Results for “DECOMMISSIONING”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 397 records · Page 22

Implementation of 10 CFR 20.1406 Through Life Cycle Planning for Decommissioning

This paper summarizes a regulatory guide that the U.S. Nuclear Regulatory Commission, Office of Nuclear Regulatory Research, is currently developing for use in implementing Title 10, Section 20.1406, of the Code of Federal Regulations (10 CFR 20.1406), 'Minimization of Contamination'. The intent of the regulation is to diminish the occurrence and severity of 'legacy sites' by taking measures to reduce and control contamination and facilitate eventual decommissioning. The thrust of the regulatory guide is to encourage applicants to use technically sound engineering judgment and a practical risk-informed approach to achieve the objectives of 10 CFR 20.1406. In particular, such an approach should consider the materials and processes involved (e.g., solids, liquids, gases), and focus on (1) the relative significance of potential contamination, (2) areas that are most susceptible to leaks, and (3) the appropriate level of consideration that should be incorporated in facility design and operational procedures to prevent and control contamination. (authors)

54 ENVIRONMENTAL SCIENCES↗

Decommissioning and PIE of the MEGAPIE spallation target

A key experiment in the Accelerated Driven Systems roadmap, the MEGAwatt PIlot Experiment (MEGAPIE) (1 MW) was initiated in 1999 in order to design and build a liquid lead-bismuth spallation target, then to operate it into the Swiss spallation neutron facility SINQ at Paul Scherrer Institute. The target has been designed, manufactured, and tested during integral tests, before irradiation carried out end of 2006. During irradiation, neutron and thermo hydraulic measurements were performed allowing deep interpretation of the experiment and validation of the models used during design phase. The decommissioning, Post Irradiation Examinations and waste management phases were defined properly. The phases dedicated to cutting, sampling, cleaning, waste management, samples preparation and shipping to various laboratories were performed by PSI teams: all these phases constitute a huge work, which allows now to perform post-irradiation examination (PIE) of structural material, irradiated in relevant conditions. Preliminary results are presented in the paper, they concern chemical characterization. The following radio-nuclides have been identified by γ-spectrometry: {sup 60}Co, {sup 101}Rh, {sup 102}Rh, {sup 108m}Ag, {sup 110m}Ag, {sup 133}Ba, {sup 172}Hf/Lu, {sup 173}Lu, {sup 194}Hg/Au, {sup 195}Au, {sup 207}Bi. For some of these nuclides the activities can be easily evaluated from γ-spectrometry results ({sup 207}Bi, {sup 194}Hg/Au), while other nuclides can only be determined after chemical separations ({sup 108m}Ag, {sup 110m}Ag, {sup 195}Au, {sup 129}I, {sup 36}Cl and α-emitting {sup 208-210}Po). The concentration of {sup 129}I is lower than expected. The chemical analysis already performed on spallation and corrosion products in the lead-bismuth eutectic (LBE) are very relevant for further applications of LBE as a spallation media and more generally as a coolant.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

D0 Decommissioning: Storage of depleted uranium modules inside D0 calorimeters after the termination of D0 experiment

Dzero liquid Argon calorimeters contain hadronic modules made of depleted uranium plates. After the termination of D0 detector's operation, liquid Argon will be transferred back to Argon storage Dewar, and all three calorimeters will be warmed up. At this point, there is no intention to disassemble the calorimeters. The depleted uranium modules will stay inside the cryostats. Depleted uranium is a by-product of the uranium enrichment process. It is slightly radioactive, emits alpha, beta and gamma radiation. External radiation hazards are minimal. Alpha radiation has no external exposure hazards, as dead layers of skin stop it; beta radiation might have effects only when there is a direct contact with skin; and gamma rays are negligible - levels are extremely low. Depleted uranium is a pyrophoric material. Small particles (such as shavings, powder etc.) may ignite with presence of Oxygen (air). Also, in presence of air and moisture it can oxidize. Depleted uranium can absorb moisture and keep oxidizing later, even after air and moisture are excluded. Uranium oxide can powder and flake off. This powder is also pyrographic. Uranium oxide may create health problems if inhaled. Since uranium oxide is water soluble, it may enter the bloodstream and cause toxic effects.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Removal and Decommissioning of Disused Gamma Irradiator in Minsk, Belarus

Under the scope of The Department of Energy’s Office of Radiological Security (ORS) Program the Belarusian company, “Isotope Technologies” (IT), in concert with assistance of “Radii” (a company based in Moscow, Russia) dismantled a disused gamma irradiator RKhM-γ-20. This project required innovation, flexibility, and prior experience. The team successfully removed the radioactive sources from the site and moved them to the local radioactive waste facility Ekores. The gamma unit had been installed at the Minsk, Belarus Research Institute of Physical Organic Chemistry in 1971. This research center is a part of the National Academy of Sciences of Belarus. There were 48 highly radioactive Cobalt 60 sources inside the unit. During the dismantling process it was discovered that the source retaining drum was broken. Therefore, the removal proved to be much more complicated than originally envisioned. IT and Radii were unable to remove a number of sources from the drum by means of standard removal equipment and finally needed to remove the entire unit itself along with the remaining sources. The problem was further complicated by a very short timeframe allowed for work implementation. This was because the unit was located near an elementary school requiring the team to complete the project prior to the end of summer school holidays. Moreover, the unit itself was not easily accessible. The project team developed a technical solution and accomplished the removal.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Application of Data Quality Objectives in Decommissioning Plans

The Data Quality Objectives (DQOs) are applicable and relevant in the design of measurements that provide data for good, effective decision-making. The DQOs provide criteria for the design of measurements and provide a target for assessing the level of data quality that is considered acceptable for effective decision-making. Such targets in the design of measurements help eliminate the acquisition of unnecessary, duplicative or overly precise data. They help provide more efficient use of limited measurement resources. With the application of DQOs, D and D program decisions are identified, DQOs are established, and measurements are designed to provide data that meet the DQOs for each decision point. Since the Historical Site Assessment (HSA), Scoping, Characterization, and Remedial Action Surveys provide data and information to all D and D program decision-making, an integrated approach should be taken where all input requirements are considered, in the design of each survey. The decision points and their linkages form a network of decisions referred to as a decision framework. Since distinct D and D program functions are linked by their decisions, programs proceed through the decision framework, in a uniform fashion, to one endpoint, the decision to release the site. The decision to release the site is based on the ability to pass the Multi-Agency Radiation Survey and Site Investigation Manual (MARSSIM). Therefore, D and D planning has a primary aim, to integrate D and D program efforts in a manner that will allow D and D decision-making to reach one end point, effective MARSSIM decision-making. The Decision Framework is best represented, schematically, by a decision tree. The decision tree is based on 3- decision points and represents a decision in each of the Remediation, Dose Assessment and MARSSIM program functions. The decisions address the extent of excavation, dose modeling approach, and sampling for the MARSSIM Final Status Survey (FSS). The simplified decision rule established for each decision point relies on the questions: deep excavation or not; site-specific modeling or not; and high number of samples or not. For these decision rules, the basic outcomes are yes or no to the questions. As decision-makers proceed through the decision tree, there are 8 different paths available based on the theoretical relationship 2N, where N=3. All the paths lead to the one-end point, MARSSIM decision-making. Data and information from pre-release surveys provide input to each decision (although not illustrated in the decision tree schematic). Here MARSSIM represents a legitimate D and D program with decision-making functions. Since D and D decisions are connected to MARSSIM decisions, as illustrated in the decision tree, D and D decision-making can be captured in the MARSSIM context and the decision tree included in the MARSSIM report. These weighted options were selected because they represent 3-alternate plans (strategies) that could be implemented with equivalent total resources (costs). Hypothetical costing for each D and D program function is indicated at each section of the paths in terms of normalized values 10 and 1, in arbitrary units. Option 1 describes a path where Deep Excavation, Site specific Modeling, and a Low Number of Samples for the FSS are the bases. Option 2 describes a path where Deep Excavation, Screening Values, and a High Number of Samples are the bases. Option 3 utilizes Shallow Excavation, Site-specific Modeling, and a High Number of Samples in the FSS design. Since the 3-options are equivalent in costs, the selection of the best D and D option or MARSSIM Plan for the site could be determined by other factors such as Waste Management, Health and Safety, or Regulatory Compliance. For example, a site with Health and Safety issues may want to utilize Option 3, so that cleanup worker exposure is minimized during excavation. A small site, that has limited technical support, may want to use tables of screening values for dose assessments, and therefore Option 2 may be an appropriate MARSSIM Plan. Another example would be a case for the use of Option 1 where the D and D manager may want to minimize difficulties with getting pass MARSSIM tests. By conducting extensive cleanup and calculating more realistic (less conservative) dose values, more flexibility in MARSSIM is obtained. for any decision framework, there are a number of reasonable paths to be considered in D and D decision-making and that these paths can be viewed as a family of MARSSIM Plans. Optimization of MARSSIM decision-making can occur by selecting, from this family of MARSSIM Plans, the most appropriate plan for the conditions at a specific site. This approach represents a more comprehensive evaluation of D and D options and strategies that regulators and stakeholders would most likely appreciate in the MARSSIM Final Report. In an era of information management, it would be prudent to take advantage of opportunities offered by the application of DQOs and the utilization of its decision-framework. The example utilized of a decision framework, is an overly simplified (N=3) model and is presented for illustrative purposes. A typical D and D project would have many more decision points to consider in formulating the decision framework and its decision tree, and the use of high level computing would be needed.

99 GENERAL AND MISCELLANEOUS↗

Principles on Radiological Characterization of the Unit 1 at Ignalina NPP for Decommissioning Purposes

There is only one nuclear power plant in Lithuania - Ignalina NPP (INPP). The INPP operated two similar units with installed capacity of 1500 MW(each). They were commissioned in 12/1983 and 08/1987, and the original design lifetime was projected out to 2010 and 2015 respectively. But the first Unit of Ignalina NPP was shutdown December 31, 2004, and second Unit will be closed down before 2010 taking into consideration substantial long-term financial assistance from the EU, G7 and other states as well as international institutions. Implementation of dismantling activities requires detailed knowledge of the radiological situation at the Unit 1. General Programme of Radiological Survey for Ignalina NPP Unit 1 based on NUREG-1575 was prepared in 2005- 2006 by Consortium led by Lithuanian Energy Institute and approved by Regulatory Bodies. It includes such main steps as historical site assessment, scoping, characterization, remedial actions/decontamination support surveys and final status surveys. General Programme of Radiological Survey defines content and principles of the surveys, and preliminary survey considerations, including identification of the contaminants, establishment of the free release levels, principles on areas classification depending on contamination potential, identification of the final survey units, criteria for selection survey instrumentation, techniques and methods etc. So, in the paper information on these principles and the content of the different stages in General Programme of Radiological Survey is presented. (authors)

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Decommissioning of Large Components as an Example of Steam Generator from PWR Nuclear Power Plants

This paper describes the procedure for the qualification of large components (Steam Generators) as an IP-2 package, the ship transport abroad to Sweden and the external treatment of this components to disburden the Nuclear Power Plant from this task, to assure an accelerated the deconstruction phase and to minimize the amount of waste. In conclusion: The transport of large components to an external treatment facility is linked with many advantages for a Nuclear Power Plant: - Disburden of the Nuclear Power Plant from the treatment of such components, - no timely influence on the deconstruction phase of the power reactor and therewith an accelerated deconstruction phase and - minimization of the waste to be returned and therewith less demand of required waste storage capacity. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Decommissioning and Environmental Cleanup of a Small Arms Training Facility - 13225

US DOE performed a (CERCLA) non-time critical removal (NTCR) action at the Small Arms Training Area (SATA) Site Evaluation Area (SEA) located at the Savannah River Site (SRS), in Aiken, South Carolina. From 1951 to May 2010, the SATA was used as a small weapons practice and qualifying firing range. The SATA consisted of 870.1 ha (2,150 ac) of woodlands and open field, of which approximately 2.9 ha (7.3 ac) were used as a firing range. The SATA facility was comprised of three small arms ranges (one static and two interactive), storage buildings for supplies, a weapons cleaning building, and a control building. Additionally, a 113- m (370-ft) long earthen berm was used as a target backstop during live-fire exercises. The berm soils accumulated a large amount of spent lead bullets in the berm face during the facilities 59- years of operation. The accumulation of lead was such that soil concentrations exceeded the U.S. Environmental Protection Agency (USEPA) residential and industrial worker regional screening levels (RSLs). The RSL threshold values are based on standardized exposure scenarios that estimate contaminant concentrations in soil that the USEPA considers protective of humans over a lifetime. For the SATA facility, lead was present in soil at concentrations that exceed both the current residential (400 mg/kg) and industrial (800 mg/kg) RSLs. In addition, the concentration of lead in the soil exceeded the Toxicity Characteristic Leaching Procedure (TCLP) (40 Code of Federal Regulations [CFR] 261.24) regulatory limit. The TCLP analysis simulates landfill conditions and is designed to determine the mobility of contaminants in waste. In addition, a principal threat source material (PTSM) evaluation, human health risk assessment (HHRA), and contaminant migration (CM) analysis were conducted to evaluate soil contamination at the SATA SEA. This evaluation determined that there were no contaminants present that constitute PTSM and the CM analysis revealed that no constituents posed a migration risk to groundwater. The NTCR action involved removal of approximately 12,092 m{sup 3} (15,816 yd{sup 3}) of spent bullets and lead-impacted soil and off-site disposal. The removal action included soils from the berm area, a fill area that received scraped soils from the berm, and soil from a drainage ditch located on the edge of the berm area. Also included in the removal action was a mixture of soil, concrete, and asphalt from the other three range areas. Under this action, 11,796 m{sup 3} (15,429 yd{sup 3}) of hazardous waste and impacted soil were removed from the SATA and transported to a permitted hazardous waste disposal facility (Lone Mountain Facility in Oklahoma) and 296 m{sup 3} (387 yd{sup 3}) of nonhazardous waste (primarily concrete debris) were removed and transported to a local solid waste landfill for disposal. During the excavation process, the extent was continuously assessed through the use of a hand-held, field-portable X-ray fluorescence unit with results verified using confirmation sampling with certified laboratory analysis. Following the completion of the excavation and confirmation sampling, final contouring, grading, and establishment of vegetative cover was performed to stabilize the affected areas. The NTCR action began on August 17, 2010, and mechanical completion was achieved on April 27, 2011. The selected removal action met the removal action objectives (RAOs), is protective of human health and the environment both in the short- and long-term, was successful in removing potential ecological risks, and is protective of surface water and groundwater. Furthermore, the selected NTCR action met residential cleanup goals and resulted in the release of the SEA from restricted use contributing to the overall footprint reduction at SRS. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Nuclear Research Reactor IEA-R1 - A Study of the Preparing for Decommissioning

The Institute of Energy and Nuclear Research (IPEN), Sao Paulo, according to the assignments given by the National Commission of Nuclear Energy (CNEN), enabled the development of this study, especially operational reports about refurbishing carried out on 2013, involving the production of radioisotopes and research in the areas of Radiochemistry and Nuclear Physics. These reports are made in accordance with established standard procedures to meet the requirements of CNEN (National Nuclear Energy Commission, the regulator the nuclear area activities in Brazil) and IAEA (International Atomic Energy Agency). This study presents an assessment of the procedures and methods of treatments for decontamination of the refrigeration primary circuit and changes parts, equipment and tubes of the of the IEA-R1 nuclear research reactor, pool type, power between 3,5 and 4,5 MW. In order to have a sequence in the work, the well-known contaminant radioisotopes were evaluated firstly, using Geiger- Muller equipment. In the second phase, the decontamination was done manually together with the ultrasound cleaning and washing equipment. From the several water solutions of citric acid assessment, the concentration with better confidence was obtained; in order to achieve the best results for decontamination. This study intends to define the best process for decontamination with low taxes of waste and without expensive costs. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Risk to Ecological Resources from Delaying Decommissioning and Waste Management: conceptualization and examples from the Hanford Site - 17156

Ecological evaluation is essential for remediation, restoration, and future land-use decisions for contaminated lands, and forms a basis for many management practices. Ecological evaluations or assessments can also be used to examine the efficacy of remediation and restoration methods, providing valuable data to plan and improve future restoration. Assessments can examine past activities, current conditions, and the effects of future remediation or restoration. In general, ecological evaluations have not been used to assess the effects of delaying remediation. Yet for complicated situations, such as at Hanford Site, where there are dozens of remediation sites still to be completed, understanding the effects of delaying remediation on ecological and eco-cultural resources adds measurably to making sound sequencing decisions. Ecological evaluations are inherently complex compared to human health risk assessment because there are hundreds of species, composing a great number of communities and ecosystems. Ecosystems are dynamic, undergoing changes in response to predictable environmental conditions (succession), as well as unforeseen events. Further, ecosystems respond to remediation and restoration actions, even when they are on adjacent areas. Conducting evaluations of the risk to ecological resources must account for the dynamic nature of ecosystems, and for the dynamic, changing landscape that results from remediation on nearby areas. The approach will provide information for sound decision-making with stakeholder participation. This project was partially funded by CRESP through the Department of Energy (DE-FC01-95EW55084). (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

High-Resolution Aerial Radiation Mapping for Nuclear Decontamination and Decommissioning - 17371

Unmanned aerial vehicles (UAVs) are now widely employed as part of numerous applications including defence, search and rescue as well as within scientific fields such as high-altitude atmospheric sampling and remote sensing, to name but a few. However, their application to the high-resolution detection of radiation anomalies (specifically as part of the routine monitoring on nuclear sites) has been less well explored. In this work, we present the results of the radiation monitoring via a lightweight aerial platform on an active nuclear site (Sellafield Ltd.); having already deployed the device in the Fukushima-contaminated region. The system employed was able to detect regions of elevated radiation at the sub-meter scale as well as attributing the species responsible. Such a system presents an extremely powerful tool where it is not desirable, nor practical, to send human operators. Results presented show that the platform is easily capable of operating within the challenging and confined settings of a site such as Sellafield (or other similar sites worldwide). (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Fixatives Used for Decommissioning and Maintenance of Radiological Facilities - 17537

The Idaho National Laboratory (INL) and the United Kingdom (UK) National Nuclear Laboratory (NNL) have been collaborating for several years on materials and methods for the fogged/misted introduction of fixatives into radiologically contaminated facilities. The objective of the project is to deliver a process for reducing airborne radiological and/or mercury contamination and affixing loose contamination in place, thereby reducing contamination risk to employees and decreasing D and D cost and schedule. The developed process provides a reliable, unmanned method of introducing a coating that captures and fixes contamination in place within facilities. The INL coating, termed FX2, has undergone extensive non-radiological testing, including determination that it is non-flammable, affixes contamination and flows well through unusual geometries (testing at Florida International University). A series of non-active fogging trials for activity knock/tie-down application have been completed at NNL Workington on behalf of Idaho National Laboratory (INL). These trials performed by the NNL employed commercially available agricultural fogging equipment and the INL's knock/tie-down latex formulation (FX-2). This testing successfully demonstrated the ability of the fogging devices to successfully spray the FX-2 formulation within various scenarios, and prepared the project for a radioactive trial. The INL has also developed a mercury vapor reducing form of the coating termed FX-Hg, which has shown great promise in laboratory studies. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Mobile platform for radiological characterization of sites under or after decommissioning - 15139

Nowadays, nuclear industry is facing a crucial need in establishing radiological characterization for the assessment and the monitoring of any remediation work. Regarding its experience in this domain, the French Commission for Atomic Energy and Alternative Energies (CEA) of Fontenay-aux-Roses, established an important feedback and developed a sound methodology for radiological characterization. A clean-up project is managed from the initial surface characterization to the final one, once volumes of contaminated soil have been removed. Samples are collected via recognized methods and data is gathered by real-time acquisition with different conveyance such as all-in-vehicles, cart, walking, helicopter or drone. Accurate radiological analyses are performed on site thanks to the mobile laboratories cluster, called SMaRT. It enables to realize long-time gamma spectroscopy, chemical preparation for alpha spectroscopy or beta liquid scintillation counting. Data is processed with geo-statistics via the software Kartotrak, 2D or 3D mapping are created with the associated uncertainty and probability map. Drilling profiles with geological data (layers composition, particles size, etc.) are studied in order to understand the behavior of the contamination in depth. Source term, contaminated volumes and sanitary impact are calculated in order to determine the optimum excavation depth. Finally, data is stored in an online site that insures the traceability of the whole process. This just-in-time production model allows a fast response and control of costs and avoids the disadvantages of radioactive material transport. This whole innovative process, developed inside the mobile platform, requires all these tools that have been used in France and continuously evolving for more than 10 years thanks to a learning organization. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Why Use Geo-statistics For Nuclear Decommissioning Projects? - 15567

Before nuclear facilities are dismantled, and contaminated sites remediated, their initial radiological state must be characterized. Combining historical information, non-destructive measurements and lab analysis results, the statistical method of geo-statistics allows all available data for 2D or 3D contamination mapping to be integrated and enhanced, and helps quantify estimation uncertainties. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Deactivation and decommissioning web log analysis using big data technology - 15710

The D and D Knowledge Management Information Tool (D and D KM- IT) is a web-based knowledge management information tool built for the D and D user community. Big data is a massive volume of structured and unstructured datasets which is so large that it's difficult to process using traditional database techniques. Web logs are the repository of files which are generated automatically for any operation on the web site. Web log files generated from the D and D KM-IT will be processed using the Apache Hadoop Framework to extract meaningful data. Hadoop is an open-source software framework for storing and processing big data in a distributed environment on large clusters of commodity hardware. Hadoop framework consists of two main layers: Hadoop distributed file system (HDFS) and the Execution engine (MapReduce). Automatic parallelization and distribution; clean and simple programming abstraction. Implementation: Web log files from the D and D KM-IT server are fetched using Apache Flume and loaded into the Hadoop distributed file system. Using the Apache Hcatalog tool, the web log data is parsed and converted into a structured table format. A Pig program is developed to query the tables to retrieve and store the significant information onto the HDFS. The extracted data is fed to business visualization tools such as Microsoft Excel for analysis and reporting. Results The reports generated through the web log data processing will be analyzed to improve the usability and performance of the D and D KM-IT. Conclusion/Future Work: User keyword information can be explored to add new trending topics to the D and D KM-IT application. Statistics generated can be compared to analysis reports from existing analytical tools.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗