Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Cost”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 397 records · Page 22

Assessing the New Home Market Opportunity: Case Study and Cost Modeling for Solar and Storage in 2030

Residential solar and storage markets are growing in the United States. With approximately 1 million new homes constructed every year, this represents a significant opportunity for solar and storage installations. Some homebuilders have begun to build new homes with solar and storage included as a standard offering. It is not clear how solar and storage is incorporated into the new construction process and at what cost. Further, it is unclear what barriers or opportunities exist to scale this model nationwide. To fill this gap in the literature, this research conducts a case study of Mandalay Homes' new solar and storage community in Arizona to gather lessons learned. From this foundation, we further generate a set of pathways to reduce install costs and expand solar and storage market penetration in this sector. To model existing and 2030 solar and storage costs, we use the National Renewable Energy Laboratory's (NREL's) bottom-up cost model. This modeling is further informed by 12 interviews conducted with new home builders, solar contractors, and other subject matter expert organizations. Our case study analysis generated three key considerations for other homebuilders including: 1. Educating local permitting, inspection, and in some cases utility officials on solar and storage products, designs, and code compliant building practices may be required. The need for education may decline as more local governments and utilities review and approve solar and storage projects. 2. Incorporating solar and storage systems into the homebuilding process can add complexity and related coordination challenges. This does not need to result in home construction delays, but can result in costly contractor "dry runs" to construction sites. 3. Deploying solar and storage at the time of new construction has significant economies of scale, which can improve the value proposition of the systems. The case study, extant literature, and interviews were used to model both existing and future solar and storage installation costs at time of new construction. Here, we find three key cost reduction opportunities relating to solar and battery storage hardware, customer acquisition, and overhead. If future contractors can maximize the cost reduction opportunities outlined here, residential new construction costs could decline by 8 - 25% by 2030, depending on the modeled scenario. Though we expect costs to decline through 2030, it is unclear which of these scenarios may ultimately appear. Interviewees further identified a variety of barriers across each cost category that could temper the savings shown here. At the same time, interviewees described several pathways to scale the new construction solar and storage market, beyond installation cost savings. Interviewees confirmed that changes in finance, rate design, resilience policies, deployment mandates, and DER aggregation could all support more market adoption than seen today. These findings suggest that there are significant opportunities to expand new construction markets and this research can serve as a baseline to assess progress in this segment through 2030.

14 SOLAR ENERGY↗

Retail Infrastructure Costs Comparison for Hydrogen and Electricity for Light-Duty Vehicles: Preprint

Both hydrogen and plug-in electric vehicles offer significant social benefits to enhance energy security and reduce criteria and greenhouse gas emissions from the transportation sector. However, the rollout of electric vehicle supply equipment (EVSE) and hydrogen retail stations (HRS) requires substantial investments with high risks due to many uncertainties. We compare retail infrastructure costs on a common basis - cost per mile, assuming fueling service to 10% of all light-duty vehicles in a typical 1.5 million person city in 2025. Our analysis considers three HRS sizes, four distinct types of EVSE and two distinct EVSE scenarios. EVSE station costs, including equipment and installation, are assumed to be 15% less than today's costs. We find that levelized retail capital costs per mile are essentially indistinguishable given the uncertainty and variability around input assumptions. Total fuel costs per mile for battery electric vehicle (BEV) and plug-in hybrid vehicle (PHEV) are, respectively, 21% lower and 13% lower than that for hydrogen fuel cell electric vehicle (FCEV) under the home-dominant scenario. Including fuel economies and vehicle costs makes FCEVs and BEVs comparable in terms of costs per mile, and PHEVs are about 10% less than FCEVs and BEVs. To account for geographic variability in energy prices and hydrogen delivery costs, we use the Scenario Evaluation, Regionalization and Analysis (SERA) model and confirm the aforementioned estimate of cost per mile, nationally averaged, but see a 15% variability in regional costs of FCEVs and a 5% variability in regional costs for BEVs.

08 HYDROGEN↗

Pumped Storage Hydropower Operation & Maintenance Cost Estimation

The National Laboratory of the Rockies (NLR) develops and hosts a pumped storage hydropower (PSH) cost model that is the most detailed bottom-up PSH cost model available to the public. It is available both as a spreadsheet and an interactive web tool, enabling users with a variety of PSH interests to transparently characterize costs of alternative PSH sites and designs. The NLR PSH cost model was designed originally to consider only upfront capital costs only. This slide deck describes methodology to expand the cost model to include operations and maintenance (OM) costs. OM costs are characterized as five distinct components with unique sources and methods for cost estimation. By combining methods for each of these components into a cumulative OM cost estimate, these methods allow a more complete estimation of total OM costs that agrees with existing literature values. The methods are scalable and transparent, allowing them to be readily to applied to any prospective PSH facility for a representative preliminary OM cost estimate in advance of detailed site-specific engineering and other studies.

13 HYDRO ENERGY↗

U.S. Balance-of-Station Cost Drivers and Sensitivities (Presentation)

With balance-of-system (BOS) costs contributing up to 70% of the installed capital cost, it is fundamental to understanding the BOS costs for offshore wind projects as well as potential cost trends for larger offshore turbines. NREL developed a BOS model using project cost estimates developed by GL Garrad Hassan. Aspects of BOS covered include engineering and permitting, ports and staging, transportation and installation, vessels, foundations, and electrical. The data introduce new scaling relationships for each BOS component to estimate cost as a function of turbine parameters and size, project parameters and size, and soil type. Based on the new BOS model, an analysis to understand the non‐turbine costs has been conducted. This analysis establishes a more robust baseline cost estimate, identifies the largest cost components of offshore wind project BOS, and explores the sensitivity of the levelized cost of energy to permutations in each BOS cost element. This presentation shows results from the model that illustrates the potential impact of turbine size and project size on the cost of energy from U.S. offshore wind plants.

17 WIND ENERGY↗

2022 GETEM Geothermal Drilling Cost Curve Update: Preprint

The Geothermal Electricity Technology Evaluation Model (GETEM) is an essential tool for the Department of Energy's (DOE) Geothermal Technology Office (GTO) to understand the performance and cost of technologies it is seeking to improve. This detailed model is used for supply curve analyses, assessing the current economic feasibility and Levelized Cost of Energy (LCOE) of hydrothermal geothermal systems and EGS, and evaluating the potential impact of advanced geothermal technologies. GETEM can be used to estimate the performance and costs of currently available U.S. geothermal power systems. It is also used to estimate the costs of technologies 5 to 20 years in the future, given the direction of potential research, development, and demonstration (RD&D) projects. The model is intended to help GTO determine which proposed RD&D programs and projects might offer the most efficient improvement when using taxpayer funding. The model requires annual updates as well as revisions to reflect the current state of the art. Drilling costs are a significant portion of total geothermal development costs. The current GETEM drilling cost inputs rely on drilling data from 2009 and require an updated analysis of more recent data to ensure they remain representative of current technologies. An updated, more accurate understanding of costs could help the geothermal industry secure project development financing and investment funding and better allow the oil and gas (O&G) industry (both operators and service companies) weigh potential geothermal market participation and customization. This report details recent drilling improvements from the Utah Frontier Observatory for Research in Geothermal Energy (FORGE) and O&G, comparing drilling performance and costs with values in GETEM, particularly the baseline drilling cost curves. Though drilling performance at FORGE has improved significantly, we did not find associated cost decreases that would justify lowering the GETEM baseline cost curves as of now.

API↗

2022 GETEM Geothermal Drilling Cost Curve Update

The Geothermal Electricity Technology Evaluation Model (GETEM) is an essential tool for the U.S. Department of Energy's (DOE) Geothermal Technologies Office (GTO) to understand the performance and cost of technologies it is seeking to improve. This detailed model is used for supply curve analyses, assessing the current economic feasibility and levelized cost of energy (LCOE) of hydrothermal geothermal systems and enhanced geothermal systems (EGS), and evaluating the potential impact of advanced geothermal technologies. GETEM can be used to estimate the performance and costs of currently available U.S. geothermal power systems. It is also used to estimate the costs of technologies 5 to 20 years in the future, given the direction of potential research, development, and demonstration (RD&D) projects. The model is intended to help GTO determine which proposed RD&D programs and projects might offer the most efficient improvement when using taxpayer funding. The model requires annual updates as well as revisions to reflect the current state of the art. Drilling costs are a significant portion of total geothermal development costs. The current GETEM drilling cost inputs rely on drilling data from 2009 and require an updated analysis of more recent data to ensure they remain representative of current technologies. An updated, more accurate understanding of costs could help the geothermal industry secure project development financing and investment funding and better allow the oil and gas (O&G) industry (both operators and service companies) to weigh potential geothermal market participation and customization. This report details recent drilling improvements from the Utah Frontier Observatory for Research in Geothermal Energy (FORGE) and the O&G sector, comparing drilling performance and costs with values in GETEM, particularly the baseline drilling cost curves. Although drilling performance at FORGE has improved significantly, we did not find associated cost decreases that would justify lowering the GETEM baseline cost curves at this time.

API↗

The development of natural gas and hydrogen pipeline capital cost estimating equations

Natural gas pipeline cost data collected by the Oil and Gas Journal (O&GJ) for interstate pipelines constructed from 1980 through 2017 were used to develop capital cost estimating equations that are a function of pipeline diameter, length, and U.S. region. Equations were developed for material, labor, miscellaneous, and right-of-way costs, the four cost components in the O&GJ data, for six different regions of the United States (U.S.). Each equation is a function of pipeline diameter and length. Adjustment mechanisms were then developed for converting the natural gas pipeline equations into equations for estimating the costs of hydrogen pipelines. These adjustments were based in part on an analysis completed by the National Institute for Standards and Technology (NIST). Here the results of this work were used to update cost models in the Hydrogen Delivery Scenario Analysis Model (HDSAM), developed by Argonne National Laboratory for the U.S. Department of Energy’s Hydrogen Program. Our analysis shows a wide range of pipeline cost across different U.S. regions, especially with respect to labor and right-of-way costs. The developed cost formulas for hydrogen pipelines are both important and timely as hydrogen is being considered as a zero-carbon energy carrier with the potential to decarbonize all energy sectors, and the cost of hydrogen transportation is essential for techno-economic analysis of its potential use in these sectors.

03 NATURAL GAS↗

Setting cost targets for zero-emission electricity generation technologies

Clean energy deployment scenarios typically assume a diverse mix of low-emission generation. However, because of historically low natural gas prices and cost reductions for onshore wind and photovoltaic technologies, recent new capacity deployment, especially in the United States, has come largely from these three generation sources. Here, we quantify competitive cost targets for three less-common zero-emission generation technologies -- nuclear, concentrating solar, and offshore wind -- under a range of future conditions. We determine the cost targets based on the technologies' system value, such that technology value equals or exceeds its cost. Using a capacity expansion model that develops system-wide, economically optimal generation scenarios of the United States power sector, we find that nuclear, concentrating solar, and offshore wind would need to attain levelized cost ranges of $53-84/MWh, $65-91/MWh, and $39-77/MWh, respectively, to achieve 1% additional grid penetration. We refer to this metric as the 'required cost,' which is a technology's levelized cost of energy needed to achieve a specific penetration level. Higher penetrations lead to lower required costs as lower-cost generation is displaced. We estimate that to reach 10% penetration, the required cost for nuclear declines to $45-76/MWh. Because of resource variability and increased transmission needs for concentrating solar power and offshore wind, even lower costs are needed to reach higher penetrations: required cost ranges to achieve 10% penetration are estimated to be $30-56/MWh and $18-40/MWh for these two technologies respectively. Our analysis informs research and development priorities and the design of policies supporting clean technologies.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Cost details from front-end engineering design of piperazine with the advanced stripper

This Front-End Engineering Design (FEED) was funded by the U.S. Department of Energy (DOE) to estimate the cost to capture and compress 90% of the CO 2 from an existing natural gas combined cycle (NGCC) in Denver City, Texas, USA. The FEED used the PZAS (Piperazine with the Advanced Stripper) 2G amine scrubbing technology developed and modeled by The University of Texas at Austin. This FEED is unique in providing more public cost details than other FEEDs funded by DOE. The primary objective of the FEED was to provide a comprehensive estimate for the total installed cost of the capture plant. The estimated capital cost of NGCC at the Mustang Station is $\$727$ million for a capacity of 460 MW and 1.6 million tonnes CO 2 /yr. This includes a contingency of $\$104.6$ million and a contractor’s profit of $\$60.1$ million. The total direct field cost is $\$384.1$ million. With an optimistic fuel value of $\$3$/MMBtu, the estimated cost of capture varies from $\$85$/t at 4% IRR/85% load to $\$170$/t at 10% IRR/52% load. Air cooling is technically feasible but expensive. The air cooling systems for the water wash and pump-around intercooling account for 23.4% of the direct cost. The gas-fired boilers represent only 4% of the direct costs, but steam extraction would reduce energy cost, free up cooling water, and reduce the direct costs of processing additional flue gas and CO 2 from the boilers. The absorbers represent 9.6% of the direct cost in this FEED with no direct contact cooler and only 7.6 m of packing. Furthermore, the solvent cross exchangers are less expensive than expected (2.5% of direct costs). Doubling the number of these exchangers could reduce the heat duty from 3.0 to 2.5 GJ/t CO 2 .

37 INORGANIC, ORGANIC, PHYSICAL, AND ANALYTICAL CH↗

Comparing the Net Cost of CSP-TES to PV Deployed with Battery Storage

Concentrated solar power with thermal energy storage (CSP-TES) is a unique source of renewable energy in that its energy can be shifted over time and it can provide the electricity system with dependable generation capacity. In this study, we provide a framework to determine if the benefits of CSP-TES (shiftable energy and the ability to provide firm capacity) exceed the benefits of PV and firm capacity sources such as long-duration battery storage or conventional natural gas combustion turbines (CTs). The results of this study using current capital cost estimates indicate that a combination of PV and conventional gas CTs provides a lower net cost compared to CSP-TES and PV with batteries. Some configurations of CSP-TES have a lower net cost than PV with batteries for even the lowest battery cost estimate. Using projected capital cost targets, however, some configurations of CSP-TES have a lower net cost than PV with either option for even the lowest battery cost estimate. The net cost of CSP-TES varies with configuration, and lower solar multiples coupled with less storage are more attractive at current cost levels, due to high component costs. However, higher solar multiples show a lower net cost using projected future costs for heliostats and thermal storage materials.

14 SOLAR ENERGY↗

Parabolic Trough Collector Cost Update for the System Advisor Model (SAM)

This report updates the baseline cost for parabolic trough solar fields in the United States within NREL's System Advisor Model (SAM). SAM, available at no cost at https://sam.nrel.gov/, is a performance and financial model designed to facilitate decision making for people involved in the renewable energy industry. SAM is the primary tool used by NREL and the U.S. Department of Energy (DOE) for estimating the performance and cost of concentrating solar power (CSP) technologies and projects. The study performed a bottom-up build and cost estimate for two state-of-the-art parabolic trough designs -- the SkyTrough and the Ultimate Trough. The SkyTrough analysis estimated the potential installed cost for a solar field of 1500 SCAs as $170/m 2 +/- $6/m 2 . The investigation found that SkyTrough installed costs were sensitive to factors such as raw aluminum alloy cost and production volume. For example, in the case of the SkyTrough, the installed cost would rise to nearly $210/m 2 if the aluminum alloy cost was $1.70/lb instead of $1.03/lb. Accordingly, one must be aware of fluctuations in the relevant commodities markets to track system cost over time. The estimated installed cost for the Ultimate Trough was only slightly higher at $178/m 2 , which includes an assembly facility of $11.6 million amortized over the required production volume. Considering the size and overall cost of a 700 SCA Ultimate Trough solar field, two parallel production lines in a fully covered assembly facility, each with the specific torque box, module and mirror jigs, would be justified for a full CSP plant.

47 OTHER INSTRUMENTATION↗

Lignite-plus-Biomass to Synthetic Jet Fuel with CO2 Capture and Storage: Design, Cost, and Greenhouse Gas Emissions Analysis for a Near-Term First-of-a-Kind Demonstration Project and Prospective Future Commercial Plants

We report on a 30-month design study for a first-of-a-kind (FOAK) demonstration plant that would be built at a site near Meridian, Mississippi, to coprocess lignite coal and woody biomass into jet fuel. The design uses an oxygen-blown TRIG™ gasifier developed by KBR and Southern Company. Fischer-Tropsch conversion of the syngas produces synthetic paraffinic kerosene (SPK) as the primary product, plus naphtha. Other co-products include electricity sold to the grid and CO 2 sold for use in enhanced oil recovery (EOR). Previous studies have identified coprocessing of various coals and biomass with CO 2 capture as promising options for cost-competitive production of low net lifecycle greenhouse gas (GHG) emissions synthetic fuels. The effort reported here goes beyond earlier studies in the level of detail in process design and cost estimation with the aim of improving the understanding of the economic prospects for lignite and woody biomass coprocessing systems. Key objectives in the design of the FOAK lignite/biomass-to-jet (LBJ) plant were to achieve net lifecycle GHG emissions for the SPK that are less than for conventional petroleum-derived jet fuel and to make process design and equipment selections such that the plant could be built and operated in the near term, e.g., before 2025. The process design was developed by researchers at Princeton University and the University of Queensland and validated by engineers at the WorleyParsons Group (WP). Commercial vendors provided design and cost estimates for several major plant components. Bare-erected capital costs and operating and maintenance costs were estimated by WP. The primary objective in building and operating the FOAK plant would be to demonstrate the technical viability of the LBJ concept as an essential first step toward launching commercial-scale plants in the longer term. With this in mind, the project team developed a set of principles to help guide the process design: the total plant cost should be less than 2 billion USD (to limit investment risk); the level of input biomass should be both proportionally significant to reflect biomass/lignite co-gasification and sufficient to achieve GHG emissions goals; process design decisions and vendor/equipment selections should prioritize the likelihood of technical success over minimizing the cost of jet fuel production. The resulting FOAK plant design capacity is 1,551 metric t/d (45.5% moisture) lignite and 556 t/d (43.3% moisture) biomass, for a total input of 295 MW HHV , of which 25% is biomass. The design output is 1,252 actual barrels per day of liquids, of which 80% is SPK (62.3 MW LHV ) and 20% is naphtha (13.9 MW LHV ). It exports 15 MW e of electricity after satisfying a 38 MW e onsite auxiliary load. Additional products are 1,326 t/d of pressurized pipeline-quality CO 2 and 49 t/day of sulfuric acid (93 wt% H 2 SO 4 ). With thinnings from sustainably-managed southern pine plantations as the biomass, and with captured CO 2 stored underground via EOR, the net lifecycle emissions for the SPK product are estimated to be about one-quarter of those for petroleum-derived jet fuel. The bare-erected cost (BEC) estimated by WP for this plant is 588 million USD (2015). The authors’ best estimate of total plant cost (TPC) is 1,230 million USD, arrived at by assuming engineering, procurement and construction management services (20% of BEC), process 5 contingencies (35% of BEC), and project contingencies (35% of the sum of all other costs, i.e., 35% of 1.55xBEC). Not surprisingly, an annual discounted cash flow (DCF) analysis determined that it would be impossible to generate a positive net present value (NPV) over a wide range in key input assumptions. An SPK production cost subsidy of nearly 400/bbl USD over a 20-year plant life would be required to achieve zero NPV under a baseline set of assumptions (including 3% real weighted average cost of capital and a levelized crude oil price of 80/bbl USD). Alternatively, a capital grant in excess of the TPC value would also achieve zero NPV. The poor financial results reflect the small scale of the plant, the design principle to prioritize technical success, the levels of contingencies appropriate for the relatively early stage of project development, and the first-of-a-kind nature of the plant. Technology innovations, learning via construction and operating experience, alternative plant configurations, and larger scale should improve economics of future plants. To help understand these prospects, a preliminary analysis of N th -of-a-kind (NOAK) plants was developed, but with the limitation that plants would use only equipment components that for the most part are already commercial today: consideration of advanced, not-yet-commercial technologies and of R&D-driven improvements in existing technologies were beyond the scope of this analysis. The analysis found that a variety of NOAK plant designs that coprocess lignite and woody biomass to make jet fuel are unlikely to be economically competitive without subsidy even in the presence of a high future carbon tax or equivalent greenhouse gas mitigation policy. This conclusion applies to process configurations and input biomass/lignite ratios that result in net GHG emissions as high as those for petroleum-derived jet fuel and as low as zero. In contrast, encouraging results were found for plants processing only biomass. The economics of these “BECCS” plants (biomass energy with CCS) improve dramatically with the strength of carbon mitigation policies because of their strongly negative net GHG emissions. These findings do not imply that coal/biomass coprocessing strategies for making synfuels with CCS are not economically promising – only that, in the case of lignite, much more than a 25% biomass coprocessing rate would be needed. However, our analysis shows that all such systems are unlikely to be economic in the absence of a strong carbon mitigation policy. Future R&D driven technological innovations could modify this conclusion. Among other R&D priorities, an emphasis on better understanding and reducing plant auxiliary loads is warranted.

09 BIOMASS FUELS↗

Mu*STAR ADSR Fuel Conversion Facility Evaluation and Cost Analysis

The purpose of the reported effort is the development of a conceptual process for conversion of used nuclear fuel (UNF) from light water reactors (LWRs) to a fluoride salt form to facilitate its use for power generation in a Mu*STAR Accelerator-driven Subcritical Reactor (ADSR). This document evaluates potential processes for converting UNF into a fluoride salt, evaluates the costs/benefits of using enriched lithium in the carrier salt, and analyzes comparable costs of similar facilities to make a rough order of magnitude estimate for the cost to design, construct, and commission a Mu*STAR ADSR fuel conversion facility. This document also makes a high-level comparison of the Mu*STAR ADSR fuel cycle with other important fuel cycles. The results of the cost analysis show that the Mu*STAR ADSR fuel conversion facility will cost more than $100M, possibly up to around $1B, to design and construct. The cost will depend on the size of the hot cell required, which will depend on the processing options chosen for converting the UNF to a molten salt. Operations and maintenance of the facility will be on the order of $10M per year. The design, fabrication, and installation of the remote process equipment to support the fuel conversion will be an additional cost of more than $50M. Cost surveys of Department of Energy hot cell designs and previous Department of Energy hot cell construction suggest that the cost variance may be large, and the risk of escalating costs may be high in the regulation-mandated atmosphere of nuclear facility design and construction. The molten salt for the Mu*STAR ADSR contains all of the nonvolatile isotopes in the UNF, and there is never a separation of the plutonium from the fission products. This makes this conversion process much more proliferation resistant than the reprocessing options used for other closed fuel cycles. When normalized to the amount of electricity produced, the Mu*STAR ADSR fuel cycle’s expected cost might be less than any reprocessing fuel cycle and possibly less than the once-through cycle now used. Simulations show that once the conversion to fluoride is made, that up to seven times as much energy can be extracted from the UNF than was produced by the LWR while making it [Bowman, 2010]. Using once-only, on-site conversion to fluoride means no mining, no enrichment, no manufacturing of fuel rods, and no transportation costs. Typically, the UNF was produced over a 40-year period in an LWR; it can potentially be used for 280 years in Mu*STAR, producing the same power as the LWR did, ultimately requiring disposal of approximately the same volume of material as the LWR generated. Mu*STAR burns most of the higher actinides, which could reduce both the cost of disposal and significantly reduce the longevity of its radiotoxicity. Mu*STAR ADSR’s ability to demonstrate unique and valuable peripheral benefits are additional arguments for this technology, including (1) turning UNF into a valuable commodity (thus, its disposal will not be such an immediate problem, so continued operation of existing LWRs will be more acceptable); (2) burning fissile or fertile fuel including excess weapons-grade plutonium in subcritical mode; and (3) providing high-temperature process heat to convert natural gas to synthetic diesel fuel, water to hydrogen, or for other process-heat applications.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

2020 Cost Analysis of Hydropower Options at Non-Powered Dams

This report provides a cost analysis of potential hydropower development for representative non-powered dam (NPD) sites in the United States. The overarching objective is to support the establishment of a basis for evaluating progress towards improving the competitiveness of new hydropower development for electricity generation. The representative sites, herein referred to as “reference sites”, were selected from sites with detailed water resource data to support the cost analysis. Facility designs, capital costs, plant generation and efficiency profiles, capacity factors, and levelized costs of energy (LCOE) are presented for the sites under baseline and near-term innovation cases. The baseline case represents facility configurations using technologies that are already widely applied in the hydropower industry, whereas near-term innovations are technologies likely to reach wide acceptance within the next 5 to 10 years. Cost savings in the near-term relative to the baseline are discussed to illustrate the potential benefits to the hydropower industry from research and development (R&D) and adoption of these innovations. Medium- to long-term innovation options expected from ongoing private and government R&D efforts are also highlighted but are not quantified in this report because of a current lack of complete information on these options. The key findings of the cost analysis in this study imply that near-term innovations could reduce the baseline costs of hydropower development at US NPD sites. Thus, if remaining R&D issues with these near-term innovations can be resolved within the next 5 to 10 years, industry-wide adoption of these technologies and improved competitiveness of NPD hydropower development can be expected. Specific key findings of the analysis include the following: 1) Potential installed capacity at the NPD sites evaluated in this study vary from 200 kW to 70 MW, representing two orders of magnitude variation across nearly 20 sites; 2) Capital costs, not including development costs, for the sites evaluated in this study vary from $2,200/kW to $34,000/kW but are below $12,000/kW for most sites; 3) Baseline LCOE estimates for lake dams are from $79/MWh to $790/MWh with most sites under $400/MWh, whereas estimates for lock dams are from $134/MWh to $289/MWh with most sites under $200/MWh; 4) Reductions in capital cost per kilowatt under the near-term innovation case are from −77% to −14% for lake dams and −21% to −2.1% for lock dams (excluding one site with a 14% increase in per-kilowatt capital costs); 5) Combined changes in capital costs and capacity factors in the near-term case relative to the baseline lead to reductions in LCOE of −71% to −14% for lake dams and −21% to −14% for lock dams; 6) Overall, LCOE reductions lead to 8 of the 18 sites under the near-term case having LCOE values below $150/MWh compared with only 2 of 18 sites in the baseline case.

13 HYDRO ENERGY↗

Cost of Fish Exclusion and Passage Technologies for Hydropower

Hydropower represents a reliable source of renewable energy and accounts for approximately 7% of the total electrical generation in the United States. Future expansion of hydropower is likely to be in the form of either smaller new stream development projects or powering existing non-powered dams. For these new projects to be successful, careful analysis of risks, costs, and uncertainty to offset reduced power production as well as ensuring the protection and safe passage of migratory fish to gain public support, will be required. Exclusion and passage are two common approaches to protect fish from entrainment and impingement at hydropower facilities. The thresholds for entrainment risk and requirements for exclusion and passage often differ depending on the species involved, the characteristics of the facility, and the goals of stakeholders. While the costs associated with environmental mitigations represent a large proportion of the total costs required for the licensing of hydropower facilities, little quantitative information is present within the literature regarding the specific costs of fish exclusion and passage. Working with FOA awardee Natel Energy, scientists at Oak Ridge National Laboratory were tasked with assessing the capital construction costs for downstream fish exclusion and passage infrastructure. This report used keyword searches of an existing environmental mitigation cost data set and manual extraction of additional cost data associated with protection, mitigation, and enhancement (PM&E) measures related to positive barrier screening and passage from regulatory licensing documents available in the Federal Energy Regulatory Commission (FERC) eLibrary. This approach yielded a total of 50 PM&E mitigation measures with estimated capital construction costs pertaining to positive barrier screens, 142 pertaining to passage studies, and 26 pertaining to passage-related studies. PM&E measures associated with positive barrier screens represented <10% of the 171 total FERC project dockets available in the data set. These data were highly skewed toward conventional relicensing projects, as <7% were associated with new stream development (NSD) projects. Results from these data indicate highly variable costs associated with fish screening, with flow-normalized costs one to two orders of magnitude higher for screening with the highest exclusion capability (≤0.09 in. spacing) compared with coarser screening (1 to 2 in.). Furthermore, estimated capital costs of passage infrastructure were positively related to the scale of the project based on installed capacity for some, but not all, types of passage. These data provide an initial baseline for estimating exclusion and passage costs for hydropower development and may help developers consider options for more fish-friendly generation technologies, though gaps remain relating to a lack of data, particularly for NSD projects. More data may still be available within the FERC eLibrary, but significant effort will be required to manually identify and extract the data for future analyses.

13 HYDRO ENERGY↗

Reliability and cost analysis methods

In the design phase of a system, how does a design engineer or manager choose between a subsystem with .990 reliability and a more costly subsystem with .995 reliability? When is the increased cost justified? High reliability is not necessarily an end in itself but may be desirable in order to reduce the expected cost due to subsystem failure. However, this may not be the wisest use of funds since the expected cost due to subsystem failure is not the only cost involved. The subsystem itself may be very costly. We should not consider either the cost of the subsystem or the expected cost due to subsystem failure separately but should minimize the total of the two costs, i.e., the total of the cost of the subsystem plus the expected cost due to subsystem failure. This final report discusses the Combined Analysis of Reliability, Redundancy, and Cost (CARRAC) methods which were developed under Grant Number NAG 3-1100 from the NASA Lewis Research Center. CARRAC methods and a CARRAC computer program employ five models which can be used to cover a wide range of problems. The models contain an option which can include repair of failed modules.

Suich, Ronald C.↗

The Launch Systems Operations Cost Model

One of NASA's primary missions is to reduce the cost of access to space while simultaneously increasing safety. A key component, and one of the least understood, is the recurring operations and support cost for reusable launch systems. In order to predict these costs, NASA, under the leadership of the Independent Program Assessment Office (IPAO), has commissioned the development of a Launch Systems Operations Cost Model (LSOCM). LSOCM is a tool to predict the operations & support (O&S) cost of new and modified reusable (and partially reusable) launch systems. The requirements are to predict the non-recurring cost for the ground infrastructure and the recurring cost of maintaining that infrastructure, performing vehicle logistics, and performing the O&S actions to return the vehicle to flight. In addition, the model must estimate the time required to cycle the vehicle through all of the ground processing activities. The current version of LSOCM is an amalgamation of existing tools, leveraging our understanding of shuttle operations cost with a means of predicting how the maintenance burden will change as the vehicle becomes more aircraft like. The use of the Conceptual Operations Manpower Estimating Tool/Operations Cost Model (COMET/OCM) provides a solid point of departure based on shuttle and expendable launch vehicle (ELV) experience. The incorporation of the Reliability and Maintainability Analysis Tool (RMAT) as expressed by a set of response surface model equations gives a method for estimating how changing launch system characteristics affects cost and cycle time as compared to today's shuttle system. Plans are being made to improve the model. The development team will be spending the next few months devising a structured methodology that will enable verified and validated algorithms to give accurate cost estimates. To assist in this endeavor the LSOCM team is part of an Agency wide effort to combine resources with other cost and operations professionals to support models, databases, and operations assessments.

Prince, Frank A.↗

Error Cost Escalation Through the Project Life Cycle

It is well known that the costs to fix errors increase as the project matures, but how fast do those costs build? A study was performed to determine the relative cost of fixing errors discovered during various phases of a project life cycle. This study used three approaches to determine the relative costs: the bottom-up cost method, the total cost breakdown method, and the top-down hypothetical project method. The approaches and results described in this paper presume development of a hardware/software system having project characteristics similar to those used in the development of a large, complex spacecraft, a military aircraft, or a small communications satellite. The results show the degree to which costs escalate, as errors are discovered and fixed at later and later phases in the project life cycle. If the cost of fixing a requirements error discovered during the requirements phase is defined to be 1 unit, the cost to fix that error if found during the design phase increases to 3 - 8 units; at the manufacturing/build phase, the cost to fix the error is 7 - 16 units; at the integration and test phase, the cost to fix the error becomes 21 - 78 units; and at the operations phase, the cost to fix the requirements error ranged from 29 units to more than 1500 units

Stecklein, Jonette M.↗