Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “FERMILAB”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 397 records · Page 22

Search for the Standard Model Higgs boson produced in association with a W Boson in the isolated-track charged-lepton channel using the Collider Detector at Fermilab

The Higgs boson is the only elementary particle predicted by the Standard Model (SM) that has not yet been observed experimentally. If it exists, it explains the spontaneous electroweak symmetry breaking and the origin of mass for gauge bosons and fermions. We test the validity of the SM by performing a search for the associated production of a Higgs boson and a W boson in the channel where the Higgs boson decays to a bottom-antibottom quark pair and the W boson decays to a charged lepton and a neutrino (the WH channel). We study a dataset of proton-antiproton collisions at a centre-of-mass energy √s = 1.96 TeV provided by the Tevatron accelerator, corresponding to an integrated luminosity of 5.7 fb -1 , and recorded using the Collider Detector at Fermilab (CDF).We select events consistent with the signature of exactly one charged lepton (electron or muon), missing transverse energy due to the undetected neutrino (MET) and two collimated streams of particles (jets), at least one of which is required to be identified as originating from a bottom quark. We improve the discrimination of Higgs signal from backgrounds through the use of an artificial neural network. Using a Bayesian statistical inference approach, we set for each hypothetical Higgs boson mass in the range 100-150 GeV/c 2 with 5 GeV/c 2 increments a 95% credibility level (CL) upper limit on the ratio between the Higgs production cross section times branching fraction and the SM prediction. Our main original contributions are the addition of a novel charged lepton reconstruction algorithm with looser requirements (ISOTRK) with respect the electron or muon tight criteria (TIGHT), as well as the introduction of a novel trigger-combination method that allows to maximize the event yield while avoiding trigger correlations and that is used for the ISOTRK category. The ISOTRK candidate is a high-transverse-momentum good-quality track isolated from other activity in the tracking system and not required to match a calorimeter cluster, as for a tight electron candidate, or an energy deposit in the muon detector, as for a tight muon candidate. The ISOTRK category recovers real charged leptons that otherwise would be lost in the non-instrumented regions of the detector. This allows the reconstruction of more W boson candidates, which in turn increases the number of reconstructed WH signal candidate events, and therefore improves the sensitivity of the WH search. For the TIGHT charged lepton categories, we employ charged-lepton-dedicated triggers to improve the rate of WH signal acceptance during data taking. Since there is no ISOTRK-dedicated trigger at CDF, for the ISOTRK charged lepton category we employ three MET-plus-jets-based triggers. For each trigger we first identify the jet selection where the trigger efficiency is flat with respect to jet information (transverse energy and direction of motion in the transverse plane for the two jets in the event) and then we parametrize the trigger efficiency as a function of trigger MET. On an event-by-event basis, for each trigger we compute a trigger efficiency as a function of trigger parametrization, trigger MET, jet information, trigger prescale and information about whether the trigger is defined or not. For the ISOTRK category we combine the three triggers using a novel method, which allows the combination of any number of triggers in order to maximize the event yield while avoiding trigger correlations. On an event-by-event basis, only the trigger with the largest efficiency is used. By avoiding a logical 'OR' between triggers, the loss in the yield of events accepted by the trigger combination is compensated by a smaller and easier-to-compute corresponding systematic uncertainty. The addition of the ISOTRK charged lepton category to the TIGHT category produces an increase of 33% in the WH signal yield and a decrease of 15.5% to 19.0% in the median expected 95% CL cross-section upper limits across the entire studied Higgs mass interval. The improvement in analysis sensitivity is smaller than the improvement in signal yield because the ISOTRK category has a smaller signal over background ratio than the TIGHT category, due to the looser ISOTRK reconstruction criteria. The observed (median expected) 95% CL SM Higgs upper limits on cross section times branching ratio vary between 2.39 x SM (2.73 x SM) for a Higgs mass of 100 GeV/c 2 to 31.1 x SM (31.2 x SM) for a Higgs mass of 150 GeV/c 2 , while the value for a 115 GeV/c 2 Higgs boson is that of 5.08 x SM (3.79 x SM). The novel trigger combination method is already in use by several CDF analyses. It is applicable to any analysis that uses triggers based on MET and jets, such as supersymmetry searches at the ATLAS and CMS experiments at the Large Hadron Collider. In its most general form, the method can be used by any analysis that combines any number of different triggers.

43 PARTICLE ACCELERATORS↗

Notes on the design of experiments and beam diagnostics with synchrotron light detected by a gated photomultiplier for the Fermilab superconducting electron linac and for the Integrable Optics Test Accelerator (IOTA)

We outline the design of beam experiments for the electron linac at the Fermilab Accelerator Science and Technology (FAST) facility and for the Integrable Optics Test Accelerator (IOTA), based on synchrotron light emitted by the electrons in bend dipoles, detected with gated microchannel-plate photomultipliers (MCP-PMTs). The system can be used both for beam diagnostics (e.g., beam intensity with full dynamic range, turn-by-turn beam vibrations, etc.) and for scientific experiments, such as the direct observation of the time structure of the radiation emitted by single electrons in a storage ring. The similarity between photon pulses and spectrum at the downstream end of the electron linac and in the IOTA ring allows one to test the apparatus during commissioning of the linac.

43 PARTICLE ACCELERATORS↗

Beam Optics Measurements at the Fermilab Linac

The Fermilab Linac delivers 400 MeV H- beam to the rest of the accelerator complex. The Linac will be replaced by a SRF Linac that doubles the output energy as part of the Proton Improvement Plan-II (PIP-II) project. For successful PIP-II commissioning and operation, a comprehensive suite of longitudinal and transverse measurements are planned to fully characterize the beam dynamics. In the 400 MeV Linac, we used prototype programs to demonstrate the viability of these workflows. Here we present the results of these measurements of longitudinal and transverse optics.

Chen, Erin [Fermilab]↗

Fermilab PIP II Machine Protection System Digitized Data Noise Elimination Scheme and Its FPGA Implementation

In Fermilab's PIP-II machine protection system, beam loss signals from various detectors are digitized at 125 MS/s. Noise from both high-frequency sources and low-frequency 60 Hz AC power equipment can con-taminate the data. To suppress noise across these ranges especially 60 Hz and its harmonics, which overlap with beam loss signal frequencies advanced digital processing beyond standard filtering is re-quired. Several real-time functional blocks were simu-lated and tested on an FPGA: (1) a dual time-constant discharging integrator filter, (2) a de-ripple baseline extraction and storage block, and (3) a fast-recovery discharging integrator. The nonlinear IIR integrator filter removes high-frequency noise and feeds into the baseline extractor. Upon detecting abrupt beam loss, it switches to a longer time constant to prevent baseline distortion. The de-ripple block calculates a valid base-line by averaging over multiple 60 Hz periods, storing results in a 4096-word FPGA RAM. This baseline is subtracted from raw data before integration by the fast-recovery block, which resets quickly after use. All blocks achieved expected performance.

Wu, Jinyuan [Fermilab] (ORCID:0000000344329521)↗

Mitigating Transition in the Fermilab Booster Using a Triple Phase Jump

The PIP-II project will significantly enhance neutrino production for DUNE, Fermilab s flagship long-baseline neutrino oscillation experiment, by doubling the beam power delivered by the accelerator complex. To achieve this, the total charge injected from the new PIP-II linac into the Booster rapid cycling synchrotron (RCS) will increase from $4.5\times 10^{12}$ to $6.5\times 10^{12}$ protons per pulse. Simultaneously, the Booster s ramp rate will rise from 15 to 20 Hz, while the injection energy will go from 400 MeV to 800 MeV. The Booster accelerates the beam to 8 GeV and crosses transition at $\gamma_t=5.45$. In current operations, no dedicated $\gamma_t$ jump system is employed; instead, longitudinal emittance growth is controlled via an active quadrupole-mode feedback system. Downstream, the Recycler Ring uses slip-stacking to accumulate beam and increase bunch intensity. However, this process imposes a constraint on the longitudinal emittance at Booster extraction, limiting it to 0.1 eV-s (95\%) to avoid excessive particle loss. Because collective effects scale with intensity, additional measures to mitigate transition crossing may be required to stay below this limit. One potential approach is the so-called triple phase-jump technique. While the method has known limitations, it offers some advantages: it can be implemented using the existing digital low-level RF (LLRF) system, requires no additional magnets or pulsed power supplies, and remains compatible with quadrupole-mode feedback.

Ostiguy, Jean-Francois [Fermilab] (ORCID:000000029↗

Dynamic Aperture Studies at the Fermilab Recycler Ring

As part of the Proton Improvement Plan II (PIP-II), Fermilab aims to increase beam intensity delivered to neutrino experiments. In this context, higher intensity injection into the Recycler Ring enhances space charge effects, pushing operations closer to third-order resonances. These resonances reduce the Dynamic Aperture (DA), leading to increased beam loss. This study presents simulations of DA as a function of tune in the Recycler Ring, incorporating chaos indicators such as the Reversibility Error Method (REM). The effectiveness of existing resonance mitigation strategies is evaluated by quantifying their ability to delay DA degradation. Additionally, the study examines how space charge detuning and DA limitations dictate viable operational tune points for the Recycler Ring.

Gonzalez-Ortiz, Cristhian Eduardo [Fermilab]↗

Correlations in bottom quark pair production at the Fermilab Tevatron

I present an analysis of b$\bar{b}$ pair production correlations, using dimuon-triggered data collected with the Collider Detector at Fermilab (CDF) in p$\bar{p}$ collisions at √s = 1.96 TeV during Run II of the TeVatron. The leading order (LO) and next-to-leading order (NLO) b quark production processes are discriminated by the angular and momentum correlations between the b{bar b} pair. Track-level jets containing a muon are classified by b quark content and used to estimate the momentum vector of the progenitor b quark. The theoretical distributions given by the MC@NLO event generator are tested against the data.

72 PHYSICS OF ELEMENTARY PARTICLES AND FIELDS↗

Low-Energy Run of Fermilab Electron Cooler's Beam Generation System

In the context of the evaluation of possibly using the Fermilab Electron Cooler for the proposed low-energy RHIC run at BNL, operating the cooler at 1.6 MeV electron beam energy was tested in a short beam line configuration. The main conclusion of this feasibility study is that the cooler's beam generation system is suitable for BNL needs. The beam recirculation was stable for all tested parameters. In particular, a beam current of 0.38 A was achieved with the cathode magnetic field up to the maximum value presently available of 250 G. The energy ripple was measured to be 40 eV. A striking difference with running the 4.3 MeV beam (nominal for operation at FNAL) is that no unprovoked beam recirculation interruptions were observed. Electron cooling proposed to increase the luminosity of the RHIC collider for heavy ion beam energies below 10 GeV/nucleon [1] needs a good quality, 0.9-5 MeV electron beam. Preliminary design studies indicate that the scheme of the Recycler's electron cooler at FNAL is suitable for low-energy RHIC cooling and most parts of the cooler can be re-used after the end of the Tevatron Run II. To analyze issues related to the generation of the electron beam in the energy recovery mode and to gain experience with the beam transport at lower beam energy, a dedicated study was performed at FNAL with a beam run through a short beam line (so called U-bend). This report summarizes our findings and observations in the course of the measurements.

43 PARTICLE ACCELERATORS↗

Fast Bunch Integrators at Fermilab During Run II

The Fast Bunch Integrator is a bunch intensity monitor designed around the measurements made from Resistive Wall Current Monitors. During the Run II period these were used in both Tevatron and Main Injector for single and multiple bunch intensity measurements. This paper presents an overview of the design and use of these systems during this period. During the Run II era the Fast Bunch integrators have found a multitude of uses. From antiproton transfers to muti-bunch beam coalescing, Main Injector transfers to halo scraping and lifetime measurements, the Fast Bunch Integrators have proved invaluable in the creation and maintenance of Colliding Beams stores at Fermilab.

43 PARTICLE ACCELERATORS↗

The Superconducting Quantum Materials and Systems Center at Fermilab

The Superconducting Quantum Materials and Systems Center, or SQMS, led by Fermilab, brings together national laboratories, academia and industry to make revolutionary advances in quantum computing and sensing, including the building and deployment of a beyond-the-state-of-the-art quantum computer. The quantum devices developed at SQMS will have game-changing impacts in basic science and in our everyday lives.

Fermilab, Fermilab↗

Artificial intelligence research at Fermilab

Artificial intelligence research at Fermilab plays an important role in every aspect of high-energy physics: in the operation of particle accelerators, the analysis of data captured by particle detectors, sweeping surveys of stars and galaxies, quantum simulations of physical phenomena.

Fermilab, Fermilab↗

Updates and Lessons Learned from NuMI Beamline at Fermilab

The Neutrinos at the Main Injector (NuMI) beamline at Fermilab generates an intense muon neutrino beam for the NOvA (NuMI Off-axis $\nu_e$ Appearance) long-baseline neutrino experiment. Over the years, the NuMI beamline has been pivotal in advancing neutrino physics, providing invaluable data and insights. This proceeding paper discusses updates and the lessons learned from recent experiences during the beam operations, maintenance, and monitoring of the NuMI beamline. Key topics include the optimization of beam performance and challenges in maintaining beamline stability. The paper aims to share best practices and provide a road-map for future beamline projects, including the Long-Baseline Neutrino Facility (LBNF).

43 PARTICLE ACCELERATORS↗

Fermilab PIP II machine protection system digitized data noise elimination scheme and its FPGA implementation

In Fermilab's PIP-II machine protection system, beam loss signals from various detectors are digitized at 125 MS/s. Noise from both high-frequency sources and low-frequency 60 Hz AC power equipment can contaminate the data. To suppress noise across these ranges especially 60 Hz and its harmonics, which overlap with beam loss signal frequencies advanced digital processing beyond standard filtering is required. Several real-time functional blocks were simulated and tested on an FPGA: (1) a dual time-constant discharging integrator filter, (2) a de-ripple baseline extraction and storage block, and (3) a fast-recovery discharging integrator. The nonlinear IIR integrator filter removes high-frequency noise and feeds into the baseline extractor. Upon detecting abrupt beam loss, it switches to a longer time constant to prevent baseline distortion. The de-ripple block calculates a valid baseline by averaging over multiple 60 Hz periods, storing results in a 4096-word FPGA RAM. This baseline is subtracted from raw data before integration by the fast-recovery block, which resets quickly after use. All blocks achieved expected performance.

Wu, J. [Fermilab] (ORCID:0000000344329521)↗

Higgs Searches at the Fermilab Tevatron p anti-p Collider

Searching for and potential discovery of Higgs boson(s) both within and beyond the standard model is perhaps the most visible physics goal of the current Fermilab Tevatron program. In this proceeding, recent results from both the CDF and D0 experiments based on analyses of datasets with integrated luminosities between 1.7 and 3.0 fb{sup -1} are summarized. The combined Tevatron cross section upper limits on the production of a standard model Higgs boson are fast approaching the expected standard model values for a wide mass range. Particularly, the Tevatron has now excluded a standard model Higgs boson with a mass of 170 GeV at 95% C.L.

72 PHYSICS OF ELEMENTARY PARTICLES AND FIELDS↗

Project X at Fermilab: Prospects and Plans

As the Fermilab Tevatron Collider program draws to a close, a strategy has emerged of an experimental program built around the high intensity frontier. The centerpiece of this program will be a new 8 GeV superconducting H{sup -} linac that will support world leading programs in long baseline neutrino experimentation and the study of rare processes. Based on technology shared with the International Linear Collider, Project X will provide multi-MW beams at 60-120 GeV from the Main Injector, simultaneous with several hundred kilowatt beams at 8 GeV. Project X will support the possibility of a future energy frontier facility based its utilization as the front end of a muon storage ring based facility.

43 PARTICLE ACCELERATORS↗

Operating Procedure Changes to Improve Antiproton Production at the Fermilab Tevatron Collider

Since the start of Fermilab Collider Run II in 2001, the maximum weekly antiproton accumulation rate has increased from 400 x 10{sup 10} Pbars/week to approximately 3,700 x 10{sup 10} Pbars/week. There are many factors contributing to this increase, one of which involves changes to operational procedures that have streamlined and automated Antiproton Source production. Automation has been added to the beam line orbit control, stochastic cooling power level management, and RF settings. In addition, daily tuning efforts have been streamlined by implementing sequencer driven tuning software.

43 PARTICLE ACCELERATORS↗

Preparations for Muon Experiments at Fermilab

The use of existing Fermilab facilities to provide beams for two muon experiments--the Muon to Electron Conversion Experiment (Mu2e) and the New g-2 Experiment--is under consideration. Plans are being pursued to perform these experiments following the completion of the Tevatron Collider Run II, utilizing the beam lines and storage rings used today for antiproton accumulation without considerable reconfiguration.

43 PARTICLE ACCELERATORS↗