Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “receiver synchronization”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 379 records · Page 21

Test of an orbiting hydrogen maser clock system using laser time transfer

We describe a joint Smithsonian Astrophysical Laboratory/National Aeronautics and Space Administration (SAO/NASA) program for flight testing a atomic hydrogen maser clock system designed for long-term operation in space. The clock system will be carried by a shuttle-launched EURECA spacecraft. Comparisons with earth clocks to measure the clock's long-term frequency stability (tau = 10(exp 4) seconds) will be made using laser time transfer from existing NASA laser tracking stations. We describe the design of the maser clock and its control systems, and the laser timing technique. We describe the precision of station time synchronization and the limitations in the comparison between the earth and space time scales owing to gravitational and relativistic effects. We will explore the implications of determining the spacecraft's location by an on-board Global Position System (GPS) receiver, and of using microwave techniques for time and frequency transfer.

Vessot, Robert F. C.↗

Using GPS Receiver 1PPS Output to Verify Time Stamp Accuracy and Measure Propagation Delay

A simple pulse overlay circuit using a logic OR gate was developed to overlay a precise leading edge 1 pulse per second time reference marker from a global positioning system receiver onto a non-return -to- zero-level pulse code modulation telemetry data stream to validate time stamp accuracy and measure propagation delay in telemetry equipment. A pulse overlay (PO) circuit was designed to produce a time reference marker within a pulse code modulation (PCM) telemetry data stream that was recorded and analyzed to validate an IRIG Standard 106-17 Chapter 10 recorder’s time stamp accuracy [1]. A manufacturer of a newly purchased Chapter 10 recorder claimed the time stamp accuracy to be better than 10 microseconds (μs) with only IRIG-B120 (IRIG-B) input and better than 1 μs with IRIG-B and one pulse per second (1PPS) inputs. The PO circuit and a Chapter 10 recorder test setup were used to verify the vendor’s data-time synchronization claims and to justify infrastructure upgrade costs to connect additional cables to each purchased recorder. The circuit was also used to measure the propagation delay (PD) of a long distance Telemetry multiplexer/demultiplexer telecommunication system which the manufacturer did not provide a PD specification. Using the one pulse per second time reference marker of the global positioning system receiver and the pulse overlay circuit to overlay the one pulse per second variable pulse width signal into a pulse code modulation telemetry stream provided an excellent means to validate time stamp accuracy within a Chapter 10 recorder and to measure propagation delays within a normal telemetry operating environment. The positive results from the Chapter 10 recorder tests validated the vendor’s claims and justified the implementation to add the one pulse per second signal to the range Chapter 10 recorders. The pulse overlay circuit and test setups defined in this paper can easily be used to measure other telemetry equipment.

Knudtson, Kevin↗

Designing and Implementing a Distributed System Architecture for the Mars Rover Mission Planning Software (Maestro)

Distributed systems allow scientists from around the world to plan missions concurrently, while being updated on the revisions of their colleagues in real time. However, permitting multiple clients to simultaneously modify a single data repository can quickly lead to data corruption or inconsistent states between users. Since our message broker, the Java Message Service, does not ensure that messages will be received in the order they were published, we must implement our own numbering scheme to guarantee that changes to mission plans are performed in the correct sequence. Furthermore, distributed architectures must ensure that as new users connect to the system, they synchronize with the database without missing any messages or falling into an inconsistent state. Robust systems must also guarantee that all clients will remain synchronized with the database even in the case of multiple client failure, which can occur at any time due to lost network connections or a user's own system instability. The final design for the distributed system behind the Mars rover mission planning software fulfills all of these requirements and upon completion will be deployed to MER at the end of 2005 as well as Phoenix (2007) and MSL (2009).

Goldgof, Gregory M.↗

Sampling and Control Circuit Board for an Inertial Measurement Unit

A circuit board that serves as a control and sampling interface to an inertial measurement unit ("IMU") is provided. The circuit board is also configured to interface with a local oscillator and an external trigger pulse. The circuit board is further configured to receive the external trigger pulse from an external source that time aligns the local oscillator and initiates sampling of the inertial measurement device for data at precise time intervals based on pulses from the local oscillator. The sampled data may be synchronized by the circuit board with other sensors of a navigation system via the trigger pulse.

Chelmins, David T↗

Modeling of GE Appliances: Final Presentation

The Energy Information Administration (EIA) estimates that electricity use will increase by more than 30 percent by 2035, and that residential electricity usage will increase by 23 percent. During this time, peak electricity demand is expected grow at an even greater rate, requiring significant investment in system capacity. In addition, increased penetration of intermittent renewable resources will increase system variability, requiring additional resources to mitigate the variability associated with generator output. Widespread adoption of demand response (DR) enabled appliances, thermostats, and other demand-side resources can result in significant reduction to peak electrical demand and provide potential grid stabilization benefits. The key to adoption is to provide this resource at a cost commensurate with traditional grid capabilities, and to appropriately share both the costs and the benefits between the consumer and the service provider (i.e., the utility). However, the business model for investing in demand-side resources cannot be determined without an estimation of the possible technical benefits and how those benefits translate to monetary value in current electrical market structures. GE Appliances has developed a line of appliances that will have the capability of offering several levels of demand reduction actions based on information received from the utility grid, often in the form of price or grid status. However due to a number of factors, including the number of DR-enabled appliances available at any given time, the reduction of diversity factor due to the synchronizing control signal, and the percentage of consumers who may override the utility signal, it can be difficult to predict the aggregate response of a large number of residences. The effects of these behaviors have been modeled and simulated in the Pacific Northwest National Laboratory (PNNL) developed open-source software, GridLAB-D™, including evaluation of appliance controls, improvement to current algorithms, and development of aggregate control methodologies. The results of these simulations provide an estimation of the possible technical benefits (e.g., peak load reduction) attributable to smart appliances, but do not describe the monetary value of these services. This report is the final in a series of three reports funded by U.S. Department of Energy Office of Electricity Delivery and Energy Reliability (DOE-OE) in collaboration with GE Appliances’ through a Cooperative Research and Development Agreement (CRADA) to describe the potential of GE Appliances’ DR-enabled appliances to provide benefits to the utility grid.

Demand Response↗

An ant-nest-like cathode substrate for lithium-sulfur batteries with practical cell fabrication parameters

We report that electrochemical performances of lithium-sulfur batteries have received much progress in recent years. However, their practical deployment encounters challenges with respect to optimizing the cell-fabrication parameters (e.g., amounts of the active material and electrolyte). We present here an “ant-nest-like” cathode substrate with unique architecture to synchronously attain high electrochemical performance and necessary cell-fabrication parameters. The cells with a high sulfur loading (11.5 mg cm -2 ), a high sulfur content (75 wt.%), and a low electrolyte/sulfur ratio (9 μL mg -1 ) display a high areal capacity and energy density of, respectively, 7 mA h cm -2 and 14 mW h cm -2 with a capacity retention of 70% after 150 cycles. Moreover, the cells exhibit a low self-discharge behavior with a low self-discharge constant of 0.0013 per day and a long rest period of one month. Lastly, these dynamic and static electrochemical stabilities are attributed to the ant-nest-like structure and low surface area of the cathode substrate that allows, respectively, the accommodation and encapsulation of a high amount of active material and reduces the consumption of electrolyte.

25 ENERGY STORAGE↗

IBRD Operational Decision Framework

The IBRD Operational Decision Framework in this document is an expansion of an emerging general risk management framework under development by an interagency working group. It provides the level of detail necessary to develop a general Consequence Management Guidance Document for biological contamination remediation and restoration. It is the intent of this document to support both wide area and individual site remediation and restoration activities. This product was initiated as a portion of the IBRD Task 1 Systems Analysis to aid in identification of wide area remediation and restoration shortcomings and gaps. The draft interagency general risk management framework was used as the basis for the analysis. The initial Task 1 analysis document expanded the draft interagency framework to a higher level of resolution, building on both the logic structure and the accompanying text explanations. It was then employed in a qualitative manner to identify responsible agencies, data requirements, tool requirements, and current capabilities for each decision and task. This resulted in identifying shortcomings and gaps needing resolution. Several meetings of a joint LLNL/SNL working group reviewed and approved the initial content of this analysis. At the conclusion of Task 1, work continued on the expanded framework to generate this Operational Decision Framework which is consistent with the existing interagency general risk management framework. A large LLNL task group met repeatedly over a three-month period to develop the expanded framework, coordinate the framework with the biological remediation checklist, and synchronize the logic with the Consequence Management Plan table of contents. The expanded framework was briefed at a large table top exercise reviewing the interagency risk management framework. This exercise had representation from major US metropolitan areas as well as national agencies. This product received positive comments from the participants. Upon completion of the Operational Decision Framework, another joint LLNL/SNL working group conducted a day-long review. Identified modifications were made to the document, resulting in the included product.

99 GENERAL AND MISCELLANEOUS↗

Television multiplexing system

A television multiplexing system which includes a circuit that inserts a digital codes sync signal and a digital code into a video signal for identifying the channel is described. The digital sync signal and the digital coded signals are generated by a single crystal controlled clock so that they are always in synchronism with each other. In demultiplexing the signals are utilized for shifting the digital coded signals into a shift register. The shift register, in turn, activates a decoder according to the code stored in the shift register for selecting the proper recording disk or receiver for storing the video signal.

Simpkins, L. G.↗

Short range laser obstacle detector

A short range obstacle detector for surface vehicles is described which utilizes an array of laser diodes. The diodes operate one at a time, with one diode for each adjacent azimuth sector. A vibrating mirror a short distance above the surface provides continuous scanning in elevation for all azimuth sectors. A diode laser is synchronized with the vibrating mirror to enable one diode laser to be fired, by pulses from a clock pulse source, a number of times during each elevation scan cycle. The time for a given pulse of light to be reflected from an obstacle and received is detected as a measure of range to the obstacle.

Kuriger, W. L.↗

Symbol lock detection in the ARX 2 and Block 5 receivers

The performances of 5 symbol-lock detectors are compared. These detectors are the square-law detector with overlapping (SQOD) and nonoverlapping integrators, the absolute-value detectors with overlapping and nonoverlapping integrators, and the signal-power estimator detector (SPED). The analysis considers various scenarios in which the observation interval is much larger than or equal to the symbol-synchronizer loop bandwidth, and which were not considered in previous analyses. Also, the case of threshold setting in the absence of signal is considered. It is shown, that the SQOD outperforms all others when the threshold is set in the presence of a signal, independent of the relationship between loop bandwidth and observation period. On the other hand, the SPED outperforms all others when the threshold is set in the presence of noise only.

Shihabi, M.↗

DSN research and technology support

Continuing testing and refinement of the remote controlled, unattended automated pulsar observing station is noted, along with routine pulsar observations of 22 pulsars. Radar observations of geostationary satellite are discussed. Current status of the 400-kW X-band radar is reported along with routine automatic testing of the stability-reliability of the DSS 13 maser-receiver noise adding radiometer combination. A failure in the Faraday rotation receiving system is noted along with discussion in some detail of the activities of the high power transmitter maintenance facility. Continuation of receiver phase stability testing, specifically the effects of temperature on coaxial cables, is discussed and results reported. A demonstration at full power of the microwave power transmission facility is noted and routine support of the planetary radio astronomy experiment is discussed. Transmission of master clock synchronization signals to overseas DSN stations is also reported.

Jackson, E. B.↗

Using the NAVSTAR Global Positioning System as a global timing system

The application of NAVSTAR GPS to the problems of PTTI dissemination is discussed. A short review of the GPS concept lead to a detailed description of the implementation of time transfer through NAVSTAR GPS. Time was followed from the U.S. Naval Observatory (USNO) through the ground control, satellite, and receiving segments of GPS to the user's clock system. The three options by which a user's system can receive from the GPS receivers, currently under development by the DOD, are defined in detail. The electrical/digital/mechanical interface parameters along with suggested methods for their use are outlined for each option. A detailed error model is also presented for the traceability of UTC (GPS) to UTC (USNO). Real time synchronization between stationary users on the time continent can be controlled to within a few nanoseconds, and absolute post processed time offset with UTC (USNO) measured within 25 nanoseconds or better. A discussion of some of the potential work around techniques and their applications are included.

Kovach, K. L.↗

Diversity reception for advanced multi-satellite networks: A CDMA approach

Diversity reception for Synchronous CDMA (S-CDMA) is introduced and analyzed. A Gaussian co-channel synchronous and asynchronous interference approximation is derived to evaluate the effects on the system bit error rate. Numerical results are provided for a simple mobile communication system where the signals transmitted by two distinct satellites in visibility are coherently combined by a three fingers Rake receiver. A second example showing performance of an integrated ground/satellite single frequency network for digital audio broadcasting is presented. Results show the capacity advantage of utilizing S-CDMA in combination with diversity reception.

Colzi, E.↗

Method and apparatus for reflection mode imaging

A volume is scanned with a raster scan about a center of rotation using a transmitter/receiver at a selected range while gating a range window on the receiver with a selected range differential. The received signals are then demodulated to obtain signals representative of a property within the volume being scanned such as the density of a tumor. The range is varied until the entire volume has been scanned at all ranges to be displayed. An imaging display is synchronously scanned together with the raster scan to display variations of the property on the display. A second transmitter/receiver with associated equipment may be offset from the first and variations displayed from each of the transmitter/receivers on its separate display. The displays may then be combined stereoscopically to provide a three-dimensional image representative of variations of the property.

Heyser, Richard C.↗

NASA Operational Simulator for Small Satellites: Tools for Software Based Validation and Verification of Small Satellites

The NASA Operational Simulator for Small Satellites (NOS3) is a suite of tools to aid in areas such as software development, integration test (IT), mission operations training, verification and validation (VV), and software systems check-out. NOS3 provides a software development environment, a multi-target build system, an operator interface-ground station, dynamics and environment simulations, and software-based hardware models. NOS3 enables the development of flight software (FSW) early in the project life cycle, when access to hardware is typically not available. For small satellites there are extensive lead times on many of the commercial-off-the-shelf (COTS) components as well as limited funding for engineering test units (ETU). Considering the difficulty of providing a hardware test-bed to each developer tester, hardware models are modeled based upon characteristic data or manufacturers data sheets for each individual component. The fidelity of each hardware models is such that FSW executes unaware that physical hardware is not present. This allows binaries to be compiled for both the simulation environment, and the flight computer, without changing the FSW source code. For hardware models that provide data dependent on the environment, such as a GPS receiver or magnetometer, an open-source tool from NASA GSFC (42 Spacecraft Simulation) is used to provide the necessary data. The underlying infrastructure used to transfer messages between FSW and the hardware models can also be used to monitor, intercept, and inject messages, which has proven to be beneficial for VV of larger missions such as James Webb Space Telescope (JWST). As hardware is procured, drivers can be added to the environment to enable hardware-in-the-loop (HWIL) testing. When strict time synchronization is not vital, any number of combinations of hardware components and software-based models can be tested. The open-source operator interface used in NOS3 is COSMOS from Ball Aerospace. For testing, plug-ins are implemented in COSMOS to control the NOS3 simulations, while the command and telemetry tools available in COSMOS are used to communicate with FSW. NOS3 is actively being used for FSW development and component testing of the Simulation-to-Flight 1 (STF-1) CubeSat. As NOS3 matures, hardware models have been added for common CubeSat components such as Novatel GPS receivers, ClydeSpace electrical power systems and batteries, ISISpace antenna systems, etc. In the future, NASA IVV plans to distribute NOS3 to other CubeSat developers and release the suite to the open-source community.

Verification↗

An OFDM System Using Polyphase Filter and DFT Architecture for Very High Data Rate Applications

This paper presents a conceptual architectural design of a four-channel Orthogonal Frequency Division Multiplexing (OFDM) system with an aggregate information throughput of 622 megabits per second (Mbps). Primary emphasis is placed on the generation and detection of the composite waveform using polyphase filter and Discrete Fourier Transform (DFT) approaches to digitally stack and bandlimit the individual carriers. The four-channel approach enables the implementation of a system that can be both power and bandwidth efficient, yet enough parallelism exists to meet higher data rate goals. It also enables a DC power efficient transmitter that is suitable for on-board satellite systems, and a moderately complex receiver that is suitable for low-cost ground terminals. The major advantage of the system as compared to a single channel system is lower complexity and DC power consumption. This is because the highest sample rate is half that of the single channel system and synchronization can occur at most, depending on the synchronization technique, a quarter of the rate of a single channel system. The major disadvantage is the increased peak-to-average power ratio over the single channel system. Simulation results in a form of bit-error-rate (BER) curves are presented in this paper.

Kifle, Muli↗

Nisar L-band Digital Electronics Subsystem

The NASA-ISRO Synthetic Aperture Radar (NISAR) L-band SAR instrument employs multiple digital channels to optimize resolution while keeping a large swath on a single pass. High-speed digitization with fine synchronization and digital beam forming are necessary in order to facilitate this new technique called SweepSAR. An architecture employing multiple FPGA based digital signal processors has been conceived to facilitate digital calibration on an individual channel basis as well as digital signal processing to optimize the receive signal. On-board processing and data compression has been implemented to reduce the volume of data in order to satisfy the operational requirements of near global coverage for the desired science targets. A novel command and timing architecture was developed to manage this complex system to meet the challenging project requirements. The NISAR L-band Digital Electronics Subsystem is the combination of the hardware, firmware and software components architected and implemented to operate this radar and return the desired quantity and quality of data for the science community.

SweepSAR↗

NISAR L-SAR Digital Electronics Subsystem - A Multichannel Distributed Processing System with Synchronous Timing Control for Digital Beam Forming and Multiple Echo Tracking

The NASA-ISRO Synthetic Aperture Radar (NISAR) L-band SAR instrument employs multiple digital channels to optimize resolution while keeping a large swath on a single pass. High-speed digitization with fine synchronization and digital beam forming are necessary in order to facilitate this new technique called SweepSAR. An architecture employing multiple FPGA based digital signal processors has been conceived to facilitate digital calibration on an individual channel basis as well as digital signal processing to optimize the receive signal. On-board processing and data compression has been implemented to reduce the volume of data in order to satisfy the operational requirements of near global coverage for the desired science targets. A novel command and timing architecture was developed to manage this complex system while providing detailed control of individual channel receive window timing required for digital beam forming. The NISAR L-band Digital Electronics Subsystem is the combination of the hardware, firmware and software components architected and implemented to operate this radar and return the desired quantity and quality of data for the science community.

Chuang, Chung-Lun↗