Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “winds”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 379 records · Page 21

Benchmarking Anticipated Wind Project Lifetimes: Results from a Survey of U.S. Wind Industry Professionals

This paper draws on a survey of wind industry professionals to clarify trends in the expected useful life of land-based wind power plants in the United States. The expected useful life of a project affects expectations about its profitability, the timing of possible decommissioning or repowering, and its levelized costs. We find that most wind project developers, sponsors and long-term owners have increased project-life assumptions over time, from a typical term of ~20 years in the early 2000s to ~25 years by the mid-2010s and ~30 years more recently. Current assumptions range from 25 to 40 years, with an average of 29.6 years. The estimated average levelized cost of energy (LCOE) for new wind projects built in 2018 is $\$ $40.4/MWh (real 2018$\$ $), assuming a 20-year project life. With a 25-year useful life and no change in assumed operations and maintenance (O&M) expenditures or wind plant performance over time, LCOE declines by 10%, to $\$ $36.2/MWh, because capital costs are recovered over five additional years of production. At the now-common 30-year assumed life, levelized costs decrease another 7%, to $\$ $33.5/MWh (under the same unaltered assumptions about O&M and performance). Even longer assumed lifetimes lead to further (but diminishing) LCOE reductions—e.g., to $\$ $31.7/MWh and $\$ $30.3/MWh for 35- and 40-year lives, respectively. The data and trends presented here may inform assumptions used by electric system planners, modelers and analysts. The results may also provide useful benchmarks to the wind industry, helping developers and assets owners to compare their expectations with those of their peers.

17 WIND ENERGY↗

Nalu-Wind and OpenFAST: A high-fidelity modeling and simulation environment for wind energy. Milestone ECP-Q2-FY19

The goal of the ExaWind project is to enable predictive simulations of wind farms comprised of many megawatt-scale turbines situated in complex terrain. Predictive simulations will require computational fluid dynamics (CFD) simulations for which the mesh resolves the geometry of the turbines and captures the rotation and large deflections of blades. Whereas such simulations for a single turbine are arguably petascale class, multi-turbine wind farm simulations will require exascale-class resources. The primary physics codes in the ExaWind project are Nalu-Wind, which is an unstructured-grid solver for the acoustically incompressible Navier-Stokes equations, and OpenFAST, which is a whole-turbine simulation code. The Nalu-Wind model consists of the mass-continuity Poisson-type equation for pressure and a momentum equation for the velocity. For such modeling approaches, simulation times are dominated by linear-system setup and solution for the continuity and momentum systems. For the ExaWind challenge problem, the moving meshes greatly affect overall solver costs as reinitialization of matrices and recomputation of preconditioners is required at every time step. This milestone represents the culmination of several parallel development activities towards the goal of establishing a full-physics simulation capability for modeling wind turbines operating in turbulent atmospheric inflow conditions. The demonstration simulation performed in this milestone is the first step towards the "ground truth" simulation and includes the following components: neutral atmospheric boundary layer inflow conditions generated using a precursor simulation, a hybrid RANS/LES simulation of the wall-resolved turbine geometry, hybridization of the turbulence equations using a blending function approach to transition from the atmospheric scales to the blade boundary layer scales near the turbine, fluid-structure interaction (FSI) that accounts for the complete set of blade deformations (bending, twisting and pitch motion, yaw and tower displacements) by coupling to a comprehensive turbine dynamics code (OpenFAST). The use of overset mesh methodology for the simulations in this milestone presents a significant deviation from the previous efforts where a sliding mesh approach was employed to model the rotation of the turbine blades. The choice of overset meshes was motivated by the need to handle arbitrarily large deformations of the blade and to allow for blade pitching in the presence of a controller and the ease of mesh generation compared to the sliding mesh approach. FSI and the new timestep algorithm used in the simulations were developed in partnership with the A2e High-Fidelity Modeling project. The individual physics components were verified and validated (V%V) through extensive code-to-code comparisons and with experiments where possible. The detailed V&V efforts provide confidence in the final simulation where these physics models were combined together even though no detailed experimental data is available to perform validation of the final configuration. Taken together, this milestone successfully demonstrated the most advanced simulation to date that has been performed with Nalu-Wind.

17 WIND ENERGY↗

Tribal Wind Assessment by the Eastern Shoshone Tribe of the Wind River Reservation

The Tribes, through its consultant and advisor, Distributed Generation Systems (Disgen) -Native American Program and Resources Division, of Lakewood CO, assessed and qualified, from a resource and economic perspective, a wind energy generation facility on tribal lands. The goal of this feasibility project is to provide wind monitoring and to engage in preproject planning activities designed to provide a preliminary evaluation of the technical, economic, social and environmental feasibility of developing a sustainable, integrated wind energy plan for the Eastern Shoshone and the Northern Arapahoe Tribes, who resides on the Wind River Indian Reservation. The specific deliverables of the feasibility study are: 1) Assessments of the wind resources on the Wind River Indian Reservation 2) Assessments of the potential environmental impacts of renewable development 3) Assessments of the transmission capacity and capability of a renewable energy project 4) Established an economic models for tribal considerations 5) Define economic, cultural and societal impacts on the Tribe

17 WIND ENERGY↗

Wind Energy Management System EMS Integration Project: Incorporating Wind Generation and Load Forecast Uncertainties into Power Grid Operations

The power system balancing process, which includes the scheduling, real time dispatch (load following) and regulation processes, is traditionally based on deterministic models. Since the conventional generation needs time to be committed and dispatched to a desired megawatt level, the scheduling and load following processes use load and wind and solar power production forecasts to achieve future balance between the conventional generation and energy storage on the one side, and system load, intermittent resources (such as wind and solar generation), and scheduled interchange on the other side. Although in real life the forecasting procedures imply some uncertainty around the load and wind/solar forecasts (caused by forecast errors), only their mean values are actually used in the generation dispatch and commitment procedures. Since the actual load and intermittent generation can deviate from their forecasts, it becomes increasingly unclear (especially, with the increasing penetration of renewable resources) whether the system would be actually able to meet the conventional generation requirements within the look-ahead horizon, what the additional balancing efforts would be needed as we get closer to the real time, and what additional costs would be incurred by those needs. To improve the system control performance characteristics, maintain system reliability, and minimize expenses related to the system balancing functions, it becomes necessary to incorporate the predicted uncertainty ranges into the scheduling, load following, and, in some extent, into the regulation processes. It is also important to address the uncertainty problem comprehensively by including all sources of uncertainty (load, intermittent generation, generators’ forced outages, etc.) into consideration. All aspects of uncertainty such as the imbalance size (which is the same as capacity needed to mitigate the imbalance) and generation ramping requirement must be taken into account. The latter unique features make this work a significant step forward toward the objective of incorporating of wind, solar, load, and other uncertainties into power system operations. Currently, uncertainties associated with wind and load forecasts, as well as uncertainties associated with random generator outages and unexpected disconnection of supply lines, are not taken into account in power grid operation. Thus, operators have little means to weigh the likelihood and magnitude of upcoming events of power imbalance. In this project, funded by the U.S. Department of Energy (DOE), a framework has been developed for incorporating uncertainties associated with wind and load forecast errors, unpredicted ramps, and forced generation disconnections into the energy management system (EMS) as well as generation dispatch and commitment applications. A new approach to evaluate the uncertainty ranges for the required generation performance envelope including balancing capacity, ramping capability, and ramp duration has been proposed. The approach includes three stages: forecast and actual data acquisition, statistical analysis of retrospective information, and prediction of future grid balancing requirements for specified time horizons and confidence levels. Assessment of the capacity and ramping requirements is performed using a specially developed probabilistic algorithm based on a histogram analysis, incorporating all sources of uncertainties of both continuous (wind and load forecast errors) and discrete (forced generator outages and start-up failures) nature. A new method called the “flying brick” technique has been developed to evaluate the look-ahead required generation performance envelope for the worst case scenario within a user-specified confidence level. A self-validation algorithm has been developed to validate the accuracy of the confidence intervals.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Conflict Resolution for Wind-Optimal Aircraft Trajectories in North Atlantic Oceanic Airspace with Wind Uncertainties

Air traffic in the North Atlantic oceanic airspace (NAT) experiences very strong winds caused by jet streams. Flying wind-optimal trajectories increases individual flight efficiency, which is advantageous when operating in the NAT. However, as the NAT is highly congested during peak hours, a large number of potential conflicts between flights are detected for the sets of wind-optimal trajectories. Conflict resolution performed at the strategic level of flight planning can significantly reduce the airspace congestion. However, being completed far in advance, strategic planning can only use predicted environmental conditions that may significantly differ from the real conditions experienced further by aircraft. The forecast uncertainties result in uncertainties in conflict prediction, and thus, conflict resolution becomes less efficient. This work considers wind uncertainties in order to improve the robustness of conflict resolution in the NAT. First, the influence of wind uncertainties on conflict prediction is investigated. Then, conflict resolution methods accounting for wind uncertainties are proposed.

wind uncertainties↗

Sustainable Energy Solutions Task 5.1:Expand the Number of Faculty Working in Wind Energy: Wind Energy Supply Chain and Logistics

Wind as a source of energy has gained a significant amount of attention because it is free and green. Construction of a wind farm involves considerable investment, which includes the cost of turbines, nacelles, and towers as well as logistical costs such as transportation of oversized parts and installation costs such as crane-rental costs. The terrain effects at the project site exert considerable influence on the turbine assembly rate and the project duration, which increases the overall installation cost. For higher capacity wind turbines (>3MW), the rental cost of the cranes is significant. In this study, the impact of interest rate, sales price of electricity, terrain effects and availability of cranes on the duration of installation and payback period for the project is analyzed. Optimization of the logistic activities involved during the construction phase of a wind farm contributes to the reduction of the project duration and also increases electricity generation during the construction phase.

17 WIND ENERGY↗

Comparing State-Space Multivariable Controls to Multi-SISO Controls for Load Reduction of Drivetrain-Coupled Modes on Wind Turbines Through Field-Testing

In this paper we present results from an ongoing controller comparison study at the National Renewable Energy Laboratory's (NREL's) National Wind Technology Center (NWTC). The intention of the study is to demonstrate the advantage of using modern multivariable methods for designing control systems for wind turbines versus conventional approaches. We will demonstrate the advantages through field-test results from experimental turbines located at the NWTC. At least two controllers are being developed side-by-side to meet an incrementally increasing number of turbine load-reduction objectives. The first, a multiple single-input, single-output (m-SISO) approach, uses separately developed decoupled and classicially tuned controllers, which is, to the best of our knowledge, common practice in the wind industry. The remaining controllers are developed using state-space multiple-input and multiple-output (MIMO) techniques to explicity account for coupling between loops and to optimize given known frequency structures of the turbine and disturbance. In this first publication from the study, we present the structure of the ongoing controller comparison experiment, the design process for the two controllers compared in this phase, and initial comparison results obtained in field-testing.

17 WIND ENERGY↗

Investigating Core Gaps and the Development of Subcomponent Validation Methods for Wind Turbine Blades: Preprint

Core gaps are a common manufacturing defect observed in wind blade composite sandwich constructions, which occur when sheets of core material are not properly butted up against each other in the mold. The aim of this study was to characterize core gaps in composite sandwich constructions at the coupon scale. This was to gain an initial understanding of the defect before developing appropriate methodologies for more complex subcomponents as part of a much broader wind blade structural validation and damage tolerance program. Long beam flexure in 4-point-bending was chosen as the most appropriate loading scenario. Beam specimens were characterized with and without 10 mm core gaps in fiberglass/balsa sandwich beams. The core gaps were characterized with two separate resin systems; a Hexion epoxy and Arkema's Elium resins system (a novel, infusible thermoplastic). Results showed that the Elium beams without the core gaps were had a 15% lower static strength than their epoxy counterparts. The introduction of the core gap to the epoxy beams reduced their static strength by 35%. The Elium beams, however, exhibited negligible strength reductions with the inclusion of the core gap. Overall, this characterization study provided pertinent information with regards to core gaps as a manufacturing defect to allow for continued development of damage tolerance and subcomponent validation methodologies with the inclusion of manufacturing defects.

17 WIND ENERGY↗

Predicting wind farm operations with machine learning and the P2D‐RANS model: A case study for an AWAKEN site

Abstract The power performance and the wind velocity field of an onshore wind farm are predicted with machine learning models and the pseudo‐2D RANS model, then assessed against SCADA data. The wind farm under investigation is one of the sites involved with the American WAKE experimeNt (AWAKEN). The performed simulations enable predictions of the power capture at the farm and turbine levels while providing insights into the effects on power capture associated with wake interactions that operating upstream turbines induce, as well as the variability caused by atmospheric stability. The machine learning models show improved accuracy compared to the pseudo‐2D RANS model in the predictions of turbine power capture and farm power capture with roughly half the normalized error. The machine learning models also entail lower computational costs upon training. Further, the machine learning models provide predictions of the wind turbulence intensity at the turbine level for different wind and atmospheric conditions with very good accuracy, which is difficult to achieve through RANS modeling. Additionally, farm‐to‐farm interactions are noted, with adverse impacts on power predictions from both models.

17 WIND ENERGY↗

A Comparison of Forecast Error Generators for Modeling Wind and Load Uncertainty

This paper presents four algorithms to generate random forecast error time series, including a truncated-normal distribution model, a state-space based Markov model, a seasonal autoregressive moving average (ARMA) model, and a stochastic-optimization based model. The error time series are used to create real-time (RT), hour-ahead (HA), and day-ahead (DA) wind and load forecast time series that statistically match historically observed forecasting data sets, used for variable generation integration studies. A comparison is made using historical DA load forecast and actual load values to generate new sets of DA forecasts with similar stoical forecast error characteristics. This paper discusses and compares the capabilities of each algorithm to preserve the characteristics of the historical forecast data sets.

Lu, Ning↗

Different Factors Affecting Short Circuit Behavior of a Wind Power Plant

A wind power plant consists of a large number of turbines interconnected by underground cable. A pad-mount transformer at each turbine steps up the voltage from generating voltage (690 V) to a medium voltage (34.5 kV). All turbines in the plant are connected to the substation transformer where the voltage is stepped up to the transmission level. An important aspect of wind power plant (WPP) impact studies is to evaluate the short-circuit (SC) current contribution of the plant into the transmission network under different fault conditions. This task can be challenging to protection engineers due to the topology differences between different types of wind turbine generators (WTGs) and the conventional generating units. This paper investigates the short circuit behavior of a wind power plant for different types of faults. The impact of wind turbine types, the transformer configuration, and the reactive compensation capacitor will be investigated. The voltage response at different buses will be observed. Finally, the SC line currents will be presented along with its symmetrical components.

Fault contribution, induction generator, protectio↗

NREL Wind Turbine Blade Structural Testing of the Modular Wind Energy MW45 Blade: Cooperative Research and Development Final Report, CRADA Number CRD-09-354

This CRADA was a purely funds-in CRADA with Modular Wind Energy (MWE). MWE had a need to perform full-scale testing of a 45-m wind turbine blade. NREL/NWTC provided the capabilities, facilities, and equipment to test this large-scale MWE wind turbine blade. Full-scale testing is required to demonstrate the ability of the wind turbine blade to withstand static design load cases and demonstrate thefatigue durability. Structural testing is also necessary to meet international blade testing certification requirements. Through this CRADA, MWE would obtain test results necessary for product development and certification, and NREL would benefit by working with an industrial partner to better understand the unique test requirements for wind turbine blades with advanced structural designs.

17 WIND ENERGY↗

Final Report on the Creation of the Wind Integration National Dataset (WIND) Toolkit and API: October 1, 2013 - September 30, 2015

The primary objective of this work was to create a state-of-the-art national wind resource data set and to provide detailed wind plant output data for specific sites based on that data set. Corresponding retrospective wind forecasts were also included at all selected locations. The combined information from these activities was used to create the Wind Integration National Dataset (WIND), and an extraction tool was developed to allow web-based data access.

17 WIND ENERGY↗

Benchmarking U.S. Small Wind Costs with the Distributed Wind Taxonomy

The objective of this report is to benchmark costs for small wind projects installed in the United States using a distributed wind taxonomy. Consequently, this report is a starting point to help expand the U.S. distributed wind market by informing potential areas for small wind cost-reduction opportunities and providing a benchmark to track future small wind cost-reduction progress.

17 WIND ENERGY↗

Definition of the UMaine VolturnUS-S Reference Platform Developed for the IEA Wind 15-Megawatt Offshore Reference Wind Turbine

The following report defines the UMaine VolturnUS-S reference floating offshore wind turbine (FOWT) semi-submersible designed to support the IEA-15-240-RWT 15-megawatt (MW) reference turbine. The semi-submersible is a generic steel version of the UMaine patented concrete floating foundation technology developed by the US Department of Energy. This report serves as an addendum to the previously published report, NREL/TP-5000-75698 IEA Wind TCP Task 37: Definition of the IEA Wind 15-Megawatt Offshore Reference Wind Turbine, and provides details on a floating semi-submersible design developed to support the15MW reference wind turbine.

17 WIND ENERGY↗

Advanced Distributed Wind Turbine Controls Series: Part 4-Wind Energy in Microgrids – Microgrids, Infrastructure Resilience, and Advanced Controls Launchpad (MIRACL)

In recent years, the technical capabilities and requirements for distributed wind turbines to provide ancillary services beyond maximum energy production has increased. Ancillary services, leveraged through advanced wind turbine controls, can support grid stability, reliability, and resilience. In the context of a microgrid, wind turbines can provide ancillary services that are useful in both islanded and grid-connected modes, as demonstrated in previous parts of this report series. This report focuses on how wind turbines with advanced controls and power electronics can support the stability of the microgrid during transitions from grid-connected to island mode, and back. This report documents simulation results from a model of the National Renewable Energy Laboratory (NREL) Flatirons Campus containing NREL's 600-kilowatt Controls Advanced Research Turbine. Using this turbine, we demonstrate through desktop simulation how a wind turbine can support the voltage and frequency of a microgrid during transitions - from making planned transitions seamless to keeping all loads online during some unplanned transitions to supporting black start in the event of an open transition (blackout).

17 WIND ENERGY↗

Benchmarking U.S. Small Wind Costs with the Distributed Wind Taxonomy

The objective of this report is to benchmark costs for small wind projects installed in the United States using a distributed wind taxonomy. Consequently, this report is a starting point to help expand the U.S. distributed wind market by informing potential areas for small wind cost-reduction opportunities and providing a benchmark to track future small wind cost-reduction progress.

17 WIND ENERGY↗