Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “technical assessment”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 379 records · Page 21

Space Shuttle Program Dual Docked Operations

Due to the ever-increasing visiting vehicle traffic to and from the International Space Station (ISS) during mated Orbiter/ISS missions, it became apparent to both the ISS Program (ISSP) and the Space Shuttle program (SSP) that there would arise occasions where a visiting vehicle docking and/or undocking could overlap when the Space Shuttle Orbiter was docked to the ISS, referred to as Dual Docked Operations (DDO). The primary concerns were that plumes from the visiting vehicles would cause contamination, corrosion, and erosion to Space Shuttle surfaces and present a toxicity hazard to ground personnel when processing the Space Shuttle after landing. This potential conflict provided the genesis for evaluating risk mitigations to gain maximum flexibility for managing potential visiting vehicle traffic to and from the ISS and to maximize launch and landing opportunities for all visiting vehicles. The overarching goal of this effort was to assess the viability and readiness of the SSP to protect for DDO on any given mission. To assess the viability of performing DDO, the ISSP delivered plume particle fluence (i.e., number of particles per unit area) and contamination deposition based on the visiting vehicle’s proximity operations to the SSP for evaluation. This paper summarizes the concept definition, studies, and analysis results generated by the SSP, ISSP, and Mission Operations Directorate (MOD) for implementing DDO involving the Orbiter and Russian vehicles (RVs). Discussion and results presented herein represent a generic assessment of the SSP and ISSP integrated safety and technical evaluations of DDO involving the Orbiter and RVs. Mission-specific analysis and operational impacts were conducted flight-by-flight as they arose.

Launch vehicles↗

Analysis and Assessment of Peak Lightning Current Probabilities at the NASA Kennedy Space Center

This technical memorandum presents a summary by the Electromagnetics and Aerospace Environments Branch at the Marshall Space Flight Center of lightning characteristics and lightning criteria for the protection of aerospace vehicles. Probability estimates are included for certain lightning strikes (peak currents of 200, 100, and 50 kA) applicable to the National Aeronautics and Space Administration Space Shuttle at the Kennedy Space Center, Florida, during rollout, on-pad, and boost/launch phases. Results of an extensive literature search to compile information on this subject are presented in order to answer key questions posed by the Space Shuttle Program Office at the Johnson Space Center concerning peak lightning current probabilities if a vehicle is hit by a lightning cloud-to-ground stroke. Vehicle-triggered lightning probability estimates for the aforementioned peak currents are still being worked. Section 4.5, however, does provide some insight on estimating these same peaks.

Johnson, D. L.↗

Technical Interchange Meeting Guidelines Breakout

Along with concept developers, the Systems Evaluation and Assessment (SEA) sub-element of VAMS will develop those scenarios and metrics required for testing the new concepts that reside within the System-Level Integrated Concepts (SLIC) sub-element in the VAMS project. These concepts will come from the NRA process, space act agreements, a university group, and other NASA researchers. The emphasis of those concepts is to increase capacity while at least maintaining the current safety level. The concept providers will initially develop their own scenarios and metrics for self-evaluation. In about a year, the SEA sub-element will become responsible for conducting initial evaluations of the concepts using a common scenario and metric set. This set may derive many components from the scenarios and metrics used by the concept providers. Ultimately, the common scenario\metric set will be used to help determine the most feasible and beneficial concepts. A set of 15 questions and issues, discussed below, pertaining to the scenario and metric set, and its use for assessing concepts, was submitted by the SEA sub-element for consideration during the breakout session. The questions were divided among the three breakout groups. Each breakout group deliberated on its set of questions and provided a report on its discussion.

Fong, Rob↗

X-57 Systems Engineering Lessons Learned

The X-57 Maxwell is an electric aircraft based on a 4-passenger, twin engine Tecnam P2006T General Aviation aircraft. The X-57 project originally envisioned a straightforward integration of commercial-off-the-shelf hardware components and software into a novel configuration to demonstrate the aerodynamic and performance benefits of Distributed Electric Propulsion (DEP). The project was initially started with a high-risk venture capitalist approach under NASA’s Convergent Aeronautics Solutions (CAS) project, which led to an initial philosophy of Project Management “light” (which was then interpreted as Systems Engineering (SE) “light”). As the project matured, it was forced to transition to one with increasing SE-rigor as the project scope changed, hardware and software deficiencies were found, and the team realized the magnitude of the technical and integration challenges. In hindsight, these technical challenges came in part from an overly optimistic technology readiness assessment (TRA) at the beginning of the project, which resulted in the project assuming that little to no subsystem development would be required. The project’s approach to systems engineering evolved throughout three separate informal phases of the project as it underwent two key transitions as a result of the team wrestling with the technical challenges and resultant changing project scope. This paper discusses the assumptions, approaches, and challenges encountered from a Systems Engineering standpoint in each of the three informal phases of the X-57 project. This paper also provides recommendations on how future projects can apply Systems Engineering best practices upfront along with a realistic TRA to aid projects that find themselves with similar challenges.

Systems Engineering↗

An assessment of the readiness of ablative materials for preflight application to the shuttle orbiter

The shuttle orbiter relies primarily on a reusable surface insulation (RSI) thermal protection system (TPS). The RSI is very efficient in its thermal performance; however, the RSI tile system has shown poor mechanical integrity. The state-of-the-art of the ablative TPS is reviewed, and an assessment made of the ablator's readiness for use on the shuttle orbiter. Unresolved technical issues with regard to the ablative TPS are identified. Short time, highly focused analytical and experimental programs were initiated to: (1) identify candidate ablation materials; (2) assess the data base for these materials; (3) evaluate the need and kind of waterproof coating; (4) calculate thermal and other stresses in an ablator tile; (5) identify an acceptable ablator/RSI tile joint filler; and (6) assess the sensitivity of the ablator to sequential heat pulses. Results from some of these programs are discussed.

Tompkins, S. S.↗

Synthesis Report of the IPCC Sixth Assessment Report (AR6)

This Synthesis Report (SYR) of the IPCC Sixth Assessment Report (AR6) summarises the state of knowledge of climate change, its widespread impacts and risks, and climate change mitigation and adaptation, based on the peer-reviewed scientific, technical and socio-economic literature since the publication of the IPCC’s Fifth Assessment Report (AR5) in 2014. he assessment is undertaken within the context of the evolving international landscape, in particular, developments in the UN Framework Convention on Climate Change (UNFCCC) process, including the outcomes of the Kyoto Protocol and the adoption of the Paris Agreement. It reflects the increasing diversity of those involved in climate action. This report integrates the main findings of the AR6 Working Group reports and the three AR6 Special Reports. It recognizes the interdependence of climate, ecosystems and biodiversity, and human societies; the value of diverse forms of knowledge; and the close linkages between climate change adaptation, mitigation, ecosystem health, human well-being and sustainable development. Building on multiple analytical frameworks, including those from the physical and social sciences, this report identifies opportunities for transformative action which are effective, feasible, just and equitable using concepts of systems transitions and resilient development pathways. Different regional classification schemes4 are used for physical, social and economic aspects, reflecting the underlying literature.

climate impacts↗

OLTARIS: On-Line Tool for the Assessment of Radiation in Space

The effects of ionizing radiation on humans in space is a major technical challenge for exploration to the moon and beyond. The radiation shielding team at NASA Langley Research Center has been working for over 30 years to develop techniques that can efficiently assist the engineer throughout the entire design process. OLTARIS: On-Line Tool for the Assessment of Radiation in Space is a new NASA website (http://oltaris.larc.nasa.gov) that allows engineers and physicists to access a variety of tools and models to study the effects of ionizing space radiation on humans and shielding materials. The site is intended to be an analysis and design tool for those working radiation issues for current and future manned missions, as well as a research tool for developing advanced material and shielding concepts. The site, along with the analysis tools and models within, have been developed using strict software practices to ensure reliable and reproducible results in a production environment. They have also been developed as a modular system so that models and algorithms can be easily added or updated.

Sandridge, Chris A.↗

Advanced transportation system studies, technical area 3. Alternate propulsion subsystem concepts: J-2S restart study

The objectives were to assess what design changes would be required to remit late production of the J-2S engine for use as a large high energy upper stage engine. The study assessed design changes required to perform per the J-2S model specification, manufacturing changes required due to obsolescence or improvements in state-of-the-practice, availability issues for supplier provided items, and provided cost and schedule estimates for this configuration. The confidence that J-2S production could be reinitiated within reasonable costs and schedules was provided. No significant technical issues were identified in either the producibility study or in the review of previous technical data. Areas of potential cost reduction were identified which could be quantified to a greater extent with further manufacturing planning. The proposed schedule can be met with no foreseeable impacts. The results of the study provided the necessary foundation for the detailed manufacturing and test plans and non-recurring and recurring cost estimates that are needed to complete the effort to reinitiate production of the J-2S engine system.

Vilja, John↗

Fourth Annual Workshop on Space Operations Applications and Research (SOAR 90)

The papers presented at the Space Operations, Applications and Research (SOAR) Symposium, hosted by the Air Force Space Technology Center and held at Albuquerque, New Mexico, on June 26-28, 1990, are documented in these proceedings. Over 150 technical papers were presented at the Symposium, which was jointly sponsored by the Air Force and NASA Johnson Space Center. the technical areas included were: Automation and Robotics, Environmental Interactions, Human Factors, Intelligent Systems, and Life Sciences. NASA and Air Force programmatic overviews and panel sessions were also held in each technical area. These proceedings, along with the comments by technical area coordinators and session chairmen, will be used by the Space Operation Technology Subcommittee (SOTS) of the Air Force Systems Command and NASA Space Technology Interdependency Group (STIG) to assess the status of the technology, as well as the joint projects/activities in various technical areas. The Symposium proceedings include papers presented by experts from NASA, the Air Force, universities, and industries in various disciplines.

Life Sciences↗

C-Band Airport Surface Communications System Engineering-Initial High-Level Safety Risk Assessment and Mitigation

This document is being provided as part of ITT's NASA Glenn Research Center Aerospace Communication Systems Technical Support (ACSTS) contract: "New ATM Requirements--Future Communications, C-Band and L-Band Communications Standard Development." ITT has completed a safety hazard analysis providing a preliminary safety assessment for the proposed C-band (5091- to 5150-MHz) airport surface communication system. The assessment was performed following the guidelines outlined in the Federal Aviation Administration Safety Risk Management Guidance for System Acquisitions document. The safety analysis did not identify any hazards with an unacceptable risk, though a number of hazards with a medium risk were documented. This effort represents an initial high-level safety hazard analysis and notes the triggers for risk reassessment. A detailed safety hazards analysis is recommended as a follow-on activity to assess particular components of the C-band communication system after the profile is finalized and system rollout timing is determined. A security risk assessment has been performed by NASA as a parallel activity. While safety analysis is concerned with a prevention of accidental errors and failures, the security threat analysis focuses on deliberate attacks. Both processes identify the events that affect operation of the system; and from a safety perspective the security threats may present safety risks.

Zelkin, Natalie↗

Assessment of avionics technology in European aerospace organizations

This report provides a summary of the observations and recommendations made by a technical panel formed by the National Aeronautics and Space Administration (NASA). The panel, comprising prominent experts in the avionics field, was tasked to visit various organizations in Europe to assess the level of technology planned for use in manufactured civil avionics in the future. The primary purpose of the study was to assess avionics systems planned for implementation or already employed on civil aircraft and to evaluate future research, development, and engineering (RD&E) programs, address avionic systems and aircraft programs. The ultimate goal is to ensure that the technology addressed by NASa programs is commensurate with the needs of the aerospace industry at an international level. The panel focused on specific technologies, including guidance and control systems, advanced cockpit displays, sensors and data networks, and fly-by-wire/fly-by-light systems. However, discussions the panel had with the European organizations were not limited to these topics.

Martinec, D. A.↗

Assessment of the US industrial program for AMTEC development

The Alkali Metal Thermal to Electric Converter (AMTEC) is a static energy conversion technology that is expected to provide low mass thermal to electric conversion with efficiencies between 20 and 35 percent. The U.S. program to develop this technology for space power applications has grown substantially over the past 3 years. This expanding program has brought together several laboratories and technical consultants, in separately sponsored projects, to develop the key elements of the technology. An assessment of this multiparty program indicates that, in general, the effort has focused on the high priority technical elements with only moderate overlap between individual projects. There are, however, several areas where additional coordination is needed between major participants in the existing projects, and other areas where new projects should be started, in order to provide reliable space power systems without unnecessary delays.

Sievers, R. K.↗

L-Band Digital Aeronautical Communications System Engineering - Initial Safety and Security Risk Assessment and Mitigation

This document is being provided as part of ITT's NASA Glenn Research Center Aerospace Communication Systems Technical Support (ACSTS) contract NNC05CA85C, Task 7: "New ATM Requirements--Future Communications, C-Band and L-Band Communications Standard Development." ITT has completed a safety hazard analysis providing a preliminary safety assessment for the proposed L-band (960 to 1164 MHz) terrestrial en route communications system. The assessment was performed following the guidelines outlined in the Federal Aviation Administration Safety Risk Management Guidance for System Acquisitions document. The safety analysis did not identify any hazards with an unacceptable risk, though a number of hazards with a medium risk were documented. This effort represents a preliminary safety hazard analysis and notes the triggers for risk reassessment. A detailed safety hazards analysis is recommended as a follow-on activity to assess particular components of the L-band communication system after the technology is chosen and system rollout timing is determined. The security risk analysis resulted in identifying main security threats to the proposed system as well as noting additional threats recommended for a future security analysis conducted at a later stage in the system development process. The document discusses various security controls, including those suggested in the COCR Version 2.0.

Zelkin, Natalie↗

NASA's Professional DEVELOPment - Evaluating 10 Weeks of Capacity Building

Under NASA’s Applied Sciences, the NASA DEVELOP Program is centered on dual capacity building. Projects bring together partners and participants to learn how Earth observation data can enhance environmental decision-making practices and inform action. During their time with DEVELOP, participants build technical skills around remotely sensed data and professional skills through interactions with team members, science advisors, and partners. To further refine the participant experience, DEVELOP explores which technical and professional skills individuals report improving during the 10-week program. An analysis of self-reported assessments from 2018 to 2021 included projects that were conducted in-person and virtually. Participants consistently indicated a strong improvement in technical and professional skills yet there was clear variation between in-person and virtual opportunities. When comparing between 2019 and 2021, self-reporting showed a higher percentage of participants reporting an increase in networking in the virtual environment and an increase in building professional relationships with project partners virtually. This analysis suggests that professional opportunities available in the virtual environment may in fact bolster early career scientists’ networking abilities. This presentation will identify DEVELOP’s approach to monitoring and evaluation, highlight interesting trends introduced by the pandemic, and lessons learned.

Sarah Payne↗

Lunar far side sample return missions using the Soviet Luna system

The paper assesses the feasibility of using the Soviet Lunar Sample Return vehicle in cooperation with the United States to return a sample of lunar soil from the far side of the moon. Analysis of the orbital mechanics of the Luna system shows how landing sites are restricted on the moon. The trajectory model is used to duplicate the 3 Luna missions flown to date and the results compared to actual Soviet data. The existence of suitable trajectories for the earth return trip is assessed, including landing dispersions at earth. Several possible areas of technical difficulty are identified.

Roberts, P. H., Jr.↗

Salton Sea Solar Pond Power Plant Design Study and Regional Applicability

Ormat collected and organized the data base and conducted conceptual plant design, performance, and cost analysis. JPL conducted site-specific studies related to solar pond chemistry, soil biological activity, and dike design and construction. WESTEC conducted environmental investigation studies and performed an environmental assessment. SCE provided planning support for licensing and permitting and technical evaluations of the system design and cost estimate.

R. L. French↗

Speed benefits of tilt-rotor designs for LHX

The merits of an advanced helicopter and a tilt rotor aircraft for light utility, scout, and attack roles in combat missions envisioned for the year 2000 and beyond were compared. It is demonstrated that speed has increasing value for 11 different mission classes broadly encompassing the intended LHX roles. Helicopter speeds beyond 250 knots are judged to have lower military worth. Since the tilt rotor concept offers a different cost speed relationship than that of helicopters, assessment of a tilt rotor LHX variant was warranted. The technical parameters of an advanced tilt rotor are stablished. Parameters of representative missions are identified, computed relative value of the tilt rotor LHX are compared to the baseline helicopter, a first-order life cycle estimate for the tilt rotor LHX is established, military worth of the alternative design is computed and the results are evaluated. It is suggested that the tilt rotor is the solution with the greatest capability for meeting the uncertainties of future needs.

Mcdaniel, R. L.↗