Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “scope”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 379 records · Page 21

F-Tank Farm Performance Assessment Updates through the Special Analysis Process at Savannah River Site - 12169

The F-Area Tank Farm (FTF) is owned by the U.S. Department of Energy and operated by Savannah River Remediation, LLC (SRR), Liquid Waste Operations contractor at DOE's Savannah River Site (SRS). The FTF is in the north-central portion of the SRS and occupies approximately 22 acres within F-Area. The FTF is an active radioactive waste storage facility consisting of 22 carbon steel waste tanks and ancillary equipment such as transfer lines, evaporators and pump tanks. An FTF Performance Assessment (PA) was prepared to support the eventual closure of the FTF underground radioactive waste tanks and ancillary equipment. The PA provides the technical basis and results to be used in subsequent documents to demonstrate compliance with the pertinent requirements identified below for final closure of FTF. The FTank Farm is subject to a state industrial waste water permit and Federal Facility Agreement. Closure documentation will include an F-Tank Farm Closure Plan and tank-specific closure modules utilizing information from the performance assessment. For this reason, the State of South Carolina and the Environmental Protection Agency must be involved in the performance assessment review process. The residual material remaining after tank cleaning is also subject to reclassification prior to closure via a waste determination pursuant to Section 3116 of the Ronald W. Reagan National Defense Authorization Act of Fiscal Year 2005. The projected waste tank inventories in the FTF PA provide reasonably bounding FTF inventory projections while taking into account uncertainties in the effectiveness of future tank cleaning technologies. As waste is removed from the FTF waste tanks, the residual contaminants will be sampled and the remaining residual inventory is characterized. In this manner, tank specific data for the tank inventories at closure will be available to supplement the waste tank inventory projections currently used in the FTF PA. For FTF, the new tank specific data will be evaluated through the Special Analysis process. The FTF Special Analyses process will be utilized to evaluate information regarding the final residual waste that will be grouted in place in the FTF Tanks and assess the potential impact the new inventory information has on the FTF PA assumptions and results. The Special Analysis can then be used to inform decisions regarding FTF tank closure documents. The purpose of this paper is to discuss the Special Analysis process and share insights gained while implementing this process. An example of an area of interest in the revision process is balancing continuous improvement versus configuration control of agreed upon methodologies. Other subjects to be covered include: 1) defining the scope of the revisions included in the Special Analysis, 2) determining which PA results should be addressed in the Special Analysis, and 3) deciding whether the Special Analysis should utilize more qualitative or quantitative assessments. For the SRS FTF, an FTF PA has been prepared to provide the technical basis and results to be used in subsequent documents to demonstrate compliance with the pertinent requirements for final closure of FTF. The FTF Special Analyses process will be utilized to evaluate the impact new information has on the FTF PA assumptions and results. The Special Analysis can then be used to inform decisions regarding FTF tank closure documents. In preparing SAs, it is crucial that the scope of the SA be well defined within the SA, since the specific scope will vary from SA to SA. Since the SAs are essentially addendums to the PA, the SA scope should utilize the PA as the baseline from which the SA scope is defined. The SA needs to focus on evaluating the change associated with the scope, and not let other changes interfere with the ability to perform that evaluation by masking the impact of the change. In preparing the SA, it is also important to let the scope determine whether the Special Analysis should utilize more qualitative or quantitative assessments and also which results from the PA should be addressed in the Special Analysis. These decisions can vary from SA and should not be predetermined. (author)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Efficiencies in the Environmental Restoration Operations at Sandia National Laboratories, New Mexico - 12198

The mission of the Environmental Restoration Operations at Sandia National Laboratories - New Mexico is to complete all necessary corrective actions at 268 legacy release soil sites and three groundwater Areas of Concern. Additional scope impacted the anticipated 2009 completion of corrective action at the remaining 32 soil sites and the three groundwater Areas of Concern. This additional scope is base-lined to require 10 years (2011-2020) at an estimated cost of $34 M to $39 M. Efficiencies been proposed to reduce the impact of this recently realized additional corrective action scope: (1) Perform activities concurrently when possible to help reduce the length of the overall schedule; (2) Implement a 'high-performance, one-pass' concept based on an early resolution of deficiencies in draft documents and attempt to avoid multi-submission cycles with long turnaround review times, and (3) Assess the appropriateness of progressing 'at risk' from groundwater characterization to groundwater remediation using existing data, conceptual models and potential remedies. The ongoing promotion and implementation of these ideas with the New Mexico Environment Department will produce scope and cost saving -- without any reduction in the protection of public health and the environment. DOE/SSO developed and presented to the NMED three areas where efficiencies in ER Operations may be realized. The NMED has not formally responded to these proposals, but in discussions with NMED in the fall of 2011 the NMED is conceptually supportive of these proposals. NMED cannot commit to an outcome (such as no NOD), but NMED is very willing to seek efficiencies that will reduce the overall scope, while achieving regulatory compliance and considering public input. The challenge of finding efficiencies to reduce the new schedule and cost has become even more of a necessity due to shrinking budgets. A prioritization of remaining activities has been discussed with the regulatory authority. Efficiencies in the ER Operations at SNL have been proposed to reduce the impact of recently realized regulatory delays and additional corrective action scope. The ongoing promotion and implementation of these ideas with the NMED will produce scope and cost saving, without any reduction in the protection of public health and the environment. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Safety-Related Instrumentation & Control Pilot Upgrade Initiation Phase Implementation Report

This research report (1) describes the process followed and products developed during the SR I&C Pilot Project Initial Scoping Phase, and (2) captures lessons learned. Exelon Generation and LWRS collaborated to develop a Digital Transformation Strategy as part of a larger Advanced Concept of Operations. The proposed SR I&C Pilot Upgrade provides a foundation stone for this Digital Transformation that will improve plant safety, reliability, and operational performance while lowering plant Total Cost of Ownership (TCO). Initial Scoping Phase activities for this Pilot Project have been performed in accordance with industry processes that have been adapted to better support digital upgrades. These processes include IP-ENG-001, Standard Design Process (SDP) [Reference 2], NISP-EN-04, Standard Digital Engineering Process (SDEP) [Reference 3], and Electric Power Research Institute (EPRI) Report 3002011816, Digital Engineering Guide (DEG). Completing Initial Scoping Phase Engineering and Operations, Licensing, and Project Management Activities was necessary to sufficiently bound the scope, schedule, and estimated cost of the Project to enable utility management to authorize moving into the Conceptual Design Phase. A significant finding of the Business Case Analysis (BCA) methodology developed and applied as part of this effort was that the growth rate of material costs for sustaining the operation of obsolete SR I&C equipment is accelerating. This directly contributed to the Project Economic Analysis created to justify continuing the Project. Project Initial Scoping Phase lessons learned have also been captured to assist the larger industry in understanding the Digital Transformation Strategy and SR I&C Pilot Project Initial Scoping Phase efforts. This is in keeping with the public/private partnership that has been established between the Department of Energy (DOE) and Exelon for this effort with engagement from the NRC. By addressing first-of-a-kind (FOAK) risks and capturing lessons learned, the SR I&C Pilot Upgrade Project addresses technical, regulatory, and business risks to enable subsequent implementers of similar upgrades.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Data for Impact of Vertical and Seasonal Variation in Leaf Traits on Simulating Soybean Canopy Photosynthesis via 1D and 3D Modeling

Accurate modeling of photosynthesis is crucial for predicting crop productivity and quantifying the carbon cycle in agroecosystems. Leaf traits are essential inputs for modeling canopy photosynthesis. Yet, many existing models still use fixed plant functional type (PTF)-based values to parameterize leaf traits under a big-leaf or two-big-leaf assumption, neglecting their vertical profiles and seasonal changes. This simplification may introduce significant uncertainties in estimating gross primary productivity (GPP). In this study, we simulated soybean GPP and tested the effects of vertical and seasonal variation in three key leaf photosynthetic traits: the maximum carboxylation rate at 25 °C (Vcmax25), leaf chlorophyll content (LCC), and leaf mass per area (LMA) in the 1D-SCOPE and 3D-Helios models. Weekly field measurements were conducted during the growing season of 2024 to support the simulation. We designed ten leaf trait parameterization schemes by incorporating different combinations of vertical profiles and seasonal changes, while assuming homogeneous canopy architecture in both models. Our results revealed that Vcmax25 vertical and seasonal variation had the strongest influence on simulated GPP in both 1D and 3D models, while LCC and LMA effects were minimal. Particularly, the scheme with an empirically parameterized Vcmax25 profile achieved comparable performance to the scheme with the measured Vcmax25 profile. Both 1D-SCOPE and 3D-Helios accurately modeled GPP (SCOPE: R2 = 0.87, Bias = 0.55 µmol m⁻² s⁻¹; Helios: R2 = 0.9, Bias = 0.22 µmol m⁻² s⁻¹) under the most complex scheme, and their responses to vertical and seasonal variation in leaf traits were consistent, demonstrating the robustness of our findings. Based on our findings, we propose a scalable framework for parameterizing leaf traits to improve GPP simulations. This study contributes to improving the representation of leaf trait dynamics in canopy-level photosynthesis models, potentially enhancing our ability to predict crop productivity and understand agroecosystem carbon dynamics.

Photosynthesis↗

The River Corridor Closure Contract How Washington Closure Hanford is Closing A Unique Department of Energy Project - 12425

Cleanup of the Hanford River Corridor has been one of Hanford Site's top priorities since the early 1990's. This urgency is due to the proximity of hundreds of waste sites to the Columbia River and the groundwater that continues to threaten the Columbia River. In April 2005, the U.S. Department of Energy, Richland Operations Office (DOE-RL) awarded the Hanford River Corridor Closure Contract (RCCC), a cost-plus incentive-fee closure contract with a 2015 end date and first of its kind at Hanford Site, to Washington Closure Hanford (WCH), a limited-liability company owned by URS, Bechtel National, and CH2M HILL. WCH is a single-purpose company whose goal is to safely, compliantly, and efficiently accelerate cleanup in the Hanford River Corridor and reduce or eliminate future obligations to DOE-RL for maintaining long-term stewardship over the site. Accelerated performance of the work-scope while keeping a perspective on contract completion presents challenges that require proactive strategies to support the remaining work-scope through the end of the RCCC. This paper outlines the processes to address the challenges of completing work-scope while planning for contract termination. WCH is responsible for cleanup of the River Corridor 569.8 km{sup 2} (220 mi{sup 2}) of the 1,517.7 km{sup 2} (586 mi{sup 2}) Hanford Site's footprint reduction. At the end of calendar year 2011, WCH's closure implementation is well underway. Fieldwork is complete in three of the largest areas within the RCCC scope (Segments 1, 2, and 3), approximately 44.5% of the River Corridor (Figure 3). Working together, DOE-RL and WCH are in the process of completing the 'paper work' that will document the completion of the work-scope and allow DOE-RL to relieve WCH of contractual responsibilities and transition the completed areas to the Long-Term Stewardship Program, pending final action RODs. Within the next 4 years, WCH will continue to complete cleanup of the River Corridor following the completion goals. As field work-scope is completed, progressive reductions of business processes, physical facilities, and staff will occur. Organizations will collapse and flatten commensurate with workload. WCH employees will move on to new endeavors, proud of their accomplishments and the legacy they are leaving behind as being the first and largest environmental cleanup closure contract at Hanford. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Commercialization of Medium Voltage HTS Triax™ Cable Systems

The original project scope that was established in 2007 aimed to install a 1,700 meter (1.1 mile) medium voltage HTS Triax™ cable system into the utility grid in New Orleans, LA. In 2010, however, the utility partner withdrew from the project, so the 1,700 meter cable installation was cancelled and the scope of work was reduced. The work then concentrated on the specific barriers to commercialization of HTS cable technology. The modified scope included long-length HTS cable design and testing, high voltage factory test development, optimized cooling system development, and HTS cable life-cycle analysis. In 2012, Southwire again analyzed the market for HTS cables and deemed the near term market acceptance to be low. The scope of work was further reduced to the completion of tasks already started and to testing of the existing HTS cable system in Columbus, OH. The work completed under the project included: • Long-length cable modeling and analysis • HTS wire evaluation and testing • Cable testing for AC losses • Optimized cooling system design • Life cycle testing of the HTS cable in Columbus, OH • Project management. The 200 meter long HTS Triax™ cable in Columbus, OH was incorporated into the project under the initial scope changes as a test bed for life cycle testing as well as the site for an optimized HTS cable cooling system. The Columbus cable utilizes the HTS Triax™ design, so it provided an economical tool for these of the project tasks.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Summary Report of Ecological Risk Assessment for the Operation of the Explosives Waste Treatment Facility at Site 300 of the Lawrence Livermore National Laboratory.

An ecological risk assessment is required as part of the Resource Recovery and Conservation Act (RCRA) permit renewal process for Miscellaneous Units subject to 22 CCR 66270.23. This risk assessment is prepared in support of the RCRA permit renewal for the Explosives Waste Treatment Facility (EWTF) at Site 300 of the Lawrence Livermore National Laboratory (LLNL). LLNL collected soil samples and used the resulting data to produce a scoping-level ecological risk assessment pursuant to the Department of Toxic Substances Control, Guidance for Ecological Risk Assessment at Hazardous Waste Sites and Permitted Facilities, Part A: Overview, July 4, 1996. The scoping-level ecological risk assessment provides a framework to determine the potential interaction between ecological receptors and chemicals of concern from hazardous waste treatment operations in the area of EWTF. A scoping-level ecological risk assessment includes the step of conducting soil sampling in the area of the treatment units. The Sampling Plan in Support of the Human Health and Ecological Risk Assessment for the Operation of the Explosives Waste Treatment Facility at Site 300 of the Lawrence Livermore National Laboratory, (Terusaki, 2007), outlines the EWTF project-specific soil sampling requirements. Soil samples were obtained and analyzed for constituents from four chemical groups: furans, explosives, semi-volatiles and metals. Analytical results showed that furans, explosives and semi-volatiles were not detected; therefore, no further analysis was conducted. The soil samples did show the presence of metals. Soil samples analyzed for metals were compared to site-wide background levels, which had been developed for site -wide cleanup activities pursuant to the Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA). Total metal concentrations from 28 discrete soil samples obtained in the EWTF area were all below CERCLA-developed background levels. Therefore, following DTSC 1996 guidance, the EWTF hazardous waste treatment units exit the ecological risk evaluation process upon completion of the requirements of a scoping-level assessment report. This summary report documents that the requirements of a scoping-level assessment have been met.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Investigation of the Relationship between Green Design and Project Delivery Methods

The selection of the project delivery method (PDM) for any project is critical--it establishes communication, coordination, and contractual issues between the owner, contractor, and designer. With an increase in the number of green design projects, understanding the relationship between the PDM and green design is paramount to project and contract management. It is reasonable to assume that a positive relationship between green design and design-build (DB) exists since both theoretically are intended to foster an integrated, holistic, and collaborative project. This research examines the relationship between the design-bid-build (DBB), construction management (CM), and DB PDMs and green design with the goal of establishing best practices and identifying potential synergies between them. The research collected information by conducting primarily telephone interviews with approximately twenty-five individuals, including owners, contractors, and designers involved in completed green design projects, mainly in the public sector. The interviews developed a general understanding of the current state of knowledge and experience and not a rigorous quantitative analysis. Upon completion of the interviews, the tabulated results were summarized and green project characteristics and project-PDM interactions emerged. Existing published research was evaluated to reveal aspects of PDMs independent of green design. Best practices were ascertained by combining information from the interviews and published research. Best practices are as follows: (1) Project implementation features--The decision to use DB as PDM on green design or other projects should be based on the specific project features; e.g., well-defined scope and adequate owner staffing. DB will not produce successful results on all projects. (2) Collaboration--Project team collaboration early in the design and construction process is an important aspect of green projects, and collaboration was considered somewhat more important in projects that used DB. (3) Experience--Team experience is important on all green design projects independent of the PDM. Owners should use a 'best value' selection process, which is more prevalent in DB projects, and include team experience as a criterion. The owner's role is critical with DB. (4) Leadership--Leadership is an important feature for all contracting parties involved in green design projects and it is a dominant success factor in DB projects. (5) Scope of work--A well-defined scope of work is important on all projects, independent of the PDM. In DB, improving the scope of work definition by developing a set of documents, typically comparable to the design development phase, as the basis for awarding a contract is called DB bridging. Using contracting techniques such as DB bridging can result in better identification of expected quality and improves the owner's level of control. (6) Funding and Budget--Having adequate funding and budget for the given scope of work is particularly important in a green design project. Public funding restrictions may not allow use of certain PDMs, and the nature of public funding streams may make non-traditional PDMs more difficult. (7) Complexity and Flexibility--Complexity and flexibility is a project feature that is more specific to green design projects and is more frequently associated with DB. (8) Control and Accountability--Control and accountability is a problem associated with DB more than with DBB. It is not specific to green design projects. DB Bridging can be used to offset the lack of control with traditional DB. The use of green design and DB is increasing and understanding the linkage between the two is important. This research has found that while linkages do exist, the owner needs to carefully consider all aspects of a green design project before making the decision of the most appropriate PDM.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

An Experimental Investigation of Students’ Learning Effects When Using a Simplified Nuclear Simulator

Securing enough data has been a main challenge in human reliability analysis (HRA). Many researchers and institutes have made a lot of efforts for collecting HRA data to produce reasonable human error probabilities (HEPs) as well as reduce the uncertainty of HRA quantification. Representatively, U.S. Nuclear Regulatory Commission (U.S. NRC), Korea Atomic Energy Research Institute (KAERI) and Idaho National Laboratory (INL) have led lots of empirical research regarding the HRA data collection. The U.S. NRC and KAERI have mainly carried out full-scope simulator research collecting HRA data through experiments using full-scope simulators with actual operators. In contrast, INL has experimentally collected the data using simplified simulators and student operators. INL has proposed the Simplified Human Error Experimental Program (SHEEP) framework to complement full-scope data collection efforts by suggesting a way to infer full-scope data based on experimental data collected from students operating simplified simulators, specifically the Rancor Microworld Simulator (Rancor) and the Compact Nuclear Simulator (CNS). The aim of the SHEEP framework is to lower the entry point for collecting useful HRA data by securing large sample sizes at a reasonable amount of cost and labor while also guaranteeing a high degree of freedom when designing experiments. The authors’ previous research investigated whether data collected from the SHEEP framework could support a representative full-scope study. Besides, human performance differences between professional and student operators when using Rancor and CNS have been analyzed to understand the lack of fidelity of the simplified simulators and student operators within the SHEEP study. As a follow up research, this study experimentally investigates students’ learning effects and the performance trends over a certain period when using Rancor. This study aims to find out 1) how much training or education is required to collect HRA data from non-experts (i.e., students) when using Rancor and 2) how much differences there are in human performance measures between students and professional operators. In this study, a longitudinal experiment is developed. The four experiment trials with two weeks interval are carried out for sixteen undergraduate students majoring nuclear engineering at Chosun University. Totally four scenarios randomly selected from ten Rancor scenarios are used in each experiment trial. Four human performance measurements (i.e., workload, situation awareness, time and error) are considered in the experiment. Lastly, the trend of students’ performance is compared with operator data having been collected from the previous experiment.

99 GENERAL AND MISCELLANEOUS↗

Analysis of Past Leaks from Waste Management Area C, Hanford, Washington - 17525

Waste Management Area C (WMA C) at the Hanford Site was actively used for several decades for storing radioactive waste in tanks, and therefore is alternatively termed a 'waste management area,' or a 'tank farm.' During its operational life, a number of documented leaks occurred within or near to the WMA. The largest ones were associated with leaks in pipelines and diversion boxes, with the inlets or outlets of the tanks, or with leaks from the tanks themselves. Contaminants associated with these leaks were released to the soil, and mobile {sup 99}Tc has reached the groundwater exceeding drinking water standards. An analysis of the impact of past leaks on groundwater resources has been undertaken as part of the overall process of closing the tank farm. The analysis of leaks was carried out using a suite of scoping cases to evaluate alternative conceptual models for the leak behavior to identify those that are in reasonable agreement with observed concentrations of {sup 99}Tc in groundwater. Comparisons of the scoping cases with available {sup 99}Tc observations indicate the following. - Several of the scoping cases produced results that are inconsistent with observations, indicating that the assumptions in those cases may not be representative of conditions in WMA C. These negative results are valuable in improving the understanding of the migration of {sup 99}Tc from WMA C. - The remaining scoping analyses produced comparable results to each other, and none were obviously superior to others in terms of explaining the {sup 99}Tc observations. When uncertainties in groundwater fluxes were taken into account, these scoping analyses were capable of producing both arrival times and concentrations consistent with observed data for {sup 99}Tc. A representative model was used to implement a forward projection of a suite of contaminants of concern to show how the contamination associated with past leaks can be expected to evolve in the future. This paper presents these results and discusses their implications on groundwater contamination at WMA C. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Airborne Single Particle Mass Spectrometers (SPLAT II & miniSPLAT) and New Software for Data Visualization and Analysis in a Geo-Spatial Context

Understanding the effect of aerosols on climate requires knowledge of the size and chemical composition of individual aerosol particles - two fundamental properties that determine an aerosol’s optical properties and ability to serve as cloud condensation or ice nuclei. Here we present miniSPLAT, our new aircraft compatible single particle mass spectrometer, that measures in-situ and in real-time size and chemical composition of individual aerosol particles with extremely high sensitivity, temporal resolution, and sizing precision on the order of a monolayer. miniSPLAT operates in dual data acquisition mode to measure, in addition to single particle size and composition, particle number concentrations, size distributions, density, and asphericity with high temporal resolution. When compared to our previous instrument, SPLAT II, miniSPLAT has been significantly reduced in size, weight, and power consumption without loss in performance. We also present ND-Scope, our newly developed interactive visual analytics software package. ND-Scope is designed to explore and visualize the vast amount of complex, multidimensional data acquired by our single particle mass spectrometers, along with other aerosol and cloud characterization instruments on-board aircraft. We demonstrate that ND-Scope makes it possible to visualize the relationships between different observables and to view the data in a geo-spatial context, using the interactive and fully coupled Google Earth and Parallel Coordinates displays. Here we illustrate the utility of ND-Scope to visualize the spatial distribution of atmospheric particles of different compositions, and explore the relationship between individual particle composition and their activity as cloud condensation nuclei.

54 ENVIRONMENTAL SCIENCES↗

Health impact assessment in the United States: Has practice followed standards?

As an emerging practice, Health Impact Assessment is heterogeneous in purpose, form, and scope and applied in a wide range of decision contexts. This heterogeneity challenges efforts to evaluate the quality and impact of practice. We examined whether information in completed HIA reports reflected objectively-evaluable criteria proposed by the North American HIA Practice Standards Working Group in 2009. From publically-available reports of HIAs conducted in the U.S. and published from 2009 to 2011, we excluded those that were components of, or comment letters on, Environmental Impact Assessments (5) or were demonstration projects or student exercises (8). For the remaining 23 reports, we used practice standards as a template to abstract data on the steps of HIA, including details on the rationale, authorship, funding, decision and decision-makers, participation, pathways and methods, quality of evidence, and recommendations. Most reports described screening, scoping, and assessment processes, but there was substantial variation in the extent of these processes and the degree of stakeholder participation. Community stakeholders participated in screening or scoping in just two-thirds of the HIAs (16). On average, these HIAs analyzed 5.5 determinants related to 10.6 health impacts. Most HIA reports did not include evaluation or monitoring plans. This study identifies issues for field development and improvement. The standards might be adapted to better account for variability in resources, produce fit-for-purpose HIAs, and facilitate innovation guided by the principles. - Highlights: • Our study examined reported HIAs in the U.S. against published practice standards. • Most HIAs used some screening, scoping and assessment elements from the standards. • The extent of these processes and stakeholder participation varied widely. • The average HIA considered multiple health determinants and impacts. • Evaluation or monitoring plans were generally not included in reports.

54 ENVIRONMENTAL SCIENCES↗

An experiential approach to improving the integration of knowledge during EIA in transport planning

The integration of knowledge from stakeholders and the public at large is seen as one of the biggest process-related barriers during the scoping phase of EIA application in transport planning. While the academic literature offers abundant analyses, discussions and suggestions how to overcome this problem, the proposed solutions are yet to be adequately tested in practice. In order to address this gap, we test the effectiveness of a set of interventions and trigger mechanisms for improving different aspects of knowledge integration. The interventions are tested in an experiential study with two sequential cases, representing “close-to-real-life” conditions, in the context of two cities in Andalusia, Spain. In general terms, the participants perceived that the integration of knowledge improved during the simulation of the EIA scoping phase. Certain shortcomings were also discussed, fundamentally related to how the time spent during the scoping phase was crucial to lead an effective learning process between the involved people. The study concludes with a reflection on the effectiveness of the tested interventions according to similarities and differences obtained from the two experiential case studies, as well as with a discussion of the potential to generate new knowledge through the use of experiential studies in EIA practice. - Highlights: • It tests a set of interventions and mechanisms to improve the integration of knowledge. • The scoping phase of EIA is simulated to assess the effectiveness of interventions. • Two sequential case studies are used.

54 ENVIRONMENTAL SCIENCES↗

A framework to collect human reliability analysis data for nuclear power plants using a simplified simulator and student operators

Data scarcity in human reliability analysis (HRA) has been a major challenge in the quantification process. Many institutes have collected HRA data through experiments using full-scope simulators with actual operators. Nevertheless, there are still some limitations to relying solely on full-scope studies. This paper aims to propose how full-scope data collection studies can be supported through the Simplified Human Error Experimental Program (SHEEP). The SHEEP framework was developed by Idaho National Laboratory (INL) to collect HRA data through a simplified simulator and student operators. This paper introduces the major tasks in the SHEEP framework, with a particular focus on differences that arise due to participant type (i.e., student vs. actual operator), based on experiments using a simplified simulator (i.e., the Rancor Microworld). This paper also describes whether the data collected via this approach could support a representative full-scope data collection study (i.e., the HuREX study) based on the experimental data.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

High time resolution electron measurement by Fast Electron energy Spectrum Analyzer (FESA)

We have newly developed an electron energy analyzer FESA (Fast Electron energy Spectrum Analyzer) for a future magnetospheric satellite mission SCOPE. The SCOPE mission is designed in order that observational studies from the cross-scale coupling viewpoint are enabled. One of the key observations necessary for the SCOPE mission is high-time resolution electron measurement. Eight FESAs on a spinning spacecraft are capable of measuring three dimensional electron distribution function with time resolution of 8 msec. FESA consists of two electrostatic analyzers that are composed of three nested hemispherical deflectors. Single FESA functions as four top-hat type electrostatic analyzers that can measure electrons with four different energies simultaneously. By measuring the characteristics of the test model FESA, we proved the validity of the design concept of FESA. Based on the measured characteristics, we designed FESA optimized for the SCOPE mission. This optimized analyzer has good enough performance to measure three dimensional electron distribution functions around the magnetic reconnection region in the Earth's magnetotail.

46 INSTRUMENTATION RELATED TO NUCLEAR SCIENCE AND ↗

Known unknowns: indirect energy effects of information and communication technology

There has been sustained and growing interest in characterizing the net energy impact of information and communication technology (ICT), which results from indirect effects offsetting (or amplifying) the energy directly consumed by ICT equipment. These indirect effects may be either positive or negative, and there is considerable disagreement as to the direction of this sign as well as the effect magnitude. Literature in this area ranges from studies focused on a single service (such as e-commerce versus traditional retail) to macroeconomic studies attempting to characterize the overall impact of ICT. Methods. We review the literature on the indirect energy effect of ICT found via Google Scholar, our own research, and input from other researchers in the field. The various studies are linked to an effect taxonomy, which is synthesized from several different hierarchies present in the literature. References are further grouped according to ICT service (e.g., e-commerce, telework) and summarized by scope, method, and quantitative and qualitative findings. Review results. Uncertainty persists in understanding the net energy effects of ICT. Results of indirect energy effect studies are highly sensitive to scoping decisions and assumptions made by the analyst. Uncertainty increases as the impact scope broadens, due to complex and interconnected effects. However, there is general agreement that ICT has large energy savings potential, but that the realization of this potential is highly dependent on deployment details and user behavior. Discussion. While the overall net effect of ICT is likely to remain unknown, this review suggests several guidelines for improving research quality in this area, including increased data collection, enhancing traditional modeling studies with sensitivity analysis, greater care in scoping, less confidence in characterizing aggregate impacts, more effort on understanding user behavior, and more contextual integration across the different levels of the effect taxonomy.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

DeepLearnMOR: a deep-learning framework for fluorescence image-based classification of organelle morphology

Abstract The proper biogenesis, morphogenesis, and dynamics of subcellular organelles are essential to their metabolic functions. Conventional techniques for identifying, classifying, and quantifying abnormalities in organelle morphology are largely manual and time-consuming, and require specific expertise. Deep learning has the potential to revolutionize image-based screens by greatly improving their scope, speed, and efficiency. Here, we used transfer learning and a convolutional neural network (CNN) to analyze over 47,000 confocal microscopy images from Arabidopsis wild-type and mutant plants with abnormal division of one of three essential energy organelles: chloroplasts, mitochondria, or peroxisomes. We have built a deep-learning framework, DeepLearnMOR (Deep Learning of the Morphology of Organelles), which can rapidly classify image categories and identify abnormalities in organelle morphology with over 97% accuracy. Feature visualization analysis identified important features used by the CNN to predict morphological abnormalities, and visual clues helped to better understand the decision-making process, thereby validating the reliability and interpretability of the neural network. This framework establishes a foundation for future larger-scale research with broader scopes and greater data set diversity and heterogeneity.

Plant Sciences↗

Monte Carlo study for designing a dedicated “D”-shaped collimator used in the external beam radiotherapy of retinoblastoma patients

Purpose: Retinoblastoma is the most common intraocular malignancy in the early childhood. Patients treated with external beam radiotherapy respond very well to the treatment. However, owing to the genotype of children suffering hereditary retinoblastoma, the risk of secondary radio-induced malignancies is high. The University Hospital of Essen has successfully treated these patients on a daily basis during nearly 30 years using a dedicated “D”-shaped collimator. The use of this collimator that delivers a highly conformed small radiation field, gives very good results in the control of the primary tumor as well as in preserving visual function, while it avoids the devastating side effects of deformation of midface bones. The purpose of the present paper is to propose a modified version of the “D”-shaped collimator that reduces even further the irradiation field with the scope to reduce as well the risk of radio-induced secondary malignancies. Concurrently, the new dedicated “D”-shaped collimator must be easier to build and at the same time produces dose distributions that only differ on the field size with respect to the dose distributions obtained by the current collimator in use. The scope of the former requirement is to facilitate the employment of the authors' irradiation technique both at the authors' and at other hospitals. The fulfillment of the latter allows the authors to continue using the clinical experience gained in more than 30 years. Methods: The Monte Carlo codePENELOPE was used to study the effect that the different structural elements of the dedicated “D”-shaped collimator have on the absorbed dose distribution. To perform this study, the radiation transport through a Varian Clinac 2100 C/D operating at 6 MV was simulated in order to tally phase-space files which were then used as radiation sources to simulate the considered collimators and the subsequent dose distributions. With the knowledge gained in that study, a new, simpler, “D”-shaped collimator is proposed. Results: The proposed collimator delivers a dose distribution which is 2.4 cm wide along the inferior-superior direction of the eyeball. This width is 0.3 cm narrower than that of the dose distribution obtained with the collimator currently in clinical use. The other relevant characteristics of the dose distribution obtained with the new collimator, namely, depth doses at clinically relevant positions, penumbrae width, and shape of the lateral profiles, are statistically compatible with the results obtained for the collimator currently in use. Conclusions: The smaller field size delivered by the proposed collimator still fully covers the planning target volume with at least 95% of the maximum dose at a depth of 2 cm and provides a safety margin of 0.2 cm, so ensuring an adequate treatment while reducing the irradiated volume.

62 RADIOLOGY AND NUCLEAR MEDICINE↗