Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Capacity Building”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 397 records · Page 22

Roadmap for the Future of Commercial Energy Codes

Building energy codes have significantly increased building efficiency over the last 38 years, since the first national energy code was published in 1975. The most commonly used path in energy codes, the prescriptive path, appears to be reaching a point of diminishing returns. The current focus on prescriptive codes has limitations including significant variation in actual energy performance depending on which prescriptive options are chosen, a lack of flexibility for designers and developers, the inability to handle optimization that is specific to building type and use, the inability to account for project-specific energy costs, and the lack of follow-through or accountability after a certificate of occupancy is granted. It is likely that an approach that considers the building as an integrated system will be necessary to achieve the next real gains in building efficiency. This report provides a high-level review of different formats for commercial building energy codes, including prescriptive, prescriptive packages, capacity constrained, outcome based, and predictive performance approaches. This report also explores a next generation commercial energy code approach that places a greater emphasis on performance-based criteria.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Proliferation Persuasion. Coercive Bargaining with Nuclear Technology

Why do states wait for prolonged periods of time with the technical capacity to produce nuclear weapons? Only a handful of countries have ever acquired the sensitive nuclear fuel cycle technology needed to produce fissile material for nuclear weapons. Yet the enduring trend over the last five decades is for these states to delay or forgo exercising the nuclear weapons option provided by uranium enrichment or plutonium reprocessing capabilities. I show that states pause at this threshold stage because they use nuclear technology to bargain for concessions from both allies and adversaries. But when does nuclear latency offer bargaining benefits? My central argument is that challengers must surmount a dilemma to make coercive diplomacy work: the more they threaten to proliferate, the harder it becomes to reassure others that compliance will be rewarded with nuclear restraint. I identify a range of mechanisms able to solve this credibility problem, from arms control over breakout capacity to third party mediation and confidence building measures. Since each step towards the bomb raises the costs of implementing these policies, a state hits a sweet spot when it first acquires enrichment and/or reprocessing (ENR) technology. Subsequent increases in proliferation capability generate diminishing returns at the bargaining table for two reasons: the state must go to greater lengths to make a credible nonproliferation promise, and nuclear programs exhibit considerable path dependency as they mature over time. Contrary to the conventional wisdom about power in world politics, less nuclear latency thereby yields more coercive threat advantages. I marshal new primary source evidence from archives and interviews to identify episodes in the historical record when states made clear decisions to use ENR technology as a bargaining chip, and employ this theory of proliferation persuasion to explain how Japan, North Korea, and Iran succeeded and failed to barter concessions from the United States. By clarifying when countries are able to leverage steps towards the bomb for international political gain, my work advances our understanding of proliferation and coercive diplomacy.

98 NUCLEAR DISARMAMENT, SAFEGUARDS, AND PHYSICAL P↗

Large Pilot Scale Testing of Linde/BASF Post-Combustion CO 2 Capture Technology at the Abbott Coal-Fired Power Plant

The work summarized in this report is the first step towards a project that will re-train and create jobs for personnel in the coal industry and continue regional economic development to benefit regions impacted by previous downturns. The larger project is aimed at capturing ~300 tons/day (272 metric tonnes/day) CO 2 at a 90% capture rate from existing coal- fired boilers at the Abbott Power Plant on the campus of University of Illinois (UI). It will employ the Linde-BASF novel amine-based advanced CO 2 capture technology, which has already shown the potential to be cost-effective, energy efficient and compact at the 0.5-1.5 MWe pilot scales. The overall objective of the project is to design and install a scaled-up system of nominal 15 MWe size, integrate it with the Abbott Power Plant flue gas, steam and other utility systems, and demonstrate the viability of continuous operation under realistic conditions with high efficiency and capacity. The project will also begin to build a workforce that understands how to operate and maintain the capture plants by including students from regional community colleges and universities in the operation and evaluation of the capture system. This project will also lay the groundwork for follow-on projects that pilot utilization of the captured CO 2 from coal-fired power plants. The net impact will be to demonstrate a replicable means to (1) use a standardized procedure to evaluate power plants for their ability to be retrofitted with a pilot capture unit; (2) design and construct reliable capture systems based on the Linde-BASF technology; (3) operate and maintain these systems; (4) implement training programs with local community colleges and universities to establish a workforce to operate and maintain the systems; and (5) prepare to evaluate at the large pilot scale level various methods to utilize the resulting captured CO 2 . Towards the larger project goal, the UI-led team, together with Linde, has completed a preliminary design for the carbon capture pilot plant with basic engineering and cost estimates, established permitting needs, identified approaches to address Environmental, Health, and Safety concerns related to pilot plant installation and operation, developed approaches for long-term use of the captured carbon, and established strategies for workforce development and job creation that will re-train coal operators to operate carbon capture plants. This report describes Phase I accomplishments and demonstrates that the project team is well-prepared for full implementation of Phase 2, to design, build, and operate the carbon capture pilot plant.

01 COAL, LIGNITE, AND PEAT↗

Probabilistic Geomechanical Analysis of Compartmentalization at the Snøhvit CO 2 Sequestration Project

Pressure build-up caused by large-scale CO 2 injection is one of the key concerns during a carbon sequestration project. Large overpressures can potentially compromise seal integrity, reactivate faults, and induce concerning seismicity, among other hazards. Furthermore, pressure build-up is directly related with storage capacity. In this work we study the geomechanical response to CO 2 injection in the Tubåen Fm at Snøhvit, with the objective of understanding the potential for fault reactivation, leakage, and contamination of the producing interval in an adjacent block through the bounding faults. Furthermore, we evaluate the potential contribution of a structural component to reservoir compartmentalization. We combine simplified analytical models, based on critically stressed fracture theory and a Mohr-Coulomb failure criterion, with a quantitative risk assessment methodology to perform a rigorous uncertainty quantification. Large stress uncertainties are present and are reflected in the modeling results. It was found that under the “most likely” stress state (Strike-Slip and North-South maximum horizontal stress (S Hmax ) azimuth) the faults are fairly stable, and tensile hydrofracturing of the caprock would be expected before fault reactivation. In most of the analyzed cases, the critical pressure perturbation needed for reactivation is above 13 MPa, which was the limiting pressure increase before reaching the fracture pressure. Faults were found to be ~ 20% less stable when considering plausible variations in the orientation of S Hmax . In those cases, fault reactivation could be expected before caprock failure if injection continued, posing risks of induced seismicity, CO 2 leakage and/or contamination of the gas producing reservoir. Finally, a potential structural component in the compartmentalization and fluid migration is difficult to assess due to stress orientation uncertainty.

54 ENVIRONMENTAL SCIENCES↗

Decarbonization of Residential Building Energy Supply: Impact of Cogeneration System Performance on Energy, Environment, and Economics

Electrical and thermal loads of residential buildings present a unique opportunity for onsite power generation, and concomitant thermal energy generation, storage, and utilization, to decrease primary energy consumption and carbon dioxide intensity. This approach also improves resiliency and ability to address peak load burden effectively. Demand response programs and grid-interactive buildings are also essential to meet the energy needs of the 21st century while addressing climate impact. Given the significance of the scale of building energy consumption, this study investigates how cogeneration systems influence the primary energy consumption and carbon footprint in residential buildings. The impact of onsite power generation capacity, its electrical and thermal efficiency, and its cost, on total primary energy consumption, equivalent carbon dioxide emissions, operating expenditure, and, most importantly, thermal and electrical energy balance, is presented. The conditions at which a cogeneration approach loses its advantage as an energy efficient residential resource are identified as a function of electrical grid’s carbon footprint and primary energy efficiency. Compared to a heat pump heating system with a coefficient of performance (COP) of three, a 0.5 kW cogeneration system with 40% electrical efficiency is shown to lose its environmental benefit if the electrical grid’s carbon dioxide intensity falls below 0.4 kg CO 2 per kWh electricity.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

PERFORMANCE EVALUATION OF CEILING RADIANT COOLING SYSTEM IN COMPOSITE CLIMATE

Radiant cooling systems are proving to be an energy efficient solution due to higher thermal capacity of cooling fluid especially for the buildings that require individual zone controls and where the latent loads are moderate. The Conventional air conditioners work at very low temperature i.e.5-8 c (refrigerant evaporator inlet) while the radiant cooling systems, also referred as high temperature cooling system, work at high temperatures i.e. 14-18 c. The radiant cooling systems can maintain lower MRT (Mean Radiant Temperature) as ceiling panels maintain uniform temperature gradient inside room and provide higher human comfort. The radiant cooling systems are relatively new systems and their operation and energy savings potential are not quantified for a large number of buildings and operational parameters. Moreover, there are only limited numbers of whole building simulation studies have been carried out for these systems to have a full confidence in the capability of modelling tools to simulate these systems and predict the impact of various operating parameters. Theoretically, savings achieve due to higher temperature set point of chilled water, which reduces chiller-running time. However, conventional air conditioner runs continuously to maintain requisite temperature. In this paper, experimental study for performance evaluation of radiant cooling system carried out on system installed at Malaviya National Institute of Technology Jaipur. This paper quantifies the energy savings opportunities and effective temperature by radiant cooling system at different chilled water flow rates and temperature range. The data collected/ analysed through experimental study will used for calibration and validation of system model of building prepared in building performance simulation software. This validated model used for exploring optimized combinations of key parameters for composite climate. These optimized combinations will used in formulation of radiant cooling system operations control strategy.

Ceiling Panels↗

Mechanically induced thermal runaway severity analysis of Li-ion batteries and continuous energy release monitoring

The large-scale deployment of Li-ion batteries in stationary energy storage and electrical vehicle applications demands a strong focus on safety, particularly on the thermal runaway risk and severity evaluation. A standardized single-side mechanical indentation test protocol was developed to induce an internal short-circuit (ISC) and evaluate cells' thermal runaway severity at different state of charge (SOC). The observed hazard severity (OHS in five categories) and evaluated scores in this work have a comprehensive consideration of each cell's capacity, initial voltage, SOC, temperature and voltage change, allowing a better evaluation of the cells' thermal runaway potential. This method was applied to about 200 Li-ion batteries in order to build an extensive thermal runaway database covering various SOCs, capacities and chemistries. In this study, we monitored the transitions of stored electrochemical energy and applied mechanical energy into both thermal energy and acoustic emissions (AE). The surface temperature and mechanical failures were monitored by infrared imaging and AE to capture critical events within battery cells throughout the mechanical indentation tests. Furthermore, the initial temperature maps can predict two types of follow-up events: thermal runaway or gradual heat release via conduction. Analyzing each cell's severity, AEs, and leveraging the evolving database offer insights into predicting occurrences of thermal runaway. The test method, thermal runaway severity evaluation and prediction, and the corresponding database provide battery designers, manufacturers, and end-users a clear overview of Li-ion batteries' thermal runaway potential under mechanical abuse, advancing the safety design of Li-ion batteries.

Acoustic emission↗

Site Characterization for CO 2 Storage from Coal-fired Power Facilities in the Black Warrior Basin of Alabama

Coal-fired power plants produce large quantities of carbon dioxide. In order to mitigate the greenhouse gas emissions from these power plants, it is necessary to separate and store the carbon dioxide. Saline formations provide a potential sink for carbon dioxide and delineating the capacity of the various known saline formations is a key part of building a storage inventory. As part of this effort, a project was undertaken to access the storage capacity of saline reservoirs in the Black Warrior Basin of Alabama. This basin has been a productive oil and gas reservoir that is well characterized to the west of the two major coal-fired power plants that are north of Birmingham. The saline zones were thought to extend as far east as the Sequatchie Anticline which is just east of the power plants. There is no oil or gas production in the area surrounding the power plants so little is known about the formations in that area. A geologic characterization well was drilled on the Gorgas Power Plant site, which is the farthest west of two power plants in the area. The well was planned to be drilled to approximately 8,000 feet, but drilling was halted at approximately 5,000 feet when a prolific freshwater zone was penetrated. During drilling, a complete set of cores through all of the potential injection zones and the seals above these zones were acquired. A complete set of openhole logs were run along with a vertical seismic profile (VSP). Before drilling started two approximately perpendicular seismic lines were run and later correlated with the VSP. While the zones that were expected were found at approximately the predicted depths, the zones that are typically saline through the reservoir were found to be saturated with a light crude oil. Unfortunately, both the porosity and permeability of these zones were small enough that no meaningful hydrocarbon production would be expected even with carbon dioxide flooding. While this part of the basin was found to be unsuitable for carbon dioxide injection, there is still a large storage capacity in the basin to the west of the power plants. It will, however, require pipeline construction to transport the carbon dioxide to the injection sites.

20 FOSSIL-FUELED POWER PLANTS↗

Renewable Energy Requirements for Future Building Codes: Options for Compliance

As the model energy codes are improved to reach efficiency levels 50 percent greater than current codes, use of on-site renewable energy generation is likely to become a code requirement. This requirement will be needed because traditional mechanisms for code improvement, including envelope, mechanical and lighting, have been pressed to the end of reasonable limits. Research has been conducted to determine the mechanism for implementing this requirement (Kaufman 2011). Kaufmann et al. determined that the most appropriate way to structure an on-site renewable requirement for commercial buildings is to define the requirement in terms of an installed power density per unit of roof area. This provides a mechanism that is suitable for the installation of photovoltaic (PV) systems on future buildings to offset electricity and reduce the total building energy load. Kaufmann et al. suggested that an appropriate maximum for the requirement in the commercial sector would be 4 W/ft 2 of roof area or 0.5 W/ft 2 of conditioned floor area. As with all code requirements, there must be an alternative compliance path for buildings that may not reasonably meet the renewables requirement. This might include conditions like shading (which makes rooftop PV arrays less effective), unusual architecture, undesirable roof pitch, unsuitable building orientation, or other issues. In the short term, alternative compliance paths including high performance mechanical equipment, dramatic envelope changes, or controls changes may be feasible. These options may be less expensive than many renewable systems, which will require careful balance of energy measures when setting the code requirement levels. As the stringency of the code continues to increase however, efficiency trade-offs will be maximized, requiring alternative compliance options to be focused solely on renewable electricity trade-offs or equivalent programs. One alternate compliance path includes purchase of Renewable Energy Credits (RECs). Each REC represents a specified amount of renewable electricity production and provides an offset of environmental externalities associated with non-renewable electricity production. The purpose of this paper is to explore the possible issues with RECs and comparable alternative compliance options. Existing codes have been examined to determine energy equivalence between the energy generation requirement and the RECs alternative over the life of the building. The price equivalence of the requirement and the alternative are determined to consider the economic drivers for a market decision. This research includes case studies that review how the few existing codes have incorporated RECs and some of the issues inherent with REC markets. Section 1 of the report reviews compliance options including RECs, green energy purchase programs, shared solar agreements and leases, and other options. Section 2 provides detailed case studies on codes that include RECs and community based alternative compliance methods. The methods the existing code requirements structure alternative compliance options like RECs are the focus of the case studies. Section 3 explores the possible structure of the renewable energy generation requirement in the context of energy and price equivalence. The price of RECs have shown high variation by market and over time which makes it critical to for code language to be updated frequently for a renewable energy generation requirement or the requirement will not remain price-equivalent over time. Section 4 of the report provides a maximum case estimate for impact to the PV market and the REC market based on the Kaufmann et al. proposed requirement levels. If all new buildings in the commercial sector complied with the requirement to install rooftop PV arrays, nearly 4,700 MW of solar would be installed in 2012, a major increase from EIA estimates of 640 MW of solar generation capacity installed in 2009. The residential sector could contribute roughly an additional 2,300 MW based on the same code requirement levels of 4 W/ft 2 of roof area. Section 5 of the report provides a basic framework for draft code language recommendations based on the analysis of the alternative compliance levels.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

What, why and when to go virtual: An international analysis of early adopters of virtual building energy codes inspections

To meet greenhouse gas reduction targets, several countries are pursuing more ambitious policies in their buildings and construction sectors, such as introducing zero net energy/carbon building codes. Countries often report not having enough qualified staff for performing building energy code inspections and many are exploring faster, easier, and more reliable methods to check the compliance of buildings with their codes. Building inspections are a critical element for ensuring code compliance and they have traditionally been performed in person. However, in-person inspections can be labor and travel intensive, costly, and prone to human error. In this paper, the authors explore how virtual inspections, particularly in light of the recent COVID-19 pandemic, have impacted processes for building code compliance checks in jurisdictions and communities around the world. Here, the authors collected data on four key parameters (time and financial savings, scope of inspections, changing practices and technological innovation, and benefits to consumers) from six jurisdictions and communities in five countries (Australia, Canada, Singapore, United Arab Emirates, and the United States) to analyze the impacts of virtual inspections on code compliance checks. The analysis found the greatest value from virtual inspections in geographically dispersed regions and for cities experiencing rapid building construction. The study also explored emerging technologies that are being piloted for virtual inspections. Although many of these technologies hold promise, more resources and capacity are needed to make them viable for use in building energy code inspections.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

High Temperature Heat Pumps and Their Roles in the Decarbonization of Building and Industry

Heat pumps have been sought as a promising technology for air and water heating processes in buildings. Several OEMs have been commercializing heat pumps with varying capacities; However, the application has been limited to lower temperatures (less than 70℃). With the recently growing interest in replacing gas-fired equipment for buildings and industrial processes, a new class of heat pumps, known as high-temperature heat pumps, is gaining substantial interest where the target temperatures are higher than the conventional heat pump technology (greater than 90℃). The current study is focused on this class of heat pumps and aims to provide a holistic overview of state-of-the-art technology while highlighting major challenges and opportunities. The discussion will be focused on the availability of technology to enable higher sink temperatures, deployment-based applications, waste heat recovery, and process integration and controls.

Nawaz, Kashif↗

Controlled Loading of Building Blocks into Temporary Self-Assembled Scaffolds for Directed Assembly of Organic Nanostructures

Using temporary self-assembled scaffolds to preorganize building blocks is a potentially powerful method for the synthesis of organic nanostructures with programmed shapes. We examined the underlying phenomena governing the loading of hydrophobic monomers into lipid bilayer interior and demonstrated successful control of the amount and ratio of loaded monomers. When excess styrene derivatives or acrylates were added to the aqueous solution of unilamellar liposomes made from saturated phospholipids, most loading occurs within the first few hours. Dynamic light scattering and transmission electron microscopy revealed no evidence of aggregation caused by monomers. Bilayers appeared to have a certain capacity for accommodating monomers. The total volume of loaded monomers is independent of monomer structure. X-ray scattering showed the increase in bilayer thickness consistent with loading monomers into bilayer interior. Loading kinetics is inversely proportional to the hydrophobicity and size of monomers. Loading and extraction kinetic data suggest that crossing the polar heads region is the rate limiting step. Consideration of loading kinetics and multiple equilibria are important for achieving reproducible monomer loading. The total amount of monomers loaded into the bilayer can be controlled by the loading time or length of hydrophobic lipid tails. The ratio of loaded monomers can be varied by changing the ratio of monomers used for loading or by the time-controlled replacement of a preloaded monomer. Understanding and controlling the loading of monomers into bilayers contributes to the directed assembly of organic nanostructures.

59 BASIC BIOLOGICAL SCIENCES↗

Cooling and Heating Season Impacts of Right-Sizing of Fixed- and Variable-Capacity Heat Pumps With Attic and Indoor Ductwork

A new generation of central, ducted variable-capacity heat pump systems has come on the market, promising very high cooling and heating efficiency. They are controlled differently than standard fixed-capacity systems. Instead of cycling on at full capacity and then cycling off when the thermostat is satisfied, they vary their cooling and heating output over a wide range (approximately 40% - 118% of nominal full capacity), thus staying 'on' for 60% - 100% more hours per day compared to fixed -capacity systems. Experiments in this research examined the performance of 2-ton and 3-ton fixed- and variable-capacity systems and the impacts of system oversizing.

BA-PIRC↗

Developing and Evaluating Metrics for Demand Flexibility in Buildings: Comparing Simulations and Field Data

Building demand flexibility (DF) has attracted significant attention in recent years among researchers, technology developers and control companies, aggregators, utilities, and many others. There are numerous challenges with today’s electricity systems such as managing peak demand capacity and integrating variable renewables into the grid. Flexible building loads can provide various grid services to help reduce electricity costs, smooth out renewables intermittency and balance supply and demand. Recognizing this, the US DOE is leading the Grid-interactive Efficient Buildings (GEB) initiative which includes research to evaluate the potential, availability and timing of flexible loads. In this paper we present load shed metrics for three building types – medium office, large office and retail store – and compare prototype simulation results with measured data from 12 actual buildings that participated in hot summertime utility demand response (DR) events. The DR strategies included varying zone temperature and reducing light levels. The magnitude of a key DF metric, “demand decrease intensity” (or “shed intensity”) (W/ft2), between the simulation results and field data are similar (14-32% differences) for both mean and median values, though the field data show much larger variation among DR events. The coefficient p-values from linear regression model tests showed that outside air temperature is a significant variable for the whole building shed intensity when the resetting zone temperature strategy is deployed. These findings support the concept of using prototype building simulation to estimate building DF and expanding future simulation research to additional building types and climate zones.

Liu, Jingjing↗

Comminty Geothermal: Planning and Design of a Heating and Cooling System in Framingham, Massachusetts

These reports, plans, and drawings review the achievements of Home Energy Efficiency Team (HEET) and its partners to plan and design a network of interconnected ground-source heat pump systems, or geothermal network, in an area encompassing multiple environmental justice (EJ) neighborhoods in the City of Framingham, MA. The materials provided in this dataset include, a) stakeholder and design best practices, b) study on optimal method to interconnect geothermal loops, c) guidelines for monitoring and metering, d) operations and maintenance plans, e) permitting guidelines and f) 10-day driller tutorial curriculum. These materials can guide the efficient and ethical design of future geothermal networks nationwide. The capacity of the system is estimated at 217 tons and is designed to provide 100% of heating and cooling needs for the buildings connected to the loop. In this project, 80 boreholes are used as the main thermal resources, the distribution system (or loop) consists of 0.61 miles of an 8-inch single-pipe at ambient temperature, with the capacity to connect 44 buildings, including 13 apartment buildings from the Framingham Housing Authority, one transitional home, one school building and 29 single family homes. While Framingham already has a geothermal network loop that is currently in the commissioning stage, our proposed project is unique because it is the first utility-led expansion loop (2nd loop) project that will connect to an adjacent existing geothermal loop (1st loop) in a pre-existing neighborhood. Both the 1st and 2nd loops are being installed, owned and operated by Eversource Energy, the utility Deployment Partner.

15 GEOTHERMAL ENERGY↗

Modular Integrated System for Carbon-Neutral Methanol Synthesis Using Direct Air Capture and Carbon-Free Hydrogen Production

This study investigates the development and economic analysis of a modular integrated system for carbon-neutral methanol synthesis, leveraging direct air capture (DAC) and solid oxide electrolysis cells (SOEC) for carbon dioxide and hydrogen production, respectively. The proposed system integrates a novel building-based DAC process, functionalized solid sorbents, and low-energy SOEC technology, aiming to minimize operational and capital costs. A comparison between the base case system (1,000 t methanol/year) and a scaled-up model (14,758 t methanol/year) reveals significant improvements in efficiency and economic feasibility. The scaled-up system achieves a levelized cost of methanol (LCOM) of $740/t, a 7.5% reduction compared to that of conventional DAC-based systems, while utilizing existing building HVAC infrastructure for air handling. Detailed sensitivity analyses were conducted, evaluating the effects of plant capacity and air flow rate on the LCOM, demonstrating the scalability of the building-based DAC system. The cradle-to-gate life cycle analysis shows that the proposed process using renewable-sourced electricity achieves a 38% reduction in greenhouse gas (GHG) emission compared to reported values of green methanol production technologies that use a conventional DAC and a conventional methanol synthesis catalyst. When fossil-sourced electricity is used in the proposed process, it leads to about a 37.5% reduction in GHG emission in comparison to reported values for conventional methanol production technologies using steam methane reforming technology and fossil-sourced electricity.

alcohols↗

Experiences with Mobile Units for Liquid RAW Management in Slovak and Czech Nuclear Power Plants - 20089

In Nuclear Power Plants VVER 440, Russian type of reactor there was designed auxiliary building where according to basic design all operational liquid radioactive waste (RAW) should be stored in large capacity tanks during the whole operational period. That's why there are in the auxiliary building several types of large storage tanks with different internal volume from 110 m{sup 3}, 460 m{sup 3} to 550 m{sup 3}. Storage tanks are usually situated in rooms with limited access and minimal handling space. Operational waste was here transported by the system of pipes from the reactor building. There is possibility to handle with the waste and set the pipeline in to the chosen storage tanks. Nobody takes care about the quality of waste in the storage tanks and waste waits for the period of decommissioning when it should be treated. The storage capacity was designed for the whole lifetime of nuclear power plant. Currently the life time of Nuclear Power Plant's (NPP) is extended and there is necessity to retrieve and treat the RAW in advance. Another reason why the stakeholder, who operates the NPPs, decides to treat the operational RAW during the operational period of NPP, is that there are still new requirements from safety point of view which need to have free available space for example because of potential accident. So treating the operational RAW during the life time of NPP is present issue. Because in basic design nobody cares how the RAW will be retrieved and treated in the future, there is usually no technology for that in existing NPP. Some of the NPPs build an additional building with suitable technologies for treatment or hire the company which offer mobile technology for retrieving the waste from the storage tanks. Wood Nuclear Slovakia PLC provides all activities within liquid RAW management projects by its own staff including management, design, construction and deployment of equipment, engineering support, as well as all RAW retrieval and solidification activities. We offer RAW management as a service without any significant changes in existing NPP's buildings and technology. It is always a technical challenge to conduct successful retrieval, pumping and treatment of RAW. The complex RAW retrieval system can be designed as tailored solution for any RAW storage according to known boundary conditions and specific needs. These systems are based on years of experience with RAW manipulation, processing and treatment and the whole RAW management knowledge by Wood Nuclear Slovakia LTD. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Geothermal Heat Pump System for New Student Housing Project at the University at Albany Main Campus

University at Albany successfully designed, constructed and is operating a new student housing building that utilizes ground source heat pump (GSHP) for heating and cooling the entire 191,500SF building. The installed system consists of a well field with 150 bores, 450 feet deep and (189) terminal heat pump units for a total capacity of 358 Tons cooling and 4,300 MBtu/h heating. The building opened in Fall 2012. The annual energy use and cost intensity of the building, after the changes made during the first 2 years’ of operation is 57kBtu/SF/Year and $1.30/SF/Year respectively. This is approximately 50% lower than the other residential quads on campus, despite the fact that the quads are not air-conditioned. The total project cost from design through 3-years of operations is approximately $6 Million, out of which $5.7 Million is for construction of the GSHP system including the well field. The University received a $2.78 Million grant from the Department of Energy. The estimated utility cost savings, compared to a baseline building with conventional HVAC system, is approximately $185,000. The estimated simple payback, after grant incentives, is 15 years. Additionally, the project has created 8.5FTE equivalent jobs.

15 GEOTHERMAL ENERGY↗