Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “scheduling and coordination”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 379 records · Page 21

Effects of Nighttime Light Radiance on the Sleep of the General Population

The objectives of this study is to verify if the exposure to greater nighttime radiance is associated with changes in the sleep/wake schedule and with greater sleep disturbances. Methods: The target population was the adults (18 years and older) living in California, USA. This represents 24 million of inhabitants. A total of 3,104 subjects participated in the survey (participation rate 85.6%). The participants were interviewed by telephone using the Sleep-EVAL system. The interviews covered several topics including sleeping habits, sleep quality, sleep disturbances, physical symptoms related to menopause. Chronic insomnia was defined as difficulty initiating or maintaining sleep for at least 3 months. Global nighttime light emissions have been collected by the Defense Meteorological Satellite Program's Operational Linescan System (DMSP/OLS) sensors. We extracted the radiance calibrated nighttime lights corresponding to the date of the interviews for a three by three window centered on each coordinate corresponding to an interview address. Results: Dissatisfaction with sleep quantity and/or quality was associated with an increased nighttime radiance (p=0.02). Similarly, excessive sleepiness accompanied with impaired functioning was significantly associated with an increased nighttime radiance (p (is) less than 0.0001). The association remained significant after controlling for age, gender and use of a night lamp in the bedroom. Confusional arousals were also significantly associated with an increased nighttime radiance (p (is) less than 0.0001). Bedtime hour was linearly increasing with the intensity of nighttime radiance: the later the bedtime, the greater the nighttime radiance (p (is) less than 0.0001). Similarly, wakeup time became progressively later as the nighttime radiance increased (p (is) less than 0.0001). Both associations remained significant after controlling for age, gender and use of a night lamp in the bedroom. Circadian Rhythm Disorders were the only sleep disorder significantly associated with increased nighttime radiance (p (is) less than 0.0001). Exposure to increased nighttime light radiance appeared to cause a shift in the sleep/wake schedule, excessive sleepiness and Circadian Rhythm Disorders.

Excessive Sleepiness↗

Lunar Atmosphere and Dust Environment Explorer Integration and Test

Integration and test (I&T) of the Lunar Atmosphere and Dust Environment Explorer (LADEE) is presented. A collaborative NASA project between Goddard Space Flight Center and Ames Research Center, LADEE's mission is to explore the low lunar orbit environment and exosphere for constituents. Its instruments include two spectrometers, a dust detector, and a laser communication technology demonstration. Although a relatively low-cost spacecraft, LADEE has I&T requirements typical of most planetary probes, such as prelaunch contamination control, sterilization, and instrument calibration. To lead to a successful mission, I&T at the spacecraft, instrument, and observatory level must include step-by-step and end-to-end functional, environmental, and performance testing. Due to its compressed development schedule, LADEE I&T planning requires adjusting test flows and sequences to account for long-lead critical-path items and limited spares. A protoflight test-level strategy is also baselined. However, the program benefits from having two independent but collaborative teams of engineers, managers, and technicians that have a wealth of flight project experience. This paper summarizes the LADEE I&T planning, flow, facilities, and probe-unique processes. Coordination of requirements and approaches to I&T when multiple organizations are involved is discussed. Also presented are cost-effective approaches to I&T that are transferable to most any spaceflight project I&T program.

Wright, Michael R.↗

Implementation and Operation of Power Flow Control Solutions for Transmission Systems

Power-flow controls (PFCs) technologies provide a suite of alternatives to more-efficiently direct the flow of power on the grid, improving flexibility and enabling the grid to be more responsive and resilient. PFCs can be used in many cases to mitigate overloads and consequently defer the installation of grid-expansion projects. They can also be suitable options in situations where new transmission lines cannot be built because of environmental constraints, land use, or other types of restrictions. Other uses include mitigation of loop or unintended flows, forcing of contractual or scheduled flows, reduction of congestion, and mitigation solutions during large maintenance or construction projects. While many studies have demonstrated the potential economic benefits of PFC for different types of applications, the implementation implications of using multiple PFCs for system operation and reliability have not been analyzed in detail. The lack of information and practical experience on these aspects hinders adoption of this technology. One use case would be that multiple PFCs are required to coordinate congestion management. In such cases, multiple PFCs are deployed in a meshed power system to control power flows across a wide area. The challenges are associated with PFC interaction—namely, the self and mutual power-flow sensitivity of each PFC, which must be accounted for in the calculation of the respective operating setpoints. This report analyzes implementation and operation that must be considered in evaluating transmission solutions using PFCs. The report first analyzes attributes with which PFC-based solutions should comply, based on the objective and characteristics of each particular use case. It then describes different approaches for coordinated control of multiple PFC devices for different applications, including options to avoid adverse interactions and reduce risks due to inappropriate coordination. Control and operation are illustrated through case studies performed on both generic and actual power system models. This report provides insights for transmission planners and operation engineers about the implementation of PFC-based transmission solutions; consequently, it will help them make informed decisions about the adoption of the technology.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Evaluation of a Dynamic Weather-Avoidance Rerouting Tool in Adjacent-Center Arrival Metering

Dynamic Reroutes for Arrivals in Weather (DRAW) is a NASA-developed decision-support tool for Traffic Management Coordinators (TMCs) at the Federal Aviation Administration's Air Route Traffic Control Centers ("Centers"). DRAW proposes weather-avoidance reroutes for en route arrival flights subject to metering restrictions when transitioning into a busy terminal airspace. The prior DRAW study demonstrated that TMCs' use of DRAW promotes earlier reroutes of arrivals, and reduces the number of routes conflicting with weather in the Center. The present paper focuses on how DRAW benefits metering delivery accuracy when schedule freeze horizon distance was altered. A human-in-the-loop simulation was conducted at NASA Ames Research Center in October-November 2018, where retired TMCs and controllers performed simulated metering operations for southeast arrivals through the Atlanta and Jacksonville Centers to the Hartsfield-Jackson Atlanta International Airport during convective weather periods. Results demonstrated that DRAW use reduced the frequency of manual adjustments of Scheduled Times of Arrival and lowered TMC workload. DRAW use also made the metering accuracy, the number of reroute amendments after the freeze horizon, and the en route sector controller workload more robust to the effect of different freeze horizon distance.

Hayashi, Miwa↗

Evaluation of a Dynamic Weather-Avoidance Rerouting Tool in Adjacent-Center Arrival Metering

Dynamic Reroutes for Arrivals in Weather (DRAW) is a NASA-developed decision-support tool for Traffic Management Coordinators (TMCs) at the Federal Aviation Administration's Air Route Traffic Control Centers ("Centers"). DRAW proposes weather-avoidance reroutes for en route arrival flights subject to metering restrictions when transitioning into a busy terminal airspace. The prior DRAW study demonstrated that TMCs' use of DRAW promotes earlier reroutes of arrivals, and reduces the number of routes conflicting with weather in the Center. The present paper focuses on how DRAW benefits metering delivery accuracy when schedule freeze horizon distance was altered. A human-in-the-loop simulation was conducted at NASA Ames Research Center in October-November 2018, where retired TMCs and controllers performed simulated metering operations for southeast arrivals through the Atlanta and Jacksonville Centers to the Hartsfield-Jackson Atlanta International Airport during convective weather periods. Results demonstrated that DRAW use reduced the frequency of manual adjustments of Scheduled Times of Arrival and lowered TMC workload. DRAW use also made the metering accuracy, the number of reroute amendments after the freeze horizon, and the en route sector controller workload more robust to the effect of different freeze horizon distance.

Air Traffic Management (ATM)↗

Actuator and Motor Control End-to-End V&V on the Mars 2020 Rover

The Mars 2020 Perseverance rover is the most advanced robotic exploration system ever sent to another planet. To support the complex scientific and mobility needs of the mission, the rover utilizes 33 actuators, three multi-degree-of-freedom force-torque sensors, fifteen single or dual-speed resolvers, two solenoid valves, and twelve contact switches. The control for these actuators and sensors is achieved by several levels of flight software, coordinated between two computers with varying bandwidth control loops. Furthermore, the actuators and sensors were integrated into multiple larger robotic mechanisms that were delivered by different organizations at various points in the Integration and Test (I&T) timeline. All of this created a very complex Verification and Validation (V&V) scenario involving multiple subsystems and teams, several hardware and software testbeds with varying levels of fidelity, and significant systems engineering to ensure the overall I&T schedule could be maintained while ensuring system hardware safety.This paper details the integrated V&V effort across multiple teams and venues to provide full coverage of all necessary functionality, performance, and fault protection. First, it provides an overview of how the V&V campaign was subdivided among teams and venues and provides descriptions of the various hardware configurations used to support the testing. The Mars 2020 implementation of the plan incorporates many of the lessons learned from Mars Science Laboratory’s test campaign, and these value-added modifications are discussed here. Also included in this section is the system-level environmental testing approach used for mechanisms. Second, the paper describes the phased approach used by the teams to support new hardware and software deliveries to testbed and Systems I&T. In this approach the test campaign was built upon higher-level mechanism needs for performance, functionality, and safety at specific times in the campaign. Finally, the paper discusses lessons learned from the V&V campaign that should be applied to future large-scale motion control testing efforts.

Borne, Davis↗

Planning for the semiconductor manufacturer of the future

Texas Instruments (TI) is currently contracted by the Air Force Wright Laboratory and the Defense Advanced Research Projects Agency (DARPA) to develop the next generation flexible semiconductor wafer fabrication system called Microelectronics Manufacturing Science & Technology (MMST). Several revolutionary concepts are being pioneered on MMST, including the following: new single-wafer rapid thermal processes, in-situ sensors, cluster equipment, and advanced Computer Integrated Manufacturing (CIM) software. The objective of the project is to develop a manufacturing system capable of achieving an order of magnitude improvement in almost all aspects of wafer fabrication. TI was awarded the contract in Oct., 1988, and will complete development with a fabrication facility demonstration in April, 1993. An important part of MMST is development of the CIM environment responsible for coordinating all parts of the system. The CIM architecture being developed is based on a distributed object oriented framework made of several cooperating subsystems. The software subsystems include the following: process control for dynamic control of factory processes; modular processing system for controlling the processing equipment; generic equipment model which provides an interface between processing equipment and the rest of the factory; specification system which maintains factory documents and product specifications; simulator for modelling the factory for analysis purposes; scheduler for scheduling work on the factory floor; and the planner for planning and monitoring of orders within the factory. This paper first outlines the division of responsibility between the planner, scheduler, and simulator subsystems. It then describes the approach to incremental planning and the way in which uncertainty is modelled within the plan representation. Finally, current status and initial results are described.

Fargher, Hugh E.↗

The Optical Fiber Array Bundle Assemblies for the NASA Lunar Reconnaissance Orbiter

The United States, National Aeronautics and Space Administration (NASA) Goddard Space Flight Center (GSFC), Fiber Optics Team in the Electrical Engineering Division of the Applied Engineering and Technology Directorate, designed, developed and integrated the space flight optical fiber array hardware assemblies for the Lunar Reconnaissance Orbiter (LRO). The two new assemblies that were designed and manufactured at NASA GSFC for the LRO exist in configurations that are unique in the world for the application of ranging and lidar. These assemblies were developed in coordination with Diamond Switzerland, and the NASA GSFC Mechanical Systems Division. The assemblies represent a strategic enhancement for NASA's Laser Ranging and Laser Radar (LIDAR) instrument hardware by allowing light to be moved to alternative locations that were not feasible in past space flight implementations. An account will be described of the journey and the lessons learned from design to integration for the Lunar Orbiter Laser Altimeter and the Laser Ranging Application on the LRO. The LRO is scheduled to launch end of 2008.

Ott, Melanie N.↗

Progress on the International Space Station - We're Part Way up the Mountain

The first phase of the International Space Station construction has been completed, and research has begun. Russian, U.S., and Canadian hardware is on orbit, and Italian logistics modules have visited often. With the delivery of the U.S. Laboratory, Destiny, significant research capability is in place, and dozens of U.S. and Russian experiments have been conducted. Crew members have been on orbit continuously since November 2000. Several "bumps in the road" have occurred along the way, and each has been systematically overcome. Enormous amounts of hardware and software are being developed by the International Space Station partners and participants around the world and are largely on schedule for launch. Significant progress has been made in the testing of completed elements at launch sites in the United States and Kazakhstan. Over 250,000 kilograms of flight hardware have been delivered to the Kennedy Space Center and integrated testing of several elements wired together has progressed extremely well. Mission control centers are fully functioning in Houston, Moscow, and Canada, and operations centers Darmstadt, Tsukuba, Turino, and Huntsville will be going on line as they are required. Extensive coordination efforts continue among the space agencies of the five partners and two participants, involving 16 nations. All of them continue to face their own challenges and have achieved significant successes. This paper will discuss the contributions of the International Space Station partners and participants, their accomplished milestones, and upcoming events. The International Space Station program, the largest and most complicated peacetime project in history, has progressed part way up the mountain, and the partners are continuing their journey to the top. The International Space Station (ISS) is unprecedented in its technological, engineering, and management complexity, and is one of the largest international collaborations ever undertaken. The ISS is a dramatic example of the ability of nations to work together as a team toward common goals and dreams. The challenges encountered and overcome by the international ISS team have been likened to climbing a mountain. Construction of the ISS has progressed rapidly in the past year. ISS is now a functioning microgravity laboratory in space hosting a permanent human presence, prompting the characterization that we are "part way up the mountain, and the team continues its climb."

Fortenberry, Lindy↗

Redesign of the Timeline Generator at Fermilab using a web-based Flutter application, GraphQL API and an IOC

The control system at Fermilab is undergoing an evolution with a shift towards web-based applications with connections to the EPICS infrastructure. The Timeline Generator (TLG) is an application that serves to coordinate events across the lab using different timing links. These links include the Tevatron clock (TCLK), a 10 MHz serial link with events encoded at 20Hz and Machine Data (MDAT), a communication link with states encoded at 720Hz. This paper covers the redesign of the major components of the TLG. This includes a web-based Flutter application for building timelines. A placement service is in use that has a GraphQL interface and uses a timeline input to compute a schedule of events and states. The Flutter application sends this computed schedule to the TLG IOC via a GraphQL interface to the Data Pool Manager (DPM). The TLG IOC runs on an Arria FPGA, the Accelerator Clock Generator (ACLK-GEN), which is responsible for writing the events and states on to the different timing links.

Carmichael, Linden [Fermilab]↗

Connected Thermostat Alternatives for Room Air Conditioners and Minisplit Heat Pumps

The availability of smart, connected thermostats has improved climate control, energy efficiency, and grid demand-response programs for central HVAC systems. However, a significant gap exists in addressing integrated control systems for point-source heating and cooling systems such as window air-conditioners (window ACs) and mini-split heat pumps (MSHPs). This report examines the emerging market of third-party connected thermostats tailored for these systems, focusing on their effectiveness, reliability, and potential barriers to adoption.This study evaluates several commercially available products designed for room ACs and MSHPs through a series of laboratory tests. While these infrared-based (IR-based) thermostats offer remote temperature control and scheduling via mobile apps, our findings reveal that none are seamless, with reliability of basic functions being a critical factor. Promising features include integration of indoor air quality metrics and time-of-use pricing, but the latter are not yet available in the U.S. Barriers to broad user acceptance include non-seamless setup processes, challenges in thermostat placement, and unclear product differentiation. There is a pressing need for research and development in enabling MSHPs and central thermostats to coordinate, enhancing energy savings and comfort in retrofit applications. This study underscores the importance of further innovation in connected thermostat technology to address the diverse needs of single-zone HVAC systems and promote efficient energy management in households.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Outcomes of 7 Years of Airborne Trace Gas Measurements over California and Nevada: The Alpha Jet Atmospheric eXperiment (AJAX)

The Alpha Jet Atmospheric eXperiment (AJAX) has been flying a scientific payload since January 2011 measuring ozone, carbon dioxide, methane, formaldehyde and meteorological parameters up to 9 kilometers. AJAX is located and operated from the San Francisco Bay Area and has flown a total of 229 flights, on a regular basis (approximately 3 per month) over all seasons cataloguing a long-term record of trace gas concentrations over California and Nevada. The AJAX project focuses on science questions which benefit from routine, frequent observations with flexible scheduling. This presentation will provide an overview of AJAX activities including a discussion of airborne measurements for: Long-Range Transport (LRT) and Stratosphere-to-Troposphere Transport (STT). Regular sampling by AJAX has aided identification of LRT and evidence of STT, which during spring and summer months are visible as elevated O3 laminae within airborne profiles. Some laminae have the ability to impact surface level air quality; Satellite validation - Regular AJAX missions include flights to Railroad Valley, NV in coordination with GOSAT (Greenhouse Gases Observing Satellite) and OCO-2 (Carbon Observatory-2) observations, and more recently to provide coincident measurements under TROPOMI (TROPOspheric Monitoring Instrument); The AJAX project is uniquely flexible to incorporate specialized flights with limited planning notice, such as sampling emissions from California wildfires. Nine wildfires have been sampled, with some more than once allowing to observe emission changes as the fire progresses; Pandora validation - Future work will include development of flight strategies for validation of ground based Pandora spectrometers.

Yates, Emma L.↗

HEAO-A nominal scanning observation schedule

The HEAO-A observatory, scheduled for launch in late June 1977, will spend most of its orbital lifetime in a scanning mode, spining from 0.03 to 0.1 rpm about an axis aligned with the sun. The dates of availability in the scan band are given for a list of 248 X-ray sources. Celestial maps of source locations and scan planes, and examples of the nighttime elevation of available sources are presented. This document is intended to aid ground-based observers in planning coordinated observations with HEAO-A.

Fishman, G. J.↗

Evidence of Completion of Milestone 3: Experimental Testbed

Construction and deployment of the experimental testbed encountered scheduling delays, and completion was subsequently further delayed by curtailment of LANL operations due to the COVID–19 pandemic. Between March and October, LANL was in a state of “Limited Operations” such that only certain “mission–critical” work was performed with approximately 25% on–site staffing. In spite of this, much of the lab space preparation was executed and the five initial model house” units were constructed and installed during this period. Still, the pace of construction was impacted by difficulty in coordinating personnel and minimizing contact between workers.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Redesign of the Timeline Generator at Fermilab using a web-based Flutter Application, GraphQL API and an IOC

Redesign of the Timeline Generator at Fermilab using a web-based Flutter application, GraphQL API and an IOC ABSTRACT = The control system at Fermilab is undergoing an evolution with a shift towards web-based applications with connections to the EPICS infrastructure. The Timeline Generator (TLG) is an application that serves to coordinate events across the lab using different timing links. These links include the Tevatron clock (TCLK), a 10 MHz serial link with events encoded at 20Hz and Ma-chine Data (MDAT), a communication link with states encoded at 720Hz. This paper covers the redesign of the major components of the TLG. This includes a web-based Flutter application for building timelines. A placement service is in use that has a GraphQL interface and uses a timeline input to compute a schedule of events and states. The Flutter application sends this computed schedule to the TLG IOC via a GraphQL interface to the Data Pool Manager (DPM). The TLG IOC runs on an Arria FPGA, the Accelerator Clock Generator (ACLK-GEN), which is responsible for writing the events and states on to the different timing links.

Carmichael, Linden [Fermilab]↗

ADS-B within a Multi-Aircraft Simulation for Distributed Air-Ground Traffic Management

Automatic Dependent Surveillance Broadcast (ADS-B) is an enabling technology for NASA s Distributed Air-Ground Traffic Management (DAG-TM) concept. DAG-TM has the goal of significantly increasing capacity within the National Airspace System, while maintaining or improving safety. Under DAG-TM, aircraft exchange state and intent information over ADS-B with other aircraft and ground stations. This information supports various surveillance functions including conflict detection and resolution, scheduling, and conformance monitoring. To conduct more rigorous concept feasibility studies, NASA Langley Research Center s PC-based Air Traffic Operations Simulation models a 1090 MHz ADS-B communication structure, based on industry standards for message content, range, and reception probability. The current ADS-B model reflects a mature operating environment and message interference effects are limited to Mode S transponder replies and ADS-B squitters. This model was recently evaluated in a Joint DAG-TM Air/Ground Coordination Experiment with NASA Ames Research Center. Message probability of reception vs. range was lower at higher traffic levels. The highest message collision probability occurred near the meter fix serving as the confluence for two arrival streams. Even the highest traffic level encountered in the experiment was significantly less than the industry standard "LA Basin 2020" scenario. Future studies will account for Mode A and C message interference (a major effect in several industry studies) and will include Mode A and C aircraft in the simulation, thereby increasing the total traffic level. These changes will support ongoing enhancements to separation assurance functions that focus on accommodating longer ADS-B information update intervals.

Barhydt, Richard↗

Evidence of Completion of Milestone 3: Experimental Testbed

Construction and deployment of the experimental testbed encountered scheduling delays, and completion was subsequently further delayed by curtailment of LANL operations due to the COVID-19 pandemic. Between March and October, LANL was in a state of “Limited Operations” such that only certain “mission-critical” work was performed with approximately 25% on-site staffing. In spite of this, much of the lab space preparation was executed and the five initial model house” units were constructed and installed during this period. Still, the pace of construction was impacted by difficulty in coordinating personnel and minimizing contact between workers. Currently, LANL is in the mode of “Normal Operations with Maximum Telework,” which continues to limit the availability of on-site personnel. Nevertheless, Milestone 3 is now complete. This document describes the experiment as it is deployed and provides status for each task for this milestone.

99 GENERAL AND MISCELLANEOUS↗

Coordinated NASA nickel-cadmium battery technology program

This paper describes the NASA nickel-cadmium (Ni-Cd) battery technology program which is being coordinated by JPL to provide NASA and other users with lighter and/or longer-lived Ni-Cd cells for low-earth-orbit, geosynchronous-orbit, and planetary spacecraft missions in the 1980s. The goal is to double the energy density and/or life of the system. Failure modes and mechanisms are differentiated and discussed to point out the critical design variables which affect Ni-Cd cell life. Cell component weights are listed, approaches for reducing weight are discussed, and program tasks and schedules are presented. The nine major tasks being worked on by various organizations are described. Progress has been made in weight reduction, understanding of life reliability mechanisms, and development of a process for manufacturing more stable electrodes. An accelerated and predictive life test program is approximately 30% complete. It appears feasible to double the life and/or usable energy density of the Ni-Cd cell.

Bogner, R. S.↗