Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “COST ESTIMATION”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 397 records · Page 22

Coal gasification systems engineering and analysis. Appendix D: Cost and economic studies

The detailed cost estimate documentation for the designs prepared in this study are presented. The include: (1) Koppers-Totzek, (2) Texaco (3) Babcock and Wilcox, (4) BGC-Lurgi, and (5) Lurgi. The alternate product cost estimates include: (1) Koppers-Totzek and Texaco single product facilities (methane, methanol, gasoline, hydrogen), (2) Kopers-Totzek SNG and MBG, (3) Kopers-Totzek and Texaco SNG and MBG, and (4) Lurgi-methane and Lurgi-methane and methanol.

Source record↗

Advanced transportation system studies technical area 3: Alternate propulsion subsystem concepts, volume 3

The objective of this contract was to provide definition of alternate propulsion systems for both earth-to-orbit (ETO) and in-space vehicles (upper stages and space transfer vehicles). For such propulsion systems, technical data to describe performance, weight, dimensions, etc. was provided along with programmatic information such as cost, schedule, needed facilities, etc. Advanced technology and advanced development needs were determined and provided. This volume separately presents the various program cost estimates that were generated under three tasks: the F-1A Restart Task, the J-2S Restart Task, and the SSME Upper Stage Use Task. The conclusions, technical results, and the program cost estimates are described in more detail in Volume 1 - Executive Summary and in individual Final Task Reports.

Levak, Daniel↗

Integrated Off-gas System: A Preconceptual Design of an Integrated Off-Gas Treatment System

The U.S. has a vested interest in the advancement of nuclear energy to achieve aggressive net-zero goals, with reprocessing and recycling of used nuclear fuels (UNF) playing a vital role. It will not be possible to meet U.S. regulatory requirements without robust off-gas treatment, so it is crucial to advance treatment technologies to facilitate the design of future reprocessing facilities. For many years, teams of researchers across the U.S. Department of Energy (DOE) National Laboratory complex have been investigating off-gas treatment technologies for the capture and removal of volatile radionuclides (i.e., 85 Kr, Xe, 14 C, and 129 I) and oxides of nitrogen (NO X ) that are produced from reprocessing. These investigations have been focused on developing individual technologies for the capture of Kr, Xe, iodine, and CO 2 . Capture technologies for each constituent were tested independently from one another by utilizing nonradioactive surrogates to simulate simplified off-gas streams. The tests have been relatively small, laboratory-scale experiments of up to approximately 1 L/minute total gas flow rate. To increase the readiness of these technologies for deployment, an integrated test system with a larger-scale capacity is needed to bridge the gap between promising bench scale and fully scalable UNF reprocessing off-gas treatment. This document contains the goals, design basis, functional requirements, preconceptual design, and cost estimates for an integrated off-gas demonstration system for the capture and removal of NO x , Kr, Xe, CO 2 , and iodine at 10× higher throughput than earlier laboratory studies. The order-of-magnitude cost estimate for this system is approximately $\$$886,000. Next phases include conceptual design, detailed design, fabrication, and commissioning.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Cost Risk Analysis Based on Perception of the Engineering Process

In most cost estimating applications at the NASA Langley Research Center (LaRC), it is desirable to present predicted cost as a range of possible costs rather than a single predicted cost. A cost risk analysis generates a range of cost for a project and assigns a probability level to each cost value in the range. Constructing a cost risk curve requires a good estimate of the expected cost of a project. It must also include a good estimate of expected variance of the cost. Many cost risk analyses are based upon an expert's knowledge of the cost of similar projects in the past. In a common scenario, a manager or engineer, asked to estimate the cost of a project in his area of expertise, will gather historical cost data from a similar completed project. The cost of the completed project is adjusted using the perceived technical and economic differences between the two projects. This allows errors from at least three sources. The historical cost data may be in error by some unknown amount. The managers' evaluation of the new project and its similarity to the old project may be in error. The factors used to adjust the cost of the old project may not correctly reflect the differences. Some risk analyses are based on untested hypotheses about the form of the statistical distribution that underlies the distribution of possible cost. The usual problem is not just to come up with an estimate of the cost of a project, but to predict the range of values into which the cost may fall and with what level of confidence the prediction is made. Risk analysis techniques that assume the shape of the underlying cost distribution and derive the risk curve from a single estimate plus and minus some amount usually fail to take into account the actual magnitude of the uncertainty in cost due to technical factors in the project itself. This paper addresses a cost risk method that is based on parametric estimates of the technical factors involved in the project being costed. The engineering process parameters are elicited from the engineer/expert on the project and are based on that expert's technical knowledge. These are converted by a parametric cost model into a cost estimate. The method discussed makes no assumptions about the distribution underlying the distribution of possible costs, and is not tied to the analysis of previous projects, except through the expert calibrations performed by the parametric cost analyst.

Dean, Edwin B.↗

Advanced transportation system studies technical area 2(TA-2): Heavy lift launch vehicle development: Executive summary - volume 1

The purpose of the TA-2 contract was to provide advanced launch vehicle concept definition and analysis to assist NASA in the identification of future launch vehicle requirements. Contracted analysis activities included vehicle sizing and performance analysis, subsystem concept definition, propulsion subsystem definition (foreign and domestic), ground operations and facilities analysis, and life cycle cost estimation. This document is part of the final report for the TA-2 contract. The final report consists of three volumes: Volume 1 is the Executive Summary, Volume 2 is Technical Results, and Volume 3 is Program Cost Estimates. The document-at-hand, Volume 1, provides a summary description of the technical activities that were performed over the entire contract duration, covering three distinct launch vehicle definition activities: heavy-lift (300,000 pounds injected mass to low Earth orbit) launch vehicles for the First Lunar Outpost (FLO), medium-lift (50,000-80,000 pounds injected mass to low Earth orbit) launch vehicles, and single-stage-to-orbit (SSTO) launch vehicles (25,000 pounds injected mass to a Space Station orbit).

McCurry, J.↗

NASA Software Engineering Benchmarking Study

To identify best practices for the improvement of software engineering on projects, NASA's Offices of Chief Engineer (OCE) and Safety and Mission Assurance (OSMA) formed a team led by Heather Rarick and Sally Godfrey to conduct this benchmarking study. The primary goals of the study are to identify best practices that: Improve the management and technical development of software intensive systems; Have a track record of successful deployment by aerospace industries, universities [including research and development (R&D) laboratories], and defense services, as well as NASA's own component Centers; and Identify candidate solutions for NASA's software issues. Beginning in the late fall of 2010, focus topics were chosen and interview questions were developed, based on the NASA top software challenges. Between February 2011 and November 2011, the Benchmark Team interviewed a total of 18 organizations, consisting of five NASA Centers, five industry organizations, four defense services organizations, and four university or university R and D laboratory organizations. A software assurance representative also participated in each of the interviews to focus on assurance and software safety best practices. Interviewees provided a wealth of information on each topic area that included: software policy, software acquisition, software assurance, testing, training, maintaining rigor in small projects, metrics, and use of the Capability Maturity Model Integration (CMMI) framework, as well as a number of special topics that came up in the discussions. NASA's software engineering practices compared favorably with the external organizations in most benchmark areas, but in every topic, there were ways in which NASA could improve its practices. Compared to defense services organizations and some of the industry organizations, one of NASA's notable weaknesses involved communication with contractors regarding its policies and requirements for acquired software. One of NASA's strengths was its software assurance practices, which seemed to rate well in comparison to the other organizational groups and also seemed to include a larger scope of activities. An unexpected benefit of the software benchmarking study was the identification of many opportunities for collaboration in areas including metrics, training, sharing of CMMI experiences and resources such as instructors and CMMI Lead Appraisers, and even sharing of assets such as documented processes. A further unexpected benefit of the study was the feedback on NASA practices that was received from some of the organizations interviewed. From that feedback, other potential areas where NASA could improve were highlighted, such as accuracy of software cost estimation and budgetary practices. The detailed report contains discussion of the practices noted in each of the topic areas, as well as a summary of observations and recommendations from each of the topic areas. The resulting 24 recommendations from the topic areas were then consolidated to eliminate duplication and culled into a set of 14 suggested actionable recommendations. This final set of actionable recommendations, listed below, are items that can be implemented to improve NASA's software engineering practices and to help address many of the items that were listed in the NASA top software engineering issues. 1. Develop and implement standard contract language for software procurements. 2. Advance accurate and trusted software cost estimates for both procured and in-house software and improve the capture of actual cost data to facilitate further improvements. 3. Establish a consistent set of objectives and expectations, specifically types of metrics at the Agency level, so key trends and models can be identified and used to continuously improve software processes and each software development effort. 4. Maintain the CMMI Maturity Level requirement for critical NASA projects and use CMMI to measure organizations developing software for NASA. 5.onsolidate, collect and, if needed, develop common processes principles and other assets across the Agency in order to provide more consistency in software development and acquisition practices and to reduce the overall cost of maintaining or increasing current NASA CMMI maturity levels. 6. Provide additional support for small projects that includes: (a) guidance for appropriate tailoring of requirements for small projects, (b) availability of suitable tools, including support tool set-up and training, and (c) training for small project personnel, assurance personnel and technical authorities on the acceptable options for tailoring requirements and performing assurance on small projects. 7. Develop software training classes for the more experienced software engineers using on-line training, videos, or small separate modules of training that can be accommodated as needed throughout a project. 8. Create guidelines to structure non-classroom training opportunities such as mentoring, peer reviews, lessons learned sessions, and on-the-job training. 9. Develop a set of predictive software defect data and a process for assessing software testing metric data against it. 10. Assess Agency-wide licenses for commonly used software tools. 11. Fill the knowledge gap in common software engineering practices for new hires and co-ops.12. Work through the Science, Technology, Engineering and Mathematics (STEM) program with universities in strengthening education in the use of common software engineering practices and standards. 13. Follow up this benchmark study with a deeper look into what both internal and external organizations perceive as the scope of software assurance, the value they expect to obtain from it, and the shortcomings they experience in the current practice. 14. Continue interactions with external software engineering environment through collaborations, knowledge sharing, and benchmarking.

Rarick, Heather L.↗

The common engine concept for ALS application - A cost reduction approach

Future launch systems require the application of propulsion systems which have been designed and developed to meet mission model needs while providing high degrees of reliability and cost effectiveness. Vehicle configurations which utilize different propellant combinations for booster and core stages can benefit from a common engine approach where a single engine design can be configured to operate on either set of propellants and thus serve as either a booster or core engine. Engine design concepts and mission application for a vehicle employing a common engine are discussed. Engine program cost estimates were made and cost savings, over the design and development of two unique engines, estimated.

Bair, E. K.↗

Engineering support for magnetohydrodynamic power plant analysis and design studies

The major factors which influence the economic engineering selection of stack inlet temperatures in combined cycle MHD powerplants are identified and the range of suitable stack inlet temperatures under typical operating conditions is indicated. Engineering data and cost estimates are provided for four separately fired high temperature air heater (HTAH) system designs for HTAH system thermal capacity levels of 100, 250, 500 and 1000 MWt. An engineering survey of coal drying and pulverizing equipment for MHD powerplant application is presented as well as capital and operating cost estimates for varying degrees of coal pulverization.

Carlson, A. W.↗

Report by the International Space Station (ISS) Management and Cost Evaluation (IMCE) Task Force

The International Space Station (ISS) Management and Cost Evaluation Task Force (IMCE) was chartered to conduct an independent external review and assessment of the ISS cost, budget, and management. In addition, the Task Force was asked to provide recommendations that could provide maximum benefit to the U.S. taxpayers and the International Partners within the President's budget request. The Task Force has made the following principal findings: (1) The ISS Program's technical achievements to date, as represented by on-orbit capability, are extraordinary; (2) The Existing ISS Program Plan for executing the FY 02-06 budget is not credible; (3) The existing deficiencies in management structure, institutional culture, cost estimating, and program control must be acknowledged and corrected for the Program to move forward in a credible fashion; (4) Additional budget flexibility, from within the Office of Space Flight (OSF) must be provided for a credible core complete program; (5) The research support program is proceeding assuming the budget that was in place before the FY02 budget runout reduction of $1B; (6) There are opportunities to maximize research on the core station program with modest cost impact; (7) The U.S. Core Complete configuration (three person crew) as an end-state will not achieve the unique research potential of the ISS; (8) The cost estimates for the U.S.-funded enhancement options (e.g., permanent seven person crew) are not sufficiently developed to assess credibility. After these findings, the Task Force has formulated several primary recommendations which are published here and include: (1) Major changes must be made in how the ISS program is managed; (2) Additional cost reductions are required within the baseline program; (3) Additional funds must be identified and applied from the Human Space Flight budget; (4) A clearly defined program with a credible end-state, agreed to by all stakeholders, must be developed and implemented.

Young, A. Thomas↗

Parametric study of transport aircraft systems cost and weight

The results of a NASA study to develop production cost estimating relationships (CERs) and weight estimating relationships (WERs) for commercial and military transport aircraft at the system level are presented. The systems considered correspond to the standard weight groups defined in Military Standard 1374 and are listed. These systems make up a complete aircraft exclusive of engines. The CER for each system (or CERs in several cases) utilize weight as the key parameter. Weights may be determined from detailed weight statements, if available, or by using the WERs developed, which are based on technical and performance characteristics generally available during preliminary design. The CERs that were developed provide a very useful tool for making preliminary estimates of the production cost of an aircraft. Likewise, the WERs provide a very useful tool for making preliminary estimates of the weight of aircraft based on conceptual design information.

Beltramo, M. N.↗

Technoeconomic Analysis of High-Value, Crystalline Silicon Photovoltaic Module Recycling Processes

Recycling is an important circular economy strategy, and for photovoltaics (PV), the one that has received the greatest research attention. Recycling of PV modules is required in Europe; everywhere else it competes in the market of end-of-life options, where cost is a primary decision factor. The vast majority of PV modules sold globally are crystalline-silicon (c-Si); most of the rest of the market are cadmium telluride thin film modules whose primary manufacturer runs its own commercial-scale recycling program. While many different c-Si recycling approaches and technologies have been proposed, they generally lack accompanying cost estimates or enough process information to model costs. Herein we develop detailed estimates of seven categories of capital and operating costs along with estimates of revenue from recovered materials for each step in two proposed recycling processes for c-Si PV modules. Using these results, we develop a hypothetical third recycling process merging process steps from the original two, estimate surcharges required to achieve minimum sustainable prices for each recycling process, as well as consider how economies of scale could reduce costs. Increasing the purity of and identifying higher-value markets for recovered materials are approaches to reducing costs and increasing recycling rates in voluntary markets.

crystalline silicon↗

The Opportunity in Commercial Approaches for Future NASA Deep Space Exploration Elements

In 2011, NASA released a report assessing the market for commercial crew and cargo services to low Earth orbit (LEO). The report stated that NASA had spent a few hundred million dollars in the Commercial Orbital Transportation Services (COTS) program on the portion related to the development of the Falcon 9 launch vehicle. Yet a NASA cost model predicted the cost would have been significantly more with a non-commercial cost-plus contracting approach. By 2016 a NASA request for information stated it must "maximize the efficiency and sustainability of the Exploration Systems development programs", as "critical to free resources for reinvestment...such as other required deep space exploration capabilities." This work joins the previous two events, showing the potential for commercial, public private partnerships, modeled on programs like COTS, to reduce the cost to NASA significantly for "...other required deep space exploration capabilities." These other capabilities include landers, stages and more. We mature the concept of "costed baseball cards", adding cost estimates to NASA's space systems "baseball cards." We show some potential costs, including analysis, the basis of estimates, data sources and caveats to address a critical question - based on initial assessment, are significant agency resources justified for more detailed analysis and due diligence to understand and invest in public private partnerships for human deep space exploration systems? The cost analysis spans commercial to cost-plus contracting approaches, for smaller elements vs. larger, with some variation for lunar or Mars. By extension, we delve briefly into the potentially much broader significance of the individual cost estimates if taken together as a NASA investment portfolio where public private partnership are stitched together for deep space exploration. How might multiple improvements in individual systems add up to NASA human deep space exploration achievements, realistically, affordably, sustainably, in a relevant timeframe?

cost modeling estimation↗

Techno-economic analysis of advanced small modular nuclear reactors

Here, small modular nuclear reactors (SMRs) represent a robust opportunity to develop low-carbon and reliable power with the potential to meet cost parity with conventional power systems. This study presents a detailed, bottom-up economic evaluation of a 12 × 77 MW e (924 MW e total) light-water SMR (LW-SMR) plant, a 4 × 262 MW e (1,048 MW e ) gas-cooled SMR (GC-SMR) plant, and a 5 × 200 MW e (1,000 MW e total) molten salt SMR (MS-SMR) plant. Cost estimates are derived from equipment costs, labor hours, material inputs, and process-engineering models. The advanced SMRs are compared to natural gas combined cycle plants with and without post-combustion carbon capture and a conventional large nuclear reactor. Overnight capital cost (OCC) and levelized cost of energy (LCOE) estimates are developed. The OCC of the LW-SMR, GC-SMR, and MS-SMR are found to be $\$4,844$/kW, $\$4,355$/kW, and $\$3,985$/kW respectively. The LCOE of the LW-SMR, GC-SMR, and MS-SMR are found to be $\$89.6$/MWh, $\$81.5$/MWh, and $\$80.6$/MWh respectively. A Monte Carlo analysis is performed, for which the OCC and construction time of the LW-SMR is found to have a lower mean and standard deviation than a conventional large reactor. The LW-SMR OCC is found to have a mean of $\$5,233$/kW with a standard deviation of $\$658$/kW and a 90 % probability of remaining between $\$4,254$/kW and $\$6,399$/kW, while the construction duration is found to have a mean of 4.5 years with a standard deviation of 0.8 years and a 90 % probability of remaining between 3.4 and 6.0 years. The economic impact of economies of scale, simplification, modularization, and construction time for SMRs are discussed. Additionally, policy implications for direct SMR capital subsidies and the impact of a carbon tax on natural gas emissions are explored.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Front End Engineering Design of Linde-BASF Advanced Post-Combustion CO 2 Capture Technology at a Southern Company Natural Gas-Fired Power Plant (Final Scientific/Technical Report)

This document details the execution of Cooperative Agreement DE-FE0031847, “Front End Engineering Design of Linde-BASF Advanced Post-Combustion Carbon Dioxide (CO 2 ) Capture Technology at a Southern Company Natural Gas-Fired Power Plant” during the period of 10/1/2019 to 6/30/2022. The project was funded by the U.S. Department of Energy’s Office of Fossil Energy and Carbon Management (FECM) and managed by the National Energy Technology Laboratory (NETL). Southern Company Services, Inc. (SCS) was the prime recipient and led the project team. Other members of the project team included Linde, Inc. (Linde), Linde Engineering – Dresden (LED), and BASF. The overall goal of the project was to complete a front-end engineering design (FEED) study for installing the Linde-BASF post-combustion capture (PCC) technology at an existing domestic natural gas-fired combined cycle (NGCC) power plant within Southern Company’s portfolio of assets. The CO 2 capture plant was to be of commercial scale (at least 375 MWe) and include process units for pre-conditioning of the flue gas system, the CO 2 capture plant island, storage vessels, the CO 2 compression train, and any necessary components for integration into the NGCC plant. Mississippi Power’s Plant Daniel Unit #4 was chosen as the host site for the FEED with the target of capturing 90% of CO 2 emissions from the existing combustion turbines. The information produced by the FEED was used to develop a cost estimate of +/- 15% accuracy. Capital costs, excluding financing, are estimated at approximately $\$752$ million dollars (2021). The execution of a project based on this FEED study has an estimated duration of almost five years.

03 NATURAL GAS↗

Low Carbon Intensity Formic Acid Chemical Synthesis from Direct Air Captured CO 2 Utilizing Chemical Plant Waste Heat - Final Technical Report

The primary objective of Low Carbon Intensity Formic Acid Chemical Synthesis from Direct Air Captured CO 2 Utilizing Chemical Plant Waste Heat (ChemFADAC) is to execute and complete a FEED study for an integrated direct air capture (DAC) and carbon conversion system (together, the DACUS system) co-located at a Nutrien nitric acid production facility in Kennewick, WA capable of capturing and converting a minimum of 5,000 MT/year net atmospheric CO 2 to low carbon intensity formic acid (FA) using industrial waste heat and renewable electricity. The goal will be achieved through the completion of four objectives using a collaborative approach with community stakeholders. Objective 1. Conduct a FEED study and Class 3 project cost estimate for the proposed DACUS system that maximizes use of thermal energy from the Nutrien KFO host site to produce low carbon intensity FA from atmospheric CO 2 . Objective 2. Perform a cradle-to-gate life-cycle analysis of the DACUS system to determine the environmental sustainability and carbon intensity (CI) of the proposed project and product from the results of the FEED study. Objective 3. Perform a business case analysis from results of the LCA, FEED study and cost estimate to justify investment to build the DACUS project at the Nutrien KFO site. Objective 4. Quantify how deployment of the proposed technology will promote and prepare a ready workforce for clean energy and manufacturing jobs and coordinate with community stakeholders to perform an environmental justice and a preliminary economic revitalization and job creation outcomes analysis.

37 INORGANIC, ORGANIC, PHYSICAL, AND ANALYTICAL CH↗

Weight and cost forecasting for advanced manned space vehicles

A mass and cost estimating computerized methology for predicting advanced manned space vehicle weights and costs was developed. The user friendly methology designated MERCER (Mass Estimating Relationship/Cost Estimating Relationship) organizes the predictive process according to major vehicle subsystem levels. Design, development, test, evaluation, and flight hardware cost forecasting is treated by the study. This methodology consists of a complete set of mass estimating relationships (MERs) which serve as the control components for the model and cost estimating relationships (CERs) which use MER output as input. To develop this model, numerous MER and CER studies were surveyed and modified where required. Additionally, relationships were regressed from raw data to accommodate the methology. The models and formulations which estimated the cost of historical vehicles to within 20 percent of the actual cost were selected. The result of the research, along with components of the MERCER Program, are reported. On the basis of the analysis, the following conclusions were established: (1) The cost of a spacecraft is best estimated by summing the cost of individual subsystems; (2) No one cost equation can be used for forecasting the cost of all spacecraft; (3) Spacecraft cost is highly correlated with its mass; (4) No study surveyed contained sufficient formulations to autonomously forecast the cost and weight of the entire advanced manned vehicle spacecraft program; (5) No user friendly program was found that linked MERs with CERs to produce spacecraft cost; and (6) The group accumulation weight estimation method (summing the estimated weights of the various subsystems) proved to be a useful method for finding total weight and cost of a spacecraft.

Williams, Raymond↗

Filer City Biomass Carbon Removal and Storage (BiCRS) Net-Negative Study

NorthStar Clean Energy Company (NorthStar) conducted the Filer City Biomass Carbon Removal and Storage (BiCRS) Net-Negative Study to develop a conceptual design and cost estimate for retrofitting the TES Filer City Station with post-combustion carbon capture technology in Mainstee Michigan. The Filer City BiCRS Net-Negative Study allowed NorthStar and team to confirm the commercial feasibility of a post-combustion carbon capture system applied to biomass-fired boilers. At the time of the study, there were no operating facilities in the world with carbon capture applied to flue gas from woody biomass as proposed for Filer City. Due to the solvent-agnostic nature of B&W’s SolveBright™ technology, the team determined that multiple amines, both traditional and proprietary, would be capable of 95% CO 2 capture efficiency with the steam available from Filer City’s existing boilers after modifications to burn 100% biomass. Based on the cost estimates produced, NorthStar can now confirm the Filer City BiCRS Project is economically viable with a combination of tax credits available from the Inflation Reduction Act of 2022 and high-quality Carbon Dioxide Removal Credits sold on the Voluntary Carbon Market. The Filer City BiCRS project is uniquely positioned to become one of the first projects to capture and sequester large volumes of CO 2 from a biogenic source, removing existing CO 2 from the atmosphere. The unlimited version of the Filer City Biomass Carbon Removal and Storage (BiCRS) Net-Negative Study Final Technical Report is attached.

01 COAL, LIGNITE, AND PEAT↗

Space Transportatioin System (STS) propellant scavenging system study. Volume 3: Cost and work breakdown structure-dictionary

Fundamentally, the volumes of the oxidizer and fuel propellant scavenged from the orbiter and external tank determine the size and weight of the scavenging system. The optimization of system dimensions and weights is stimulated by the requirement to minimize the use of partial length of the orbiter payload bay. Thus, the cost estimates begin with weights established for the optimum design. Both the design, development, test, and evaluation and theoretical first unit hardware production costs are estimated from parametric cost weight scaling relations for four subsystems. For cryogenic propellants, the widely differing characteristics of the oxidizer and the fuel lead to two separate tank subsystems, in addition to the electrical and instrumentation subsystems. Hardwares costs also involve quantity, as an independent variable, since the number of production scavenging systems is not firm. For storable propellants, since the tankage volume of the oxidizer and fuel are equal, the hardware production costs for developing these systems are lower than for cryogenic propellants.

Source record↗