Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Charger”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

393 records · Page 22

Electric Vehicle Charging Infrastructure Trends from the Alternative Fueling Station Locator (Third Quarter 2023)

Electric vehicle (EV) charging infrastructure continues to rapidly change and grow. Using data from the U.S. Department of Energy's (DOE's) Alternative Fueling Station Locator, this report provides a snapshot of the state of EV charging infrastructure in the United States in the third calendar quarter of 2023 (Q3 2023) by charging level, network, and location. Additionally, this report measures the current state of charging infrastructure compared to the infrastructure requirement scenario outlined in the National Renewable Energy Laboratory (NREL) report, The 2030 National Charging Network: Estimating U.S. Light-Duty Demand for Electric Vehicle Charging Infrastructure. This information is intended to help transportation planners, policymakers, researchers, infrastructure developers, and others understand the rapidly changing landscape of EV charging infrastructure. This is the fifteenth report in a series. Reports from previous quarters can be found in the Alternative Fuels Data Center (AFDC) and NREL publication databases, as well as the AFDC Charging Infrastructure Trends page (https://afdc.energy.gov/fuels/electricity_infrastructure_trends.html).

33 ADVANCED PROPULSION SYSTEMS↗

Intelligent, grid-friendly, modular extreme fast charging system with solid-state DC protection

The development of electric vehicle (EV) charging infrastructure is crucial for the widespread adoption of electric transportation. However, implementing such infrastructure is a complex task that requires consideration of factors such as space limitations, adherence to industry standards, grid capacity, and other technical and policy issues. This project seeks to create a framework for the efficient design of compact medium voltage (MV) extreme fast charging (XFC) stations for EVs. The station design involves the use of a solid-state transformer (SST) that connects to the MV distribution network, delivering power to a shared DC bus. This innovative approach eliminates the need for a step-down transformer to provide low-voltage service by connecting directly to the MV distribution network. Eliminating the low-frequency transformer not only reduces the system footprint and losses but also eliminates inrush currents during grid black-start. Additionally, placing power electronics directly on the distribution system allows for high-bandwidth filtering and power factor correction. The inclusion of a shared DC bus enables multiple charging dispensers and DC storage/generation units to connect, forming a DC microgrid. This setup facilitates power sharing with minimal conversion stages. The project showcases a DC distribution network protected by intelligent solid-state (SS) DC circuit breakers (DCCB) capable of isolating the smallest section of the faulted circuit much faster than existing mechanical solutions.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Electric Vehicle Charging Infrastructure Trends from the Alternative Fueling Station Locator: Fourth Quarter 2023

Electric vehicle (EV) charging infrastructure continues to rapidly change and grow. Using data from the U.S. Department of Energy's (DOE's) Alternative Fueling Station Locator, this report provides a snapshot of the state of EV charging infrastructure in the United States in the fourth calendar quarter of 2023 (Q4 2023) by charging level, network, and location. Additionally, this report measures the current state of charging infrastructure compared to the infrastructure requirement scenario outlined in the National Renewable Energy Laboratory (NREL) report, The 2030 National Charging Network: Estimating U.S. Light-Duty Demand for Electric Vehicle Charging Infrastructure. This information is intended to help transportation planners, policymakers, researchers, infrastructure developers, and others understand the rapidly changing landscape of EV charging infrastructure. This is the sixteenth report in a series. Reports from previous quarters can be found in the Alternative Fuels Data Center (AFDC) and NREL publication databases, as well as the AFDC Charging Infrastructure Trends page (https://afdc.energy.gov/fuels/electricity_infrastructure_trends.html).

33 ADVANCED PROPULSION SYSTEMS↗

Electric Vehicle Charging Infrastructure Trends from the Alternative Fueling Station Locator: First Quarter 2024

Electric vehicle (EV) charging infrastructure continues to rapidly change and grow. Using data from the U.S. Department of Energy's (DOE's) Alternative Fueling Station Locator, this report provides a snapshot of the state of EV charging infrastructure in the United States in the first calendar quarter of 2024 (Q1 2024) by charging level, network, and location. Additionally, this report measures the current state of charging infrastructure compared to the infrastructure requirement scenario outlined in the National Renewable Energy Laboratory (NREL) report, "The 2030 National Charging Network: Estimating U.S. Light-Duty Demand for Electric Vehicle Charging Infrastructure" (https://www.nrel.gov/docs/fy23osti/85654.pdf). This information is intended to help transportation planners, policymakers, researchers, infrastructure developers, and others understand the rapidly changing landscape of EV charging infrastructure. This is the 17th report in a series. Reports from previous quarters can be found in the Alternative Fuels Data Center (AFDC) and NREL publication databases, as well as the AFDC Charging Infrastructure Trends page (https://afdc.energy.gov/fuels/electricity_infrastructure_trends.html).

33 ADVANCED PROPULSION SYSTEMS↗

Electric Vehicle Charging Infrastructure Trends from the Alternative Fueling Station Locator: Second Quarter 2024

Electric vehicle (EV) charging infrastructure continues to rapidly change and grow. Using data from the U.S. Department of Energy's (DOE's) Alternative Fueling Station Locator, this report provides a snapshot of the state of EV charging infrastructure in the United States in the second calendar quarter of 2024 (Q2 2024) by charging level, network, and location. Additionally, this report measures the current state of charging infrastructure compared to the infrastructure requirement scenario outlined in the National Renewable Energy Laboratory (NREL) report, "The 2030 National Charging Network: Estimating U.S. Light-Duty Demand for Electric Vehicle Charging Infrastructure" (https://www.nrel.gov/docs/fy23osti/85654.pdf). This information is intended to help transportation planners, policymakers, researchers, infrastructure developers, and others understand the rapidly changing landscape of EV charging infrastructure. This is the 18th report in a series. Reports from previous quarters can be found in the Alternative Fuels Data Center (AFDC) and NREL publication databases, as well as the AFDC Charging Infrastructure Trends page (https://afdc.energy.gov/fuels/electricity_infrastructure_trends.html).

33 ADVANCED PROPULSION SYSTEMS↗

Thermal Evaluation of CCS and NACS Reference Devices and Adapters

It is important for manufacturers of electric vehicle charging connectors, inlets, and adapters to understand the thermal performance of their devices. Various standards, such as SAE J1772, SAE J3400, IEC 62196, UL 2251, and UL 2252, list temperature limits that charging hardware needs to meet. However, there are currently very limited standardized reference devices against which to measure connector performance, and those that do currently exist generally serve charging currents less than 500A. This can make determining whether a charging connector meets the appropriate temperature limits difficult. Additionally, as automakers and charging station suppliers transition from the SAE J1772 CCS charging standard to SAE J3400 NACS, a number of CCS-to-NACS and NACS-to-CCS adapters are entering the market. These devices are being produced both by well-known automakers/equipment OEMs and lesser-known third-party suppliers, across a wide range of price points and construction qualities. Though SAE J3400/1 and UL 2252 lay out standards for adapter construction, performance and overtemperature response, there is no guarantee that any particular adapter will follow these standards and react to overtemperature events appropriately. This work addresses these issues by developing and evaluating a set of CCS and NACS reference inlet devices to validate the performance of charging connectors in the 500-800A range. The work also evaluates the performance of multiple NACS-to-CCS and CCS-to-NACS charging adapters with respect to UL 2252 temperature limits and SAE J3400/1 overtemperature signaling criteria.

33 ADVANCED PROPULSION SYSTEMS↗

Pull Force Evaluation of CCS Insulated End Caps

Insulated end caps installed on DC pins of Combined Charging System (CCS) inlets have been identified as potential debris sources within electric vehicle supply equipment (EVSE) connectors, increasing the risk of electric shock and fire hazards. Although standards such as IEC 62196-1:2022 specify mechanical pull-force requirements for these end caps, it remains unclear whether these requirements provide adequate robustness under real-world conditions. To address this concern, the National Charging Experience (ChargeX) Consortium's Hardware Task Force conducted evaluations of insulated end caps used in OEM CCS inlets. This study assesses the performance of insulated end caps used in OEM CCS inlets, specifically those installed on DC pins, using the procedures defined in IEC 62196-1:2022 (Section Sign) 26.7 and SAE J3400, supplemented by additional experimental conditioning. To ensure relevance to real-world conditions, NLR collaborated with charging network operators (CNOs) to guide the selection of charging inlet samples. Material analyses of the insulated end cap samples were conducted to confirm that the tested materials reflected the types and properties commonly observed in the field. The selected samples underwent temperature and humidity conditioning followed by pull-force testing to evaluate the end-cap integrity. Although SAE J3400 inlets were not directly tested due to limited diversity in available field data, the underlying end-cap principles between CCS and SAE J3400 are comparable, allowing the study's insights to be relevant to both technologies. Overall, this study provides a structured evaluation framework to inform potential refinements to mechanical pull-force requirements in charging standards.

33 ADVANCED PROPULSION SYSTEMS↗

Architecture for Co-Simulation of Transportation and Distribution Systems with Electric Vehicle Charging at Scale in the San Francisco Bay Area

This work describes the Grid-Enhanced, Mobility-Integrated Network Infrastructures for Extreme Fast Charging (GEMINI) architecture for the co-simulation of distribution and transportation systems to evaluate EV charging impacts on electric distribution systems of a large metropolitan area and the surrounding rural regions with high fidelity. The current co-simulation is applied to Oakland and Alameda, California, and in future work will be extended to the full San Francisco Bay Area. It uses the HELICS co-simulation framework to enable parallel instances of vetted grid and transportation software programs to interact at every model timestep, allowing high-fidelity simulations at a large scale. This enables not only the impacts of electrified transportation systems across a larger interconnected collection of distribution feeders to be evaluated, but also the feedbacks between the two systems, such as through control systems, to be captured and compared. The findings are that with moderate passenger EV adoption rates, inverter controls combined with some distribution system hardware upgrades can maintain grid voltages within ANSI C.84 range A limits of 0.95 to 1.05 p.u. without smart charging. However, EV charging control may be required for higher levels of charging or to reduce grid upgrades, and this will be explored in future work.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Advancing Federal Infrastructure Through Innovation: Selecting Electric Vehicle Charging Infrastructure Wisely

The Biden Administration's issuance of Executive Orders directly addressing and accelerating Federal fleet electrification places an onus on both fleet and facility managers. This panel will help fleet and facility personnel understand how to select EVSE infrastructure in terms of implementation, energy management, and costs of procurement, installation/deployment, and electricity. The panel will cover technology aspects to include managed EVSE, bi-directional charging, implications on local electrical systems and storage needs in certain cases to buffer power demand. Discussion will include various considerations relevant to ensuring adequate EVSE, balancing infrastructure needs, and upgrades with fleet needs. The panelists will discuss how to provide sufficient infrastructure support, including which stakeholders to involve, procurement impediments, easement locations, and requirements that arise during the design and implementation process.

ADVANCED PROPULSION SYSTEMS,ENERGY PLANNING, POLIC↗

EVs@Scale High-Power Charging (HPC) Pillar Deep-Dive Technical Meeting

EVs@Scale Lab Consortium is addressing challenges, developing solutions, and enabling technologies for transportation electrification ecosystem. The consortium has five research pillars one of which focuses on high power charging (HPC). HPC pillar brings together hardware and software expertise, capabilities, and facilities related to high power EV charging, charge management, and grid integration. Deep-dive technical meetings are organized twice a year and provides an opportunity for more industry engagement and technical feedback for the national labs throughout the project lifecycle. High-Power Charging pillar has two active projects: (i) Next-Gen Profiles (NGP) and (ii) High-Power Electric Vehicle Charging Hub Integration Platform (eCHIP). This presentation summarizes the progress made in both projects during the past six months focusing on specific topics. There will be two deep-dive technical meetings twice a year. Every deep-dive meeting will focus on different aspects of the project progress.

ADVANCED PROPULSION SYSTEMS↗

MUTCD 11th Edition - What's New in Signage for Electric Vehicle Charging and Parking

This handout summarizes key changes to the Manual on Uniform Traffic Control Devices for Streets and Highways (MUTCD) with respect to signage for electric vehicle (EV) charging and parking. The final rule for the 11th edition of the MUTCD was published in the Federal Register on Dec. 19, 2023, and became effective Jan. 18, 2024. The previous edition was issued in 2009. Going forward, the Bipartisan Infrastructure Law requires updates every four years. Visit the MUTCD 11th Edition for full details.

ADVANCED PROPULSION SYSTEMS,ENERGY PLANNING, POLIC↗