Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “program administration”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 379 records · Page 21

The U. S. Space Program -- An Appraisal

The National Aeronautics and Space Administration has a significant interest in research on magnetic materials and in developing a better understanding of magnetic phenomena here on earth, in space and in the vicinity of the other planets of our solar system. But it would be presumptuous of me, an ordinary administrator, to lecture to this distinguished group of experts in the field on the subject of magnetism and magnetic materials. Instead, I propose to tell you briefly about the dimensions and principal areas of effort of the program we are pursuing in space research. Naturally, I will identify the nature of our interest in the specialty with which you are concerned. Finally, I want to attempt an assessment of the United States program in space exploration with perhaps a sidelong glance at the comparable efforts of our principal competitor in this field -- the Soviet Union. In the preparation of this paper, I have had the assistance of several very able scientists who are members of our staff at NASA.

Glennan, T. Keith↗

NASA's Laser Communications Relay Demonstration (LCRD) Experiment Program: Characterization and Initial Operations

The National Aeronautics and Space Administration’s (NASA) Laser Communications Relay Demonstration (LCRD) completed the first 18 months of its Experiment Program in December 2023. Geosynchronous-ground experiments to date have included demonstrations of optimetrics and of Delay/Disruption Tolerant Networking (DTN), and measurements of the effects of the atmosphere on lasercom performance and availability. Future operational scenarios have been emulated. This paper provides an overview and highlights of the first 18 months of LCRD experiments, and a preview of the upcoming experiments, including relaying data to and from the International Space Station.

optical communications↗

NASA’s Laser Communications Relay Demonstration (LCRD) Experiment Program: Characterization And Initial Operations

The National Aeronautics and Space Administration’s (NASA) Laser Communications Relay Demonstration (LCRD) completed the first 18 months of its Experiment Program in December 2023. The LCRD geosynchronous payload includes two laser communications terminals interconnected via an onboard electronic switch. The payload can relay information between any two of a set of three ground stations. Two optical ground stations are located in California and Hawaii, and an RF ground station is located in New Mexico. Experiments to date have included demonstration of optimetrics, demonstrations of Delay/Disruption Tolerant Networking (DTN), and measurements of the effects of the atmosphere (turbulence, weather) on the performance and availability of lasercom (pointing, tracking, communications, and adaptive optics). Furthermore, future operational scenarios including robotic and exploration missions with various network service configurations have been emulated. This paper provides an overview and highlights of the first 18 months of LCRD experiments, and a preview of the upcoming experiments, including relaying data to and from the Integrated LCRD Low-Earth Orbit (LEO) User Modem and Amplifier Terminal (ILLUMA-T) on the International Space Station. LCRD is a joint project involving NASA Goddard Space Flight Center (GSFC), the California Institute of Technology Jet Propulsion Laboratory (JPL), and Massachusetts Institute of Technology Lincoln Laboratory (MIT LL).

David J. Israel↗

Analyses of Kennedy Space Center Tropospheric Doppler Radar Wind Profiler Data for Space Launch System Program Certification

This paper documents the methodology and results of analyses used to certify the Kennedy Space Center (KSC) Tropospheric Doppler Radar Wind Profiler (TDRWP) as input to launch commit evaluations for the National Aeronautics and Space Administration’s (NASA) Space Launch System Program (SLSP). These analyses, and the requirements that they address, were designed by the Marshall Space Flight Center Natural Environments Branch (MSFC NE) to certify that the TDRWP provides data of sufficient accuracy and resolution for SLSP, and that the instrument provides enough reliability to support Day-of- Launch Initialization Loads Update (DOLILU) operations. On day-of-launch (DOL), space launch vehicle operators have used data from wind profilers to reverse a previous GO call in prelaunch loads and trajectory assessments due to the profiler’s capability to quickly identify changes in the wind profile within a rapidly changing wind environment. Certification of the TDRWP would allow SLSP to use DOL wind data generated by the TDRWP to design the vehicle trajectory and to verify trajectory and load constraints during the countdown for launch commit decision.

Barbre, Robert E., Jr.↗

Phase 1 research program overview

The Phase 1 research program was unprecedented in its scope and ambitious in its objectives. The National Aeronautics and Space Administration committed to conducting a multidisciplinary long-duration research program on a platform whose capabilities were not well known, not to mention belonging to another country. For the United States, it provided the first opportunity to conduct research in a long-duration space flight environment since the Skylab program in the 1970's. Multiple technical as well as cultural challenges were successfully overcome through the dedicated efforts of a relatively small cadre of individuals. The program developed processes to successfully plan, train for and execute research in a long-duration environment, with significant differences identified from short-duration space flight science operations. Between August 1994 and June 1998, thousands of kilograms of research hardware was prepared and launched to Mir, and thousands of kilograms of hardware and data products were returned to Earth. More than 150 Principal Investigators from eight countries were involved in the program in seven major research disciplines: Advanced Technology; Earth Sciences; Fundamental Biology; Human Life Sciences; International Space Station Risk Mitigation; Microgravity; and Space Sciences. Approximately 75 long-duration investigations were completed on Mir, with additional investigations performed on the Shuttle flights that docked with Mir. The flight phase included the participation of seven US astronauts and 20 Russian cosmonauts. The successful completion of the Phase 1 research program not only resulted in high quality science return but also in numerous lessons learned to make the ISS experience more productive. The cooperation developed during the program was instrumental in its success. c2001 AIAA. Published by Elsevier Science Ltd.

short duration↗

Modular space station Phase B extension NASA administrator's review

The preliminary design, reference program, costs, and sortie and program options for the modular space station are outlined. The Phase B has a barbell configuration baseline with a manipulator. The baseline includes two capability plateaus, a 6-man station followed after five years by growth to a 12-man station. It is concluded that a common development approach is the most cost effective and flexible system. The system includes a module to support automated payload servicing, a set of sortie labs, and the cargo modules, RAMs, and space station modules. These would be developed and operated in conjunction with the space shuttle.

Source record↗

National Aeronautics and Space Administration plans for space communication technology

A program plan is presented for a space communications application utilizing the 30/20 GHz frequency bands (30 GHz uplink and 20 GHz downlink). Results of market demand studies and spacecraft systems studies which significantly affect the supporting research and technology program are also presented, along with the scheduled activities of the program plan.

Alexovich, R. E.↗

National Aeronautics and Space Administration plans for space communication technology

A program plan is presented for a space communications application utilizing the 30/20 GHz frequency bands (30 GHz uplink and 20 GHz downlink). Results of market demand studies and spacecraft systems studies which significantly affect the supporting research and technology program are also presented, along with the scheduled activities of the program plan.

Alexovich, R. E.↗

Use of the Advanced Communications Technology Satellite to Promote International Distance Education Programs for Georgetown University

Georgetown's distance education program is designed to demonstrate to faculty and administrators the feasibility and desirability of using two-way video transmission for international education. These programs will extend the reach of Georgetown's educational offerings; enrich the curriculum and content of Georgetown's offerings by interaction with institutions in other nations; enhance the world view of the School of Business Administration; enable Georgetown to share its resources with other institutions outside of the United States; and promote Commerce within the Americas. The primary reason for this pilot program is to evaluate the effectiveness and economic viability of offering academic courses and Small Business Development training.

Bradley, Harold↗

Nutrition and renal stone disease in space

There is a growing body of evidence from the National Aeronautics and Space Administration and the Russian space program showing that humans exposed to the microgravity environment of space have a greater risk for developing renal stones. Increased bone resorption and the attendant hypercalciuria and hyperphosphaturia contribute significantly to raising the urinary state of saturation with respect to the calcium salts, namely calcium oxalate and calcium phosphate. In addition, other environmental and dietary factors may adversely affect urine composition and increase stone formation risk during space flight. For example, reductions in urinary volume, pH, and citrate contribute to raising stone formation risk. In addition to raising the risk for calcium stone formation, this metabolic profile is conducive to the formation of uric acid stones. Although observations to date have suggested that there may actually be a reduced food intake during the early phase of flight, crew members on longer-duration flights may increase food intake and be at increased risk for stone formation. Taken together, these findings support the use of nutritional recommendations for crew members that would serve to reduce the stone-forming propensity of the urinary environment. Pharmacologic intervention should be directed at raising urinary volumes, diminishing bone losses, and preventing reductions in urinary pH and citrate. Success in reducing the risk for stone formation in astronauts would also be of potential major benefit to the estimated 20 million Americans with nephrolithiasis.

Review↗

Space Launch System Spacecraft and Payload Elements: Making Progress Toward First Launch

Significant and substantial progress continues to be accomplished in the design, development, and testing of the Space Launch System (SLS), the most powerful human-rated launch vehicle the United States has ever undertaken. Designed to support human missions into deep space, SLS is one of three programs being managed by the National Aeronautics and Space Administration's (NASA's) Exploration Systems Development directorate. The Orion spacecraft program is developing a new crew vehicle that will support human missions beyond low Earth orbit, and the Ground Systems Development and Operations (GSDO) program is transforming Kennedy Space Center (KSC) into next-generation spaceport capable of supporting not only SLS but also multiple commercial users. Together, these systems will support human exploration missions into the proving ground of cislunar space and ultimately to Mars. SLS will deliver a near-term heavy-lift capability for the nation with its 70 metric ton Block 1 configuration, and will then evolve to an ultimate capability of 130 metric tons. The SLS program marked a major milestone with the successful completion of the Critical Design Review in which detailed designs were reviewed and subsequently approved for proceeding with full-scale production. This marks the first time an exploration class vehicle has passed that major milestone since the Saturn V vehicle launched astronauts in the 1960s during the Apollo program. Each element of the vehicle now has flight hardware in production in support of the initial flight of the SLS - Exploration Mission-1 (EM-1), an uncrewed mission to orbit the moon and return, and progress in on track to meet the initial targeted launch date in 2018. In Utah and Mississippi, booster and engine testing are verifying upgrades made to proven shuttle hardware. At Michoud Assembly Facility (MAF) in Louisiana, the world's largest spacecraft welding tool is producing tanks for the SLS core stage. This paper will particularly focus on work taking place at Marshall Space Flight Center (MSFC) and United Launch Alliance (ULA) in Alabama, where upper stage and adapter elements of the vehicle are being constructed and tested. Providing the Orion crew capsule/launch vehicle interface and in-space propulsion via a cryogenic upper stage, the Spacecraft/Payload Integration and Evolution (SPIE) Element serves a key role in achieving SLS goals and objectives. The SPIE element marked a major milestone in 2014 with the first flight of original SLS hardware, the Orion Stage Adapter (OSA) which was used on Exploration Flight Test-1 with a design that will be used again on EM-1. Construction is already underway on the EM-1 Interim Cryogenic Propulsion Stage (ICPS), an in-space stage derived from the Delta Cryogenic Second Stage. Manufacture of the Orion Stage Adapter and the Launch Vehicle Stage Adapter is set to begin at the Friction Stir Facility located at MSFC while structural test articles are either completed (OSA) or nearing completion (Launch Vehicle Stage Adapter). An overview is provided of the launch vehicle capabilities, with a specific focus on SPIE Element qualification/testing progress, as well as efforts to provide access to deep space regions currently not available to the science community through a secondary payload capability utilizing CubeSat-class satellites.

Schorr, Andrew A.↗

Space Launch System Spacecraft and Payload Elements: Making Progress Toward First Launch

Significant and substantial progress continues to be accomplished in the design, development, and testing of the Space Launch System (SLS), the most powerful human-rated launch vehicle the United States has ever undertaken. Designed to support human missions into deep space, SLS is one of three programs being managed by the National Aeronautics and Space Administration's (NASA's) Exploration Systems Development directorate. The Orion spacecraft program is developing a new crew vehicle that will support human missions beyond low Earth orbit, and the Ground Systems Development and Operations program is transforming Kennedy Space Center into next-generation spaceport capable of supporting not only SLS but also multiple commercial users. Together, these systems will support human exploration missions into the proving ground of cislunar space and ultimately to Mars. SLS will deliver a near-term heavy-lift capability for the nation with its 70 metric ton (t) Block 1 configuration, and will then evolve to an ultimate capability of 130 t. The SLS program marked a major milestone with the successful completion of the Critical Design Review in which detailed designs were reviewed and subsequently approved for proceeding with full-scale production. This marks the first time an exploration class vehicle has passed that major milestone since the Saturn V vehicle launched astronauts in the 1960s during the Apollo program. Each element of the vehicle now has flight hardware in production in support of the initial flight of the SLS -- Exploration Mission-1 (EM-1), an un-crewed mission to orbit the moon and return. Encompassing hardware qualification, structural testing to validate hardware compliance and analytical modeling, progress in on track to meet the initial targeted launch date in 2018. In Utah and Mississippi, booster and engine testing are verifying upgrades made to proven shuttle hardware. At Michoud Assembly Facility in Louisiana, the world's largest spacecraft welding tool is producing tanks for the SLS core stage. This paper will particularly focus on work taking place at Marshall Space Flight Center (MSFC) and United Launch Alliance in Alabama, where upper stage and adapter elements of the vehicle are being constructed and tested. Providing the Orion crew capsule/launch vehicle interface and in-space propulsion via a cryogenic upper stage, the Spacecraft/Payload Integration and Evolution (SPIE) Element serves a key role in achieving SLS goals and objectives. The SPIE element marked a major milestone in 2014 with the first flight of original SLS hardware, the Orion Stage Adapter (OSA) which was used on Exploration Flight Test-1 with a design that will be used again on EM-1. Construction is already underway on the EM-1 Interim Cryogenic Propulsion Stage (ICPS), an in-space stage derived from the Delta Cryogenic Second Stage. Manufacture of the Orion Stage Adapter and the Launch Vehicle Stage Adapter is set to begin at the Friction Stir Facility located at MSFC while structural test articles are either completed (OSA) or nearing completion (Launch Vehicle Stage Adapter). An overview is provided of the launch vehicle capabilities, with a specific focus on SPIE Element qualification/testing progress, as well as efforts to provide access to deep space regions currently not available to the science community through a secondary payload capability utilizing CubeSat-class satellites.

Schorr, Andrew A.↗

Space Launch System Spacecraft and Payload Elements: Progress Toward Crewed Launch and Beyond

While significant and substantial progress continues to be accomplished toward readying the Space Launch System (SLS) rocket for its first test flight, work is already underway on preparations for the second flight - using an upgraded version of the vehicle - and beyond. Designed to support human missions into deep space, SLS is the most powerful human-rated launch vehicle the United States has ever undertaken, and is one of three programs being managed by the National Aeronautics and Space Administration's (NASA's) Exploration Systems Development division. The Orion spacecraft program is developing a new crew vehicle that will support human missions beyond low Earth orbit (LEO), and the Ground Systems Development and Operations (GSDO) program is transforming Kennedy Space Center (KSC) into a next-generation spaceport capable of supporting not only SLS but also multiple commercial users. Together, these systems will support human exploration missions into the proving ground of cislunar space and ultimately to Mars. For its first flight, SLS will deliver a near-term heavy-lift capability for the nation with its 70-metric-ton (t) Block 1 configuration. Each element of the vehicle now has flight hardware in production in support of the initial flight of the SLS, which will propel Orion around the moon and back. Encompassing hardware qualification, structural testing to validate hardware compliance and analytical modeling, progress is on track to meet the initial targeted launch date. In Utah and Mississippi, booster and engine testing are verifying upgrades made to proven shuttle hardware. At Michoud Assembly Facility (MAF) in Louisiana, the world's largest spacecraft welding tool is producing tanks for the SLS core stage. Providing the Orion crew capsule/launch vehicle interface and in-space propulsion via a cryogenic upper stage, the Spacecraft/Payload Integration and Evolution (SPIE) element serves a key role in achieving SLS goals and objectives. The SPIE element marked a major milestone in 2014 with the first flight of original SLS hardware, the Orion Stage Adapter (OSA) which was used on Exploration Flight Test-1 with a design that will be used again on the first flight of SLS. The element has overseen production of the Interim Cryogenic Propulsion Stage (ICPS), an in-space stage derived from the Delta Cryogenic Second Stage, which was manufactured at United Launch Alliance (ULA) in Decatur, Alabama, prior to being shipped to Florida for flight preparations. Manufacture of the OSA and the Launch Vehicle Stage Adapter (LVSA) took place at the Friction Stir Facility located at Marshall Space Flight Center (MSFC) in Huntsville, Alabama. Marshall is also home to the Integrated Structural Test of the ICPS, LVSA, and OSA, subjecting the stacked components to simulated stresses of launch. The SPIE Element is also overseeing integration of 13 "CubeSat" secondary payloads that will fly on the first flight of SLS, providing access to deep space regions in a way currently not available to the science community. At the same time as this preparation work is taking place toward the first launch of SLS, however, the Space Launch System Program is actively working toward its second launch. For its second flight, SLS will be upgraded to the more-capable Block 1B configuration. While the Block 1 configuration is capable of delivering more than 70 t to LEO, the Block 1B vehicle will increase that capability to 105 t. For that flight, the new configuration introduces two major new elements to the vehicle - an Exploration Upper Stage (EUS) that will be used for both ascent and in-space propulsion, and a Universal Stage Adapter (USA) that serves as a "payload bay" for the rocket, allowing the launch of large exploration systems along with the Orion spacecraft. Already, flight hardware is being prepared for the Block 1B vehicle. Welding is taking place on the second rocket's core stage. Flight hardware production has begun on booster components. An RS-25 engine slated for that flight has been tested. Development work is taking place on the EUS, with contracts in place for both the stage and the RL10 engines which will power it. (The EUS will use four RL10 engines, an increase from one on the ICPS.) For the crew configuration of the Block 1B vehicle, the SLS SPIE element is managing the USA and accompanying Payload Adapter, which will accommodate both large payloads co-manifested with Orion and small-satellite secondary payloads. This co-manifested payload capacity will be instrumental for missions into the proving ground around the moon, where NASA will test new systems and demonstrate new capabilities needed for human exploration farther into deep space.

Schorr, Andrew A.↗

Space Launch System Spacecraft and Payload Elements: Progress Toward Crewed Launch and Beyond

While significant and substantial progress continues to be accomplished toward readying the Space Launch System (SLS) rocket for its first test flight, work is already also underway on preparations for the second flight - using an upgraded version of the vehicle - and beyond. Designed to support human missions into deep space, Space Launch System (SLS), is the most powerful human-rated launch vehicle the United States has ever undertaken, and is one of three programs being managed by the National Aeronautics and Space Administration's (NASA's) Exploration Systems Development division. The Orion spacecraft program is developing a new crew vehicle that will support human missions beyond low Earth orbit (LEO), and the Ground Systems Development and Operations program is transforming Kennedy Space Center into a next-generation spaceport capable of supporting not only SLS but also multiple commercial users. Together, these systems will support human exploration missions into the proving ground of cislunar space and ultimately to Mars. For its first flight, SLS will deliver a near-term heavy-lift capability for the nation with its 70-metric-ton (t) Block 1 configuration. Each element of the vehicle now has flight hardware in production in support of the initial flight of the SLS, which will propel Orion around the moon and back. Encompassing hardware qualification, structural testing to validate hardware compliance and analytical modeling, progress in on track to meet the initial targeted launch date. In Utah and Mississippi, booster and engine testing are verifying upgrades made to proven shuttle hardware. At Michoud Assembly Facility in Louisiana, the world's largest spacecraft welding tool is producing tanks for the SLS core stage. Providing the Orion crew capsule/launch vehicle interface and in-space propulsion via a cryogenic upper stage, the Spacecraft/Payload Integration and Evolution (SPIE) element serves a key role in achieving SLS goals and objectives. The SPIE element marked a major milestone in 2014 with the first flight of original SLS hardware, the Orion Stage Adapter (OSA) which was used on Exploration Flight Test-1 with a design that will be used again on the first flight of SLS. The element has overseen production of the Interim Cryogenic Propulsion Stage (ICPS), an in-space stage derived from the Delta Cryogenic Second Stage, which was manufactured at United Launch Alliance in Decatur, Alabama, prior to being shipped to Florida for flight preparations. Manufacture of the Orion Stage Adapter and the Launch Vehicle Stage Adapter (LVSA) took place at the Friction Stir Facility located at Marshall Space Flight Center in Huntsville, Alabama. Marshall is also home to the Integrated Structural Test of the ICPS, LVSA, and OSA, subjecting the stacked components to simulated stresses of launch. The SPIE Element is also overseeing integration of 13 "CubeSat" secondary payloads that will fly on the first flight of SLS, providing access to deep space regions in a way currently not available to the science community. At the same time as this preparation work is taking place toward the first launch of SLS, however, the Space Launch System Program is actively working toward its second launch. For its second flight, SLS will be upgraded to the more-capable Block 1B configuration. While the Block 1 configuration is capable of delivering more than 70 metric tons to low Earth orbit, the Block 1B vehicle will increase that capability to 105 t. For that flight, the new configuration introduces two major new elements to the vehicle - an Exploration Upper Stage (EUS) that will be used for both ascent and in-space propulsion, and a Universal Stage Adapter (USA) that serves as a "payload bay" for the rocket, allowing the launch of large exploration systems along with the Orion spacecraft. Already, flight hardware is being prepared for the Block 1B vehicle. Welding is taking place on the second rocket's core stage. Flight hardware production has begun on booster components. An RS-25 engine slated for that flight has been tested. Development work is taking place on the Exploration Upper Stage, with contracts in place for both the stage and the RL10 engines which will power it. (The EUS will use four RL10 engines, an increase from one on the ICPS.) For the crew configuration of the Block 1B vehicle, the SLS SPIE element is managing the USA and accompanying Payload Adapter, which will accommodate both large payloads co-manifested with Orion and small-satellite secondary payloads. This co-manifested payload capacity will be instrumental for missions into the Proving Ground around the moon, where NASA will test new systems and demonstrate new capabilities needed for human exploration farther into deep space.

Schorr, Andrew A.↗

VISUAL CONTROL OF RENDEZVOUS

Space rendezvous involving human occupants will be required in many phases of space flight. In order that rendezvous capability be concurrent with other phases of manned space flight to insure that such tasks as the rotation and addition of crews for manned space station, supply of stations and launching complexes for deep-space probes, and the emergency rescue of personnel may be carried out, it is desirable to determine the ability of a human pilot to control the rendezvous maneuver. The National Aeronautics and Space Administration has conducted a study program to determine vehicle requirements and control techniques for a number of proposed methods for performing piloted space rendezvous. The final step in each phase of the rendezvous study program has been a simulation of the man-machine combination to test its feasibility. Initially, an analytical study was conducted to determine a range of conditions that would exist at the beginning of the terminal phase of rendezvous (ref. 1). Piloted systems were investigated for rendezvous control using these initial conditions. One such study of piloted rendezvous in which all the required control information was displayed to the simulator pilot on instruments is presented in reference 2. While the control of the rendezvous maneuver by use of the instrument display was shown to be feasible, the sufficiently accurate measurement of the necessary information to operate the instrument was realized to be a difficult problem. Consideration was therefore given to the possibility of maneuvering range and range rate required for the control of the rendezvous from visual sightings made during the initial control application. To provide this capability, an analytical study was made. This analytical study, presented in reference 3, derived three techniques for obtaining range and range rate visually and conducted a simplified preliminary situation to test the three analytical techniques. The study reported herein is a continuation of the simulation work begun in reference 3, and is aimed at determining the ability of a pilot to use visual information to reduce or eliminate the need for some or all of the data that would normally be displayed on instruments.

Rendezvous↗

A study of the potential of remote sensors in urban transportation planning

The potential uses of remotely sensed data as applied to the transportation planning process are presented. By utilizing the remote sensing technology developed by the National Aeronautics and Space Administration in the various space programs, it is hoped that both the expense and errors inherent in the conventional data collection techniques can be avoided. Additional bonuses derived from the use of remotely sensed data are those of the permanent record nature of the data and the traffic engineering data simultaneously made available. The major mathematical modeling phases and the role remotely sensed data might play in replacing conventionally collected data are discussed. Typical surveys undertaken in the overall planning process determine the nature and extent of travel desires, land uses, transportation facilities and socio-economic characteristics. Except for the socio-economic data, data collected in the other surveys mentioned can be taken from photographs in sufficient detail to be useful in the modeling procedures.

Rietschier, D.↗

Fabrication and assembly of the ERDA/NASA 100 kilowatt experimental wind turbine

As part of the Energy Research and Development Administration (ERDA) wind-energy program, NASA Lewis Research Center has designed and built an experimental 100-kW wind turbine. The two-bladed turbines drives a synchronous alternator that generates its maximum output of 100 kW of electrical power in a 29-km/hr (18-mph) wind. The design and assembly of the wind turbine were performed at Lewis from components that were procured from industry. The machine was installed atop the tower on September 3, 1975.

Puthoff, R. L.↗