Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Generation scheduling”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 397 records · Page 22

Commercialization and Standardization Progress Towards an Optical Communications Earth Relay

NASA is planning to launch the next generation of a space based Earth relay in 2025 to join the current Space Network, consisting of Tracking and Data Relay Satellites in space and the corresponding infrastructure on Earth. While the requirements and architecture for that relay satellite are unknown at this time, NASA is investing in communications technologies that could be deployed to provide new communications services. One of those new technologies is optical communications. The Laser Communications Relay Demonstration (LCRD) project, scheduled for launch in 2018 as a hosted payload on a commercial communications satellite, is a critical pathfinder towards NASA providing optical communications services on the next generation space based relay. This paper will describe NASA efforts in the on-going commercialization of optical communications and the development of inter-operability standards. Both are seen as critical to making optical communications a reality on future NASA science and exploration missions. Commercialization is important because NASA would like to eventually be able to simply purchase an entire optical communications terminal from a commercial provider. Inter-operability standards are needed to ensure that optical communications terminals developed by one vendor are compatible with the terminals of another. International standards in optical communications would also allow the space missions of one nation to use the infrastructure of another.

lasers↗

The Earth Observing System Data and Information System

The system is described in terms of the broad context of scientific cooperation and research which are facilitated by the architecture designed and the nature of the generated data. The Earth Observing System Data and Information System (EOSDIS) is composed of earth-science and applications data systems which archive global-change data and distribute the information to system users. Several archive centers catalogue selected Pathfinder data sets and generate new data products (such as maps of sea ice, cloud studies, etc.) with consistent calibration of all data. The schedule of three versions of EOSDIS is discussed with reference to the system architecture, programmatic plans, and data policy. The critical issue for EOSDIS is international cooperation to sponsor an infrastructure of global change data of this magnitude for public benefit and scientific research.

Maiden, Martha E.↗

The application of compiler-assisted multiple instruction retry to VLIW architectures

Very Long Instruction Word (VLIW) architectures enhance performance by exploiting fine-grained instruction level parallelism. We describe the development of two compiler assisted multiple instruction word retry schemes for VLIW architectures. The first scheme utilizes the compiler techniques previously developed for processors with single functional units. A compiler generated hazard-free code with different degrees of rollback capability for uniprocessors is compacted by a modified VLIW trace scheduling algorithm. Nops are then inserted in the scheduled code words to resolve data hazards for VLIW architectures. Performance is compared under three parameters: the rollback distance for uni-processors; the number of functional units; and the rollback distance for VLIW architectures. The second scheme employs a hardware read buffer to resolve frequently occurring data hazards, and utilizes the compiler to resolve the remaining hazards. Performance results are shown for six benchmark programs.

Chen, Shyh-Kwei↗

Bonneville, Power Administration Timing System

Time is an integral part of the Bonneville Power Administration's (BPA) operational systems. Generation and power transfers are planned in advance. Utilities coordinate with each other by making these adjustments on a timed schedule. Price varies with demand, so billing is based on time. Outages for maintenance are scheduled to assure they do not interrupt reliable power delivery. Disturbance records are aligned with recorded timetags for analysis and comparison with related information. Advanced applications like traveling wave fault location and real-time phase measurement require continuous timing with high precision. Most of BPA is served by a Central Time System (CTS) at the Dittmer Control Center near Portland, OR. This system keeps time locally and supplies time to both the control center systems and field locations via a microwave signal. It is kept synchronized to national standard time and coordinated with interconnected utilities. It is the official BPA time. Powwer system control and operation is described, followed by a description of BPA timing systems including CTS, the Fault Location Acquisition Reporter, time dissemination, and phasor measurements. References are provided for further reading.

Martin, Kenneth E.↗

Compressed CO2 Hard Rock Drill for Mars

We have developed a down-the-hole (DTH) rotary-percussive drill prototype that could operate on compressed Mars atmospheric CO2 gas with a wireline drilling approach. This technology addresses a need for more aggressive sampling and drilling techniques, for both scientific purposes and to obtain In-Situ Resource Utilization (ISRU) resources for future NASA missions and human crew support. Using a spool of lightweight, high-pressure capillary, a DTH drill assembly would be moved in and out of the hole that could be a kilometer or more in depth. The CO2 drill is designed so that Mars atmospheric CO2 could be collected, compressed, and supplied down the hole and routed through microducts, valves, and reservoirs for the purpose of controlling miniature mechanical actuation in the assembly. By using compressed CO2, the drill system avoids the need for heavy electrical cabling and actuator systems or a liquid media for carrying away particulates as is typically used in terrestrial drilling systems. Instead, the liquid CO2 that powers the drill expands to a gas and could be channeled around the drill housing to carry cuttings to be collected in a bailing bucket. Where terrestrial systems often use drill depth vs time as a metric, a Mars drilling system would need to be extremely low mass, but would have no need to perform under tight schedules. In this paper, we will document our trade studies, progression for the design of microduct logic verified through multiple generations of prototypes, and provide predictive performance data on energy consumption, hole depth, and drill time.

Wilcox, Brian↗

Compressed CO2 Hard Rock Drill for Mars

We have developed a down-the-hole (DTH) rotary-percussive drill prototype that could operate on compressed Mars atmospheric CO2 gas with a wireline drilling approach. This technology addresses a need for more aggressive sampling and drilling techniques, for both scientific purposes and to obtain In-Situ Resource Utilization (ISRU) resources for future NASA missions and human crew support. Using a spool of lightweight, high-pressure capillary, a DTH drill assembly would be moved in and out of the hole that could be a kilometer or more in depth. The CO2 drill is designed so that Mars atmospheric CO2 could be collected, compressed, and supplied down the hole and routed through microducts, valves, and reservoirs for the purpose of controlling miniature mechanical actuation in the assembly. By using compressed CO2, the drill system avoids the need for heavy electrical cabling and actuator systems or a liquid media for carrying away particulates as is typically used in terrestrial drilling systems. Instead, the liquid CO2 that powers the drill expands to a gas and could be channeled around the drill housing to carry cuttings to be collected in a bailing bucket. Where terrestrial systems often use drill depth vs time as a metric, a Mars drilling system would need to be extremely low mass, but would have no need to perform under tight schedules. In this paper, we will document our trade studies, progression for the design of microduct logic verified through multiple generations of prototypes, and provide predictive performance data on energy consumption, hole depth, and drill time.

Wilcox, Brian↗

Effects of modeling errors on trajectory predictions in air traffic control automation

Air traffic control automation synthesizes aircraft trajectories for the generation of advisories. Trajectory computation employs models of aircraft performances and weather conditions. In contrast, actual trajectories are flown in real aircraft under actual conditions. Since synthetic trajectories are used in landing scheduling and conflict probing, it is very important to understand the differences between computed trajectories and actual trajectories. This paper examines the effects of aircraft modeling errors on the accuracy of trajectory predictions in air traffic control automation. Three-dimensional point-mass aircraft equations of motion are assumed to be able to generate actual aircraft flight paths. Modeling errors are described as uncertain parameters or uncertain input functions. Pilot or autopilot feedback actions are expressed as equality constraints to satisfy control objectives. A typical trajectory is defined by a series of flight segments with different control objectives for each flight segment and conditions that define segment transitions. A constrained linearization approach is used to analyze trajectory differences caused by various modeling errors by developing a linear time varying system that describes the trajectory errors, with expressions to transfer the trajectory errors across moving segment transitions. A numerical example is presented for a complete commercial aircraft descent trajectory consisting of several flight segments.

Jackson, Michael R. C.↗

Planetary science with Space Telescope

The capabilities of the Space Telescope observatory which will comprise a 2.4 m primary mirror scheduled for launch into low earth orbit in late 1983 by the Shuttle are discussed. Attention is given to the first generation of science instruments, including two imaging systems, two complementary spectrographs, a high-speed photometer, and a fine guidance/astrometry system. A specific observing program, an intercomparison of Uranus and Neptune, is examined in detail.

Caldwell, J.↗

Stratified charge rotary engine for general aviation

A development history, a current development status assessment, and a design feature and performance capabilities account are given for stratified-charge rotary engines applicable to aircraft propulsion. Such engines are capable of operating on Jet-A fuel with substantial cost savings, improved altitude capability, and lower fuel consumption by comparison with gas turbine powerplants. Attention is given to the current development program of a 400-hp engine scheduled for initial operations in early 1990. Stratified charge rotary engines are also applicable to ground power units, airborne APUs, shipboard generators, and vehicular engines.

Mount, R. E.↗

Lightning in Jupiter's atmosphere

This paper introduces some current ideas on the dynamical structure of Jupiter's atmosphere that are likely to be important for the generation of lightning and reviews briefly the present understanding of Jovian lightning. The Galileo probe into Jupiter's atmosphere is now scheduled for a space shuttle launch in October 1989, with the probe entry into Jupiter's atmosphere to occur in December 1995. The atmospheric probe carries a radio frequency (RF) and optical lightning detection instrument to investigate the characteristics of Jovian lightning,.

Lanzerotti, L. J.↗

Forebody tangential blowing for control at high angles of attack

A feasibility study to determine if the use of tangential leading edge blowing over the forebody could produce effective and practical control of the F-18 HARV aircraft at high angles of attack was conducted. A simplified model of the F-18 configuration using a vortex-lattice model was developed to obtain a better understanding of basic aerodynamic coupling effects and the influence of forebody circulation on lifting surface behavior. The effect of tangential blowing was estimated using existing wind tunnel data on normal forebody blowing and analytical studies of tangential blowing over conical forebodies. Incorporation of forebody blowing into the flight control system was investigated by adding this additional yaw control and sideforce generating actuator into the existing F-18 HARV simulation model. A control law was synthesized using LQG design methods that would schedule blowing rates as a function of vehicle sideslip, angle of attack, and roll and yaw rates.

Kroo, I.↗

Nozomi Cis-Lunar Phase Orbit Determination

Japan's Institute of Space and Astronautical Science (ISAS) launched Nozomi, its first mission to the planet Mars using the newly developed M-V launch vehicle on July 3, 1998. Scientific objectives of the mission are to study the structure and dynamics of the Martian upper atmosphere and its interaction with the solar wind. Nozomi is a cooperative mission between ISAS and the National Aeronautics and Space Administration (NASA). The NASA contribution includes navigation and tracking services provided by the Jet Propulsion Laboratory (JPL). The spacecraft also serves as an engineering demonstration of basic technology for planetary exploration. One of the new technologies was a unique trajectory, developed by ISAS, which used solar gravitational perturbations at the weak stability boundary as an aid to achieve an Earth-Mars transfer orbit. This trajectory saves approximately 120 m/s of Delta V compared to direct hyperbolic insertion and is considered an enabling technology for the mission. Nozomi was the first spacecraft to employ this trajectory and provided on-orbit validation of the technique. The trajectory was achieved by initially placing the spacecraft in a highly elliptical cis-lunar phasing orbit. Six maneuvers were performed during this period to correct injection errors and target an outbound lunar swingby in September 1998. The gravity assist from the lunar swingby raised apogee to the vicinity of the weak stability boundary. After three more targeting maneuvers, Nozomi performed an inbound lunar swingby followed immediately by a powered Earth swingby in late December 1998. A 420 m/s Trans Mars Insertion (TMI) burn at the final Earth periapsis was intended to place the spacecraft on a heliocentric trajectory leading to Mars orbit insertion in October 1999. Orbit determination for Nozomi is performed in parallel by both ISAS and the Multi-Mission Navigation (MMNAV) group at JPL. This was an advantage for the mission because each group would generate solutions based on data collected from their respective tracking networks. Spacecraft events, such as sequence uplinks and maneuvers, were generally scheduled during passes at the Usuda tracking station in Japan. As a result, maneuver design and reconstruction was derived from MMNAV solutions based on JPL tracking data obtained immediately prior to or following maneuvers. Data was also exchanged between ISAS and MMNAV so orbit determination could be performed on joint data sets in support of critical targeting late in the cis-lunar phase. In this paper, information regarding the MMNAV orbit determination effort for the first six months of the mission is presented. The spacecraft trajectory is characterized first, followed by a discussion of the orbit determination estimation procedure and models. Results from selected orbit solutions are presented and compared against reconstructed trajectories. One area of emphasis in this paper is orbit determination in the vicinity of the weak stability boundary. Precise navigation was necessary to target the second lunar swingby and the powered Earth swingby. Delivery accuracy of 150 m was required for these critical encounters, but a number of factors contributed to the general degradation of orbit determination accuracy. This included the fact that the spacecraft was at apogee, at a range of 1.7 million km and moving at less than I km/sec perpendicular to the line of sight. Nozomi was also close to zero degrees declination where there are known limitations on orbit determination performance. Finally, S-band tracking data was acquired through the Nozomi backup low gain antenna. This antenna is offset from the axis of this spin stabilized spacecraft and superimposed large signatures in the Doppler and range data. These difficulties were overcome by combining long data arcs, spanning several maneuvers, with a high fidelity solar pressure model. The model included a physically accurate representation of the spacecraft structure and a high time resolution orientation model. Observation modeling included the removal of the spin induced Doppler bias, spin signature and per pass correction of range calibration errors applied for data leading up to critical events. As a result, all orbit determination goals were met. A second area of emphasis in this paper is the JPL tracking and orbit determination effort in support of the TMI maneuver. TMI occurred out of contact with ground stations and the JPL Goldstone tracking complex had the first pass following the bum. As a result, MMNAV had the responsibility to make a rapid assessment of the maneuver performance. MMNAV made the determination that a 100 m/s under bum had occurred and promptly informed ISAS via voice lines. ISAS immediately began preparations for a correction maneuver (TMIc), which had to be performed during the next Usuda pass. The near real time assessment by MMNAV provided accurate antenna frequency and pointing updates for the spacecraft acquisition at Usuda and the close coordination between the two agencies enabled the design and successful execution of the TMc maneuver. Propellant consumption during the correction burn dictated that the mission be redesigned. ISAS developed a new plan which adds 3 full solar orbits, two Earth swingbys and one lunar swingby with arrival at Mars in January 2004. The final Mars orbit will still enable the mission to achieve all of its science objectives.

Ryne, Mark↗

The Space Technology 5 Avionics System

The Space Technology 5 (ST5) mission is a NASA New Millennium Program project that will validate new technologies for future space science missions and demonstrate the feasibility of building launching and operating multiple, miniature spacecraft that can collect research-quality in-situ science measurements. The three satellites in the ST5 constellation will be launched into a sun-synchronous Earth orbit in early 2006. ST5 fits into the 25-kilogram and 24-watt class of very small but fully capable spacecraft. The new technologies and design concepts for a compact power and command and data handling (C&DH) avionics system are presented. The 2-card ST5 avionics design incorporates new technology components while being tightly constrained in mass, power and volume. In order to hold down the mass and volume, and quali& new technologies for fUture use in space, high efficiency triple-junction solar cells and a lithium-ion battery were baselined into the power system design. The flight computer is co-located with the power system electronics in an integral spacecraft structural enclosure called the card cage assembly. The flight computer has a full set of uplink, downlink and solid-state recording capabilities, and it implements a new CMOS Ultra-Low Power Radiation Tolerant logic technology. There were a number of challenges imposed by the ST5 mission. Specifically, designing a micro-sat class spacecraft demanded that minimizing mass, volume and power dissipation would drive the overall design. The result is a very streamlined approach, while striving to maintain a high level of capability, The mission's radiation requirements, along with the low voltage DC power distribution, limited the selection of analog parts that can operate within these constraints. The challenge of qualifying new technology components for the space environment within a short development schedule was another hurdle. The mission requirements also demanded magnetic cleanliness in order to reduce the effect of stray (spacecraft-generated) magnetic fields on the science-grade magnetometer.

Speer, Dave↗

Periodic, On-Demand, and User-Specified Information Reconciliation

Automated sequence generation (autogen) signifies both a process and software used to automatically generate sequences of commands to operate various spacecraft. Autogen requires fewer workers than are needed for older manual sequence-generation processes and reduces sequence-generation times from weeks to minutes. The autogen software comprises the autogen script plus the Activity Plan Generator (APGEN) program. APGEN can be used for planning missions and command sequences. APGEN includes a graphical user interface that facilitates scheduling of activities on a time line and affords a capability to automatically expand, decompose, and schedule activities.

Kolano, Paul↗

Integration of Ares I-X Ground System Modifications with Space Shuttle Operations

This discussion will focus on the development and implementation cycles and their respective challenges of accommodating and integrating with Space Shuttle Operations. There is a difference during the development and implementation cycles while trying to still operate an ongoing program within the same facilities and infrastructure. Due to this unique environment requirements are generated from outside Ares I-X that have significant impacts on design and implementation of those designs. Impacts are technical, schedule, and cost. So in this unique environment besides dealing with changing test flight vehicle changes the system (hardware and team members) must be flexible enough to accommodate operational and manifest changes while still maintaining delivery and performance requirements. The purpose of this session will be to highlight some of these challenges and identify the lessons learned from this experience.

Stover, Billy R.↗

Communicating Navigation Data Inside the Cassini-Huygens Project: Visualizations and Tools

The Cassini-Huygens Saturn tour poses an interesting navigation challenge. From July 2004 through June 2008, the Cassini orbiter performed 112 of 161 planned maneuvers. This demanding schedule, where maneuvers are often separated by just a few days, motivated the development of maneuver design/analysis automation software tools. Besides generating maneuver designs and presentations, these tools are the mechanism to producing other types of navigation information; information used to facilitate operational decisions on such issues as maneuver cancellation and alternate maneuver strategies. This paper will discuss the navigation data that are communicated inside the Cassini-Huygens Project, as well as the maneuver software tools behind the processing of the data.

maneuver↗

Peregrine Sustainer Motor Development

The Peregrine sounding rocket is an in-house NASA design that provides approximately 15 percent better performance than the motor it replaces. The design utilizes common materials and well-characterized architecture to reduce flight issues encountered with the current motors. It engages NASA design, analysts, test engineers and technicians, ballisticians, and systems engineers. The in-house work and collaboration within the government provides flexibility to efficiently accommodate design and program changes as the design matures and enhances the ability to meet schedule milestones. It provides a valuable tool to compare industry costs, develop contracts, and it develops foundational knowledge for the next generation of NASA engineers.

Brodell, Chuck↗

Show Me the Money! Evaluating A Graduated Incentive Structure to Keep Respondents Engaged Through 101 Surveys in 28 Days

We report the results of a survey test conducted in advance of a series of community response tests (CRTs) to evaluate response to noise from NASA’s X-59 aircraft. The CRTs will require a substantial number of observations to generate a dose response curve for noise exposure and related annoyance levels and the timeframe is limited due to resource and scheduling constraints with an experimental aircraft. Within each CRT area, we will recruit a sample of residents in advance and ask them to fill out a brief survey each time the aircraft passes over. Respondents will be asked to fill out the survey either on the web or as part of an application they are able to download onto their mobile phones. Respondents will be notified each time the plane flies over, asking for their reactions. On many days, respondents will be asked to fill out the survey for multiple flights. Typical incentives are used during the recruitment phase (pre-incentive for a household screener and post-paid for a background survey completed by the selected respondent) and post-paid for an end of study survey. To improve response rates over such a demanding survey schedule (101 surveys in 28 days) we will implement a weekly incentive based upon participation rates, with higher incentives for greater participation and increasing rates each week. The survey test will follow the proposed methodology of the CRTs. We will report on the participation rates by incentive amount and the effectiveness of the incentive structure in obtaining and maintaining response rates over the 4 weeks. We will examine how quickly participation fades over the 4-week period and consider whether the incentive schedule could be improved by altering the distribution of payments. Finally, we will compare how these rates varied across web and app respondents. We will use the results of this work to confirm or improve the design of the CRTs, ensuring the collection of data needed by NASA to evaluate the impact of this innovative technology.

incentives↗