Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “technical potential”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 379 records · Page 21

TFaNS Tone Fan Noise Design/Prediction System: User's Manual - Volume 2

TFaNS is the Tone Fan Noise Design/Prediction System developed by Pratt & Whitney under contract to NASA Lewis (presently NASA Glenn). The purpose of this system is to predict tone noise emanating from a fan stage including the effects of reflection and transmission by the rotor and stator and by the duct inlet and nozzle. These effects have been added to an existing annular duct/isolated stator noise prediction capability. TFaNS consists of: the codes that compute the acoustic properties (reflection and transmission coefficients) of the various elements and write them to files. CUP3D: Fan Noise Coupling Code that reads these files, solves the coupling problem, and outputs the desired noise predictions. AWAKEN: CFD/Measured Wake Postprocessor which reformats CFD wake predictions and/or measured wake data so it can be used by the system. This volume of the report provides information on code input and file structure essential for potential users of TFANS. This report is divided into three volumes: Volume 1. System Description, CUP3D Technical Documentation, and Manual for Code Developers; Volume 2. User's Manual, TFANS Vers. 1.4; Volume 3. Evaluation of System Codes.

Topol, David A.↗

Asteroid Redirect Mission (ARM) Formulation Assessment and Support Team (FAST) Final Report

The Asteroid Redirect Mission (ARM) Formulation Assessment and Support Team (FAST) was a two-month effort, chartered by NASA, to provide timely inputs for mission requirement formulation in support of the Asteroid Redirect Robotic Mission (ARRM) Requirements Closure Technical Interchange Meeting held December 15-16, 2015, to assist in developing an initial list of potential mission investigations, and to provide input on potential hosted payloads and partnerships. The FAST explored several aspects of potential science benefits and knowledge gain from the ARM. Expertise from the science, engineering, and technology communities was represented in exploring lines of inquiry related to key characteristics of the ARRM reference target asteroid (2008 EV5) for engineering design purposes. Specific areas of interest included target origin, spatial distribution and size of boulders, surface geotechnical properties, boulder physical properties, and considerations for boulder handling, crew safety, and containment. In order to increase knowledge gain potential from the mission, opportunities for partnerships and accompanying payloads were also investigated. Potential investigations could be conducted to reduce mission risks and increase knowledge return in the areas of science, planetary defense, asteroid resources and in-situ resource utilization, and capability and technology demonstrations. This report represents the FASTâ€"TM"s final product for the ARM.

Mazanek, Daniel D.↗

Building an Economical and Sustainable Lunar Infrastructure to Enable Lunar Industrialization

A new concept study was initiated to examine the architecture needed to gradually develop an economical, evolvable and sustainable lunar infrastructure using a public/private partnerships approach. This approach would establish partnership agreements between NASA and industry teams to develop a lunar infrastructure system that would be mutually beneficial. This approach would also require NASA and its industry partners to share costs in the development phase and then transfer operation of these infrastructure services back to its industry owners in the execution phase. These infrastructure services may include but are not limited to the following: lunar cargo transportation, power stations, communication towers and satellites, autonomous rover operations, landing pads and resource extraction operations. The public/private partnerships approach used in this study leveraged best practices from NASA's Commercial Orbital Transportation Services (COTS) program which introduced an innovative and economical approach for partnering with industry to develop commercial cargo services to the International Space Station. This program was planned together with the ISS Commercial Resupply Services (CRS) contracts which was responsible for initiating commercial cargo delivery services to the ISS for the first time. The public/private partnerships approach undertaken in the COTS program proved to be very successful in dramatically reducing development costs for these ISS cargo delivery services as well as substantially reducing operational costs. To continue on this successful path towards installing economical infrastructure services for LEO and beyond, this new study, named Lunar COTS (Commercial Operations and Transport Services), was conducted to examine extending the NASA COTS model to cis-lunar space and the lunar surface. The goals of the Lunar COTS concept are to: 1) develop and demonstrate affordable and commercial cis-lunar and surface capabilities, such as lunar cargo delivery and surface power generation, in partnership with industry; 2) incentivize industry to establish economical and sustainable lunar infrastructure services to support NASA missions and initiate lunar commerce; and 3) encourage creation of new space markets for economic growth and benefit. A phased-development approach was also studied to allow for incremental development and demonstration of capabilities needed to build a lunar infrastructure. This paper will describe the Lunar COTS concept goals, objectives and approach for building an economical and sustainable lunar infrastructure. It will also describe the technical challenges and advantages of developing and operating each infrastructure element. It will also describe the potential benefits and progress that can be accomplished in the initial phase of this Lunar COTS approach. Finally, the paper will also look forward to the potential of a robust lunar industrialization environment and its potential effect on the next 50 years of space exploration.

Zuniga, Allison F.↗

Airspace Performance Observations of Scalable Autonomous Operations in a High Density Vertiplex Simulation

The National Aeronautics and Space Administration’s (NASA’s) High Density Vertiplex (HDV) subproject aims to develop and demonstrate progressive automation technologies that contribute to the Advanced Air Mobility (AAM) concept. Using Human-and-Hardware-In-TheLoop (HHITL) techniques, HDV demonstrates initial vertiport automation services at vertiports with increased air traffic volume in both simulated and live test environments. In 2023, the Scalable Autonomous Operations (SAO) simulation was conducted in which prototype vertiport, airspace, and ground control station technologies were assessed on technical performance. During the SAO simulation, an observational study captured an initial impression of the HDV airspace performance, potential disruptions to the airspace, and highlighted some capability and procedural gaps. Observations took place in two parts. In the first part, five scenario use cases (Nominal, Missed Approach, Speed Change, Divert, and MultiAircraft Divert) were conducted with three human operator roles (Vertiport Manager, Fleet Manager, and Ground Control Station Operator). Researchers collected metrics on throughput, closest point of approach, and airborne delay. In the second part of the study, the Missed Approach scenario was observed under three traffic density levels (20, 40, and 60 operations per hour) to challenge the automation to correctly identify slots in the vertiport arrival schedule. The results showed that the automation successfully found a slot for the Missed Approach vehicle in the 20 operations per hour condition, after some delay it found one in the 40 condition, and it did not find one in the 60 condition. The observations of technical and human performance throughout the five scenario use cases and the Missed Approach case study indicated that for HDV to increase traffic density and maintain or increase throughput, airspace monitoring services should be able to detect and resolve conflicts between aircraft. Furthermore, the roles and responsibilities of human operators need additional definition when it comes to responding to vehicle conflicts.

Advanced Air Mobility↗

Airspace Performance Observations of Scalable Autonomous Operations in a High Density Vertiplex Simulation

The National Aeronautics and Space Administration’s (NASA’s) High Density Vertiplex (HDV) sub- project aims to develop and demonstrate progressive automation technologies that contribute to the Advanced Air Mobility (AAM) concept. Using Human-and-Hardware-In-The- Loop (HHITL) techniques, HDV demonstrates initial vertiport automation services at vertiports with increased air traffic volume in both simulated and live test environments. In 2023, the Scalable Autonomous Operations (SAO) simulation was conducted in which prototype vertiport, airspace, and ground control station technologies were assessed on technical performance. During the SAO simulation, an observational study captured an initial impression of the HDV airspace performance, potential disruptions to the airspace, and highlighted some capability and procedural gaps. Observations took place in two parts. In the first part, five scenario use cases (Nominal, Missed Approach, Speed Change, Divert, and Multi- Aircraft Divert) were conducted with three human operator roles (Vertiport Manager, Fleet Manager, and Ground Control Station Operator). Researchers collected metrics on throughput, closest point of approach, and airborne delay. In the second part of the study, the Missed Approach scenario was observed under three traffic density levels (20, 40, and 60 operations per hour) to challenge the automation to correctly identify slots in the vertiport arrival schedule. The results showed that the automation successfully found a slot for the Missed Approach vehicle in the 20 operations per hour condition, after some delay it found one in the 40 condition, and it did not find one in the 60 condition. The observations of technical and human performance throughout the five scenario use cases and the Missed Approach case study indicated that for HDV to increase traffic density and maintain or increase throughput, airspace monitoring services should be able to detect and resolve conflicts between aircraft. Furthermore, the roles and responsibilities of human operators need additional definition when it comes to responding to vehicle conflicts.

advanced air mobility↗

Panel Resource Management (PRM) Implementation and Effects within Safety Review Panel Settings and Dynamics

While technical training and advanced degree's assure proficiency at specific tasks within engineering disciplines, they fail to address the potential for communication breakdown and decision making errors familiar to multicultural environments where language barriers, intimidating personalities and interdisciplinary misconceptions exist. In an effort to minimize these pitfalls to effective panel review, NASA's lead safety engineers to the ISS Safety Review Panel (SRP), and Payload Safety Review Panel (PSRP) initiated training with their engineers, in conjunction with the panel chairs, and began a Panel Resource Management (PRM) program. The intent of this program focuses on the ability to reduce the barriers inhibiting effective participation from all panel attendees by bolstering participants confidence levels through increased communication skills, situational awareness, debriefing, and a better technical understanding of requirements and systems.

Taylor, Robert W.↗

Shuttle Entry Imaging Using Infrared Thermography

During the Columbia Accident Investigation, imaging teams supporting debris shedding analysis were hampered by poor entry image quality and the general lack of information on optical signatures associated with a nominal Shuttle entry. After the accident, recommendations were made to NASA management to develop and maintain a state-of-the-art imagery database for Shuttle engineering performance assessments and to improve entry imaging capability to support anomaly and contingency analysis during a mission. As a result, the Space Shuttle Program sponsored an observation campaign to qualitatively characterize a nominal Shuttle entry over the widest possible Mach number range. The initial objectives focused on an assessment of capability to identify/resolve debris liberated from the Shuttle during entry, characterization of potential anomalous events associated with RCS jet firings and unusual phenomenon associated with the plasma trail. The aeroheating technical community viewed the Space Shuttle Program sponsored activity as an opportunity to influence the observation objectives and incrementally demonstrate key elements of a quantitative spatially resolved temperature measurement capability over a series of flights. One long-term desire of the Shuttle engineering community is to calibrate boundary layer transition prediction methodologies that are presently part of the Shuttle damage assessment process using flight data provided by a controlled Shuttle flight experiment. Quantitative global imaging may offer a complementary method of data collection to more traditional methods such as surface thermocouples. This paper reviews the process used by the engineering community to influence data collection methods and analysis of global infrared images of the Shuttle obtained during hypersonic entry. Emphasis is placed upon airborne imaging assets sponsored by the Shuttle program during Return to Flight. Visual and IR entry imagery were obtained with available airborne imaging platforms used within DoD along with agency assets developed and optimized for use during Shuttle ascent to demonstrate capability (i.e., tracking, acquisition of multispectral data, spatial resolution) and identify system limitations (i.e., radiance modeling, saturation) using state-of-the-art imaging instrumentation and communication systems. Global infrared intensity data have been transformed to temperature by comparison to Shuttle flight thermocouple data. Reasonable agreement is found between the flight thermography images and numerical prediction. A discussion of lessons learned and potential application to a potential Shuttle boundary layer transition flight test is presented.

Horvath, Thomas↗

Evaluation of Flight Attendant Technical Knowledge

Accident and incident reports have indicated that flight attendants have numerous opportunities to provide the flight-deck crew with operational information that may prevent or lessen the severity of a potential problem. Additionally, as carrier fleets transition from three person to two person flight-deck crews, the reliance upon the cabin crew for the transfer of this information may increase further. Recent research indicates that flight attendants do not feel confident in their ability to describe mechanical parts or malfunctions of the aircraft, and the lack of flight attendant technical training has been referenced in a number of recent reports. Chute and Wiener describe five factors which may produce communication barriers between cockpit and cabin crews: the historical background of aviation, the physical separation of the two crews, psychosocial issues, regulatory factors, and organizational factors. By examining these areas of division we can identify possible bridges and address the implications of deficient cockpit/cabin communication on flight safety. Flight attendant operational knowledge may provide some mitigation of these barriers. The present study explored both flight attendant technical knowledge and flight attendant and pilot expectations of flight attendant technical knowledge. To assess the technical knowledge of cabin crewmembers, 177 current flight attendants from two U.S. carriers voluntarily completed a 13-item technical quiz. To investigate expectations of flight attendant technical knowledge, 181 pilots and a second sample of 96 flight attendants, from the same two airlines, completed surveys designed to capture each group's expectations of operational knowledge required of flight attendants. Analyses revealed several discrepancies between the present level of flight attendant operational knowledge and pilots' and flight attendants' expected and desired levels of technical knowledge. Implications for training will be discussed.

Dunbar, Melisa G.↗

Cognitive Bias in the Verification and Validation of Space Flight Systems

Cognitive bias is generally recognized as playing a significant role in virtually all domains of human decision making. Insight into this role is informally built into many of the system engineering practices employed in the aerospace industry. The review process, for example, typically has features that help to counteract the effect of bias. This paper presents a discussion of how commonly recognized biases may affect the verification and validation process. Verifying and validating a system is arguably more challenging than development, both technically and cognitively. Whereas there may be a relatively limited number of options available for the design of a particular aspect of a system, there is a virtually unlimited number of potential verification scenarios that may be explored. The probability of any particular scenario occurring in operations is typically very difficult to estimate, which increases reliance on judgment that may be affected by bias. Implementing a verification activity often presents technical challenges that, if they can be overcome at all, often result in a departure from actual flight conditions (e.g., 1-g testing, simulation, time compression, artificial fault injection) that may raise additional questions about the meaningfulness of the results, and create opportunities for the introduction of additional biases. In addition to mitigating the biases it can introduce directly, the verification and validation process must also overcome the cumulative effect of biases introduced during all previous stages of development. A variety of cognitive biases will be described, with research results for illustration. A handful of case studies will be presented that show how cognitive bias may have affected the verification and validation process on recent JPL flight projects, identify areas of strength and weakness, and identify potential changes or additions to commonly used techniques that could provide a more robust verification and validation of future systems.

Larson, Steve↗

Research on the International Space Station: Understanding Future Potential from Current Accomplishments

In November 2007, the International Space Station (ISS) will have supported seven years of continuous presence in space, with 15 Expeditions completed. These years have been characterized by the numerous technical challenges of assembly as well as operational and logistical challenges related to the availability of transportation by the Space Shuttle. During this period, an active set of early research objectives have also been accomplished alongside the assembly. This paper will review the research accomplishments on ISS to date, with the objective of drawing insights on the potential of future research following completion of ISS assembly. By the end of Expedition 15, an expected 121 U.S.-managed investigations will have been conducted on ISS, with 91 of these completed. Many of these investigations include multiple scientific objectives, with an estimated total of 334 scientists served. Through February 2007, 101 scientific publications have been identified. Another 184 investigations have been sponsored by ISS international partners, which independently track their scientists served and results publication. Through this survey of U.S. research completed on ISS, three different themes will be addressed: (1) How have constraints on transportation of mass to orbit affected the types of research successfully completed on the ISS to date? What lessons can be learned for increasing the success of ISS as a research platform during the period following the retirement of the Space Shuttle? (2) How have constraints on crew time for research during assembly and the active participation of crewmembers as scientists affected the types of research successfully completed on the ISS to date? What lessons can be learned for optimizing research return following the increase in capacity from 3 to 6 crewmembers (planned for 2009)? What lessons can be learned for optimizing research return after assembly is complete? (3) What do early research results indicate about the various scientific disciplines represented in investigations on ISS? Are there lessons specific to human research, technology development, life sciences, and physical sciences that can be used to increase future research accomplishments? Research has been conducted and completed on ISS under a set of challenging constraints during the past 7 years. The history of research accomplished on ISS during this time serves as an indicator of the value and potential of ISS when full utilization begins. By learning from our early experience in completing research on ISS, NASA and our partners can be positioned to optimize research returns as a full crew complement comes onboard, assembly is completed, and research begins in full.

Robinson, Julie A.↗

Technical considerations on using the large Nancay radio telescope for SETI

The Nancay decimetric Radio Telescope (NRT) in Nancay, France, is described, and its potential use for Search for Extraterrestrial Intelligence (SETI) observations is discussed. The conclusion reached is that the NRT is well suited for SETI observations because of its large collecting area, its large sky coverage, and its wideband frequency capability. However, a number of improvements are necessary in order to take full advantage of the system in carrying out an efficient SETI program. In particular, system sensitivity should be increased. This can be achieved through a series of improvements to the system, including lowering the ground pickup noise through the use of ground reflectors and more efficient feed design, and by using low-noise amplifier front ends.

Gulkis, S.↗

Evaluation of Cabin Crew Technical Knowledge

Accident and incident reports have indicated that flight attendants have numerous opportunities to provide the flight-deck crew with operational information that may prevent or essen the severity of a potential problem. Additionally, as carrier fleets transition from three person to two person flight-deck crews, the reliance upon the cabin crew for the transfer of this information may increase further. Recent research (Chute & Wiener, 1996) indicates that light attendants do not feel confident in their ability to describe mechanical parts or malfunctions of the aircraft, and the lack of flight attendant technical training has been referenced in a number of recent reports (National Transportation Safety Board, 1992; Transportation Safety Board of Canada, 1995; Chute & Wiener, 1996). The present study explored both flight attendant technical knowledge and flight attendant and dot expectations of flight attendant technical knowledge. To assess the technical knowledge if cabin crewmembers, 177 current flight attendants from two U.S. carriers voluntarily :ompleted a 13-item technical quiz. To investigate expectations of flight attendant technical knowledge, 181 pilots and a second sample of 96 flight attendants, from the same two airlines, completed surveys designed to capture each group's expectations of operational knowledge required of flight attendants. Analyses revealed several discrepancies between the present level of flight attendants.

Dunbar, Melisa G.↗

A feasibility study of orbiter flight control experiments

The results of a feasibility study of orbiter flight control experiments performed are summarized. Feasibility studies were performed on a group of 14 experiments selected from a candidate list of 35 submitted to the study contractor by the flight control community. Concepts and requirements were developed for the 14 selected experiments and they were ranked on a basis of technical value, feasibility, and cost. It was concluded that all the selected experiments can be considered as potential candidates for the Orbiter Experiment program, which is being formulated for the Orbiter Flight Tests and subsequent operational flights, regardless of the relative ranking established during the study. None of the selected experiments has significant safety implications and the cost of most was estimated to be less than $200K.

Geissler, W. H.↗

Fluorine-Hydrazine Propulsion Technology update

The current status of the fluorine hydrazine propulsion system development is discussed. Progress on the components, rocket engine, and system design is presented. A detailed look at a fluorine hydrazine system as a potential propulsion option for the Galileo Project (Jupiter orbiter) is delineated and the results of safety and technical reviews which were accomplished to verify the feasibility of this option are summarized.

Bond, D. L.↗

The worldwide market for photovoltaics in the rural sector

Attention is given to the assessment of results obtained by three NASA studies aimed at determining the global market for stand-alone photovoltaic (PV) power systems in the village power, cottage industry, and agricultural applications areas of the rural sector. An attempt was made to identify technical, social, and institutional barriers to PV system implementation, as well as the funding sources available to potential users. Country- and sector-specific results are discussed, and marketing strategies appropriate for each sector are suggested for the benefit of American PV products manufacturers.

Brainard, W. A.↗

Project Cassini - A potential collaborative ESA/NASA Saturn Orbiter and Titan Probe mission

Project Cassini is concerned with a potential collaborative mission to Saturn and Titan. The project has been the subject of a joint ESA/NASA Technical Assessment Study from April 1984 to July 1985. The spacecraft consists of a Saturn Orbiter and a Titan entry Probe. Science objectives with respect to Titan include a determination of the abundances of atmospheric constituents and isotope ratios, a study of the distribution of trace gases, cloud physics, and a determination of the state of the surface. Other science objectives are related to Saturn, the rings, icy satellites, the magnetosphere of Saturn, and asteroids. Attention is given to mission design, the spacecraft, and future prospects.

Beckman, J.↗

The Space Communications Protocol Standards Program

In the fall of 1992 NASA and the Department of Defense chartered a technical team to explore the possibility of developing a common set of space data communications standards for potential dual-use across the U.S. national space mission support infrastructure. The team focused on the data communications needs of those activities associated with on-lined control of civil and military aircraft. A two-pronged approach was adopted: a top-down survey of representative civil and military space data communications requirements was conducted; and a bottom-up analysis of available standard data communications protocols was performed. A striking intersection of civil and military space mission requirements emerged, and an equally striking consensus on the approach towards joint civil and military space protocol development was reached. The team concluded that wide segments of the U.S. civil and military space communities have common needs for: (1) an efficient file transfer protocol; (2) various flavors of underlying data transport service; (3) an optional data protection mechanism to assure end-to-end security of message exchange; and (4) an efficient internetworking protocol. These recommendations led to initiating a program to develop a suite of protocols based on these findings. This paper describes the current status of this program.

Jeffries, Alan↗

Design and Fabrication of a Dielectric Total Internal Reflecting Solar Concentrator and Associated Flux Extractor for Extreme High Temperature (2500K) Applications

The Analex Corporation, under contract to the NASA Lewis Research Center (LeRC), Cleveland, Ohio, recently evaluated the feasibility of utilizing refractive secondary concentrators for solar heat receivers operating at temperatures up to 2500K. The feasibility study pointed out a number of significant advantages provided by solid single crystal refractive devices over the more conventional hollow reflective compound parabolic concentrators (CPCs). In addition to the advantages of higher concentration ratio and efficiency, the refractive concentrator, when combined with a flux extractor rod, provides for flux tailoring within the heat receiver cavity. This is a highly desirable, almost mandatory, feature for solar thermal propulsion engine designs presently being considered for NASA and Air Force thermal applications. Following the feasibility evaluation, the NASA-LeRC, NASA-Marshall Space Flight Center (MSFC), and Analex Corporation teamed up to design, fabricate, and test a refractive secondary concentrator/flux extractor system for potential use in the NASA-MSFC "Shooting Star" flight experiment. This paper describes the advantages and technical challenges associated with the design methodologies developed and utilized and the material and fabrication limitations encountered.

Soules, Jack A.↗