Migration of 60 Co, 133 Ba, 137 Cs, and 152 Eu from cementitious wasteforms in field lysimeter experiments

Safe and effective storage of radioactive waste is essential to protect environmental health. Due to the potential for accidental releases and the severity of the associated risks, it is imperative to further understand radionuclide transport should an accident occur. This work analyzed the vadose zone migration of radionuclides from cementitious wasteforms at the Savannah River Site after ten years. The observed radionuclides are prominent constituents of radioactive waste or analogs for other groups or series of radionuclides. Lysimeters were first analyzed in 2016 using a collimated high-purity germanium gamma-ray spectrometer to non-destructively measure the concentration of each radionuclide in the sediment column as a function of depth. Following these measurements, the lysimeters were redeployed in the field for another 4 years. All radionuclides in all lysimeters were observed to transport further during the redeployment period; however, the extent of migration varied with the material used for introduction. Except for 137 Cs, migration through the sediment control system increased with decreasing ionic potential (ionic charge/radius); migration order: 152 Eu< 137 Cs< 60 Co< 133 Ba. Overall, the cementitious wasteforms were observed to decrease radionuclide migration extent relative to the filter paper. In both cementitious wasteforms, the migration extent increased in the order 152 Eu< 133 Ba< 60 Co< 137 Cs. However, less migration was measured when the radionuclides were incorporated into a reducing grout wasteform. The novelty of this paper is the demonstration of a technique capable of creating non-destructive measurements over decade time scales. Ultimately, this work provides insight into the long-term migration of alkali, alkali earth, divalent transition metal, and trivalent actinide element isotopes.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Saltstone Paddles and Augers Materials of Construction Study

The Saltstone Production Facility (SPF) uses a 10-inch READCO continuous, co-rotating twin-screw mixer to mix the dry premix with the low-level radioactive waste (LLW) salt solution to produce fresh saltstone grout. The paddles and augers within the mixer degrade via erosion in the region where the salt solution is introduced into the mixer. After the paddles/augers erode to a point where the throughput impacts operations, the mixer is disassembled, the effected paddles/augers are replaced, and the mixer is reassembled. Saltstone Engineering indicated that this effort requires an approximately three-week outage. The objective of this task is to assess alternative materials of construction (MOCs) that will provide better erosion characteristics and decrease the frequency in which the paddles and augers need replacement. Previous Astralloy V studies looked only at Charpy Impact and Rockwell Hardness Testing. Each of these will be examined for different alloys as well as Miller Testing (abrasion to determine wear) which will provide a good assessment of an alloy’s erosion/wear characteristics. The following facts concerning the current and proposed alloys for Saltstone Paddles and Augers are provided in this report. • Current Astralloy V material and alloy E52100 had the most favorable Miller Testing Results. • Charpy Impact Testing did not correlate with Miller Testing Results. • Hardness Testing correlated with Miller Testing results meaning that higher hardness will provide more favorable wear resistance. • Further investigation of E52100 and various tool grade steels is recommended for achieving wear resistant properties.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Characterization of Tank 15H Sample in Support of Preliminary Cease Waste Removal and Closure Mode Determination

The Savannah River National Laboratory (SRNL) was requested by Savannah River Mission Completion (SRMC) to provide sample preparation and analysis of Tank 15H characterization samples. These samples follow an interest in exploring avenues to condense the extensive sampling of the Tank Closure process. One such pathway would be to collect a sample during an earlier waste removal campaign for analysis to determine comparability to the later residual tank inventory determined through Residual Material sampling and characterization prior to grouting. Six Tank 15H samples (HTF-15-24-9, HTF- HTF-15-24-10, HTF-15-24-11, HTF-15-24-12, HTF&#x2;15-24-13, and HTF-15-24-14) were delivered to SRNL in May of 2024. These six Tank 15H samples were taken as close as possible to the solids layer of the Tank 15H. These six Tank 15H samples were combined to form one composite sample for characterization due to the lack of sufficient solids fraction.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Conceptual Model Testing Related to SDU 6 Drainwell Observations

From its inception in the early 1950s through the end of the Cold War in the early 1990s, the Savannah River Site (SRS) produced nuclear materials for national defense in five reactors. Additionally, irradiated reactor fuel and target tubes were dissolved in nitric acid to recover plutonium and uranium using the PUREX (Plutonium Uranium Reduction EXtraction) process. Liquid waste from these chemical separations processes was then stored onsite in 51 underground tanks. Eight waste storage tanks have been operationally closed (i.e. cleaned and grouted) and the remaining tanks hold a mixture of liquids, insoluble solids, and precipitated salts (SRMC-LWP-2022-00001), the latter generated by evaporating water from the liquid waste. Waste is currently being retrieved from tanks and separated into 1) high-radioactivity, low-volume, and 2) low-radioactivity, high-volume components, principally through the Salt Waste Processing Facility (SWPF) (SRMC-LWP-2023-00001). The former waste stream is vitrified in the Defense Waste Processing Facility (DWPF), stored onsite, and destined for offsite disposal in a deep geologic repository. The latter stream is mixed with dry cementitious materials in the Saltstone Production Facility (SPF) and the wet slurry placed in onsite Saltstone Disposal Units (SDUs) within the Saltstone Disposal Facility (SDF), where it hardens into a cement waste form termed saltstone. A low-infiltration surface cover system will be placed over the SDF at closure, where SDUs will then be in the subsurface post-closure (SRR-CWDA-2019-00001).

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Determination of 2,4-Dinitrophenol (2,4-DNP) in Simulated Radioactive Waste by High Performance Liquid Chromatography

The River Protection Project (RPP) at Hanford, Washington is evaluating an alternative treatment method for low activity tank waste (LAW) disposition. Specifically, grout solidification/immobilization for LAW needs to demonstrate adequate treatment for Land Disposal Restricted (LDR) Organic chemicals. LDR organic chemical pretreatment, such as evaporations testing and oxidation decomposition, are under assessment to reduce the LDR organic chemicals concentration in the LDR waste. 2,4-dinitrophenol was spiked into LAW simulated waste and monitored in these studies using High Performance Liquid Chromatography (HPLC). The development and implementation of this HPLC method is discussed in this presentation.

Dekarske, John R. [Savannah River National Laborat↗

Integrity Monitoring and Assessment, Prediction, Repair, and Corrosion Control of the Hanford Storage Tanks — 25213

BACKGROUND AND PROJECT TASKS Proposed work addresses focus area 1: Waste Retrieval, Transport and Closure, with particular focus on increasing volume available for tank storage 1) Refurbish/fortify existing double shell storage tanks (Tank Refurbish – Polymer Grout) 2) Robust monitoring tools for internal corrosion (Integrity Monitoring -Reference Electrodes) 3) Mitigate external corrosion (Degradation Prevention - Cathodic Protection) 4) Determine viability of constructing new tanks, and storage room creation by way of evaporation (Cost Benefit Analysis)

Shukla, Pavan K. [Savannah River National Laborato↗

Replacement of Fly Ash with Natural Pozzolans in Cementitious Waste Forms: Progress Report

The Department of Energy Environmental Management (DOE EM) Office is currently responsible for treating radioactive and mixed waste, environmental restoration, and closing contaminated tanks and facilities resulting from radioactive isotope production for defense applications during the Cold War. Cementitious reagents are the most widely used materials for (1) chemically stabilizing and encapsulating radionuclides and hazardous metals contaminated with radionuclides and Resource Conservation and Recovery Act (RCRA) hazardous metals and (2) solidifying radioactive and mixed wastewater for final disposal. Cementitious grouts and flowable concretes are also the most widely used materials for DOE waste tank and facility closures.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Macromolecules & Manufacturing Science

Outline • SRNL Overview • Mission overview • Polymers enabling the mission • R&D Highlights • Polymers in radiation environments • Tooling in shielded cells • Packaging for nuclear material shipments • Polymers supporting tank waste remediation • Ref electrode • Epoxy and polymer grout • Polymers for fusion energy • Deuterium labelling • Polymers for additive manufacturing • Coalescence and blends: experimental and predictive • Process modelling and sorting through big data (peregrine and latticeJ)

Chatham, Camden [Savannah River National Laborator↗

Flow Regimes for Gas Migration in Liquid Stemming Columns

Some underground engineering projects require the design of an effective stemming column to confine pressurized gases within boreholes. While solid materials such as grout plugs are commonly used, their exothermic curing can damage diagnostic tools, particularly under harsh in situ conditions involving elevated pressure and temperature.

42 ENGINEERING↗

SUMMARY OF 2009 RHEOLOGY MODIFIER PROGRAM

The overall objective of the EM-31 Rheological Modifiers and Wetting Agents program is to utilize commercially available rheology modifiers to increase the solids fraction of radioactive sludge based waste streams, resulting in an increase in throughput and decreasing the overall processing time. The program first investigates the impact of rheology modifiers on slurry simulants and then utilizes the most effective rheology modifiers on radioactive slurries. The work presented in this document covers the initial investigation of rheology modifier testing with simulants. This task is supported by both the Savannah River National Laboratory (SRNL) and Pacific Northwest National Laboratory (PNNL). The SRNL EM-31 task, for this year, was to investigate the use of rheology modifiers on simulant Defense Waste Processing Facility (DWPF) melter feeds. The task is to determine, based on the impact of the rheology modifier, if there are rheology modifiers that could reduce the water content of the slurry going to the DWPF melter, hence increasing the melt rate by decreasing the water loading. The rheology modifier in essence would allow a higher solids content slurry to have the same type of rheology or pumpability of a lower solids slurry. The modifiers selected in this report were determined based on previous modifiers used in high level waste melter feed simulants, on-going testing performed by counterparts at PNNL, and experiences gain through use of modifiers in other Department of Energy (DOE) processes such as grout processing. There were 12 rheology modifiers selected for testing, covering both organic and inorganic types and they were tested at four different concentrations for a given melter feed. Five different DWPF melter feeds were available and there was adequate material in one of the melter feeds to increase the solids concentration, resulting in a total of six simulants for testing. The mass of melter feed available in each simulant was not adequate for testing each rheology modifier, hence based on the changes in rheology for a given rheology modifier, rheology modifiers were either dropped or added between simulants. Three rheology modifiers were used on all simulants. The results from this testing indicate that citric acid or polycarboxylate based rheology modifiers are the most effective in reducing the yield stress, by as much as 70% at the higher rheology modifier additions and were effective on most of the tested simulants. These rheology modifiers are organic, hence the can also be used as reductants in melter operations. The most effective non-organic rheology modifiers, sodium metasilicate reduced the yield stress by 10%. It is recommended that both citric acid and commercially available polycarboxylate rheology modifiers be further investigated. Different molecular weight polycarboxylates and different types of polycarboxylates used in other industries must be considered. These polycarboxylates are extensively utilized in the cement, ceramic, and water treatment processes, hence readily available. Future work on DWPF melter feeds involving rheology modifiers should include, assuming the present method of processing sludge through DPWF does not change, is: (1) Investigate the use of polycarboxylate in various processes and procure polycarboxylates for testing. Limit rheology modifier selection and future testing between four and eight different types. (2) Test rheology modifiers on at least two different chemical types or bounding DWPF SME product simulants. Test to include the impact of boiling and the effectiveness in reducing water content via rheology versus weight percent curves. (3) Based on selected modifiers, perform testing on actual radioactive melter feed based on results from simulant testing.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Spring 2009 Semiannual (III.H. and I.U.) Report for the HWMA/RCRA Post-Closure Permit for the INTEC Waste Calcining Facility at the INL Site

The Waste Calcining Facility is located at the Idaho Nuclear Technology and Engineering Center. In 1999, the Waste Calcining Facility was closed under and approved Hazardous Waste Management Act/Resource Conservation and Recovery Act Closure plan. Vessels and spaces were grouted and then covered with a concrete cap. This permit sets forth procedural requirements for groundwater characterization and monitoring, maintenance, and inspections of the Waste Calcining Facility to ensure continued protection of human health and the environment.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Small Column Ion Exchange Design and Safety Strategy

Small Column Ion Exchange (SCIX) is a transformational technology originally developed by the Department of Energy (DOE) Environmental Management (EM-30) office and is now being deployed at the Savannah River Site (SRS) to significantly increase overall salt processing capacity and accelerate the Liquid Waste System life-cycle. The process combines strontium and actinide removal using Monosodium Titanate (MST), Rotary Microfiltration, and cesium removal using Crystalline Silicotitanate (CST, specifically UOP IONSIV{reg_sign}IE-911 ion exchanger) to create a low level waste stream to be disposed in grout and a high level waste stream to be vitrified. The process also includes preparation of the streams for disposal, e.g., grinding of the loaded CST material. These waste processing components are technically mature and flowsheet integration studies are being performed including glass formulations studies, application specific thermal modeling, and mixing studies. The deployment program includes design and fabrication of the Rotary Microfilter (RMF) assembly, ion-exchange columns (IXCs), and grinder module, utilizing an integrated system safety design approach. The design concept is to install the process inside an existing waste tank, Tank 41H. The process consists of a feed pump with a set of four RMFs, two IXCs, a media grinder, three Submersible Mixer Pumps (SMPs), and all supporting infrastructure including media receipt and preparation facilities. The design addresses MST mixing to achieve the required strontium and actinide removal and to prevent future retrieval problems. CST achieves very high cesium loadings (up to 1,100 curies per gallon (Ci/gal) bed volume). The design addresses the hazards associated with this material including heat management (in column and in-tank), as detailed in the thermal modeling. The CST must be size reduced for compatibility with downstream processes. The design addresses material transport into and out of the grinder and includes provisions for equipment maintenance including remote handling. The design includes a robust set of nuclear safety controls compliant with DOE Standard (STD)-1189, Integration of Safety into the Design Process. The controls cover explosions, spills, boiling, aerosolization, and criticality. Natural Phenomena Hazards (NPH) including seismic event, tornado/high wind, and wildland fire are considered. In addition, the SCIX process equipment was evaluated for impact to existing facility safety equipment including the waste tank itself. SCIX is an innovative program which leverages DOE's technology development capabilities to provide a basis for a successful field deployment.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

HEAVY WATER COMPONENTS TEST REACTOR DECOMMISSIONING

The Heavy Water Components Test Reactor (HWCTR) Decommissioning Project was initiated in 2009 as a Comprehensive Environmental Response, Compensation and Liability Act (CERCLA) Removal Action with funding from the American Recovery and Reinvestment Act (ARRA). This paper summarizes the history prior to 2009, the major D&D activities, and final end state of the facility at completion of decommissioning in June 2011. The HWCTR facility was built in 1961, operated from 1962 to 1964, and is located in the northwest quadrant of the Savannah River Site (SRS) approximately three miles from the site boundary. The HWCTR was a pressurized heavy water test reactor used to develop candidate fuel designs for heavy water power reactors. In December of 1964, operations were terminated and the facility was placed in a standby condition as a result of the decision by the U.S. Atomic Energy Commission to redirect research and development work on heavy water power reactors to reactors cooled with organic materials. For about one year, site personnel maintained the facility in a standby status, and then retired the reactor in place. In the early 1990s, DOE began planning to decommission HWCTR. Yet, in the face of new budget constraints, DOE deferred dismantlement and placed HWCTR in an extended surveillance and maintenance mode. The doors of the reactor facility were welded shut to protect workers and discourage intruders. In 2009 the $1.6 billion allocation from the ARRA to SRS for site footprint reduction at SRS reopened the doors to HWCTR - this time for final decommissioning. Alternative studies concluded that the most environmentally safe, cost effective option for final decommissioning was to remove the reactor vessel, both steam generators, and all equipment above grade including the dome. The transfer coffin, originally above grade, was to be placed in the cavity vacated by the reactor vessel and the remaining below grade spaces would be grouted. Once all above equipment including the dome was removed, a concrete cover was to be placed over the remaining footprint and the groundwater monitored for an indefinite period to ensure compliance with environmental regulations.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Recovery Act Progress Update: HWCTR Tapping

Closure activity at the half-century old heavy water components reactor. Decommissioning is kicked off with the grouting of the basin to further protect the environment from radioactive waste.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

The Cementitious Barriers Partnership (CBP) Software Toolbox Capabilities In Assessing The Degradation Of Cementitious Barriers

The Cementitious Barriers Partnership (CBP) Project is a multi-disciplinary, multi-institutional collaboration supported by the U.S. Department of Energy (US DOE) Office of Tank Waste and Nuclear Materials Management. The CBP program has developed a set of integrated tools (based on state-of-the-art models and leaching test methods) that help improve understanding and predictions of the long-term structural, hydraulic and chemical performance of cementitious barriers used in nuclear applications. Tools selected for and developed under this program have been used to evaluate and predict the behavior of cementitious barriers used in near-surface engineered waste disposal systems for periods of performance up to 100 years and longer for operating facilities and longer than 1000 years for waste disposal. The CBP Software Toolbox has produced tangible benefits to the DOE Performance Assessment (PA) community. A review of prior DOE PAs has provided a list of potential opportunities for improving cementitious barrier performance predictions through the use of the CBP software tools. These opportunities include: 1) impact of atmospheric exposure to concrete and grout before closure, such as accelerated slag and Tc-99 oxidation, 2) prediction of changes in Kd/mobility as a function of time that result from changing pH and redox conditions, 3) concrete degradation from rebar corrosion due to carbonation, 4) early age cracking from drying and/or thermal shrinkage and 5) degradation due to sulfate attack. The CBP has already had opportunity to provide near-term, tangible support to ongoing DOE-EM PAs such as the Savannah River Saltstone Disposal Facility (SDF) by providing a sulfate attack analysis that predicts the extent and damage that sulfate ingress will have on the concrete vaults over extended time (i.e., > 1000 years). This analysis is one of the many technical opportunities in cementitious barrier performance that can be addressed by the DOE-EM sponsored CBP software tools. Modification of the existing tools can provide many opportunities to bring defense in depth in prediction of the performance of cementitious barriers over time.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Technitium Management at the Hanford Site

Long Abstract. Full Text. The Hanford tank waste contains approx 26,000 Ci of technetium-99 (Tc-99), the majority of which is in the supernate fraction. Tc-99 is a long-lived radionuclide with a half-life of approx 212,000 years and, in its predominant pertechnetate (TcO{sub 4}) form, is highly soluble and very mobile in the vadose zone and ultimately the groundwater. Tc-99 is identified as the major dose contributor (in groundwater) by past Hanford site performance assessments and therefore considered a key radionuclide of concern at Hanford. The United States Department of Energy (DOE) River Protection Project's (RPP) long-term Tc-99 management strategy is to immobilize the Tc-99 in a waste form that will retain the Tc-99 for many thousands of years. To achieve this, the RPP flowsheet will immobilize the majority of the Tc-99 as a vitrified low-activity waste product that will be ultimately disposed on site in the Integrated Disposal Facility. The Tc-99 will be released gradually from the glass at very low rates such that the groundwater concentrations at any point in time would be substantially below regulatory limits.The liquid secondary waste will be immobilized in a low-temperature matrix (cast stone) and the solid secondary waste will be stabilized using grout. Although the Tc-99 that is immobilized in glass will meet the release rate for disposal in IDF, a proportion is driven into the secondary waste stream that will not be vitrified and therefore presents a disposal risk. If a portion of the Tc-99 were to be removed from the Hanford waste inventory and disposed off-site, (e.g., as HLW), it could lessen a major constraint on LAW waste form performance, i.e., the requirement to retain Tc-99 over thousands of years and have a positive impact on the IDF Performance Assessment. There are several technologies available at various stages of technical maturity that can be employed for Tc-99 removal. The choice of technology and the associated efficacy of the technology are dependent on the chemical fonn of the technetium in the waste, the removal location in the tlowsheet. and the ultimate disposition path chosen for the technetium product. This paper will discuss the current plans for the management of the technetium present in the Hanford tank waste. It will present the risks associated with processing technetium in the current treatment flowsheet and present potential mitigation opportunities, the status of available technetium removal technologies, the chemical speciation of technetium in the tank waste, and the available disposition paths and waste forms for technetium containing streams.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

In-service Inspection of Radioactive Waste Tanks at the Savannah River Site – 15410

Liquid radioactive wastes from the Savannah River Site (SRS) separation process are stored in large underground carbon steel tanks. The high level wastes are processed in several of the tanks and then transferred by piping to other site facilities for further processing before they are stabilized in a vitrified or grout waste form. Based on waste removal and processing schedules, many of the tanks will be required to be in service for times exceeding the initial intended life. Until the waste is removed from storage, transferred, and processed, the materials and structures of the tanks must maintain a confinement function by providing a barrier to the environment and by maintaining acceptable structural stability during design basis events, which include loadings from both normal service and abnormal (e.g., earthquake) conditions. A structural integrity program is in place to maintain the structural and leak integrity functions of these waste tanks throughout their intended service life. In-service inspection (ISI) is an essential element of a comprehensive structural integrity program for the waste tanks at the Savannah River Site (SRS). The ISI program was developed to determine the degree of degradation the waste tanks have experienced due to service conditions. As a result of the inspections, an assessment can be made of the effectiveness of corrosion controls for the waste chemistry, which precludes accelerated localized and general corrosion of the waste tanks. Ultrasonic inspections (UT) are performed to detect and quantify the degree of general wall thinning, pitting and cracking as a measure of tank degradation. The results from these inspections through 2013, for the 27 Type III/IIIA tanks, indicate no reportable in-service corrosion degradation in the primary tank (i.e., general, pitting, or cracking). The average wall thickness for all tanks remains above the manufactured nominal thickness minus 0.25 millimeter and the largest pit identified is approximately 1.70 millimeter deep (i.e., less than 10% through-wall). Improvements to the inspection program were recently instituted to provide additional confidence in the degradation rates. Thickness measurements from a single vertical strip along the accessible height of the primary tank have been used as a baseline to compare historical measurements. Changes in wall thickness and pit depths along this vertical strip are utilized to estimate the rate of corrosion degradation. An independent review of the ISI program methodology, results, and path forward was held in August 2009. The review recommended statistical sampling of the tanks to improve the confidence of the single strip inspection program. The statistical sampling plan required that SRS increase the amount of area scanned per tank. Therefore, in addition to the baseline vertical strip that is obtained for historical comparisons, four additional randomly selected vertical strips are inspected. To date, a total of 104 independent vertical strips along the height of the primary tank have been completed. A statistical analysis of the data indicates that at this coverage level there is a 99.5% confidence level that one of the worst 5% of all the vertical strips was inspected. That is, there is a relatively high likelihood that the SRS inspection program has covered one of the most corroded areas of any of the Type III/IIIA waste tanks. These data further support the conclusion that there are no significant indications of wall thinning or pitting. Random sampling will continue to increase the confidence that one of the worst 5% has been inspected. In order to obtain the additional vertical strips, and minimize budget and schedule impacts, data collection speed for the UT system was optimized. Prior to 2009, the system collected data at a rate of 32 square centimeters per minute. The scan rate was increased to 129 - 160 square centimeters per minute by increasing the scanner step and pixel sizes in the data acquisition set-up. Laboratory testing was utilized to optimize the scan index/pixel size such that the requirements for wall thinning and pit detection were still maintained. SRS continues to evaluate improvements to ultrasonic equipment.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Commercial Submersible Mixing Pump For SRS Tank Waste Removal - 15223

The Savannah River Site Tank Farms have 45 active underground waste tanks used to store and process nuclear waste materials. There are 4 different tank types, ranging in capacity from 2839 m 3 to 4921 m 3 (750,000 to 1,300,000 gallons). Eighteen of the tanks are older style and do not meet all current federal standards for secondary containment. The older style tanks are the initial focus of waste removal efforts for tank closure and are referred to as closure tanks. Of the original 51 underground waste tanks, six of the original 24 older style tanks have completed waste removal and are filled with grout. The insoluble waste fraction that resides within most waste tanks at SRS requires vigorous agitation to suspend the solids within the waste liquid in order to transfer this material for eventual processing into glass filled canisters at the Defense Waste Processing Facility (DWPF). SRS suspends the solid waste by use of recirculating mixing pumps. Older style tanks generally have limited riser openings which will not support larger mixing pumps, since the riser access is typically 58.4 cm (23 inches) in diameter. Agitation for these tanks has been provided by four long shafted standard slurry pumps (SLP) powered by an above tank 112KW (150 HP) electric motor. The pump shaft is lubricated and cooled in a pressurized water column that is sealed from the surrounding waste in the tank. Closure of four waste tanks has been accomplished utilizing long shafted pump technology combined with heel removal using multiple technologies. Newer style waste tanks at SRS have larger riser openings, allowing the processing of waste solids to be accomplished with four large diameter SLPs equipped with 224KW (300 HP) motors. These tanks are used to process the waste from closure tanks for DWPF. In addition to the SLPs, a 224KW (300 HP) submersible mixer pump (SMP) has also been developed and deployed within older style tanks. The SMPs are product cooled and product lubricated canned motor pumps designed to fit within available risers and have significant agitation capabilities to suspend waste solids. Waste removal and closure of two tanks has been accomplished with agitation provided by 3 SMPs installed within the tanks. In 2012, a team was assembled to investigate alternative solids removal technologies to support waste removal for closing tanks. The goal of the team was to find a more cost effective approach that could be used to replace the current mixing pump technology. This team was unable to identify an alternative technology outside of mixing pumps to support waste agitation and removal from SRS waste tanks. However, the team did identify a potentially lower cost mixing pump compared to the baseline SLPs and SMPs. Rather than using the traditional procurement using an engineering specification, the team proposed to seek commercially available submersible mixer pumps (CSMP) as alternatives to SLPs and SMPs. SLPs and SMPs have a high procurement cost and the actual cost of moving pumps between tanks has shown to be significantly higher than the original estimates that justified the reuse of SMPs and SLPs. The team recommended procurement of “off-the-shelf” industry pumps which may be available for significant savings, but at an increased risk of failure and reduced operating life in the waste tank. The goal of the CSMP program is to obtain mixing pumps that could mix from bulk waste removal through tank closure and then be abandoned in place as part of tank closure. This paper will present the development, progress and relative advantages of the CSMP.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗