Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Engineering management”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 397 records · Page 22

Sample Preparation Laboratory (SPL) Best Practices: CGD as the Primary Acceptance Method

The traditional paradigm applied to the construction of nuclear safety related systems, structures, and components (SSCs), like SPL, involves an owner/licensee hiring an EPC firm with an NQA 1 program to manage the engineering, procurement, and construction of the desired SSC. This traditional approach would have posed significant barriers to the successful completion of the SPL. As a smaller capital project, in the $\$$100–$\$$200 million range, there was concern that employing one of the larger EPC companies would escalate costs and extend the projected schedule beyond what would be feasible for the Department of Energy (DOE). The traditional acceptance method employed for nuclear facilities with credited safety functions requires the use of an EPC firm applying American Society of Mechanical Engineers (ASME) NQA 1 nuclear quality assurance (NQA) to accept safety SSCs. In lieu of this approach, INL elected to apply its own NQA 1 program to hire an EPC firm operating a commercial quality program. This method used commercial grade dedication (CGD) as outlined in NQA 1 which had not been applied at this scale. Use of the commercial supply chain was identified as a key factor to the successful completion of SPL. Favorable conditions enabling the use of CGD included: • INL serving as both the designer and the design authority • Design created by an NQA 1 qualified source • A mature CGD program • Availability of a CGD subject matter expert (SME) • A strong construction management program. This white paper elaborates on the methodology employed in the construction of the SPL, the successes achieved, and best practices implemented.

42 - ENGINEERING↗

Feedback from International Decommissioning Planning Projects - 20269

Decommissioning of Nuclear Power Plants is an increasing reality in many countries with nuclear power. Already many years before final shutdown, planning of the decommissioning work is usually started in order to understand for example the costs, waste volume capacity and licensing work needed. In many countries it is required to have a final decommissioning plan before any decommissioning work is allowed to start. Westinghouse has been involved in international decommissioning planning for more than 30 years, where the first 20 years was mostly funding and preliminary plans due to that decommissioning was many years away. However, as many more plants are now moving into decommissioning, the focus has shifted to final decommissioning plans with budgets instead of funding plans, strategic decisions instead of choices, waste volume specifications instead of estimates and a defined approach instead of what ifs. Westinghouse has developed a methodology based on the planning and execution of many decommissioning projects in Europe, America and Asia. That international experience and understanding helps the customers to adopt a systematic planning process where strategy development is done with the end state in mind, where the goals are clearly outlined and the starting point described. The process and steps to reach the desired end state need to be clearly defined and all options/alternatives evaluated from a cost/benefit point of view. This is followed by a thorough and quantitative risk analysis in order to give solid recommendations and credible conclusions. One important feedback has been that real decommissioning experience from reference projects is invaluable for an efficient and timely progress in order not to spend unnecessary time and effort on understanding the barriers and links between different activities in decommissioning. Skilled project managers or engineers can drive the project forward, but without decommissioning experience previously gained, valuable lessons learned are not used and the same mistakes can be made again. Many utilities have invested in knowledge transfer from other decommissioning projects through site visits, exchange programs and supplier meetings, which is a valuable asset and way of implementing lessons learned from performed decommissioning projects into the planning process. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

GPM Timeline Inhibits For IT Processing

The Safety Inhibit Timeline Tool was created as one approach to capturing and understanding inhibits and controls from IT through launch. Global Precipitation Measurement (GPM) Mission, which launched from Japan in March 2014, was a joint mission under a partnership between the National Aeronautics and Space Administration (NASA) and the Japan Aerospace Exploration Agency (JAXA). GPM was one of the first NASA Goddard in-house programs that extensively used software controls. Using this tool during the GPM buildup allowed a thorough review of inhibit and safety critical software design for hazardous subsystems such as the high gain antenna boom, solar array, and instrument deployments, transmitter turn-on, propulsion system release, and instrument radar turn-on. The GPM safety team developed a methodology to document software safety as part of the standard hazard report. As a result of this process, a new tool safety inhibit timeline was created for management of inhibits and their controls during spacecraft buildup and testing during IT at GSFC and at the launch range in Japan. The Safety Inhibit Timeline Tool was a pathfinder approach for reviewing software that controls the electrical inhibits. The Safety Inhibit Timeline Tool strengthens the Safety Analysts understanding of the removal of inhibits during the IT process with safety critical software. With this tool, the Safety Analyst can confirm proper safe configuration of a spacecraft during each IT test, track inhibit and software configuration changes, and assess software criticality. In addition to understanding inhibits and controls during IT, the tool allows the Safety Analyst to better communicate to engineers and management the changes in inhibit states with each phase of hardware and software testing and the impact of safety risks. Lessons learned from participating in the GPM campaign at NASA and JAXA will be discussed during this session.

Inhibits↗

Results from NASA Agile Teams Study

In order to meet the demands of the current global economy, a study of agile teams at NASA was conducted by the NASA Engineering and Safety Center (NESC) to explore how the Agency can become more adaptable and flexible due to several influences, including the maturity and availability of digital tools and NASA’s increased reliance on commercial providers. NESC Technical Discipline Teams (TDTs) perform annual studies to understand the needs of their stakeholders, establish a state of the discipline, and inform strategic planning efforts. As part of the 2022 interview series, the Systems Engineering TDT utilized the dissertation work of Dr. Jackelynne Silva-Martinez that focused on NASA agile teams. The Systems Engineering TDT partnered with the Software and Human Factors TDTs on the formulation of interview questions and subsequent solicitation of customer inputs, which helped attract diverse agile teams across the Agency. 34 participants were interviewed, including civil servants and contractors, with open-ended questions related to their teams’ adoption and transition to agile. Participants were also questioned about their perceptions of the implementation of agile approaches across the Agency. Results showed a consistent framing of agile as incremental knowledge growth, a way of showing progress, and as the incorporation of frequent customer feedback. However, participants emphasized a lack of a common understanding of agile across the Agency, which sometimes caused managers and engineers to be reluctant to accept and support them. Results also showed the most successful agile teams had formal training with over five years of agile experience, used retrospectives, and tailored their agile processes for their specific situation and needs. This paper provides details of the interview responses gathered in the study and suggests actions for NASA to become more agile.

NASA↗

ISS Fiber Optic Failure Investigation Root Cause Report

In August of 1999, Boeing Corporation (Boeing) engineers began investigating failures of optical fiber being used on International Space Station flight hardware. Catastrophic failures of the fiber were linked to a defect in the glass fiber. Following several meetings of Boeing and NASA engineers and managers, Boeing created and led an investigation team, which examined the reliability of the cable installed in the U.S. Lab. NASA Goddard Space Flight Center's Components Technologies and Radiation Effects Branch (GSFC) led a team investigating the root cause of the failures. Information was gathered from: regular telecons and other communications with the investigation team, investigative trips to the cable distributor's plant, the cable manufacturing plant and the fiber manufacturing plant (including a review of build records), destructive and non-destructive testing, and expertise supplied by scientists from Dupont, and Lucent-Bell Laboratories. Several theories were established early on which were not able to completely address the destructive physical analysis and experiential evidence. Lucent suggested hydrofluoric acid (HF) etching of the glass and successfully duplicated the "rocket engine" defect. Strength testing coupled with examination of the low strength break sites linked features in the polyimide coating with latent defect sites. The information provided below explains what was learned about the susceptibility of the pre-cabled fiber to failure when cabled as it was for Space Station and the nature of the latent defects.

Leidecker, Henning↗

Learning Lessons from the X-37 Project

The X-37 was planned as an automated vehicle capable of flight-testing new aerospace technologies in combined environments that are beyond the capability of existing ground or flight platforms. Flight demonstration with the X-37 architecture and configuration in relevant environments was planned to reduce the risk of developing launch vehicle technologies for sustainable, affordable exploration and other aerospace applications. Current plans are for the X-37 Approach and Landing Test Vehicle (ALTV) to be atmospheric tested in 2005 from Scaled Composite's White Knight carrier aircraft at up to 40,000 feet over California's Mojave Spaceport, with and turnaround maintenance performed. The fight Operations Control Center will conduct the mission, using a streamlined operations concept. Taxi-tow and captive-carry tests will be conducted prior to the atmospheric-test series. Sponsored by the Defense Advanced Research Projects Agency (DARPA) with NASA participation, technical objectives are to: (1) mature Computed Air Data System/Remote Pressure Sensor technology, (2) manage energy during Terminal Area Energy Management/Heading Alignment Cone maneuvers, and (3) validate the aerodatabase. The X-37 Project began in 1999 under a cooperative agreement as an element of NASA's Future X Program and transitioned to a NASA Research Announcement under the Space Launch Initiative. In mid-2004, NASA transferred ownership to DARPA, with its heritage of performing high-risk, high-payoff research and development. NASA contributes technical expertise, including risk analysis and system integration. The Boeing Company is the prime contractor, with nationwide suppliers. This recent partnership exemplifies the synergy attainable when NASA Centers, other Government agencies, and industry work together toward a common goal - contributing to the knowledge base for U.S. exploration and other aerospace endeavors. The X-37 team represents a range of space transportation disciplines - from engineering to management. Some members have been with the project since its inception. All have gained priceless experience during the design, manufacturing, and testing of the ALTV, as well as through developing advanced orbital flight technologies, such as state-of-the-art Thermal Protection Systems and hot structures. Throughout this process, the X-37 Project team captures lessons that are directly applicable to other such efforts. The upcoming ALTV flights offer another dimension of data and first-hand experience that will prove invaluable to those designing new generations of reusable spacecraft. And ongoing technology developments will expand the aerospace knowledge base. Delivering prototype hardware is always a risky proposition. During the course of the X-37 effort, the team has experienced many challenging opportunities, delivering significant accomplishments and learning numerous lessons in the process. The ability to manage the risk landscape is key to overcoming obstacles, especially technical hurdles that are encountered in progressing hardware from design to flight. The approach to managing risk under this partnership is evolving but, in general, the team allocates resources to reduce the likelihood of severe-consequence risks, thus maximizing mission success and ensuring that the X-37 Project delivers value to its stakeholders. As the team sharpens its focus on operations, it continues to contribute knowledge to those who would undertake high-risk, high-payoff research and development and provides valuable experience to implement the exploration vision.

Turner, Susan↗

Learning Lessons from the X-37 Project

The X-37 was planned as an automated vehicle capable of flight-testing new aerospace technologies in combined environments that are beyond the capability of existing ground or flight platforms. Flight demonstration with the X-37 architecture and configuration in relevant environments was planned to reduce the risk of developing launch vehicle technologies for sustainable, affordable exploration and other aerospace applications. Current plans are for the X-37 Approach and Landing Test Vehicle (ALTV) to be atmospheric tested in 2005 from Scaled Composite s White Knight carrier aircraft at up to 40,000 feet over California's Mojave Spaceport, with landing and turnaround maintenance performed. The Flight Operations Control Center will conduct the mission, using a streamlined operations concept. Taxi-tow and captive-carry tests will be conducted prior to the atmospheric-test series. Sponsored by the Defense Advanced Research Projects Agency (DARPA) with NASA participation, technical objectives are to: (1) mature Computed Air Data System/Remote Pressure Sensor technology, (2) manage energy during Terminal Area Energy Management/Heading Alignment Cone maneuvers, and (3) validate the aerodatabase. The X-37 Project began in 1999 under a cooperative agreement as an element of NASA's Future X Program and transitioned to a NASA Research Announcement under the Space Launch Initiative. In mid-2004, NASA transferred ownership to DARPA, with its heritage of performing high-risk, high-payoff research and development (R&D). NASA contributes technical expertise, including risk analysis and system integration. The Boeing Company is the prime contractor, with nationwide suppliers. This partnership exemplifies the synergy attainable when NASA Centers, other Government agencies, and industry work together toward a common goal - contributing to the knowledge base for U.S. exploration and other aerospace endeavors. The X-37 team represents a range of space transportation disciplines - from engineering to management. Some members have been with the project since its inception. All have gained priceless experience during the design, manufacturing, and testing of the ALTV, as well as through developing advanced orbital flight technologies, such as state-of-the-art Thermal Protection Systems and hot structures. Throughout this process, the X-37 Project team captures lessons that are directly applicable to other such efforts. The upcoming ALTV flights offer another dimension of data and first-hand experience that will prove invaluable to those designing new generations of reusable spacecraft. And ongoing technology developments will expand the aerospace knowledge base. Delivering prototype hardware is always a risky proposition. During the course of this effort, the X-37 team has experienced many challenging opportunities, delivering significant accomplishments and learning numerous lessons in the process. The ability to manage the risk landscape is key to overcoming obstacles, especially technical hurdles that are encountered in progressing hardware from design to flight. The approach to managing risk under this partnership is evolving but, in general, the team allocates resources to reduce the likelihood of severe-consequence risks, thus maximizing mission success and ensuring that the X-37 Project delivers value to its stakeholders. As the team sharpens its focus on operations, it continues to contribute knowledge to those who would undertake high-risk, high-payoff R&D and provides valuable experience to implement the Vision for Space Exploration.

Turner, Susan↗

An Overview of Space Exploration Simulation (Basis of Confidence) Documentation

Models and simulations (M&S) are critical resources in the exploration of space. They support program management, systems engineering, integration, analysis, test, and operations by providing critical information that supports key analyses and decisions (technical, cost and schedule). Consequently, there is a clear need to establish a solid understanding of M&S strengths and weaknesses, and the bounds within which they can credibly support decision making. In this presentation we will describe how development of simulation capability documentation will be used to form a Basis of Confidence (Basis of Confidence) for National Aeronautics and Space Administration (NASA) M&S. The process by which BOC documentation is developed will be addressed, as well as the structure and critical concepts that are essential for establishing credibility of NASA's Exploration Systems Mission Directorate (ESMD) legacy M&S. We will illustrate the significance of BOC documentation in supporting decision makers and Accreditation Authorities in M&S risk management.

Bray, Alleen↗

A machine learning pipeline for identifying infiltration managed aquifer recharge locations from satellite imagery in the San Joaquin Valley, California

This study focuses on an agricultural region in California’s Central Valley, USA, where Managed Aquifer Recharge (MAR) is widely implemented to mitigate groundwater depletion under increasing water demand and climate variability. A deep learning and machine learning framework was developed to identify infiltration-MAR locations using satellite imagery and environmental data. The framework integrates surface water detection from Sentinel-2 imagery, geospatial delineation of water bodies, spatiotemporal tracking of water body dynamics, and supervised classification using meteorological, environmental, and topographic variables. The framework was applied to a 2379 km² study area southwest of Fresno, where 765 water bodies were detected, including 139 identified MAR sites based on publicly available datasets and expert knowledge. The classification model achieved an accuracy of 0.94 and an F1 score of 0.85. Feature importance analysis indicates that cropland, normalized difference vegetation index (NDVI), and evaporation are among the most influential predictors for infiltration-MAR. Notably, the framework suggests that engineered water management in infiltration-MAR systems can disrupt or even reverse the expected positive correlation between surface water extent and precipitation. These findings provide physically interpretable insights into the characteristics of existing infiltration-MAR facilities and demonstrate the potential of the proposed framework as a reproducible, interpretable, and potentially transferable tool for data-driven infiltration-MAR identification and inventory development under growing climatic and hydrological uncertainty.

Classification↗

Integrated Modeling and Simulation Verification, Validation, and Accreditation Strategy for Exploration Systems Mission Directorate

Models and simulations (M&S) are critical resources in the exploration of space. They support program management, systems engineering, integration, analysis, test, and operations and provide critical information and data supporting key analyses and decisions (technical, cost and schedule). Consequently, there is a clear need to establish a solid understanding of M&S strengths and weaknesses, and the bounds within which they can credibly support decision-making. Their usage requires the implementation of a rigorous approach to verification, validation and accreditation (W&A) and establishment of formal process and practices associated with their application. To ensure decision-making is suitably supported by information (data, models, test beds) from activities (studies, exercises) from M&S applications that are understood and characterized, ESMD is establishing formal, tailored W&A processes and practices. In addition, to ensure the successful application of M&S within ESMD, a formal process for the certification of analysts that use M&S is being implemented. This presentation will highlight NASA's Exploration Systems Mission Directorate (ESMD) management approach for M&S W&A to ensure decision-makers receive timely information on the model's fidelity, credibility, and quality.

Hale, Joseph P.↗

Innovation in Extraterrestrial Service Systems - A Challenge for Service Science

This presentation was prepared at the invitation of Professor Yukio Ohsawa, Department of Systems Innovation, School of Engineering, The University of Tokyo, for delivery at the International Workshop on Innovating Service Systems, sponsored by the Japanese Society of Artificial Intelligence (JSAI) as part of the JSAI Internation Symposium on AI, 2010. It offers several challenges for Service Science and Service Innovation. the goal of the presentation is to stimulate thinking about how service systems viII evolve in the future, as human society advances from its terrestrial base toward a permanent presence in space. First we will consider the complexity of the International Space Station (ISS) as it is today, with particular emphasis of its research facilities, and focus on a current challenge - to maximize the utilization of ISS research facilities for the benefit of society. After briefly reviewing the basic principles of Service Science, we will discuss the potential application of Service Innovation methodology to this challenge. Then we viII consider how game-changing technologies - in particular Synthetic Biology - could accelerate the pace of sociocultural evolution and consequently, the progression of human society into space. We will use this provocative vision to advance thinking about how the emerging field of Service Science, Management, and Engineering (SSME) might help us anticipate and better handle the challenges of this inevitable evolutionary process.

Bergner, David↗

PanDA: Production and Distributed Analysis System

The Production and Distributed Analysis (PanDA) system is a data-driven workload management system engineered to operate at the LHC data processing scale. The PanDA system provides a solution for scientific experiments to fully leverage their distributed heterogeneous resources, showcasing scalability, usability, flexibility, and robustness. The system has successfully proven itself through nearly two decades of steady operation in the ATLAS experiment, addressing the intricate requirements such as diverse resources distributed worldwide at about 200 sites, thousands of scientists analyzing the data remotely, the volume of processed data beyond the exabyte scale, dozens of scientific applications to support, and data processing over several billion hours of computing usage per year. PanDA’s flexibility and scalability make it suitable for the High Energy Physics community and wider science domains at the Exascale. Beyond High Energy Physics, PanDA’s relevance extends to other big data sciences, as evidenced by its adoption in the Vera C. Rubin Observatory and the sPHENIX experiment. As the significance of advanced workflows continues to grow, PanDA has transformed into a comprehensive ecosystem, effectively tackling challenges associated with emerging workflows and evolving computing technologies. The paper discusses PanDA’s prominent role in the scientific landscape, detailing its architecture, functionality, deployment strategies, project management approaches, results, and evolution into an ecosystem.

97 MATHEMATICS AND COMPUTING↗

Retrofitting Holcim Ste. Genevieve Cement Plant with CO2 Capture Plant Using Air Liquide Cryocap™ FG Technology

The global cement manufacturing industry is a major contributor to carbon dioxide emissions. The International Energy Agency's "Net Zero Emissions by 2050 Scenario" identifies CCS as a major strategy for meeting that goal. This project is among the first attempts to transfer capture technology developed at coal-fired power plants to the cement industry. The main objective of the project is to execute and complete a front-end engineering and design (FEED) studies for commercial-scale, carbon capture projects that separates 95% of the total CO2 emissions at the Holcim (US) Ste. Genevieve cement manufacturing facility using Air Liquide’s Pressure Swing Adsorption system (PSA) assisted Cryocap™ technology. The Holcim Ste. Genevieve cement plant in Missouri, US, boasts one of the largest single cement production lines in the world, with a capacity of approximately 12,000 t/day. The plant currently uses traditional fuels, namely coal and petcoke. The captured CO2 will be pipeline and geological storage grade. The industrial host site emits approximately 3.0 million tonne CO2/yr. Air Liquide’s Cryocap™ technology has been developed over the last 18+ years for CO2 capture applications. It has been shown to be applicable to a variety of industrial applications (e.g., steel, cement, SMR, Fluidized Catalytic Crackers (FCCs)). Cryocap™ FG consists of a Pressure Swing Adsorption (PSA) unit coupled with a Cryogenic System. The PSA pre-concentrates the CO2 from the flue gas, while the cryogenic unit enables the CO2 purity to be increased to the desired level. The project team is led by the Prairie Research Institute at the University of Illinois at Urbana-Champaign. The tasks include: complete FEED study for retrofitting the industrial facility with a carbon capture system to support developing a detailed cost estimate; business case analysis outlining the anticipated revenue and credits if projects was built and operated; technoeconomic analysis (TEA) outlining how capture system achieves DOE capture goals; and life cycle (LCA) analysis demonstrating zero net carbon emissions. The FEED study was successfully completed. This includes completing the process basis of design; preliminary engineering; outside battery limits (OSBL) detailed engineering including a Zero Liquid Discharge (ZLD) wastewater treatment system; inside battery limits (ISBL) detailed engineering [1]. An overall project capital cost estimate within a -20%/+30% accuracy was developed. The major contributors to the Total Plant Cost (TPC), by system, are the costs associated with the Outside Battery Limit (OSBL) section of the plant which includes a new river water intake structure and a Zero Liquid Discharge (ZLD) system. By cost category, the major contributors to the TPC are equipment and subcontractor costs, followed closely by engineering, construction management, home office and contractor fees. The TEA has been created to reflect the findings of the project. It analyzes the economic performance of the Cryocap™ technology by reviewing the estimated capital costs, operating cost, and revenue. The Cost of Capture (COC) associated with the Cryocap™ technology for 95% CO2 capture, when considering NETL 2018 economic assumptions (42/58 debt/equity ratio, 5.15% interest on debt and 1.42% return on equity in real dollars) and 2022 economic assumptions (42/58 debt/equity ratio, 8.82% interest on debt and 4.90% return on equity in real dollars) was found to be much lower than that for the DOE-NETL’s base-line cases. The highest contributors to the COC are annualized capital expenditures (CAPEX) and electricity consumption which can be offset by using lower cost renewable sources. The LCA was conducted using OpenLCA which is an open-source software that is recommended by NETL. The database utilized for this study was a modified version of TRACI 2.1 (developed by the US. Environmental Protection Agency’s National Risk Management Research Laboratory and modified by NETL). The Cryocap™ FG technology does not consume fuels in significant quantities and does not utilize specialized chemical solvents subject to decomposition, such as those utilized in amine-based carbon capture systems. The Cryocap™ FG technology mainly utilizes electricity as its energy input; hence, its calculated emissions are mainly associated with the generation of electricity offsite and are dependent on the energy matrix of the grid at the time of project implementation. The water consumption impact of the Cryocap™ FG is mostly for makeup of the water lost by evaporation in the cooling tower; however, the carbon capture plant will be equipped with a ZLD system to avoid effluent streams and minimize water consumption. The successful construction and operation of this plant based on this study results will provide a means to demonstrate an economically attractive and transformational capture technology that can be used to retrofit existing plants and be deployed at new plants.

01 COAL, LIGNITE, AND PEAT↗

A robust deep learning workflow to predict multiphase flow behavior during geological C O 2 sequestration injection and Post-Injection periods

Simulation of multiphase flow in porous media is essential to manage the geologic CO 2 sequestration (GCS) process, and physics-based simulation approaches usually take prohibitively high computational cost due to the nonlinearity of the coupled physics. This paper contributes to the development and evaluation of a deep learning workflow that accurately and efficiently predicts the temporal-spatial evolution of pressure and CO 2 plumes during injection and post-injection periods of GCS operations. Based on a Fourier Neural Operator, the deep learning workflow takes input variables or features including rock properties, well operational controls and time steps, and predicts the state variables of pressure and CO 2 saturation. To further improve the predictive fidelity, separate deep learning models are trained for CO 2 injection and post-injection periods due to the difference in primary driving force of fluid flow and transport during these two phases. We also explore different combinations of features to predict the state variables. We use a realistic example of CO 2 injection and storage in a 3D heterogeneous saline aquifer, and apply the deep learning workflow that is trained from physics-based simulation data and emulate the physics process. Through this numerical experiment, we demonstrate that using two separate deep learning models to distinguish post-injection from injection period generates the most accurate prediction of pressure, and a single deep learning model of the whole GCS process including the cumulative injection volume of CO 2 as a deep learning feature, leads to the most accurate prediction of CO 2 saturation. For the post-injection period, it is key to use cumulative CO 2 injection volume to inform the deep learning models about the total carbon storage when predicting either pressure or saturation. The deep learning workflow not only provides high predictive fidelity across temporal and spatial scales, but also offers a speedup of 250 times compared to full physics reservoir simulation, and thus will be a significant predictive tool for engineers to manage the long-term process of GCS.

58 GEOSCIENCES↗

ELaNa - Educational Launch of Nanosatellite Enhance Education Through Space Flight

One of NASA's missions is to attract and retain students in the science, technology, engineering and mathematics (STEM) disciplines. Creating missions or programs to achieve this important goal helps strengthen NASA and the nation's future work force as well as engage and inspire Americans and the rest of the world. During the last three years, in an attempt to revitalize educational space flight, NASA generated a new and exciting initiative. This initiative, NASA's Educational Launch of Nanosatellite (ELaNa), is now fully operational and producing exciting results. Nanosatellites are small secondary satellite payloads called CubeSats. One of the challenges that the CubeSat community faced over the past few years was the lack of rides into space. Students were building CubeSats but they just sat on the shelf until an opportunity arose. In some cases, these opportunities never developed and so the CubeSat never made it to orbit. The ELaNa initiative is changing this by providing sustainable launch opportunities for educational CubeSats. Across America, these CubeSats are currently being built by students in high school all the way through graduate school. Now students know that if they build their CubeSat, submit their proposal and are selected for an ELaNa mission, they will have the opportunity to fly their satellite. ELaNa missions are the first educational cargo to be carried on expendable launch vehicles (ELY) for NASA's Launch Services Program (LSP). The first ELaNa CubeSats were slated to begin their journey to orbit in February 2011 with NASA's Glory mission. Due to an anomaly with the launch vehicle, ELaNa II and Glory failed to reach orbit. This first ELaNa mission was comprised of three IU CubeSats built by students at Montana State University (Explorer Prime Flight 1), the University of Colorado (HERMES), and Kentucky Space, a consortium of state universities (KySat). The interface between the launch vehicle and the CubeSat, the Poly-Picosatellite Orbital Deployer (P-POD), was developed and built by students at California Polytechnic State University (Cal Poly). Integrating a P-POD on a NASA ELV was not an easy task. The creation of new processes and requirements as well as numerous reviews and approvals were necessary within NASA before the first ELaNa mission could be attached to a NASA launch vehicle (LV). One of the key objectives placed on an ELaNa mission is that the CubeSat and PPOD does not increase the baseline risk to the primary mission and launch vehicle. The ELaNa missions achieve this objective by placing a rigorous management and engineering process on both the LV and CubeSat teams. So, what is the future of ELaNa? Currently there are 16 P-POD missions manifested across four launch vehicles to support educational CubeSats selected under the NASA CubeSat Initiative. From this initiative, a rigorous selection process produced 22-student CubeSat missions that are scheduled to fly before the end of 2012. For the initiative to continue, organizations need to submit proposals to the annual CubeSat initiative call so they have the opportunity to be manifested and launched.

Skrobot, Garrett Lee↗

Employing Technology to Enable Remote Research Charrettes as a Method for Engaging Industry and Uncovering Best Practices: A Novel Approach for a Post-COVID-19 World

Methods to collect data in construction engineering and management (CEM) research are evolving, informed by recent technological advancements. One such method is research charrettes that allow effective interactions and knowledge sharing between expert industry practitioners and academic researchers, all colocated in a single venue, enabling rich data collection and live communication. A pivot point in technological evolution occurred with the COVID-19 pandemic, forcing a global shift to remote work. Hence, planned in-person research charrettes had to shift to remote sessions, relying on virtual conferencing platforms and online data collection mechanisms. Technology-enabled charrettes have allowed the authors to collect significantly richer data sets and ensure a more diverse representation of participants, while saving tremendous amounts of time. With the continuing emergence of technological applications, the world might not go back to functioning fully in person. The authors believe remote research charrettes (RRCs) will still be used in a post-COVID-19 world because of their superior performance. This paper builds on a previous publication that described traditional research charrettes as a method to enhance CEM research a decade ago; it offers a significantly updated and improved RRC method based on the knowledge gained from transitioning a dozen in-person charrettes into RRCs. It also presents performance comparisons between RRCs and traditional charrettes by quantifying metrics indicating how RRCs are more time-efficient and cost-saving, harness more participants from more diverse locations, and enable the collection of richer data sets and four times more industry comments and expert feedback. This paper also provides guidance on the integration of technology with traditional research charrettes, hence contributing to the CEM body of knowledge.

42 ENGINEERING↗

Manual control models of industrial management

The industrial engineer is often required to design and implement control systems and organization for manufacturing and service facilities, to optimize quality, delivery, and yield, and minimize cost. Despite progress in computer science most such systems still employ human operators and managers as real-time control elements. Manual control theory should therefore be applicable to at least some aspects of industrial system design and operations. Formulation of adequate model structures is an essential prerequisite to progress in this area; since real-world production systems invariably include multilevel and multiloop control, and are implemented by timeshared human effort. A modular structure incorporating certain new types of functional element, has been developed. This forms the basis for analysis of an industrial process operation. In this case it appears that managerial controllers operate in a discrete predictive mode based on fast time modelling, with sampling interval related to plant dynamics. Successive aggregation causes reduced response bandwidth and hence increased sampling interval as a function of level.

Crossman, E. R. F. W.↗

Long‐Range Confinement‐Driven Enrichment of Surface Oxygen‐Relevant Species Promotes C−C Electrocoupling in CO 2 Reduction

Abstract CO 2 reduction is a highly attractive route to transform CO 2 into useful feedstocks, of which C 2 products are more desired than C 1 , yet face high kinetic barriers of C−C electrocoupling. Here, the engineering of pore‐enabled local confinement reaction environments is reported for tuning the enrichment of surface‐adsorbed oxygen‐relevant species and the establishment of their pronounced benefits in promoting C−C coupling over oxide‐derived Cu‐based catalysts. A new approach of utilizing the microphase separation of a block copolymer is developed to fabricate bicontinuous mesoporous CuO nanofibers (CuO‐BPNF). The enhanced confinement from long‐range mesochannels enables the adsorption of OH ad /O ad on the Cu surface at a wide negative potential range of −0.7 – −1.3 V in CO 2 reduction, which cannot be achieved over conventional deficient and short‐range pores. Constant‐potential DFT calculations reveal that the surface‐bound oxygen species weakens *CO affinity with the Cu (111) surface and lowers the kinetic barriers for both *CO−CO dimerization and *CO hydrogenation to enable *CO−CHO coupling. Accordingly, a CO 2 ‐to‐C 2 Faradaic efficiency of 74.7% over CuO‐BPNF is shown, significantly larger than counterparts with conventional pores. This work offers a general design principle of confinement engineering to manage the adsorption of reactive species for steering reaction pathways in interfacial catalysis.

Chemistry↗