Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Accelerated beam”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 397 records · Page 22

Development of a direct-sampling RF receiver for precision beam charge measurements in the MOLLER experiment

Here, we have developed and tested a direct-sampling RF receiver capable of measuring the amplitude of a 1497 MHz sinusoidal beam signal in 0.5 ms integration windows with a relative uncertainty of better than 10 parts per million. The receiver is intended for measuring signals from beam current monitoring cavities on the beamline of the Continuous Electron Beam Accelerator Facility (CEBAF) at Jefferson Lab. The beam signal strength, frequency, and integration window fulfill the thus far unmet requirements of the upcoming MOLLER experiment to measure the beam charge for different helicity states.

47 OTHER INSTRUMENTATION↗

Rotation of a 1-GeV particle beam by a fan system of thin crystals

The deflection of a 1-GeV charged particle beam by a system formed by fan-oriented thin silicon wafers has been studied theoretically and experimentally. Software has been developed for numerical simulation of a particle beam transmission through a fan crystal system. In the U-70 experiment on a proton beam, the particles were deflected by such a system through an angle exceeding 1 mrad. Thus, a new method has been demonstrated for rotating a particle beam, which can be used for creating accelerator beams for medical purposes.

75 CONDENSED MATTER PHYSICS, SUPERCONDUCTIVITY AND↗

A Procedure for Beamline Characterization and Tuning in Open-Ended Beamlines

Standard closed-orbit techniques for Twiss parameter measurement are not applicable to the open-ended Continuous Electron Beam Accelerator Facility (CEBAF) at Jefferson Lab. The evolution of selected sets of real orbits in the accelerator models the behavior of a "synthetic" beam. This process should provide the distributed optical information needed to optimize beamline tuning for an open-ended system. This work will discuss the development and current state of this technique, as well as examples of its use in the CEBAF machine.

Bodenstein, Ryan↗

Design and calculations for HWR Strongback

The PIP-II Superconductive Linac is a linear accelerator that provides the first stage of beam acceleration. The velocity increase is achieved through a sequence of different cryomodules, where all the cavities are aligned to form a continuous string. The cryomodule team is currently developing a spare for the HWR cryomodule. This spare will not be an exact replica of the existing one, but rather will be based on the SSR f650 cryomodule design created for PIP-II . Each cavity , magnet , and coupler form a unit, with a total of eight units per string. These components, together with additional equipment (such as piping , the thermal shield , and beamline interconnections ), are supported by the Strongback . The aim of this project is to develop a brand-new Strongback design for HWR cavities, and to perform the related analyses and calculations in order to meet the required specifications.

43 PARTICLE ACCELERATORS↗

20 Years Experience with the World's Largest Superconducting RF Application: CEBAF

The Continuous Electron Beam Accelerator Facility (CEBAF) uses over 350 multi-cell resonant rf structures to accelerate a precision high-power electron beam for nuclear physics research. These cavities are made of bulk niobium and operated CW at 2.07K, employing the world's 2nd largest sub-lambda cryogenics system. The superconducting system is a vital part of this unique tool for fundamental research. Through 20 years of system construction and operation the preparation methods have evolved and the performance levels have continued to climb. State-of-the practice now supports > 50 MV/m surface electric fields and > 100 mT surface magnetic fields while maintaining < 30 nOhm surface resistance. The evolution of the superconducting aspects of CEBAF will be reviewed, together with the associated production methods.

Reece, Charles↗

Status of Error Correction Studies in Support of FFA@CEBAF

In pursuit of higher energy at the Continuous Electron Beam Accelerator Facility (CEBAF), the FFA@CEBAF energy upgrade study is considering the implementation of a novel technology to recirculate electron beam through the accelerating gradient of the machine more times. The technology in question is Fixed-Field Alternating-gradient (FFA) bending accelerator arcs: these arcs may replace the present highest energy electromagnetic (EM) arcs, and due to a much wider energy acceptance allow several more passes. The survey and beam error tolerance of the FFA arcs need to be well understood prior to commissioning, in addition to the limits of planned correction magnets and diagnostics. This work explores the current state of error tolerance and correction studies in FFA arcs at CEBAF.

Benesch, J.↗

Diamagnetic Loop Testing on DARHT-I

Diamagnetic loops (DML) can be used as a noninvasive method for measurements of beam size in electron beam accelerators that use solenoidal magnetic transport. The loop fundamentally measures the magnetic flux excluded by a diamagnetic object. A comprehensive theory relates the rms beam radius to the excluded flux measured by the DML. We have built, and calibrated a DML apparatus. Recently, this DML has been used to measure the size of the electron beam near the final focus of the DARHT-I flash-radiography accelerator. Results are in agreement with beam transport code predictions. In this article, we review and summarize the construction, calibration, and electron-beam testing of this DML.

43 PARTICLE ACCELERATORS↗

Suppression of Deflecting Forces in Planar-Symmetric Dielectric Wakefield Accelerating Structures with Elliptical Bunches

Wakefield based accelerators capable of accelerating gradients two orders of magnitude higher than present accelerators offer a path to compact high energy physics instruments and light sources. However, for high gradient accelerators, beam instabilities driven by commensurately high transverse wakefields limit beam quality. It has been previously theoretically shown that transverse wakefields can be reduced by elliptically shaping the transverse sizes of beams in dielectric structures with planar symmetry. We report here experimental measurements that demonstrate reduced transverse wakefields for elliptical beams in planar symmetric structures which are consistent with theoretical models. Furthermore, these results may enable the design of gigavolt-per-meter gradient wakefield based accelerators that produce and stably accelerate high quality beams.

47 OTHER INSTRUMENTATION↗

Operation and commissioning of IFMIF (International Fusion Materials Irradiation Facility) LIPAc injector

The objective of linear IFMIF prototype accelerator is to demonstrate 125 mA/CW deuterium ion beam acceleration up to 9 MeV. The injector has been developed in CEA Saclay and already demonstrated 140 mA/100 keV deuterium beam [R. Gobin et al., Rev. Sci. Instrum. 85, 02A918 (2014)]. The injector was disassembled and delivered to the International Fusion Energy Research Center in Rokkasho, Japan. After reassembling the injector, commissioning has started in 2014. Up to now, 100 keV/120 mA/CW hydrogen and 100 keV/90 mA/CW deuterium ion beams have been produced stably from a 10 mm diameter extraction aperture with a low beam emittance of 0.21 π mm mrad (rms, normalized). Neutron production by D-D reaction up to 2.4 × 10{sup 9} n/s has been observed in the deuterium operation.

46 INSTRUMENTATION RELATED TO NUCLEAR SCIENCE AND ↗

Experimental Mapping and Benchmarking of Magnetic Field Codes on the LHD Ion Accelerator

For the validation of the numerical models used for the design of the Neutral Beam Test Facility for ITER in Padua [1], an experimental benchmark against a full-size device has been sought. The LHD BL2 injector [2] has been chosen as a first benchmark, because the BL2 Negative Ion Source and Beam Accelerator are geometrically similar to SPIDER, even though BL2 does not include current bars and ferromagnetic materials. A comprehensive 3D magnetic field model of the LHD BL2 device has been developed based on the same assumptions used for SPIDER. In parallel, a detailed experimental magnetic map of the BL2 device has been obtained using a suitably designed 3D adjustable structure for the fine positioning of the magnetic sensors inside 27 of the 770 beamlet apertures. The calculated values have been compared to the experimental data. The work has confirmed the quality of the numerical model, and has also provided useful information on the magnetic non-uniformities due to the edge effects and to the tolerance on permanent magnet remanence.

43 PARTICLE ACCELERATORS↗

Characteristics of auroral electron acceleration regions observed by Atmosphere Explorer C

Satellite measurements of electron precipitation and ion drift velocities showed that electron acceleration regions (or inverted V's) in the 1200 to 1800 MLT quadrant exhibit the following systematic behavior: electron distribution functions in the accelerated region can be well described by Maxwellian primary electron beams accelerated through an electrostatic potential; the typical inverted V latitudinal structure is always observed in the accelerated regions, the electrostatic potential reaching a maximum and consequently decreasing to near zero over distances of 100 to 250 km; the Maxwellian temperature of the primary electron beam increases systematically with increasing electrostatic potential; rather weak acceleration regions, characterized by values of the electrostatic potential below 1 keV and values of the Maxwellian temperature between 100 and 350 eV, occur in the cusp and in the highest-latitude portion of the dusk side electron precipitation zone.

Burch, J. L.↗

2D Simulations of Diamagnetic Loop Calibrations

Diamagnetic loops can be used as a non-invasive method for measurements of beam size in electron beam accelerators that use solenoidal magnetic transport. A comprehensive theory for interpreting data from a diamagnetic loop relates the rms beam radius to the excluded flux measured by the loop and the beam current. Thus, primary calibration of the loop must relate the loop signal directly to the exclude d flux. We have simulated these calibrations with a 2D field solver in order to identify possible sources of uncertainty in our calibration technique.

43 PARTICLE ACCELERATORS↗

Optimization of a buncher for High Energy H- Beam Transport [Slides]

Accelerators and beam transport systems typically contain numerous beamline devices, diagnostics, system study, and upgrade. Routinely TRACE, MADX and TRANSPORT codes are used for the beam envelope prediction and optimization. Unknown problems of accelerators and beam-transport are addressed based on R&D, such as LFB voltage variation effect study. A nominal diagnostic have used in non-traditional beam transport path to address scientific question (such as use of a BPM in the air). High energy beam operation is a methodical process and routine R&D is required to maintain high standards to deliver beam.

43 PARTICLE ACCELERATORS↗

Superconducting Magnets for the 12 GeV Upgrade at Jefferson Lab

Jefferson Laboratory is embarked on an energy upgrade to its flagship continuous electron beam accelerator in order to expand the scope of its research capabilities and probe further into the structure of nuclear particles. The 12 GeV upgrade includes the design, manufacture, integration, installation and commissioning of eight different superconducting magnets in three separate experimental halls. The effort involves other national laboratories, universities and industry spanning three countries. This paper will summarize the key characteristics of these magnets, ranging in size from 0.2 to 23 MJ in stored energy, and featuring many different types and configurations. The paper will also give an overview of the specific technical challenges for each magnet, and a status report on magnet manufacture and expected delivery dates. The 12GeV upgrade at J-Lab represents the largest superconducting magnet fabrication and installation program currently ongoing in the United States and this paper will present the breadth of collaborations supporting it.

12 GeV upgrade, continuous electron beam accelerat↗

End-to-end simulation of bunch merging for a muon collider

Muon accelerator beams are commonly produced indirectly through pion decay by interaction of a charged particle beam with a target. Efficient muon capture requires the muons to be first phase-rotated by rf cavities into a train of 21 bunches with much reduced energy spread. Since luminosity is proportional to the square of the number of muons per bunch, it is crucial for a Muon Collider to use relatively few bunches with many muons per bunch. In this paper we will describe a bunch merging scheme that should achieve this goal. We present for the first time a complete end-to-end simulation of a 6D bunch merger for a Muon Collider. The 21 bunches arising from the phase-rotator, after some initial cooling, are merged in longitudinal phase space into seven bunches, which then go through seven paths with different lengths and reach the final collecting "funnel" at the same time. The final single bunch has a transverse and a longitudinal emittance that matches well with the subsequent 6D rectilinear cooling scheme.

43 PARTICLE ACCELERATORS↗

RF pulse shape control in the compact linear collider test facility

The Compact Linear Collider (CLIC) is a study for an electron–positron machine aiming at accelerating and colliding particles at the next energy frontier. The CLIC concept is based on the novel two-beam acceleration scheme, where a high-current low-energy drive beam generates RF in series of power extraction and transfer structures accelerating the low-current main beam. To compensate for the transient beam-loading and meet the energy spread specification requirements for the main linac, the RF pulse shape must be carefully optimized. This was recently modelled by varying the drive beam phase switch times in the sub-harmonic buncher so that, when combined, the drive beam modulation translates into the required voltage modulation of the accelerating pulse. In this paper, the control over the RF pulse shape with the phase switches, that is crucial for the success of the developed compensation model, is studied. The results on the experimental verification of this control method are presented and a good agreement with the numerical predictions is demonstrated. Implications for the CLIC beam-loading compensation model are also discussed.

46 INSTRUMENTATION RELATED TO NUCLEAR SCIENCE AND ↗

Polarized electron injector for positron production at CEBAF

As a part of the effort to expand the capabilities of CE-BAF 12 GeV (Continuous Electron Beam Accelerator Facility) at Jefferson Lab, the addition of a polarized positron source is considered. This capability would provide acceleration of high duty-cycle polarized posi-trons, with spin >60% polarization, through the same main CEBAF accelerator machine with appropriate mag-net field reversals and linac phasing to the four CEBAF experimental halls. To produce this positron beam, a high average current (3-10 mA) highly polarized electron beam with energy of 100 ? 150 MeV is required at the positron source target. The focus of this paper is the de-sign of that polarized electron beam injector. We will describe the production and delivery of a >3 mA highly polarized electron beam. We will discuss different aspects of the design, the photocathode gun, beam dynamics simulation results, spin manipulation, bunching and accelerating process and final electron beam parameters.

Kazimi, R.↗