Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Analysis facilities”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 397 records · Page 22

ePROJECT BUILDER: PROMOTING WIDER ADOPTION OF ENERGY SAVINGS PERFORMANCE CONTRACTS THROUGH STANDARDIZATION AND TRANSPARENCY

The United States Federal Government has been conducting guaranteed savings energy savings performance contracts for over 20 years and now relies on ESPC for the majority of its energy efficiency work. Along with a related financed project type, these deals resulted in $4.2 billion of project investment in the five years ending in 2016, a pace that has even accelerated since. Measurement and verification (M&V) on the projects is the key to assuring savings realization and persistence. Perceived as a weakness or burdensome added cost in the early years of the program, M&V has become a strength. All energy conservation measures (ECMs) have some form of measurement – defined as a measured baseline establishment followed by at least one measurement of the main energy-saving parameter taken in the performance period for each ECM. The government’s in-house energy consulting office, the Federal Energy Management Program (FEMP), now recommends measurement of these “Option A” M&V ECMs throughout the contract term, usually annually. Moreover, a significantly higher percentage of projects are now characterized by more ambitious M&V, including Option B (all parameter measurement) for most generation (including renewable) and some efficiency measures, and more frequent Option C (whole facility utility bill analysis) for “deep retrofit” projects with multiple, interactive ECMs. Coincident with this progress in M&V has been a much greater embracing of ESPC by the federal agencies, resulting in the enormous rate of projects now executed. This paper traces the evolution of M&V in federal ESPC and argues that the heightened credibility of the savings has contributed significantly to the procurement vehicle’s long-term viability. This focus on savings integrity via M&V has been learned over two decades for U.S. federal ESPC, but countries with developing ESPC markets would be wise to emphasize it as their markets emerge, allowing them to avoid some of the “growing pains” experienced in the U.S.

Earni, Shankar↗

M&V in ESPC: The U.S. Federal Experience and Implications for Developing ESPC Markets

The United States Federal Government has been conducting guaranteed savings energy savings performance contracts for over 20 years and now relies on ESPC for the majority of its energy efficiency work. Along with a related financed project type, these deals resulted in $4.2 billion of project investment in the five years ending in 2016, a pace that has even accelerated since. Measurement and verification (M&V) on the projects is the key to assuring savings realization and persistence. Perceived as a weakness or burdensome added cost in the early years of the program, M&V has become a strength. All energy conservation measures (ECMs) have some form of measurement – defined as a measured baseline establishment followed by at least one measurement of the main energy-saving parameter taken in the performance period for each ECM. The government’s in-house energy consulting office, the Federal Energy Management Program (FEMP), now recommends measurement of these “Option A” M&V ECMs throughout the contract term, usually annually. Moreover, a significantly higher percentage of projects are now characterized by more ambitious M&V, including Option B (all parameter measurement) for most generation (including renewable) and some efficiency measures, and more frequent Option C (whole facility utility bill analysis) for “deep retrofit” projects with multiple, interactive ECMs. Coincident with this progress in M&V has been a much greater embracing of ESPC by the federal agencies, resulting in the enormous rate of projects now executed. This paper traces the evolution of M&V in federal ESPC and argues that the heightened credibility of the savings has contributed significantly to the procurement vehicle’s long-term viability. This focus on savings integrity via M&V has been learned over two decades for U.S. federal ESPC, but countries with developing ESPC markets would be wise to emphasize it as their markets emerge, allowing them to avoid some of the “growing pains” experienced in the U.S.

Coleman, Philip↗

M&V in ESPC: The U.S. Federal Experience and Implications for Developing ESPC Markets

The United States Federal Government has been conducting guaranteed savings energy savings performance contracts for over 20 years and now relies on ESPC for the majority of its energy efficiency work. Along with a related financed project type, these deals resulted in $4.2 billion of project investment in the five years ending in 2016, a pace that has even accelerated since.Measurement and verification (M&V) on the projects is the key to assuring savings realization and persistence. Perceived as a weakness or burdensome added cost in the early years of the program, M&V has become a strength. All energy conservation measures (ECMs) have some form of measurement – defined as a measured baseline establishment followed by at least one measurement of the main energy-saving parameter for a given ECM taken in the performance period. The government’s in-house energy consulting office, the Federal Energy Management Program (FEMP), now recommends measurement of these “Option A” M&V ECMs throughout the contract term, usually annually. Moreover, a significantly higher percentage of projects are now characterized by more ambitious M&V, including Option B (all parameter measurement) for most generation (including renewable) and some efficiency measures, and more frequent Option C (whole facility utility bill analysis) for “deep retrofit” projects with multiple, interactive ECMs. Coincident with this progress in M&V has been a much greater embracing of ESPC by the federal agencies, resulting in the enormous rate of projects now executed. This paper traces the evolution of M&V in federal ESPC and argues that the heightened credibility of the estimated (and guaranteed) savings has contributed significantly to the procurement vehicle’s long-term viability. This focus on savings integrity via M&V has been learned over two decades for U.S. federal ESPC, but countries with developing ESPC markets would be wise to emphasize it as their markets emerge, allowing them to avoid some of the “growing pains” experienced in the U.S.

Coleman, Philip↗

One of These Things IS Like the Other: Pursuing a New Taxonomy of Industry for Improved Energy System Modeling

Industrial processes drive the exchange of materials, energy, and currency throughout the economy. These processes are powered by electricity and direct combustion, with variation in their operation even within the same industry. This heterogeneity makes it difficult for large models, including the National Energy Modeling System (US), to project their energy use while remaining tractable. Decarbonization and ensuing changes to the energy system require changes to industrial processes while offering opportunities for process innovation, but the extent and nature of changes are difficult to model with current classification schemes and corresponding data. The North American Industrial Classification (NAICS) is an economic taxonomy of industries, but its categories are less meaningful from an energy and material flow perspective. For example, a facility that makes steel from iron ore in a blast furnace/basic oxygen furnace is categorized under the same NAICS code as a facility that makes steel from scrap in an electric arc furnace despite the scale, use of recycled scrap versus iron ore, and energy use differences in the two facility types. Exploratory analysis is performed on a large dataset used for plant-level energy assessment in order to detect clusters that can aid in better modeling of industry for energy analysis in an evolving system with breakthrough technologies.

28 EE - Advanced Manufacturing Office (EE-5A)↗

The Modeling of the Synfuel Production Process: Process models of Fischer-Tropsch production with electricity and hydrogen provided by various scales of nuclear plants

Synthetic fuels (synfuels), also known as electro-fuels (E-fuels), are hydrocarbon fuels produced from waste CO2 streams and water electrolysis, with electricity as the primary source of energy. To achieve substantial reductions in greenhouse gas (GHG) emissions, electricity sources must release zero carbon or near-zero carbon, as is the case with solar, wind, hydro, and nuclear power. Nuclear power is one of the largest and steadiest domestic sources of clean energy in the United States. Moreover, nuclear power has the potential to produce hydrogen economically for less than $2/kg, reaching the DOE near-term target price. Thus, using nuclear power to produce synfuels has the unique potential to significantly reduce the GHG emissions of hydrocarbon fuels production and end-use applications. Fisher-Tropsch or FT fuel (a mixture of naphtha, jet fuel, and diesel) is of great interest because it is a drop-in fuel that can be blended with conventional petroleum counterparts and is compatible with existing infrastructure. By using the ASPEN Plus model, this report develops FT fuel production models on three scales, corresponding to nuclear plants with capacities of 1000 MWe, 437 Mwe, and 100 MWe, respectively. The FT model case with energy from a 437-MWe nuclear plant is used as a baseline case. This report summarizes the baseline ASPEN Plus model results with a detailed mass and energy analysis. Our modeled facility produces 507 MT/day (185,000 gal/day) of FT fuel by converting 255 MT/day of hydrogen and 1,580 MT/day of CO2. The FT fuel production energy efficiency from hydrogen and electricity energy inputs is 70% (lowerheating-value or LHV-based). Including the high-temperature electrolyzer in the system boundary, the FT fuel production LHV efficiency from electricity and thermal energy inputs is 51%, considering 39.8 kWh/kg of electricity and 6.86 kWh/kg of thermal energy use from a nuclear plant for hydrogen production. The FT production efficiency can potentially be increased by further integrating the heat exchange between nuclear plant and FT process, and this study is underway. The carbon conversion ratio in the baseline case is 99%, with process CO2 capture and recirculation and oxy-combustion using the oxygen by-product from water electrolysis. The hydrogen consumption is 1.38 kg/gal-FT fuel and the CO2 consumption is 8.56 kg/gal-FT fuel in the baseline case. With different FT production scales determined by the nuclear plant capacity, the FT model was scaled using the same operating parameters, which led to the same conversion efficiency regardless of scale. However, the different FT plant scales will impact the economics of FT fuel production; this impact will be examined in the next phase of this study.

Zang, Guiyan↗

Preliminary analysis of an integrated logistics system for OSSA payloads. Volume 4: Supportability analysis of the 1.8m centrifuge

Supportability issues for the 1.8 meter centrifuge in the Life Science Research Facility are addressed. The analysis focuses on reliability and maintainability and the potential impact on supportability and affordability. Standard logistics engineering methodologies that will be applied to all Office of Space Science and Applications' (OSSA) payload programs are outlined. These methodologies are applied to the 1.8 meter centrifuge.

Palguta, T.↗

Initial Jitter Analysis of Lynx, A Proposed Future Large Astrophysics Facility

Lynx, formerly known as the X-Ray surveyor, is one of the large strategic mission concepts being studied for input into the 2020 Astrophysics Decadal Survey. Lynx is the first future X-ray mission concept planning to match Chandra's angular-resolution and will combine this with very high throughput, large field of view, and high-resolution spectroscopy for point-like and extended sources. These ambitious performance requirements clearly merit early detailed engineering to demonstrate feasibility. An on-going structural dynamic analysis is being performed on the Lynx structural design to predict dynamic responses, jitter, to expected on-board vibrational disturbances. Applicable disturbance sources include a cryogenic pump, and six reaction wheels. The structural design, disturbances, analysis, and results are presented. Ultimately, responses will be compared to Lynx performance requirements as they relate to a system error budget.

Knight, J. Brent↗

Transportation and Systems Analysis Collaborations in Support of a Federal Consolidated Interim Storage Facility

The U.S. Department of Energy’s Integrated Waste Management (IWM) program under the Office of Nuclear Energy is planning for the future transportation, storage, and eventual disposal of spent nuclear fuel (SNF) and high-level radioactive waste (HLW) from nuclear power plant sites across the United States. To better enable informed decision-making regarding the back end of the nuclear fuel cycle, the IWM program has been sponsoring the development and application of system analysis tools capable of analyzing various options for managing SNF and HLW. With these tools, integrated waste management system (IWMS) architecture analyses are being conducted to support the future deployment of a comprehensive nuclear waste management system that considers all major back-end aspects of the nuclear fuel cycle (i.e., transportation, storage, and disposal). System analyses and assessments typically use these modeling and simulation tools to investigate implications of changes in various assumptions and parameters such as acceptance rates, receipt logic, facility capacities and capabilities, use of standardized canisters, start and stop dates of facilities, etc. The Next Generation System Analysis Model (NGSAM) is an agent-based simulation toolkit that is used for a system-level simulation and analysis focused on SNF management in the United States. An analyst using NGSAM has the ability to define several factors like the number of storage facilities, capacity at each facility, transportation schedules, shipment rates, and other conditions. NGSAM’s primary purpose is to provide a system analyst with capabilities to model the IWMS and gain insights into SNF and HLW management alternatives including the impact of system choices, associated cost estimates, and development of integrated yet flexible approaches. IWM is also developing the Stakeholder Tool for Assessing Radioactive Transportation (START). START is a web-based geospatial tool developed to provide visualization and initial evaluation of transportation options associated with future SNF and HLW shipment planning and operations. This includes characterizing safety, economic, and environmental conditions on and in proximity to shipment origins as well as along prospective transportation routes. Information from the START tool can be presented/shared as maps, graphics, geospatial files, and tabular form to enable easy data representation and export functionality. The system analysis, NGSAM, and START teams had been working closely for several years before formalizing this collaboration. START provides the SNF routing information for use in NGSAM. System analysts use the NGSAM tool to generate results (schedule, costs, infrastructure acquisitions, shipment rates, etc.). Subject-matter experts and system analysts work together to inform how NGSAM should model the waste management system. Specifically, this paper discusses the collaborations between the system analysis, NGSAM, and START teams and their accomplishments over the past year. Some examples of these efforts include calibrating and adding data to the START output files to meet NGSAM needs, gaining a better understanding of START data used in NGSAM, as well as how updates in START data could result in an improved NGSAM analysis. Detailed examples of various tasks that have been performed by the team will be discussed in the full paper. Continued efforts in this direction are expected in the coming years.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Capabilities of the Impact Testing Facility at Marshall Space Flight Center

The test and analysis capabilities of the Impact Testing Facility at NASA's Marshall Space Flight Center are described. Nine different gun systems accommodate a wide range of projectile and target sizes and shapes at velocities from subsonic through hypersonic, to accomplish a broad range of ballistic and hypervelocity impact tests. These gun systems include ballistic and microballistic gas and powder guns, a two-stage light gas gun, and specialty guns for weather encounter studies. The ITF "rain gun" is the only hydrometeor impact gun known to be in existence in the United States that can provide single impact performance data with known raindrop sizes. Simulation of high velocity impact is available using the Smooth Particle Hydrodynamic Code. The Impact Testing Facility provides testing, custom test configuration design and fabrication, and analytical services for NASA, the Department of Defense, academic institutions, international space agencies, and private industry in a secure facility located at Marshall Space Flight Center, on the US Army's Redstone Arsenal in Huntsville, Alabama. This facility performs tests that are subject to International Traffic in Arms Regulations (ITAR) and DoD secret classified restrictions as well as proprietary and unrestricted tests for civil space agencies, academic institutions, and commercial aerospace and defense companies and their suppliers.

Finchum, Andy↗

Techno-Economic and life cycle assessment of standalone Single-Stream material recovery facilities in the United states

Material Recovery Facilities (MRFs) are crucial players in achieving a circular economy. MRFs receive complex waste streams and separate valuable recyclables from these mixtures. This study conducts techno-economic analysis (TEA) to estimate the net present value (NPV) and life cycle assessment (LCA) to estimate different environmental impacts of a commercial scale standalone, single-stream MRF to assess the economic feasibility and environmental impacts of recovering valuable recyclables from an MRF processing 120,000 tonnes per year (t/y). The TEA employs a discounted cash flow rate of return (DCFROR) analysis over a 20-year facility lifetime, along with a sensitivity analysis on the impact of different operating and economic parameters. Results show that the total fixed cost of building the MRF facility is $\$ $23 MM, and the operating cost is $\$ $45.48/tonne. Further the NPV of the MRF can vary from $\$ $3.57 MM to $\$ $60 MM, while 100-year global warming potential can range from 5.98 to 8.53 kg carbon dioxide equivalents (CO2-eq) per tonne of MSW. We have also found that MSW composition (arising from regional effects) significantly impacts costs, 100-year global warming potential, and other impact categories such as acidification potential, eutrophication potential, ecotoxicity, ozone depletion, photochemical oxidation, carcinogenic effects, and non-carcinogenic effects. Sensitivity and uncertainty analysis indicate that waste composition and market prices significantly impact the profitability of the MRF, and the waste composition mostly impacts global warming potential. Our analysis also indicates that facility capacity, fixed capital cost, and waste tipping fees are vital parameters that affect the economic viability of MRF operations.

36 MATERIALS SCIENCE↗

Andes Data Analysis System at the Oak Ridge Leadership Computing Facility

Andes is a (704)-node commodity-type Linux® cluster. Each of Andes’s 704 nodes contain two 16-core 3.0 GHz AMD EPYC 7302 processors with AMD’s Simultaneous Multithreading (SMT) Technology and 256GB of main memory. Andes also has nine large memory GPU nodes. These nodes each have 1TB of main memory and two NVIDIA K80 GPUs with two 14-core 2.30 GHz Intel Xeon processors with HT Technology.

AMD EPYC↗

Analysis of the passive stabilization of the long duration exposure facility

The nominal Long Duration Exposure Facility (LDEF) configurations and the anticipated orbit parameters are presented. A linear steady state analysis was performed using these parameters. The effects of orbit eccentricity, solar pressure, aerodynamic pressure, magnetic dipole, and the magnetically anchored rate damper were evaluated to determine the configuration sensitivity to variations in these parameters. The worst case conditions for steady state errors were identified, and the performance capability calculated. Garber instability bounds were evaluated for the range of configuration and damping coefficients under consideration. The transient damping capabilities of the damper were examined, and the time constant as a function of damping coefficient and spacecraft moment of inertia determined. The capture capabilities of the damper were calculated, and the results combined with steady state, transient, and Garber instability analyses to select damper design parameters.

Siegel, S. H.↗

Transportation and System Analysis Collaborations in Support of a Federal Consolidated Interim Storage Facility

The U.S. Department of Energy’s Integrated Waste Management (IWM) program under the Office of Nuclear Energy is planning for the future transportation, storage, and eventual disposal of spent nuclear fuel (SNF) and high-level radioactive waste (HLW) from nuclear power plant and waste custodian sites across the United States. To better enable informed decision-making regarding the back end of the nuclear fuel cycle, the IWM program has been sponsoring the development and application of system analysis tools capable of analyzing various options for managing SNF and HLW. With these tools, integrated waste management system (IWMS) architecture analyses are being conducted to support the future deployment of a comprehensive nuclear waste management system that considers all major back-end aspects of the nuclear fuel cycle (i.e., transportation, storage, and disposal). System analyses and assessments typically use these modeling and simulation tools to investigate implications of changes in various assumptions and parameters such as acceptance rates, receipt logic, facility capacities and capabilities, use of standardized canisters, start and stop dates of facilities, etc. The Next Generation System Analysis Model (NGSAM) is an agent-based simulation toolkit that is used for a system-level simulation and analysis focused on SNF management in the United States. NGSAM’s primary purpose is to provide a system analyst with capabilities to model the IWMS and gain insights into SNF and HLW management alternatives including the impact of system choices, associated cost estimates, and development of integrated yet flexible approaches. An analyst using NGSAM can define several factors like the number of storage facilities, capacity at each facility, transportation schedules, shipment rates, and other conditions. IWM is also developing the Stakeholder Tool for Assessing Radioactive Transportation (START). START is a web-based geospatial tool developed to provide the visualization and initial evaluation of transportation options associated with future SNF and HLW shipment planning and operations. This includes characterizing safety, economic, and environmental conditions at and in proximity to shipment origins as well as along prospective transportation routes. Information from the START tool can be presented/shared as maps, graphics, geospatial files, and tabular form to enable easy data representation and export functionality. The system analysis, NGSAM, and START teams have been working closely for several years before formalizing this collaboration. START provides the SNF transportation routing information for use in NGSAM. System analysts use the NGSAM tool to generate results (schedule, costs, infrastructure acquisitions, shipment rates, etc.). Subject-matter experts and system analysts work together to inform how NGSAM should model the waste management system. Specifically, this paper discusses the collaborations between the system analysis, NGSAM, and START teams and their accomplishments over the past year. Some examples of these efforts include calibrating and adding data to the START output files to meet NGSAM needs, gaining a better understanding of START data used in NGSAM as well as how updates in START data could result in an improved NGSAM analysis. Detailed examples of various tasks that have been performed by the team will be discussed in the full paper. Continued efforts in this direction are expected in the coming years.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Past and Present Large Solid Rocket Motor Test Capabilities

A study was performed to identify the current and historical trends in the capability of solid rocket motor testing in the United States. The study focused on test positions capable of testing solid rocket motors of at least 10,000 lbf thrust. Top-level information was collected for two distinct data points plus/minus a few years: 2000 (Y2K) and 2010 (Present). Data was combined from many sources, but primarily focused on data from the Chemical Propulsion Information Analysis Center s Rocket Propulsion Test Facilities Database, and heritage Chemical Propulsion Information Agency/M8 Solid Rocket Motor Static Test Facilities Manual. Data for the Rocket Propulsion Test Facilities Database and heritage M8 Solid Rocket Motor Static Test Facilities Manual is provided to the Chemical Propulsion Information Analysis Center directly from the test facilities. Information for each test cell for each time period was compiled and plotted to produce a graphical display of the changes for the nation, NASA, Department of Defense, and commercial organizations during the past ten years. Major groups of plots include test facility by geographic location, test cells by status/utilization, and test cells by maximum thrust capability. The results are discussed.

Kowalski, Robert R.↗

Possible safety hazards associated with the operation of the 0.3-m transonic cryogenic tunnel at the NASA Langley Research Center

The 0.3 m Transonic Cryogenic Tunnel (TCT) at the NASA Langley Research Center was built in 1973 as a facility intended to be used for no more than 60 hours in order to verify the validity of the cryogenic wind tunnel concept at transonic speeds. The role of the 0.3 m TCT has gradually changed until now, after over 3000 hours of operation, it is classified as a major NASA research facility and, under the administration of the Experimental Techniques Branch, it is used extensively for the testing of airfoils at high Reynolds numbers and for the development of various technologies related to the efficient operation and use of cryogenic wind tunnels. The purpose of this report is to document the results of a recent safety analysis of the 0.3 m TCT facility. This analysis was made as part of an on going program with the Experimental Techniques Branch designed to ensure that the existing equipment and current operating procedures of the 0.3 m TCT facility are acceptable in terms of today's standards of safety for cryogenic systems.

Webster, T. J.↗

A study of the local pressure field in turbulent shear flow and its relation to aerodynamic noise generation

Work during the period of this report has been in three areas: (1) pressure transducer error analysis, (2) fluctuating velocity and pressure measurements in the NASA Lewis 6-inch diameter quiet jet facility, and (3) measurement analysis. A theory was developed and experimentally verified to quantify the pressure transducer velocity interference error. The theory and supporting experimental evidence show that the errors are a function of the velocity field's turbulent structure. It is shown that near the mixing layer center the errors are negligible. Turbulent velocity and pressure measurements were made in the NASA Lewis quiet jet facility. Some preliminary results are included.

Jones, B. G.↗

SRS Composite Analysis Monitoring Plan (FY2019 Model Validation)

Using a projected end-state date of 2065 (SRNS 2015b), the Savannah River Site (SRS) Composite Analysis (CA) modeling for each facility and waste site began on the inventory year assigned to it so that source depletion and radionuclide transport out of the system could be appropriately captured. Some SRS waste sites that have already achieved their end states (i.e. end-state inventories and end-state configuration) are currently contributing to the potential off-site public dose through source release, groundwater transport, discharge to on-site surface streams, and stream transport to the CA point of assessments (POAs). The inventory year assigned to these waste sites is 2002 or before. This means that SRS CA results from 2002 and beyond are a reasonable representation for these waste sites that have already achieved their end states and are currently contributing to the potential off-site public dose. The SRS Annual Environmental Report (AER) monitoring can differentiate and separate liquid pathway data allowing the data representing only waste sites at their end state to be produced. Because the SRS CA has projected reasonable end-state impacts from 2002 and beyond, and the AER monitoring can differentiate and separate operating and end-state contributions to annual liquid pathway release, an opportunity exists to use the AER monitoring data to validate the SRS CA model. The CA model validation program uses a graded and systematic approach for taking corrective action, starting with an SRS established administrative dose limit of 15 mrem/yr, below which no action is required. Based on the location of the 2010 SRS CA POAs, the only potential exposure pathway for the public is through surface water. The completion of the FY2019 CA model validation indicates that the SRS CA projected dose, while generally conservative, provides a reasonable representation of the maximum annual doses. These doses are well below the administrative limit; therefore, no additional action is required.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗