Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Contamination Control Process”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 397 records · Page 22

Planetary protection, legal ambiguity and the decision making process for Mars sample return

As scientists and mission planners develop planetary protection requirements for future Mars sample return missions, they must recognize the socio-political context in which decisions about the mission will be made and pay careful attention to public concerns about potential back contamination of Earth. To the extent that planetary protection questions are unresolved or unaddressed at the time of an actual mission, they offer convenient footholds for public challenges in both legal and decision making realms, over which NASA will have little direct control. In this paper, two particular non-scientific areas of special concern are discussed in detail: 1) legal issues and 2) the decision making process. Understanding these areas is critical for addressing legitimate public concerns as well as for fulfilling procedural requirements regardless whether sample return evokes public controversy. Legal issues with the potential to complicate future missions include: procedural review under National Environmental Policy Act (NEPA); uncertainty about institutional control and authority; conflicting regulations and overlapping jurisdictions; questions about international treaty obligations and large scale impacts; uncertanities about the nature of the organism; and constitutional and regulatory concerns about quarantine, public health and safety. In light of these important legal issues, it is critical that NASA consider the role and timing of public involvement in the decision making process as a way of anticipating problem areas and preparing for legitimate public questions and challenges to sample return missions.

NASA Discipline Number 59-10↗

Solvent-driven aqueous separations for hypersaline brine concentration and resource recovery

Solvent-driven separation processes can extract water and high-value minerals from high salinity or contaminated brines, simultaneously reducing the environmental impact of brine disposal and enabling resource recovery. The efficient dewatering of hypersaline brines is essential for the sustainable minimal and zero liquid discharge processing of industrial wastewaters. Fractional crystallization can selectively extract ions from contaminated waste streams, allowing critical materials to be recycled, including transition and lanthanide metals required for renewable energy generation and storage. Mass transfer in solvent-driven water extraction occurs across a liquid–liquid interface, eliminating the scaling and fouling of membrane and heat exchanger surfaces and limiting the need for extensive pretreatment. Solvent-driven fractional crystallization can leverage sequential treatment and control of process conditions to rapidly recover salts without requiring evaporation of water. Despite promising applications, the principles and potential of solvent-driven aqueous separations remain poorly understood. This critical review explores the opportunities presented by solvent-based aqueous separations from the molecular to process scale, evaluating the chemistry of solvation and system design in the broader context of desalination, resource recovery, water softening, and mineral production.

37 INORGANIC, ORGANIC, PHYSICAL, AND ANALYTICAL CH↗

The Walls Come Tumbling Down: Decontamination and Demolition of 29 Manhattan Project and Cold War-Era Buildings and Structures at Los Alamos National Laboratory-12301

When the nation's top scientists and military leaders converged on Los Alamos, New Mexico in the 1943, to work on the Manhattan Project, the facilities they used to conduct their top-secret work were quickly constructed and located in the middle of what eventually became the Los Alamos town site. After one of these early facilities caught on fire, it seemed wise to build labs and production facilities farther away from the homes of the town's residents. They chose to build facilities on what was then known as Delta Prime (DP) Mesa and called it Technical Area 21, or TA-21. With wartime urgency, a number of buildings were built at TA-21, some in as little as a few months. Before long, DP Mesa was populated with several nondescript metal and cinder-block buildings, including what became, immediately following the war, the world's first plutonium production facility. TA-21 also housed labs that used hazardous chemicals and analyzed americium, tritium and plutonium. TA-21 was a bustling center of research and production for the next several decades. Additional buildings were built there in the 1960's, but by the 1990's many of them had reached the end of their service lives. Labs and offices were moved to newer, more modern buildings. When Los Alamos National Laboratory received $212 million in funding from the American Recovery and Reinvestment Act in July 2009 for environmental cleanup projects, about $73 million of the funds were earmarked to decontaminate and demolish 21 of the old buildings at TA-21. Although some D and D of TA-21 buildings was performed in the 1990's, many of the facilities at DP Site remained relatively untouched for nearly three decades following their final operational use. In 2006, there were over three dozen buildings or structures on the mesa to be removed so that soil cleanup could be completed (and the land made available for transfer and reuse). The total footprint of buildings across the mesa was approximately 18,580 m{sup 2} (200,000 ft{sup 2}). The initially approved baseline for the ARRA D and D Project was to remove 22 buildings and structures that included approximately 14,680 m{sup 2} (158,000 ft{sup 2}) of footprint. By employing efficiencies during subcontracting, demolition, and waste segregation, the savings allowed an additional 1,580 m{sup 2} (17,000 ft{sup 2}) of footprint to be removed using ARRA funds. Additionally, the lessons learned from this experience were used to apply NNSA funding to the removal of six additional non-contaminated buildings and structures. In the end, 29 buildings and structures, including stacks, cooling towers and tanks, were removed from the mesa. The entire DP East area was cleared of buildings and sub-grade structures and the soils cleaned to residential standards. The total footprint reduction at TA-21 as a result of this effort was in excess of 17,650 m{sup 2} (190,000 ft{sup 2}). The use of a Laboratory self-performance team to start demolition of non-contaminated structures resulted in steady work performance early in the project while subcontracts were being put in place to perform more complicated abatement and contaminated demolition activities. Most importantly, there were no serious worker injuries and the minor injuries recorded were those common to construction type activities. Extensive monitoring along the site boundary demonstrated that no hazardous chemicals or radioactive contamination were released and radiological dose to the public was negligible. The ARRA demolition activities were completed six months in advance of the deadline for employing ARRA funds. Additionally, over 17,585 m{sup 3} (23,000 yds{sup 3}) of building demolition debris was safely removed from DP Mesa. All of the major buildings have been removed, unencumbered access to the SWMUs that are required to be cleaned up by the Consent Order with the state of New Mexico, has been achieved, and a significant portion of the mesa has been prepared to support a process that will eventually transfer this land from federal government control for further use. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Environmental cleanup of the East Tennessee Technology Park - Year three - A status report - 15522

On August 1, 2011, URS - CH2M Oak Ridge LLC (UCOR) began its five-year, $1.4 billion cleanup of the East Tennessee Technology Park (ETTP), the former Oak Ridge Gaseous Diffusion Plant, located on the U.S. Department of Energy's (DOE) Oak Ridge Reservation (Reservation) in Tennessee. Under the contract, the base period scope of work to be completed by 2016 includes demolition of both the K-25 and K-31 gaseous diffusion buildings and all demolition waste dispositioned, initiation of demolition on the remaining K-27 gaseous diffusion building, safe storage of transuranic (TRU) waste for eventual transfer to the Transuranic Waste Processing Center, previously designated -No-Path-To-Disposition Waste- dispositioned to the extent possible, and completion of design and engineering of a mercury treatment system to be installed at the Y-12 National Security Complex (Y-12). UCOR will have also managed DOE Oak Ridge Office of Environmental Management (OREM)-owned facilities at ETTP, Oak Ridge National Laboratory (ORNL), and Y-12 in a safe and cost-effective manner. Since assuming responsibilities as the ETTP and Oak Ridge Reservation cleanup contractor, UCOR has completed its life-cycle Performance Measurement Baseline; received its Earned Value Management System (EVMS) certification; completed the deactivation and demolition (D and D) of the 44-acre K-25 gaseous diffusion building; removed and disposed of a contaminated underground storage tank (Tank W-1A) at ORNL; dispositioned mercury-contaminated storage tanks at Y-12; completed closure of the Toxic Substances Control Act Incinerator; disposed of more than 158,000 cubic yards of cleanup waste while managing the on-site Environmental Management Waste Management Facility (EMWMF); and conducted operations, surveillance, and maintenance activities at 180 DOE EM facilities at ETTP, ORNL, and Y-12 in a safe and cost-effective manner. In 2014, UCOR completed the removal and disposal of all of the K-25 demolition debris; completed the removal of asbestos-laden transite siding on the K-31 gaseous diffusion building and began demolition of that 17-acre building; advanced the characterization and deactivation of the K-27 gaseous diffusion building, readying the building for the start of demolition in 2015; advanced the design and engineering of a Mercury Treatment Facility to be located at Y-12; continued the cost-effective and safe disposition of all cleanup wastes; and readied ETTP for Voluntary Protection Program Star Status Assessment in 2015. Project performance as of December 31, 2014, continued to be excellent: - Cost Performance Index - 1.12 - Schedule Performance Index - 1.02 At the same time, since safety is the foundation of all cleanup work, UCOR's safety record goes hand-in-hand with its excellent project performance. Through calendar year 2014, UCOR's recordable injury rate was 1.04 occurrences per 200,000 work hours, and the lost workday case rate was 0.52. This performance continues to be due, in large part, to the people and processes URS and CH2M HILL, the parent companies of UCOR, brought to the project. Key enablers included: - Selected and deployed experienced staff in key leadership positions throughout the organization, continually re-energizing the organization with new leaders - Implemented previously successful safety programs and initiatives from other DOE sites, such as DOE's Voluntary Protection Program - Brought fresh thinking and innovation to tackling tough project issues, such as the deactivation of the Technetium-99-contaminated areas of K-27, applying lessons learned from the D and D of K-25; and implementing a -waste factory- approach to cleanup - Maintained continuing alignment between UCOR's contract with DOE and its Performance Measurement Baseline - rapidly addressing contract changes when they arose - Maintained a readiness both from a process as well as experienced personnel perspective to support DOE OREM in performing other significant Oak Ridge Reservation cleanup activities. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Innovative Use of Cr(VI) Plume Depictions and Pump-and-Treat Capture Analysis to Estimate Risks of Contaminant Discharge to Surface Water at Hanford Reactor Areas

The Hanford Site nuclear reactor operations required large quantities of high-quality cooling water, which was treated with chemicals including sodium dichromate dihydrate for corrosion control. Cooling water leakage, as well as intentional discharge of cooling water to ground during upset conditions, produced extensive groundwater recharge mounds consisting largely of contaminated cooling water and resulted in wide distribution of hexavalent chromium (Cr[VI]) contamination in the unconfined aquifer. The 2013 Cr(VI) groundwater plumes in the 100 Areas cover approximately 6 km2 (1500 acres), primarily in the 100-HR-3 and 100-KR-4 groundwater operable units (OUs). The Columbia River is a groundwater discharge boundary; where the plumes are adjacent to the Columbia River there remains a potential to discharge Cr(VI) to the river at concentrations above water quality criteria. The pump-and-treat systems along the River Corridor are operating with two main goals: 1) protection of the Columbia River, and 2) recovery of contaminant mass. An evaluation of the effectiveness of the pump-and-treat systems was needed to determine if the Columbia River was protected from contamination, and also to determine where additional system modifications may be needed. In response to this need, a technique for assessing the river protection was developed which takes into consideration seasonal migration of the plume and hydraulic performance of the operating well fields. Groundwater contaminant plume maps are generated across the Hanford Site on an annual basis. The assessment technique overlays the annual plume and the capture efficiency maps for the various pump and treat systems. The river protection analysis technique was prepared for use at the Hanford site and is described in detail in M.J. Tonkin, 2013. Interpolated capture frequency maps, based on mapping dynamic water level observed in observation wells and derived water levels in the vicinity of extraction and injection wells, are developed initially. Second, simulated capture frequency maps are developed, based on transport modelling results. Both interpolated and simulated capture frequency maps are based on operation of the systems over a full year. These two capture maps are then overlaid on the plume distribution maps for inspection of the relative orientation of the contaminant plumes with the capture frequency. To quantify the relative degree of protection of the river from discharges of Cr(VI) (and conversely, the degree of threat) at any particular location, a systematic method of evaluating and mapping the plume/capture relationship was developed. By comparing the spatial relationship between contaminant plumes and hydraulic capture frequency, an index of relative protectiveness is developed and the results posted on the combined plume/capture plan view map. Areas exhibiting lesser degrees of river protection are identified for remedial process optimization actions to control plumes and prevent continuing discharge of Cr(VI) to the river.

Miller, Chuck W.↗

Development of a Trace Detection Method for Mercury Speciation in Hanford Tank Waste - 19014

The U.S. Department of Energy's (DOE) Hanford Site in southeast Washington State stores 56 million gallons of chemical and radioactive waste stored in underground tanks. Mercury species in liquid and solid fractions of Hanford tank waste pose a risk to the implementation and execution of DoE's River Protection Project mission due to mercury concentration limits imposed under waste acceptance criteria, toxicity characteristic leaching procedure restrictions for secondary waste disposal, and air emission permits. Although there is currently no processing of tank waste at Hanford, waste processing is imminent, and representative mercury inventory tracking will be important to anticipate and mitigate stack emissions and secondary liquid waste disposal issues. A methodology to accurately determine total mercury and mercury speciation in Hanford tank waste, while maintaining low mercury detection limits, currently does not exist at Hanford. Moreover, the mercury species in the waste solids are unknown and may be waste type-specific. The development of an analytical method to separate and speciate mercury in tank waste was undertaken by the Pacific Northwest National Laboratory (PNNL) while leveraging an existing non-radiological, ultra-trace mercury detection technique frequently performed at PNNL's Marine Sciences Laboratory in Sequim, Washington. The ultimate goal of this work is to develop an analytical method to obtain detailed mercury speciation information and update flowsheet modeling assumptions related to mercury partitioning at Hanford. The first phase of testing was completed in the development of an analytical methodology for the low-level determination of total mercury, elemental mercury, methylmercury, and dimethylmercury in Hanford tank waste. This paper presents Phase I testing which focused on determining whether mercury species can be preconcentrated from aqueous Hanford tank waste solution onto a solid substrate, while simultaneously eliminating or very significantly reducing the parent radionuclide activity. This was demonstrated by developing protocols for the separation and preconcentration of total mercury and methylmercury onto solid substrates, then measuring the substrates for radiological content at PNNL's Radiochemical Processing Laboratory on the Hanford Site. The mercury content was successfully separated onto stable substrates and the radionuclide activity reduction was significant enough that the preconcentrated samples could be subjected to quantification using far less restrictive handling and radiological controls than would be required for the parent sample (i.e., contamination area fume hood vs. hot cell). This mercury separation method required no sample dilution, which enables maximum mercury detectability, while still allowing mercury speciation. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Electron nanoprobe induced oxidation: A simulation of direct-write purification

Electron beam direct-write has recently taken a large step forward with the advent of methods to purify deposits. This development has opened the door for future direct-write device prototyping and editing. In one such approach, an additional beam scanning procedure removes carbonaceous impurities via oxidation from metal–carbon deposits (e.g., PtC 5 ) in the presence of H 2 O or O 2 after deposition. So far, critical aspects of the oxidation reaction remain unclear; experiments reveal clearly that electron stimulated oxidation drives the process yet it is not understood why H 2 O purifies by a bottom-up mechanism while O 2 purifies from the top-down. The simulation results presented here suggest that the chemisorption of dissolved O 2 at buried Pt nanoparticle surfaces controls purification in the top-down case while both the high relative solubility coupled with weak physisorption of H 2 O explains the bottom-up process. Crucial too is the role that the carbonaceous contaminant itself has on the dissolution and diffusion of O 2 and H 2 O. The results pave the way for simulation driven experiments where (1) the transient densification of the deposit can be accounted for in the initial deposit design stage and (2) the deposition and purification steps can be combined.

77 NANOSCIENCE AND NANOTECHNOLOGY↗

THE SCENARIOS APPROACH TO ATTENUATION-BASED REMEDIES FOR INORGANIC AND RADIONUCLIDE CONTAMINANTS

Guidance materials based on use of conceptual model scenarios were developed to assist evaluation and implementation of attenuation-based remedies for groundwater and vadose zones contaminated with inorganic and radionuclide contaminants. The Scenarios approach is intended to complement the comprehensive information provided in the US EPA's Technical Protocol for Monitored Natural Attenuation (MNA) of Inorganic Contaminants by providing additional information on site conceptual models and extending the evaluation to consideration of Enhanced Attenuation approaches. The conceptual models incorporate the notion of reactive facies, defined as units with hydrogeochemical properties that are different from surrounding units and that react with contaminants in distinct ways. The conceptual models also incorporate consideration of biogeochemical gradients, defined as boundaries between different geochemical conditions that have been induced by waste disposal or other natural phenomena. Gradients can change over time when geochemical conditions from one area migrate into another, potentially affecting contaminant mobility. A recognition of gradients allows the attenuation-affecting conditions of a site to be projected into the future. The Scenarios approach provides a stepwise process to identify an appropriate category of conceptual model and refine it for a specific site. Scenario materials provide links to pertinent sections in the EPA technical protocol and present information about contaminant mobility and important controlling mechanism for attenuation-based remedies based on the categories of conceptual models.

54 ENVIRONMENTAL SCIENCES↗

Arsenic stabilization performance of a novel starch-modified Fe-Mn binary oxide colloid

Arsenic (As) is an environmentally hazardous contaminant and can be a serious threat to human health. In China, remediation needs for a large number of As-contaminated sites renders a strong demand for efficient remedial reagents and cost effective approaches. In this study, a novel starch-modified Fe-Mn binary oxide (SFM), an amorphous colloidal material, has been synthesized as a remedial reagent and its As stabilization performance has been evaluated. A set of laboratory batch experiments were carried out by directly adding SFM of different dosages into three contaminated soils. Results demonstrated that SFM could transform As in soil from non-specifically and specifically sorbed fractions to the more stable form bounded to amorphous iron hydrous oxides, thus reducing the As concentration in TCLP leachates by 42.0-93.2%. Results from adsorption tests and microscopic analysis indicated that the interactions between SFM and As are mainly controlled by adsorption, oxidation, and precipitation processes. SFM has abundant surface hydroxyl groups, with excellent adsorption properties for both As(V) and As(III), with the maximum adsorption capacities of 160.63 and 284.64 mg/g respectively at pH 7.0. The adsorption process closely fitted pseudo second-order kinetics and Freundlich isotherm model. SFM could increase soil Eh and oxidize As(III) to As(V), which facilitated the As stabilization in soilColloidal iron-based material directly used for stabilization in As contaminated soils is reported here for the first time. Starch modification improves both the reactivity and mobility of SFM in soil. Our findings propose an efficient and convenient reagent for As remediation in soil.

Yan, Xiulan↗

Autonomous Sampling Platform Development: Radiological Contamination Mapping at SRS

From 1961 to 1964, radioactive elements were released from the Savannah River Site into local bodies of water via cooling water charges from the reactors on site. In 1983, the extent of the radioactive contamination was first studied, and elements such as 137 Cs, 90 Sr, 238 Pu, 241 Am, 244 Cm, and tritium were found to have seeped from local bodies of water into sediment and the surrounding flora and fauna. The current method of tracking and monitoring radioactive contamination at the SRS is to gather samples and conduct measurements in a laboratory. A cheaper, and safer, method to conduct such measurements would be to automate the process by using an autonomous boat that can travel to locations, conduct measurements, and return home all without human intervention. To introduce this idea, the construction of an autonomous boat prototype was completed to demonstrate the practicality and feasibility of such an idea. The prototype travels to a set of waypoints, stops at each waypoint, and returns when all waypoints have been reached. It does this by employing a simple battery-powered boat with an Arduino controller that steers the boat using a steering algorithm incorporated into a Proportional Integral Derivative (PID) function. A total of three tests were conducted at two different bodies of water; and after working out some hardware problems, the boat drone was able to successfully steer and reach all programmed waypoints. With the prototype complete, the next steps to realizing the final product of the boat drone will include adopting a processing unit with higher-bit architecture, using a bigger boat with a more powerful trolling motor, and incorporating a solar panel for continuous power and round-the-clock performance.

42 ENGINEERING↗

Visible, Durable, Enforceable Institutional Controls: Weldon Spring Site - A 10-Year Journey - 13190

The DOE Office of Legacy Management's (LM's) mission is to manage the DOE's post-closure responsibilities and ensure the future protection of human health and the environment. LM has control and custody of legacy land, structures, and facilities and is responsible for maintaining them at levels suitable for their long-term use. This includes all engineered and institutional controls (ICs) designed as another level of assurance to prevent exposure to residual contamination and waste. The development and management of ICs has been, and continues to be, a critical component to the success of LM surveillance and maintenance activities. Many major federal laws, Executive Orders, regulations, and various other drivers influence the establishment and use of ICs at LM sites. LM uses a wide range of ICs to appropriately limit access to, or uses of, land, facilities, and other real and personal properties; protect the environment; maintain the physical safety and security of DOE facilities; and prevent or limit inadvertent human and environmental exposure to residual contaminants and other hazards. The ICs at the Weldon Spring, Missouri, Site were developed in close coordination with federal and state regulators. An Explanation of Significant Differences (ESD) was issued in February 2005, which clarified the use restrictions necessary for the remedial actions specified in the Records of Decision for the separate operable units to remain protective over the long-term. The operable units included the Chemical Plant Operable Unit, the Chemical Plant Groundwater Operable Unit, and the Quarry Residuals Operable Unit. The ESD clarified specific requirements for each site area that needed use restrictions and established how DOE would implement, maintain, and monitor the specific requirements. DOE developed the Long-Term Surveillance and Maintenance Plan for the U.S. Department of Energy Weldon Spring, Missouri, Site (LTS and M Plan) that addressed the full scope of the site management activities necessary to ensure that the Weldon Spring Site remains protective over the long-term. The LTS and M Plan is revised periodically to ensure its applicability to changing site, regulatory, or procedural conditions. In addition to addressing such activities as long-term groundwater monitoring and disposal cell maintenance, the LTS and M Plan was developed and issued to ensure that the use restrictions identified in the ESD were properly imposed and maintained. The LTS and M Plan included a detailed IC Implementation Plan, which includes a process for evaluating and identifying specific IC mechanisms that best accomplish the objectives set out in the ESD. Consistent with EPA guidance on selecting ICs, various IC mechanisms were evaluated, including government controls, proprietary controls, enforcement tools, and informational devices. Where appropriate, redundant mechanisms were employed to increase the effectiveness of the ICs. Information in the IC Implementation Plan includes: (1) a discussion of current site conditions (reflecting post-remedial action conditions for the Chemical Plant and Quarry Areas and the risk-basis for why use restrictions are needed); (2) the objectives of, or performance expectations for, the use restrictions; (3) specific ICs already in place and additional mechanisms identified for implementation; (4) a schedule for implementing additional ICs; (5) procedures for maintaining the ICs and for conducting periodic inspections; and (6) general provisions for the implementing ICs for the site. The actual agreements and documentation of the various ICs are included in an appendix of the LTS and M Plan. These documents are also available via the internet from the authorizing agencies (County, Missouri Department of Natural Resources, EPA, etc.) The Weldon Spring Site personnel have been successful in finalizing each of the ICs that were established for the site. The planning, establishment, and implementation of the ICs was a long and detailed process with several lessons-learned that were identified along the way. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Chemical Looping Coal Gasification Sub-Pilot Unit Demonstration and Economic Assessment for IGCC applications (Final Report)

The Ohio State University (OSU) coal to syngas (CTS) technology is an advanced air separation process that can be applied for electricity production via an integrated gasification combined cycle (IGCC). The objective of the proposed project is to enable the OSU CLG technology for a commercially relevant demonstration by 2020. In order to accomplish this objective, small pilot scale demonstration of the CLG reactor system was performed. The small pilot test unit incorporates commercially scalable non-mechanical gas sealing and solids flow control components for extended operations of the integrated reactor system. A cumulative demonstration of greater than 100 hours was performed to confirm the reliability of the reactors (reducer and oxidizer) and non-mechanical devices in maintaining controlled solid circulation, gas sealing, and coal distribution in the reactor (reducer) as well as to confirm sustained syngas product performance. A comprehensive techno-economic analysis (TEA) of the OSU CLG process for IGCC application was conducted with the support of WorleyParsons, Ltd. (WP) and compared to the Department of Energy (DOE) baseline IGCC report. Using the data gained from the small pilot demonstration, a complete comprehensive techno-economic analysis (TEA) of the CLG process was conducted. The evaluation was used as basis to attract utilities and coal industries in Ohio. The project duration lasts 30 months (6 months of no cost extension). Ohio coal was used in the integrated CLG small pilot unit to convert to high hydrogen syngas. A demonstration of the integrated chemical looping reactor system at the 15 kW th scale accelerates technology commercialization in the near term. The 15 kWth demonstration addressed several major technology gaps, such as coal injection and distribution in the reducer, controllable solids circulation with the desired fuel to solids ratio, system pressure distribution for proper gas sealing, effects of contaminants and fuel/oxygen carrier residence time requirements. The fates of impurities, such as SO x and NO x was also investigated in unit demonstrations. WP conducted a comprehensive system TEA to optimize the OSU CLG process design for efficient electricity generation with greater than 90% CO 2 capture in IGCC applications. The conclusion of this project supports the further scale-up of the technology to a commercially applicable large pilot scale test unit for operation by 2020. More importantly, it benefits Ohio as it provides an economically competitive mean for power generation with carbon capture. Given the rise of natural gas usage and strict environmental regulations, the use of Ohio coal is expected to decrease and thus impact the coal economy in Ohio. The conclusion of this project provided way for Ohio coal to compete in the future and secure jobs in the energy sector.

01 COAL, LIGNITE, AND PEAT↗

Human Mars Surface Science Operations

Human missions to the surface of Mars will have challenging science operations. This paper will explore some of those challenges, based on science operations considerations as part of more general operational concepts being developed by NASA's Human Spaceflight Architecture (HAT) Mars Destination Operations Team (DOT). The HAT Mars DOT has been developing comprehensive surface operations concepts with an initial emphasis on a multi-phased mission that includes a 500-day surface stay. This paper will address crew science activities, operational details and potential architectural and system implications in the areas of (a) traverse planning and execution, (b) sample acquisition and sample handling, (c) in-situ science analysis, and (d) planetary protection. Three cross-cutting themes will also be explored in this paper: (a) contamination control, (b) low-latency telerobotic science, and (c) crew autonomy. The present traverses under consideration are based on the report, Planning for the Scientific Exploration of Mars by Humans1, by the Mars Exploration Planning and Analysis Group (MEPAG) Human Exploration of Mars-Science Analysis Group (HEM-SAG). The traverses are ambitious and the role of science in those traverses is a key component that will be discussed in this paper. The process of obtaining, handling, and analyzing samples will be an important part of ensuring acceptable science return. Meeting planetary protection protocols will be a key challenge and this paper will explore operational strategies and system designs to meet the challenges of planetary protection, particularly with respect to the exploration of "special regions." A significant challenge for Mars surface science operations with crew is preserving science sample integrity in what will likely be an uncertain environment. Crewed mission surface assets -- such as habitats, spacesuits, and pressurized rovers -- could be a significant source of contamination due to venting, out-gassing and cleanliness levels associated with crew presence. Low-latency telerobotic science operations has the potential to address a number of contamination control and planetary protection issues and will be explored in this paper. Crew autonomy is another key cross-cutting challenge regarding Mars surface science operations, because the communications delay between earth and Mars could as high as 20 minutes one way, likely requiring the crew to perform many science tasks without direct timely intervention from ground support on earth. Striking the operational balance between crew autonomy and earth support will be a key challenge that this paper will address.

Bobskill, Marianne R.↗

Monaural Sound Localization Revisited

Research reported during the past few decades has revealed the importance for human sound localization of the so-called 'monaural spectral cues.' These cues are the result of the direction-dependent filtering of incoming sound waves accomplished by the pinnae. One point of view about how these cues are extracted places great emphasis on the spectrum of the received sound at each ear individually. This leads to the suggestion that an effective way of studying the influence of these cues is to measure the ability of listeners to localize sounds when one of their ears is plugged. Numerous studies have appeared using this monaural localization paradigm. Three experiments are described here which are intended to clarify the results of the previous monaural localization studies and provide new data on how monaural spectral cues might be processed. Virtual sound sources are used in the experiments in order to manipulate and control the stimuli independently at the two ears. Two of the experiments deal with the consequences of the incomplete monauralization that may have contaminated previous work. The results suggest that even very low sound levels in the occluded ear provide access to interaural localization cues. The presence of these cues complicates the interpretation of the results of nominally monaural localization studies. The third experiment concerns the role of prior knowledge of the source spectrum, which is required if monaural cues are to be useful. The results of this last experiment demonstrate that extraction of monaural spectral cues can be severely disrupted by trial-to-trial fluctuations in the source spectrum. The general conclusion of the experiments is that, while monaural spectral cues are important, the monaural localization paradigm may not be the most appropriate way to study their role.

Wightman, Frederic L.↗

Florida International University Research on Soil and Groundwater Contamination at DOE's Hanford and Savannah River Sites - 18547

Nuclear weapons production and other defense-related activities at U.S. Department of Energy (DOE) sites have resulted in radionuclide and heavy metal contamination in surface and subsurface environments nationwide. The DOE Office of Environmental Management (DOE EM) faces a number of environmental challenges that are technically complex and unique to EM with tremendous associated cleanup costs. The success of the DOE EM mission will require development and insertion of innovative approaches and novel technologies to address the significant challenges associated with the remaining cleanup of contaminated sites. A key focus of the applied research portfolio addresses data gaps related to the behavior and chemistry of radionuclides of concern as well as the co-mingling of these contaminants in groundwater at EM sites such as Hanford, Savannah River, Oak Ridge and others. Florida International University (FIU) is conducting research in conjunction with Pacific Northwest National Laboratory (PNNL) and savannah River National Laboratory (SRNL) scientists to support environmental remediation efforts at Hanford and SRS. This research is focused on remediation technologies for contaminated soil and groundwater as well as the assessment of the fate and transport of contaminants in the environment. The overall objective is to reduce contaminant mobility through the development and application of state-of-the-art scientific and environmental remediation technologies. The FIU strategy is to conduct basic science research that fills knowledge gaps and complements work conducted at DOE sites. Support to Hanford includes contributing to the understanding of {sup 99}Tc chemistry and the fate and transport mechanisms of co-mingled contaminants including {sup 99}Tc, U(VI), Cr, and iodine (I). FIU has also provided basic science research that supports a treatability study currently underway at Hanford, which uses ammonia gas injection to manipulate pH and immobilize U(VI) in the subsurface. In addition, support for long-term monitored natural attenuation is provided through geophysical research that monitors subsurface contaminant and microbial responses. Research to evaluate the environmental factors that control the fate and transport of contaminants and co-contaminants in soil and groundwater is being performed for SRS. This research has contributed to the development, design, and deployment of innovative strategies to enhance the natural attenuation processes and to validate novel in situ remediation technologies. The SRS EM test bed demonstrations directly benefit SRS cleanup initiatives. Current investigations focus on natural organic compounds, such as humate, as a potential amendment for the treatment of uranium in groundwater associated with the SRS F-Area Seepage Basins plume, investigates the synergy between humate and silica to optimize the pH adjustment strategy for uranium remediation and investigates the interaction of Tc and I with soil from the Four Mile Branch wetland. Collaborative relationships between FIU and the national laboratories have provided synergy and benefits over the years to FIU, the national laboratories, the DOE complex, and the DOE EM mission. By working closely with the national laboratories, FIU research is not only closely aligned with the cleanup mission priorities at the DOE sites, but complements and supports the work at national laboratories. This coordination and leveraging of research efforts results in time- and cost-savings, and accelerates progress in the DOE EM environmental restoration mission. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Contacting nanowires and nanotubes with atomic precision for electronic transport

Making contacts to nanostructures with atomic precision is an important process in the bottom-up fabrication and characterization of electronic nanodevices. Existing contacting techniques use top-down lithography and chemical etching, but lack atomic precision and introduce the possibility of contamination. Here, we report that a field-induced emission process can be used to make local contacts onto individual nanowires and nanotubes with atomic spatial precision. The gold nano-islands are deposited onto nanostructures precisely by using a scanning tunneling microscope tip, which provides a clean and controllable method to ensure both electrically conductive and mechanically reliable contacts. To demonstrate the wide applicability of the technique, nano-contacts are fabricated on silicide atomic wires, carbon nanotubes, and copper nanowires. The electrical transport measurements are performed in situ by utilizing the nanocontacts to bridge the nanostructures to the transport probes.

77 NANOSCIENCE AND NANOTECHNOLOGY↗

Probing electronic transport of individual nanostructures with atomic precision

Accessing individual nanostructures with atomic precision is an important process in the bottom-up fabrication and characterization of electronic nanodevices. Local electrical contacts, namely nanoelectrodes, are often fabricated by using top-down lithography and chemical etching techniques. These processes however lack atomic precision and introduce the possibility of contamination. Here, we review recent reports on the application of a field-induced emission process in the fabrication of local contacts onto individual nanowires and nanotubes with atomic spatial precision. In this method, gold nanoislands are deposited onto nanostructures precisely by using a scanning tunneling microscope tip, which provides a clean and controllable process to ensure both electrically conductive and mechanically reliable contacts. The applicability of the technique has been demonstrated in a wide variety of nanostructures, including silicide atomic wires, carbon nanotubes, and copper nanowires. These local contacts bridge the nanostructures and the transport probes, allowing for the measurements of both electrical transport and scanning tunneling microscopy on the same nanostructures in situ. The direct correlation between electronic and transport properties and atomic structures can be explored on individual nanostructures at the unprecedented atomic level.

77 NANOSCIENCE AND NANOTECHNOLOGY↗