Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “DEMONSTRATION”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 397 records · Page 22

Strategy for Fuel Rod Receipt, Characterization, Sample Allocation for the Demonstration Sister Rods

The U.S. Department of Energy Office of Nuclear Energy (DOE-NE), Office of Fuel Cycle Technology, has established the Used Fuel Disposition Campaign (UFDC) to conduct the research and development activities related to storage, transportation, and disposal of used nuclear fuel and high-level radioactive waste. The mission of the UFDC is to identify alternatives and conduct scientific research and technology development to enable storage, transportation and disposal of used nuclear fuel (UNF) and wastes generated by existing and future nuclear fuel cycles. The UFDC Storage and Transportation staffs are responsible for addressing issues regarding the extended or long-term storage of UNF and its subsequent transportation. The near-term objectives of the Storage and Transportation task are to use a science-based approach to develop the technical bases to support the continued safe and secure storage of UNF for extended periods, subsequent retrieval, and transportation. While low burnup fuel [that characterized as having a burnup of less than 45 gigawatt days per metric tonne uranium (GWD/MTU)] has been stored for nearly three decades, the storage of high burnup used fuels is more recent. The DOE has funded a demonstration project to confirm the behavior of used high burnup fuel under prototypic conditions. The Electric Power Research Institute (EPRI) is leading a project team to develop and implement the Test Plan to collect this data from a UNF dry storage system containing high burnup fuel. The Draft Test Plan for the demonstration outlines the data to be collected; the high burnup fuel to be included; the technical data gaps the data will address; and the storage system design, procedures, and licensing necessary to implement the Test Plan. To provide data that is most relevant to high burnup fuel in dry storage, the design of the test storage system must closely mimic real conditions high burnup SNF experiences during all stages of dry storage: loading, cask drying, inert gas backfilling, and transfer to an Independent Spent Fuel Storage Installation (ISFSI) for multi-year storage. To document the initial condition of the used fuel prior to emplacement in a storage system, “sister ” fuel rods will be harvested and sent to a national laboratory for characterization and archival purposes. This report supports the demonstration by describing how sister rods will be shipped and received at a national laboratory, and recommending basic nondestructive and destructive analyses to assure the fuel rods are adequately characterized for UFDC work. For this report, a hub-and-spoke model is proposed, with one location serving as the hub for fuel rod receipt and characterization. In this model, fuel and/or clad would be sent to other locations when capabilities at the hub were inadequate or nonexistent. This model has been proposed to reduce DOE-NE’s obligation for waste cleanup and decontamination of equipment.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Laser Ceilometer CL51 Demonstration Field Campaign Report

Improvements in the measurements of clouds and the ability to support observation systems are critically important to advancing our understanding and improving global climate model performance. The purpose of a demonstration of the Vaisala CL51 ceilometer was to evaluate its high-range capabilities as a possible augmentation to data provided by the CL31 ceilometer that currently is deployed at U.S. Department of Energy (DOE) Atmospheric Radiation Measurement (ARM) Climate Research Facility sites. Vaisala performed a no-cost demonstration of the equipment; Pacific Northwest National Laboratory (PNNL) supported the data analysis; and ARM provided logistical support, power, maintenance, etc. The laser ceilometer provided measurements of cloud-base height, vertical visibility, and backscatter profile at a vertical range of 15 km. The ceilometer demonstration was conducted during the Characterization of Cirrus and Aerosol Properties campaign (CCAP) to provide coincident observations of cirrus cloud heights and potential backscatter signals by aerosols. This campaign included deployment of a CL51 ceilometer at the ARM Facility’s Southern Great Plains (SGP) site, co-located with the current CL31, micropulse lidar, and balloon-borne sounding system. Data collected from these sensors were analyzed to compare and contrast the data from the CL51 ceilometer.

54 ENVIRONMENTAL SCIENCES↗

Demonstration of a prototype hydrogen sensor and electronics package

This is a progress report for the demonstration of a prototype hydrogen sensor and electronics package. There are five tasks associated with this, and four have been completed as of August 2016: Station Demonstration and Site Recommendation, Order Sensor Equipment, Build Sensors, and Install Sensors. The final task to be completed is Sensor Demonstration and Data Analysis, and expected completion date is January 26, 2017. This progress report details each of the tasks and goes into detail about what is currently being worked on, along with the budget and planned work for July 27, 2016 to January 26, 2017.

36 MATERIALS SCIENCE↗

Actual Waste Demonstration of the Nitric-Glycolic Flowsheet for Sludge Batch 9 Qualification

For each sludge batch that is processed in the Defense Waste Processing Facility (DWPF), the Savannah River National Laboratory (SRNL) performs qualification testing to demonstrate that the sludge batch is processable. Testing performed by the Savannah River National Laboratory has shown glycolic acid to be effective in replacing the function of formic acid in the DWPF chemical process. The nitric-glycolic flowsheet reduces mercury, significantly lowers the catalytic generation of hydrogen and ammonia which could allow purge reduction in the Sludge Receipt and Adjustment Tank (SRAT), stabilizes the pH and chemistry in the SRAT and the Slurry Mix Evaporator (SME), allows for effective rheology adjustment, and is favorable with respect to melter flammability. In order to implement the new flowsheet, SRAT and SME cycles, designated SC-18, were performed using a Sludge Batch (SB) 9 slurry blended from SB8 Tank 40H and Tank 51H samples. The SRAT cycle involved adding nitric and glycolic acids to the sludge, refluxing to steam strip mercury, and dewatering to a targeted solids concentration. Data collected during the SRAT cycle included offgas analyses, process temperatures, heat transfer, and pH measurements. The SME cycle demonstrated the addition of glass frit and the replication of six canister decontamination additions. The demonstration concluded with dewatering to a targeted solids concentration. Data collected during the SME cycle included offgas analyses, process temperatures, heat transfer, and pH measurements. Slurry and condensate samples were collected for subsequent analysis

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Sludge Washing and Demonstration of the DWPF Nitric/Formic Flowsheet in the SRNL Shielded Cells for Sludge Batch 9 Qualification

Savannah River National Laboratory (SRNL) was requested by Savannah River Remediation (SRR) to qualify the next batch of sludge – Sludge Batch 9 (SB9). Current practice is to prepare sludge batches in Tank 51 by transferring sludge to Tank 51 from other tanks. The sludge is washed and transferred to Tank 40, the current Defense Waste Process Facility (DWPF) feed tank. Prior to sludge transfer from Tank 51 to Tank 40, the Tank 51 sludge must be qualified. SRNL qualifies the sludge in multiple steps. First, a Tank 51 sample is received, then characterized, washed, and again characterized. SRNL then demonstrates the DWPF Chemical Process Cell (CPC) flowsheet with the sludge. The final step of qualification involves chemical durability measurements of glass fabricated in the DWPF CPC demonstrations. In past sludge batches, SRNL had completed the DWPF demonstration with Tank 51 sludge. For SB9, SRNL has been requested to process a blend of Tank 51 and Tank 40 at a targeted ratio of 44% Tank 51 and 56% Tank 40 on an insoluble solids basis.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

LIQUIDARMOR CM Flashing and Sealant, High Impact Technology Demonstration

Air leakage is responsible for about 1.1 quads of energy or 6% of the total energy used by commercial buildings in the US. Consequently, infiltration and exfiltration are among the largest envelope-related contributors to the heating, ventilation, and air conditioning loads in commercial buildings. New air sealing technologies have recently emerged that aim to improve the performance of air barrier systems by simplifying their installation procedure. LIQUIDARMORTM CM Flashing and Sealant is an example of these new advanced material technologies. This technology is a spray-applied sealant and liquid flashing and can span gaps that are up to ¼ in. wide without a supporting material. ORNL verified the performance of LIQUIDARMORTM CM with field tests and energy simulations from a building in which LIQUIDARMORTM CM was one of components of the air barrier system. The Homeland Security Training Center (HTC) at the College of DuPage in Glen Ellyn, IL, served as the demonstration site. Blower door test results show the average air leakage rate in the demonstration site to be 0.15 cfm/ft2 at 1.57 psf, or 63% lower than the 0.4 cfm at 1.57 psf specified in the 2015 International Energy Conservation Code (IECC). According to simulation results, HTC lowered its annual heating and cooling cost by about $3,000 or 9% compared to a similar building that lacked an air barrier system. This demonstration project serves as an example of the level of building envelope airtightness that can be achieved by using air barrier materials that are properly installed, and illustrates the energy and financial savings that such an airtight envelope could attain.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Slipstream pilot-scale demonstration of a novel amine-based post-combustion technology for carbon dioxide capture from coal-fired power plant flue gas

Post-combustion CO 2 capture (PCC) technology offers flexibility to treat the flue gas from both existing and new coal-fired power plants and can be applied to treat all or a portion of the flue gas. Solvent-based technologies are today the leading option for PCC from commercial coal-fired power plants as they have been applied in large-scale in other applications. Linde and BASF have been working together to develop and further improve a PCC process incorporating BASF’s novel aqueous amine-based solvent technology. This technology offers significant benefits compared to other solvent-based processes as it aims to reduce the regeneration energy requirements using novel solvents that are very stable under the coal-fired power plant feed gas conditions. BASF has developed the desired solvent based on the evaluation of a large number of candidates. In addition, long-term small pilot-scale testing of the BASF solvent has been performed on a lignite-fired flue gas. In coordination with BASF, Linde has evaluated a number of options for capital cost reduction in large engineered systems for solvent-based PCC technology. This report provides a summary of the work performed and results from a project supported by the US DOE (DE-FE0007453) for the pilot-scale demonstration of a Linde-BASF PCC technology using coal-fired power plant flue gas at a 1-1.5 MWe scale in Wilsonville, AL at the National Carbon Capture Center (NCCC). Following a project kick-off meeting in November 2011 and the conclusion of pilot plant design and engineering in February 2013, mechanical completion of the pilot plant was achieved in July 2014, and final commissioning activities were completed to enable start-up of operations in January 2015. Parametric tests were performed from January to December 2015 to determine optimal test conditions and evaluate process performance over a variety of operation parameters. A long-duration 1500-hour continuous test campaign was performed from May to August 2016 at a selected process condition to evaluate process performance and solvent stability over a longer period similar to how the process would operate as a continuously running large-scale PCC plant. The pilot plant integrated a number of unique features of the Linde-BASF technology aimed at lowering overall energy consumption and capital costs. During the overall test period including startup, parametric testing and long-duration testing, the pilot plant was operated for a total of 6,764 hours out of which testing with flue gas was performed for 4,109 hours. The pilot plant testing demonstrated all of the performance targets including CO 2 capture rate exceeding 90%, CO 2 purity exceeding 99.9 mol% (dry), flue gas processing capacity up to 15,500 lbs/hr (equivalent to 1.5 MWe capacity slipstream), regeneration energy as low as 2.7 GJ/tonne CO 2 , and regenerator operating pressure up to 3.4 bara. Excellent solvent stability performance data was measured and verified by Linde and BASF during both test campaigns. In addition to process data, significant operational learnings were gained from pilot tests that will contribute greatly to the commercial success of PCC. Based on a thorough techno-economic assessment (TEA) of the Linde-BASF PCC process integrated with a 550 MWe supercritical coal-fired power plant, the net efficiency of the integrated power plant with CO 2 capture is increased from 28.4% with the DOE/NETL Case 12 reference to 30.9% with the Linde-BASF PCC plant previously presented utilizing the BASF OASE® blue solvent [Ref. 4], and is further increased to 31.4% using a Linde-BASF PCC plant with BASF OASE® blue solvent and an advanced stripper interstage heater (SIH) configuration. The Linde-BASF PCC plant incorporating the BASF OASE® blue solvent also results in significantly lower overall capital costs, thereby reducing the cost of electricity (COE) and cost of CO 2 captured from $147.25/MWh and $56.49/MT CO 2 , respectively, for the reference DOE/NETL Case 12 plant, to $128.49/MWh and $41.85/MT CO2 for process case LB1, respectively, and $126.65/MWh and $40.66/MT CO 2 for process case SIH, respectively. With additional innovative Linde-BASF PCC process configuration improvements, the COE and cost of CO 2 captured can be further reduced to $125.51/MWh and $39.90/MT CO 2 for a further optimized PCC process defined as LB1-CREB. Most notably, the Linde-BASF process options assessed have already demonstrated the potential to lower the cost of CO 2 captured below the DOE target of $40/MT CO 2 at the 550 MWe scale for second generation PCC technologies. Project organization, structure, goals, tasks, accomplishments, process criteria and milestones will be presented in this report along with highlights and key results from parametric and long-duration testing of the Linde-BASF PCC pilot. The parametric and long-duration testing campaigns were aimed at validating the performance of the PCC technology against targets determined from a preliminary techno-economic assessment. The stability of the solvent with extended operation in a realistic power plant setting was measured with performance verified. Additionally, general solvent classification information, process operating conditions, normalized solvent performance data, solvent stability test results, flue gas conditions data, CO 2 purity data in the gaseous product stream, steam requirements and process flow diagrams, and updated process economic data for a scaled-up 550 MWe supercritical power plant with CO 2 capture are presented and discussed in this report.

20 FOSSIL-FUELED POWER PLANTS↗

Moderator Demonstration Facility Design and Optimization

The Spallation Neutron Source (SNS) facility at Oak Ridge National Laboratory (ORNL) is implementing a Moderator Demonstration Facility (MDF) to demonstrate the performance characteristics of advanced moderators central to the Second Target Station (STS) for SNS. The MDF will use the "spare" front-end installation within the SNS accelerator support complex – an ion source, radio-frequency quadrupole (RFQ) accelerator, and medium-energy beam transport (MEBT) chopper - to provide a 2.5 MeV proton beam of peak current 50 mA and maximum pulse length of less than 10 s at a repetition rate of no more than 60 Hz to a suitable neutron-producing target to demonstrate those aspects of moderator performance necessary to meet the goals of the STS design e ort. The accelerator beam parameters are not open to variation beyond that described above - they are fixed by the nature of the spare front-end installation (the Integrated Test Stand Facility; ITSF). Accordingly, there are some neutronic challenges in developing prototypic moderator illumination from a very non-prototypic primary neutron source; the spallation source we are attempting to mimic has an extended neutron source volume approximately 40 cm long (in the direction of the proton beam), approximately 10 cm wide (horizontally transverse to the proton beam) and approximately 5 cm high (vertically transverse to the proton beam), and an isotropic evaporation energy spectrum with mean energy above 1 MeV. In contrast, the primary neutron source available from the 7Li(p,n) reaction (the most prolific at 2.5 MeV proton energy by more than an order of magnitude) is strongly anisotropic, with an energy spectrum that is both strongly dependent on emission angle and kinematically limited to less than 700 keV, and the interaction zone between the incident protons and any target material (neutron-producing or not) is intrinsically limited to a few tens of microns. The MDF will be unique and innovative amongst the world’s moderator test facilities in that it will be intended to be very prototypic in terms of "moderator illumination" - the spatial variation of the neutron flux entering the moderator itself - as well as capable of testing so-called high-brightness moderators in a wing configuration.

47 OTHER INSTRUMENTATION↗

Research, Development and Demonstration of Peak Load Reduction on Distribution Feeders Using Distributed Energy Resources for the City of Fort Collins

This project titled “Research, Development and Demonstration of Peak Load Reduction on Distribution Feeders Using Distributed Energy Resources for the City of Fort Collins” evolved in response to the Department of Energy’s (DOE) Funding Opportunity Announcement (FOA) Number DE-PS26-07NT43119. Also referred to as the Fort Collins Renewable and Distributed System Integration (RDSI) Project, the effort was undertaken by a diverse group of local government, higher education and business organizations; and was driven by three overarching goals: I. Fulfill the requirements of the DOE FOA’s Area of Interest 2: Renewable and Distributed System Integration; most notably, to demonstrate the ability to reduce electric system distribution feeder peak load by 15% or more through the coordinated use of Distributed Energy Resources (DER). II. Advance the expertise, technologies and infrastructure necessary to support the long term vision of the Fort Collins Zero Energy District (FortZED) and move towards creating a zero energy district in the Fort Collins “Old Town” area. III. Further the goals of the City of Fort Collins Energy Policy, including the development of a Smart Grid-enabled distribution system in Fort Collins, expanded use of renewable energy, increased energy conservation, and peak load reduction. Through the collaborative efforts of the partner organizations, the Fort Collins RDSI project was successful in achieving all three of these goals. This report is organized into two distinct sections corresponding to the two phases of the project: • Part 1: Feeder Peak Load Reduction and the FortZED Initiative. • Part 2: Forming and Operating Utility Microgrids and Managing Load and Production Variability The original project scope addressed the Part 1 feeder peak load reduction. That work took place from 2009 through 2011 and was largely complete when the project scope was amended to include a demonstration of microgrid operations. While leveraging the assets, partner relationships, and lessons learned from Part 1, Part 2 was managed and executed as a distinct and substantially independent sub-project during the spring and summer of 2013. Both Parts 1 and 2 of the overall RDSI project can be viewed as cohesive stand-alone bodies of work and are presented as such within this report. In addition to the narratives, this document includes two Appendices that were compiled to supplement information about the various aspects of activities performed during Parts 1 and 2 of the project. Moreover, these Appendices are organized (as outlined below) so as to directly relate to the narratives in Part 1 and 2 of this report. • Appendix - Part 1: describes the roles of each project participant in regards to the feeder peak load reduction effort, and • Appendix - Part 2: deals with the microgrid research/demonstration.

14 SOLAR ENERGY↗

Demonstration of Advanced CO 2 Capture Process Improvements for Coal-Fired Flue Gas

This document summarizes the activities of Cooperative Agreement DE-FE0026590, “Demonstration of Advanced CO 2 Capture Process Improvements for Coal-Fired Flue Gas” during the performance period of October 1, 2015 through May 31, 2017. This project was funded by the U.S. Department of Energy (DOE) National Energy Technology Laboratory (NETL). Southern Company Services, Inc. (SCS) was the prime contractor and co-funder of the project. Mitsubishi Heavy Industries America (MHIA) and AECOM were project team members. The overall project objective was to improve costs, energy requirements, and performance of an existing amine-based CO 2 capture process. This will occur via improvements in three areas: 1. Reboiler design – The first objective of the program was to demonstrate performance of an integrated stripper/reboiler (termed Built-in Reboiler, or BIR) to reduce footprint, capital costs, and integration issues of the current technology. 2. Particulate management – The second objective was to carry out a Particulate Matter Management (PMM) test. This has the potential to reduce operating costs and capital costs due to the reduced or eliminated need for mechanical filtration. 3. Solvent – The third objective was to carry out a new solvent test plan (referred to as NSL) to demonstrate a new solvent (termed New Solvent A), which is expected to reduce regeneration steam. The bulk price is also expected to be lower than KS-1, which is the current solvent used in this process. NSL testing would include baseline testing, optimization, long term testing, solvent reclamation testing, and final inspection. These combine to form the Advanced Carbon Capture (ACC) technology. Much of this work will be applicable to generic solvent processes, especially in regards to improved reboiler design, and focused to meet or exceed the DOE’s overall carbon capture performance goals of 90% CO 2 capture rate with 95% CO 2 purity at a cost of $40/tonne of CO 2 by 2025 and at a cost of electricity (COE) 30% less than baseline CO 2 capture approaches by 2030. This project was divided into two phases. Phase 1 is the planning phase, and Phase 2 is the construction, operations, testing, and analysis phase. A down select occurred after Phase 1. Phase 1 activities were carried out during this reporting period, and therefore, Phase 1 activities are solely considered in this report. The project was not selected for Phase 2 funding.

01 COAL, LIGNITE, AND PEAT↗

Final Technical Report: Commercial Advanced Lighting Control (ALC) Demonstration and Deployment

This three-year demonstration and deployment project sought to address market barriers to accelerating the adoption of Advanced Lighting Controls (ALCs), an underutilized technology with low market penetration. ALCs are defined as networked, addressable lighting control systems that utilize software or intelligent controllers to combine multiple energy-saving lighting control strategies in a single space (e.g., smart-time scheduling, daylight harvesting, task tuning, occupancy control, personal control, variable load-shedding, and plug-load control). The networked intelligent aspect of these systems allows applicable lighting control strategies to be combined in a single space, layered over one another, maximizing overall energy-savings. The project included five real building demonstrations of ALCs across the Northeast US region. The demonstrations provided valuable data and experience to support deployment tasks that are necessary to overcome market barriers. These deployment tasks included development of training resources for building designers, installers, and trades, as well as development of new energy efficiency rebates for the technology from Efficiency Forward’s utility partners. Educating designers, installers, and trades on ALCs is a critical task for reducing the cost of the technology that is currently inflated due to perceived complexity and unfamiliarity with how to design and install the systems. Further, utility and non-utility energy efficiency programs continue to relegate the technology to custom or ill-suited prescriptive program designs that do not effectively deploy the technology at scale. This project developed new, scalable rebate approaches for the technology. Efficiency Forward utilized their DesignLights Consortium® (DLC) brand and network of 81 DLC member utilities to develop and deploy the results of the project. The outputs of the project have included five published case studies, a six-hour ALC technology training curriculum that has already been deployed in five US states, and new rebates offered for the technology that have been deployed by a dozen utilities across the US. Widespread adoption of ALC technology in commercial buildings would provide tremendous benefits. The current market penetration of ALC systems is estimated at <0.1% in commercial buildings. If ALC systems were installed in all commercial buildings, approximately 1,051 TBtu of energy could be saved. This would translate into customer cost savings of approximately $10.7 billion annually.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Dual-Purpose Canister Filling Demonstration Project Progress Report, Rev. 1

This report discusses the initial progress made at the Oak Ridge National Laboratory to support direct disposal of dual-purpose canisters (DPCs)using filler materials to demonstrate that the probability of criticality in DPCs during disposal to be below the probability for inclusion in a repository performance assessment. In the initial phase of a multi-phase effort that will result in a full-scale demonstration, a computational fluid dynamics (CFD) model was developed to gauge the filling process and to uncover any unforeseen issues. The initial filling simulations of the lower region (mouse holes) of a prototypic DPC show successful removal of the inner space voids and smooth,even progression of the liquid level. In the initial phase, flow through a pipe that is similar to the drain pipe in a DPC will be investigated separately to gain valuable insight of flow regime inside a pipe. The initial experimental setups for validating the computational filling model have been designed,and the various assembly parts are being procured. The experience gained from the initial experiments will be applied to the next steps toward a full-scale demonstration and to the validation of multiphysics filling simulation models.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

ARRA Energy Storage Demonstration Projects: Lessons Learned and Recommendations

The American Recovery and Reinvestment Act (ARRA) of 2009 (Recovery Act) provided funding for 16 energy storage demonstration projects. The projects ranged in scope from feasibility studies and technology demonstrations to full-scale, operational energy storage plants. This investment had a significant positive impact on the grid-connected energy storage industry. The goal of this report is to summarize the lessons learned from the ARRA projects, and to make recommendations for future Department of Energy (DOE) investments. Information for this report primarily came from three sources: a questionnaire and interview with each project team; DOE energy storage program peer review presentations; and DOE reports required as part of the ARRA project. Some lessons learned were common to many projects. Development of standards, codes and protocols specific to energy storage systems will mitigate uncertainty over code compliance, streamline permitting, and should be a priority (especially related to safety). Removal of regulatory barriers that preclude optimal operation of an energy storage system with multiple applications would immediately enable further deployment (e.g., FERC standards preclude the marketing department from reliability activities). Maturity of the approach to monetization varies substantially between applications with frequency regulation as an ancillary service leading other applications. Finally, developers focused on ramp mitigation and time shifting envision a reference plant. This reference plant would scale up from the current demonstration systems and would lead to the deployment of 50 MW-scale peaker plants.

25 ENERGY STORAGE↗

Dual-Purpose Canister Filling Demonstration Project Progress Report

This report discusses the initial progress made at the Oak Ridge National Laboratory to support direct disposal of dual-purpose canisters (DPCs) using filler materials to demonstrate that the probability of criticality in DPCs during disposal to be below the probability for inclusion in a repository performance assessment. In the initial phase of a multi-phase effort that will result in a full-scale demonstration, a computational fluid dynamics (CFD) model was developed to gauge the filling process and to uncover any unforeseen issues. The initial filling simulations of the lower region (mouse holes) of a prototypic DPC show successful removal of the inner space voids and smooth, even progression of the liquid level. In the initial phase, flow through a pipe that is similar to the drain pipe in a DPC will be investigated separately to gain valuable insight of flow regime inside a pipe. The initial experimental setups for validating the computational filling model have been designed, and the various assembly parts are being procured. The experience gained from the initial experiments will be applied to the next steps toward a full-scale demonstration and to the validation of multiphysics filling simulation models.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

The Northwest Geysers Enhanced Geothermal System Demonstration Project, The Geysers, California (Final Report)

An Enhanced Geothermal System (EGS) Demonstration Project was completed in the northwest portion of The Geysers geothermal field in Northern California. The goal was to demonstrate the feasibility of stimulating a deep, high temperature reservoir (HTR) with measured temperatures up to 750 °F (400 °C). We note that while some of the traditional Hot Dry Rock EGS concepts involves one or a few repeated hydraulically pressurized stimulations, our concept involves continuous injection over a periods of years at relatively low injection flows and at low pressures. Important measures of success are a sustained steam production rate and decreasing noncondensible gas (NCG) concentrations within the EGS Demonstration area. The project was completed in three phases and this Final Report characterizes the EGS reservoir and documents the successful stimulation of the HTR by the continuous injection of treated wastewater under only a gravity pressure head.

15 GEOTHERMAL ENERGY↗

Furnace and Water Heater Venting Field Demonstration

A field demonstration was performed to evaluate the venting performance of the M&G DuraVent FasNSeal 80/90 venting system. The venting system uses a unique pipe within a pipe design to vent a condensing furnace and an natural-draft water heater, and can enable a condensing furnace to be installed in a home in which a condensing furnace could not otherwise be installed due to venting constraints. The field demonstration found that the FasNSeal 80/90 venting system successfully vented the orphaned water heater in each of the 16 demonstration homes and that the venting performance of the FasNSeal 80/90 venting system is generally comparable to the performance of venting systems initially installed in the 16 homes.

42 ENGINEERING↗

Zero Emission Delivery Vehicle Demonstration Project (Final Technical Report)

The purpose of the project was to demonstrate thirty (30) fully developed, operational, advanced vehicle technology prototypes for on-road delivery applications within the Houston-Galveston-Brazoria Nonattainment Region. After some initial project delays related to difficulties related to financial difficulties from the initial manufacturing partners, the project began to move forward in late 2014 using a fleet-first approach. Ultimately, this project was able to deploy 18 trucks within the Houston region. These vehicles were developed and manufactured by Workhorse and purchased by United Parcel Service (UPS) according to UPS specifications and to be operated out of three different facilities located in the Houston region. Following final delivery of these vehicles during the summer of 2016, the demonstration period began in earnest in December 2016 and continued until the end of November 2018. Once deployed and operating in regular delivery service, the 18 battery electric delivery trucks encountered challenges typical to any new vehicle deployment. In addition to the expected difficulties related to any new vehicle deployments, there were unexpected persistent and ongoing performance issues related to the all-electric technology integrated into the vehicles. This caused significant downtime for many of the project vehicles and lower than anticipated utilization rates over the entire two-year demonstration period.

33 ADVANCED PROPULSION SYSTEMS↗

Demonstration of a Desktop Liquid Direct Metal Write Additive Manufacturing System (CRADA NFE-17-06531 Final Report)

ORNL worked with PrintSpace 3D to demonstrate cost effective electromagnetic induction melting of aluminum alloys on their desktop Altair 3D printer. An electromagnetic coil design and susceptor have been optimized and paired with a high frequency power supply to melt Al-Ce alloys. The manufacturing feasibility of Al-Ce wire was also proven to be successful and precise process control of electro-magnetic heating was demonstrated. The system was found to have inherent safety benefits, requiring no powder handling and with very localized heating. Further research will demonstrate the ability to use DMW technology to print high temperature engine components for the transportation industry.

36 MATERIALS SCIENCE↗