Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Discovery Mission”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 397 records · Page 22

Constraining the Venus Interior Structure With Future VERITAS Measurements of the Gravitational Atmospheric Loading

The complex dynamics of the Venus atmosphere produces a periodic mass redistribution pattern that creates a time-variable modulation of the gravity field of Venus. This gravity signal depends on the net transport of mass across the globe and on the response of the solid body to the normal loading of its crust imparted by the atmosphere. In this work, we explore the possibility of measuring this phenomenon with VERITAS, a NASA Discovery-class mission. By simulating the gravity science experiment, we explore the possibility of measuring the response of Venus to the atmospheric loading, parametrized by the loading Love numbers ( 𝑘 𝑙 ' ), and assess the dependence of these parameters on fundamental interior structure properties. Using the most recent models of Venus' interior, we compute the Venus Love numbers in a compressible viscoelastic setting and compare them with the predicted uncertainty of the VERITAS measurements. We show that VERITAS will measure 𝑘 2 ' at the 4% level and that this measurement could possibly help to distinguish between different equally plausible interior structure models, especially allowing us to distinguish different rheological laws. We also show that a measurement campaign such as the VERITAS gravity science investigation has the potential of measuring 𝑘 2 ' not only at the loading forcing frequency, but also at the tidal frequency, ultimately providing a way to probe the response of the planet at different forcing periods.

Atmospheric tides↗

Venus Atmosphere Experimental Simulation Performance of the Glenn Extreme Environment Rig

The rejuvenated exploration of Venus remains a high priority within NASA, as evidenced by the selection of two Discovery class missions (DAVINCI and VERITAS) to be launched within the decade, and the support of the European Space Agency’s EnVision mission. All three missions represent a transformative advancement in the understanding of Earth’s enigmatic neighbor. In order to maximize the science return from these missions, and to facilitate the infusion of new technologies into potential future missions, NASA’s Glenn Research Center operates a unique facility, the Glenn Extreme Environment Rig (GEER), to simulate ambient conditions at Venus’ surface for long durations.

GEER↗

Lucy Orbit Determination Performance From Launch Through EGA-1

Lucy is a 12-year long NASA Discovery-class mission which launched on October 16, 2021 and is currently on its way to the Jupiter-Trojan asteroids at the L4 and L5 Lagrange points. On its journey to the Trojan asteroids, Lucy will also fly by two main belt asteroids, and perform 3 Earth fly bys. This paper summarizes primarily the Orbit Determination (OD) aspect of the first year of the mission from launch through the first Earth fly by (EGA-1). Some challenges were encountered for OD as part of the +Y solar array not fully deploying, but these were resolved within the first year of flight. The high quality radio-metric data from the Deep Space Network including 2- and 3-way Doppler, sequential 2-way ranging, complemented by delta differential one-way ranging (∆DOR) has enabled the OD team to characterize the Solar Radiation Pressure force, resolve desaturation maneuvers, generate both maneuver reconstructions and accurate long-term predicted trajectories. This paper discusses the filter setup and strategies implemented, as well as the OD performance from launch, through cruise, and including EGA-1.

Jeroen L. Geeraert↗

Venus Atmosphere Experimental Simulation Performance of the Glenn Extreme Environment Rig

The rejuvenated exploration of Venus remains a high priority within NASA, as evidenced by the selection of two Discovery class missions (DAVINCI and VERITAS) to be launched within the decade, and the support of the European Space Agency’s EnVision mission. All three missions represent a transformative advancement in the understanding of Earth’s enigmatic neighbor. In order to maximize the science return from these missions, and to facilitate the infusion of new technologies into potential future missions, NASA’s Glenn Research Center operates a unique facility, the Glenn Extreme Environment Rig (GEER), to simulate ambient conditions at Venus’ surface for long durations.

GEER↗

Characterizing and testing a thermally isolating superconducting link for SAFIRE-like missions

The recent discovery of high temperature ceramic superconductors with transition temperatures above 90 K has opened the possibilities for new space applications. One application is the fabrication of an electrically conducting and thermally isolating electronic link to connect IR detectors to data acquisition electronics on remote sensing platforms. The Spectroscopy of the Atmosphere using Far Infra-Red Emission (SAFIRE) mission is an example of a platform which employs hybrid dewars and combines both mechanical and cryogenic liquid cooling. This new technology is limited by the heat conducted through sensor array leads that connect the electronics (at approximately 80 K) to the sensors (at approximately 4 K). This link must be made of material that has high electrical conductivity and high thermal resistance. The YBa2Cu3O(x) superconductor with a transition temperature, T(sub c), of 93 K can achieve these conflicting requirements. A link with these characteristics will improve the thermal isolation of IR detectors and will increase the lifetime of the cryogen. A reduction of the thermal load due to the link by a factor of four will increase the lifetime of a seven year mission by about one year.

Selim, Raouf L.↗

Aerocapture Performance Analysis of A Venus Exploration Mission

A performance analysis of a Discovery Class Venus Exploration Mission in which aerocapture is used to capture a spacecraft into a 300km polar orbit for a two year science mission has been conducted to quantify its performance. A preliminary performance assessment determined that a high heritage 70 sphere-cone rigid aeroshell with a 0.25 lift to drag ratio has adequate control authority to provide an entry flight path angle corridor large enough for the mission s aerocapture maneuver. A 114 kilograms per square meter ballistic coefficient reference vehicle was developed from the science requirements and the preliminary assessment s heating indicators and deceleration loads. Performance analyses were conducted for the reference vehicle and for sensitivity studies on vehicle ballistic coefficient and maximum bank rate. The performance analyses used a high fidelity flight simulation within a Monte Carlo executive to define the aerocapture heating environment and deceleration loads and to determine mission success statistics. The simulation utilized the Program to Optimize Simulated Trajectories (POST) that was modified to include Venus specific atmospheric and planet models, aerodynamic characteristics, and interplanetary trajectory models. In addition to Venus specific models, an autonomous guidance system, HYPAS, and a pseudo flight controller were incorporated in the simulation. The Monte Carlo analyses incorporated a reference set of approach trajectory delivery errors, aerodynamic uncertainties, and atmospheric density variations. The reference performance analysis determined the reference vehicle achieves 100% successful capture and has a 99.87% probability of attaining the science orbit with a 90 meters per second delta V budget for post aerocapture orbital adjustments. A ballistic coefficient trade study conducted with reference uncertainties determined that the 0.25 L/D vehicle can achieve 100% successful capture with a ballistic coefficient of 228 kilograms per square meter and that the increased ballistic coefficient increases post aerocapture V budget to 134 meters per second for a 99.87% probability of attaining the science orbit. A trade study on vehicle bank rate determined that the 0.25 L/D vehicle can achieve 100% successful capture when the maximum bank rate is decreased from 30 deg/s to 20 deg/s. The decreased bank rate increases post aerocapture delta V budget to 102 meters per second for a 99.87% probability of attaining the science orbit.

Starr, Brett R.↗

Throttling Impacts on Hall Thruster Performance, Erosion, and Qualification for NASA Science Missions

With the SMART-1, Department of Defense, and commercial industry successes in Hall thruster technologies, NASA has started considering Hall thrusters for science missions. The recent Discovery proposals included a Hall thruster science mission and the In-Space Propulsion Project is investing in Hall thruster technologies. As the confidence in Hall thrusters improve, ambitious multi-thruster missions are being considered. Science missions often require large throttling ranges due to the 1/r(sup 2) power drop-off from the sun. Deep throttling of Hall thrusters will impact the overall system performance. Also, Hall thrusters can be throttled with both current and voltage, impacting erosion rates and performance. Last, electric propulsion thruster lifetime qualification has previously been conducted with long duration full power tests. Full power tests may not be appropriate for NASA science missions, and a combination of lifetime testing at various power levels with sufficient analysis is recommended. Analyses of various science missions and throttling schemes using the Aerojet BPT-4000 and NASA 103M HiVHAC thruster are presented.

Dankanich, John W.↗

Psyche Early Project Verification & Validation Planning Development

The Psyche mission to the asteroid (16) Psyche was selected as the fourteenth mission in the Discovery program in January 2017. The Psyche mission will determine if (16) Psyche is the core of a larger differentiated body. As part of the development of this mission a Verification and Validation (V&V) engineer was assigned early in the project’s design Phase B. This paper will discuss some of the strategies that the Psyche team is using to take full advantage of the early planning for V&V on flight projects and specifically how the Psyche mission is approaching these tasks. This paper will discuss the effects of having a V&V mindset on: 1) The Psyche requirements development process, and how focusing not only on how the team will verify these requirements but also on developing the tools necessary to track and monitor that verification feeds back into the requirement development process. 2) The Psyche testbed development, and how using a verification mindset is useful for identifying holes in the testbed development process, including the required testbed speed and how to think about testbed certification early in the process while encouraging trades and developing relationships with the testbed team. 3) Developing new V&V Tools for Psyche, and how developing tools early in the project development process means that they can influence the development of other requirement and scheduling tools. 4) Verification Activity Planning, which is typically done to a preliminary level during Phase B of the project, and is important for understanding the major testing that is needed to ensure that the system as built represents the design. On Psyche we are not only focused on bringing this planning to a preliminary level, we are also developing a V&V focused schedule to help us de-conflict V&V activities that may require similar resources early on in the program’s development. 5) Validation Planning, for which we are working with the testbed and model development teams to ensure that their models can be effectively validated and that the plans to do so are in place. In this paper we will describe how the Psyche mission is approaching each of these V&V areas and identify lessons that can be taken by other space missions trying to decide how much effort should be put into V&V early in the project lifecycle.

Solish, Benjamin↗

(abstract) A Low-Cost Mission to 2060 Chiron Based on the Pluto Fast Flyby

The Pluto Fast Flyby-based mission to Chiron described in this paper is a low cost, scientifically rewarding, focused mission in the outer solar system. The proposed mission will make a flyby of 2060 Chiron, an active 'comet' with over 10(sup 4) times the mass of Halley, and an eccentric, Saturn-crossing orbit which ranges from 8.5 to 19 AU. This mission concept achieves the flyby 4.2 years after launch on a direct trajectory from Earth, is independent of Jupiter launch windows, and fits within Discovery cost guidelines. This mission offers the scientific opportunity to examine a class of object left unsampled by the trail-blazing Mariners, Pioneers, Voyagers, and missions to Halley. Spacecraft reconnaissance of Chiron addresses unique objectives relating to cometary science, other small bodies, the structure of quasi-bound atmospheres on modest-sized bodies, and the origin of primitive bodies and the giant planets. Owing to Chiron's large size (180<D<370 km), unique nature, and unusual orbit, this mission is likely to draw significant public interest. As described by COMPLEX, the SSEC, and later the SSES, flybys are the appropriate scale missions for initial reconnaissance missions. Carrying three sophisticated instruments, the proposed flyby will return critical data about Chiron's size, shape, polar obliquity, atmosphere, surface morphology, surface composition, internal structure, surface activity (including the nature of Chiron's outbursts), and origin. Engineering analysis indicates that the spacecraft is capable of navigating to and encountering Chiron at close approach distances of less than 5 000 km, well inside the 50 000 to 150 000 km coma, and perhaps within the collisional chemistry zone of the coma. The low cost of the proposed Chiron mission is based on the opportunity to use the planned Pluto Flyby spare spacecraft and a Proton Expendable Launch Vehicle (ELV) (the pluto spacecraft is being designed to be compatible with a Proton launch). Backup launch opportunities on Delta II and Atlas ELVs are available. The Pluto Fast Flyby mission plans to develop a low cost ($150M), lightweight (<150 kg) outer planet spacecraft which is well suited to flyby reconnaissance in the outer solar system. This Chiron flyby mission is designed to leverage SSED's Pluto spacecraft investment into a scientifically valuable successor mission within the Discovery cost cap. Taking advantage of the spare spacecraft, we estimate the Discovery Chiron intercept mission can be launched for less than $100 M. We believe this makes a highly attractive proposal, which maintains US presence and leadership in the study of the outer solar system, and enables the first-time exploration of a wholly new class of planetary target, an outer solar system planetesimal.

2060 Chiron planetesimal flyby Pluto Fast Flyby sp↗

Systems Engineering Using Heritage Spacecraft Technology: Lessons Learned from Discovery and New Frontiers Deep Space Missions

In the design and development of complex spacecraft missions, project teams frequently assume the use of advanced technology or heritage systems to enable a mission or reduce the overall mission risk and cost. As projects proceed through the development life cycle, increasingly detailed knowledge of the advanced or heritage systems and the system environment identifies unanticipated issues that result in cost overruns or schedule impacts. The Discovery & New Frontiers (D&NF) Program Office recently studied cost overruns and schedule delays resulting from advanced technology or heritage assumptions for 6 D&NF missions. The goal was to identify the underlying causes for the overruns and delays, and to develop practical mitigations to assist the D&NF projects in identifying potential risks and controlling the associated impacts to proposed mission costs and schedules. The study found that the cost and schedule growth did not result from technical hurdles requiring significant technology development. Instead, systems engineering processes did not identify critical issues early enough in the design cycle to ensure project schedules and estimated costs address the inherent risks. In general, the overruns were traceable to: inadequate understanding of the heritage system s behavior within the proposed spacecraft design and mission environment; an insufficient level of experience with the heritage system; or an inadequate scoping of the system-wide impacts necessary to implement the heritage or advanced technology. This presentation summarizes the study s findings and offers suggestions for improving the project s ability to identify and manage the risks inherent in the technology and heritage design solution.

Barley, Bryan↗

NASA Discovery Program Workshop

The purpose of the workshop was to review concepts for Discover-class missions that would follow the first two missions (MESUR-Pathfinder and NEAR) of this new program. The concepts had been generated by scientists involved in NASA's Solar System Exploration Program to carry out scientifically important investigations within strict guidelines -- $150 million cap on development cost and 3 year cap on development schedule. Like the Astrophysics Small Explorers (SMEX), such 'faster and cheaper' missions could provide vitality to solar system exploration research by returning high quality data more frequently and regularly and by involving many more young researchers than normally participate directly in larger missions. An announcement of opportunity (AO) to propose a Discovery mission to NASA is expected to be released in about two years time. One purpose of the workshop was to assist Code SL in deciding how to allocate its advanced programs resources. A second, complimentary purpose was to provide the concept proposers with feedback to allow them to better prepare for the AO.

Source record↗

Mission Advantages of NEXT: Nasa's Evolutionary Xenon Thruster

With the demonstration of the NSTAR propulsion system on the Deep Space One mission, the range of the Discovery class of NASA missions can now be expanded. NSTAR lacks, however, sufficient performance for many of the more challenging Office of Space Science (OSS) missions. Recent studies have shown that NASA's Evolutionary Xenon Thruster (NEXT) ion propulsion system is the best choice for many exciting potential OSS missions including outer planet exploration and inner solar system sample returns. The NEXT system provides the higher power, higher specific impulse, and higher throughput required by these science missions.

Oleson, Steven↗

Technical Track on Biomass Carbon Removal and Storage (BiCRS): Mapping bioresources, phase 1 - Consistency check comparing Mission Innovation’s Data Visualization Tool for Bioresources and the Clean Energy Ministerial Biofuture Initiative Global Biomass data accessible via the US Department of Energy’s Bioenergy Knowledge Discovery Framework (KDF)

The Mission Innovation (MI) Carbon Dioxide Removal (CDR) Mission, Technical Track on Biomass Carbon Dioxide Removal and Storage (BiCRS), has produced a biomass resource database for its members. In parallel, Oak Ridge National Laboratory (ORNL) developed the International Feedstock Reporting data portal—herein referred to as the CEM Biofuture-KDF data—on behalf of the Clean Energy Ministerial Biofuture Initiative (CEM Biofuture), as a specific task under Biofuture’s 2024–25 Action Plan. This work was conducted at the request of CEM Biofuture and funded by the U.S. Department of Energy in support of that initiative, and it is hosted within DOE’s Knowledge Discovery Framework (KDF).

09 BIOMASS FUELS↗

Performance Evaluation of an Expanded Range XIPS Ion Thruster System for NASA Science Missions

This paper examines the benefit that a solar electric propulsion (SEP) system based on the 5 kW Xenon Ion Propulsion System (XIPS) could have for NASA's Discovery class deep space missions. The relative cost and performance of the commercial heritage XIPS system is compared to NSTAR ion thruster based systems on three Discovery class reference missions: 1) a Near Earth Asteroid Sample Return, 2) a Comet Rendezvous and 3) a Main Belt Asteroid Rendezvous. It is found that systems utilizing a single operating XIPS thruster provides significant performance advantages over a single operating NSTAR thruster. In fact, XIPS performs as well as systems utilizing two operating NSTAR thrusters, and still costs less than the NSTAR system with a single operating thruster. This makes XIPS based SEP a competitive and attractive candidate for Discovery class science missions.

ion thrusters↗

The Beginning of the Universe

I will review our current understanding of the early universe, including recent discoveries from NASA missions. I will also plot a course f or future discovery.

Chuss, David↗

Venus Multiprobe Mission

A summary of the proposal for the Discovery Program Venus Multiprobe Mission (VMPM) which was submitted in 1994 will be presented. The major goal of the mission was to provide sufficient observations of winds and thermal structure in the Venus atmosphere that the mechanism producing the atmospheric superrotation could be identified. The superrotation has been a major unsolved problem of planetary science for over 30 years. In spite of many theoretical efforts and many spacecraft missions to Venus, the principal driving mechanism(s) remain undetermined. Sixteen small probes, modeled after the Pioneer Venus small probes, would enter the Venus atmosphere, and measure winds, temperatures, and pressures from 60 km to the surface. Towards the bottom of the atmosphere, measurements would be made at 10 meter intervals. Temperature and pressure measurements are similar to those used on Pioneer Venus, but are four times more sensitive. Winds would be obtained by dual-frequency, differential. long-baseline interferometry, using S- and X-band transmitters on the probes, and four receiving telescopes round the Pacific rim. The precision of wind measurements is 0.05 ms- 1 or better, at least twenty times more precise than for Pioneer Venus. Ground based observations occurring in conjunction with the multiprobe entries would provide a temporal context for the upper boundary to the probe observations. UV and near IR features would be tracked for periods of hours to weeks to obtain cloud level zonal mean and transient eddy circulations with accuracies of 10 /ms or better. The data would be processed into wind and opacity maps. A hierarchy of atmospheric numerical models would be used to distinguish different dynamical elements existing in the data. Primary among the models was the development of a Venus general circulation model containing all known physical processes.

Young, Richard E.↗

Cometary Coma Chemical Composition (C4) Mission

Cometary exploration remains of great importance to virtually all of space science. Because comets are presumed to be remnants of the early solar nebula, they are expected to provide fundamental knowledge as to the origin and development of the solar system as well as to be key to understanding of the source of volatiles and even life itself in the inner solar system. Clearly the time for a detailed study of the composition of these apparent messages from the past has come. A comet rendezvous mission, the Cometary Coma Chemical Composition (C4) Mission, is now being studied as a candidate for the new Discovery program. This mission is a highly-focussed and usefully-limited subset of the Cometary Rendezvous Asteroid Flyby (CRAF) Mission. The C4 mission will concentrate on measurements that will produce an understanding of the composition and physical makeup of a cometary nucleus. The core science goals of the C4 mission are 1) to determine the chemical, elemental, and isotopic composition of a cometary nucleus and 2) to characterize the chemical and isotopic nature of its atmosphere. A related goal is to obtain temporal information about the development of the cometary coma as a function of time and orbital position. The four short-period comets -- Tempel 1, Tempel 2, Churyumov-Gerasimenko, and Wirtanen -which all appear to have acceptable dust production rates, were identified as candidate targets. Mission opportunities have been identified beginning as early as 1998. Tempel I with a launch in 1999, however, remains the baseline comet for studies of and planning the C4 mission. The C4 mission incorporates two science instruments and two engineering instruments in the payload to obtain the desired measurements. The science instruments include an advanced version of the Cometary Ice and Dust Experiment (CIDEX), a mini-CIDEX with a sample collection system, an X-ray Fluorescence Spectrometer and a Pyrolysis-Gas Chromatograph, and a simplified version of the Neutral Gas and Ion Mass Spectrometer (NIGMS). Both of these instruments have substantial heritage as they are based on those developed for the CRAF Mission. The engineering instruments include a simplified Comet Dust Environmental Monitor (SCODEM) and a navigational Camera, NAVCAM. While neither of the instruments will be permitted to establish science requirements, it is anticipated that significant science return will be accomplished Radio science will also be included.

Carle, Glenn C.↗

TOI-503: The First Known Brown-dwarf Am-star Binary from the TESS Mission

We report the discovery of an intermediate-mass transiting brown dwarf (BD), TOI-503b, from the TESS mission. TOI-503b is the first BD discovered by TESS, and it has circular orbit around a metallic-line A-type star with a period of P = 3.6772 ± 0.0001 days. The light curve from TESS indicates that TOI-503b transits its host star in a grazing manner, which limits the precision with which we measure the BD’s radius (R{sub b}=1.34{sub −0.15}{sup +0.26}R{sub J}). We obtained high-resolution spectroscopic observations with the FIES, Ondřejov, PARAS, Tautenburg, and TRES spectrographs, and measured the mass of TOI-503b to be M {sub b} = 53.7 ± 1.2 M{sub J}. The host star has a mass of M {sub ⋆} = 1.80 ± 0.06 M {sub ⊙}, a radius of R {sub ⋆} = 1.70 ± 0.05R {sub ⊙}, an effective temperature of T {sub eff} = 7650 ± 160 K, and a relatively high metallicity of 0.61 ± 0.07 dex. We used stellar isochrones to derive the age of the system to be ∼180 Myr, which places its age between that of RIK 72b (a ∼10 Myr old BD in the Upper Scorpius stellar association) and AD 3116b (a ∼600 Myr old BD in the Praesepe cluster). Given the difficulty in measuring the tidal interactions between BDs and their host stars, we cannot precisely say whether this BD formed in situ or has had its orbit circularized by its host star over the relatively short age of the system. Instead, we offer an examination of plausible values for the tidal quality factor for the star and BD. TOI-503b joins a growing number of known short-period, intermediate-mass BDs orbiting main-sequence stars, and is the second such BD known to transit an A star, after HATS-70b. With the growth in the population in this regime, the driest region in the BD desert (35--55M{sub J}sin i) is reforesting.

79 ASTRONOMY AND ASTROPHYSICS↗