessment is performed to identify all threats posed to the COPV during the different phases of its lifecycle. The threat assessment is then used as the basis for creating a series of general inspection, surveillance and reporting requirements which apply across all phases of the COPV's life, targeted requirements only applicable to specific work phases and a series of training courses for both ground personnel and crew aboard the ISS. A particularly important area of emphasis deals with creating DCP requirements for a highly pressurized, large and unprotected RTA COPV for use during Inter Vehicular Activities (IVA) operations in the micro gravity environment while supplying pressurized gas to the ISS for crew life support.

Cook, Anthony J.↗