Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “power systems planning”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 379 records · Page 21

The Los Angeles 100% Renewable Energy Study (LA100): Chapter 4. Customer-Adopted Rooftop Solar and Storage

The City of Los Angeles has set ambitious goals to transform its electricity supply, aiming to achieve a 100% renewable energy power system by 2045, along with aggressive electrification targets for buildings and vehicles. To reach these goals, and assess the implications for jobs, electricity rates, the environment, and environmental justice, the Los Angeles City Council passed a series of motions directing the Los Angeles Department of Water and Power (LADWP) to determine the technical feasibility and investment pathways of a 100% renewable energy portfolio standard. The Los Angeles 100% Renewable Energy Study (LA100) is a first-of-its-kind objective, rigorous, and science-based power systems analysis to determine what investments could be made to achieve these goals. The LA100 final report is presented as a collection of 12 chapters and an executive summary, each of which is available as an individual download. This chapter explores the technical and economic potential for rooftop solar in LA, and how much solar and storage might be adopted by customers.

100% Renewable↗

The Los Angeles 100% Renewable Energy Study (LA100): Chapter 12. Synthesis

The City of Los Angeles has set ambitious goals to transform its electricity supply, aiming to achieve a 100% renewable energy power system by 2045, along with aggressive electrification targets for buildings and vehicles. To reach these goals, and assess the implications for jobs, electricity rates, the environment, and environmental justice, the Los Angeles City Council passed a series of motions directing the Los Angeles Department of Water and Power (LADWP) to determine the technical feasibility and investment pathways of a 100% renewable energy portfolio standard. The Los Angeles 100% Renewable Energy Study (LA100) is a first-of-its-kind objective, rigorous, and science-based power systems analysis to determine what investments could be made to achieve these goals. The LA100 final report is presented as a collection of 12 chapters and an executive summary, each of which is available as an individual download. This chapter reviews high-level findings, costs, benefits, and lessons learned from integrating this diverse suite of models and conducting a high-fidelity 100% renewable energy study.

100% Renewable↗

Achieving an 80% Renewable Portfolio in Alaska's Railbelt: Cost Analysis

This study examines the system-level costs and benefits of increased renewable energy deployment in the Railbelt grid, in the context of a proposed 80% renewable portfolio standard (RPS). This work studies the period from 2024 to 2040 and uses a model that simulates the planning, evolution, and operation of the power system to identify the mix of resources that maintains system reliability at the lowest electricity system cost over the period of analysis. The model tracks several reliability metrics, including the ability to serve demand during all hours of the year, even when normal power system failures occur. The model includes several measures (and associated costs) to address the variable output of renewable resources, including additional operating reserves, fuel storage, cycling of fossil plants, and additional equipment needed to maintain system stability. The Reference (least-cost) scenario results in substantial deployment of renewable energy and cost savings, reaching about 76% of Railbelt generation derived from renewables in 2040. Annual savings average about $105 M/year from 2030 to 2040. About 50% of this generation is from wind by 2040. Enforcing an 80% RPS results in about a 2% cumulative reduction in net savings. Demand is met in all scenarios, relying heavily on use of existing hydropower and fossil-fueled generators during periods of low renewable output. Meeting the increase in variability will require substantial changes in how the system is operated, with inverter-based resources providing nearly 100% of electricity during some periods.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Dynamic Isotope Surface Power Systems

The Dynamic Isotope Power Systems (DIPS) demonstration program, sponsored by the U.S. Department of Energy (DOE) with support funding from the National Aeronautics and Space Administration (NASA), is currently focused on the development of a standardized 2.5 kWe portable generator for multiple applications on the lunar or Martian surface. A variety of potential remote and mobile applications has been identified by NASA including surface rovers for both short and extended duration missions, remote power to science packages, and backup to central base power. Recent work focused on refining the 2.5 kWe design including assessing compatibility with the Martian environment to assure the design is suitable while imposing only a minor mass penalty on lunar operations. Additional work included a study performed to compare the DIPS with regenerative fuel cell systems for lunar mobile and remote power systems. Power requirements were reviewed and a modular system chosen for the comparison. Finally, a plan and cycle schematic were generated for an early demonstration of a prototypic isotope power Brayton system using the Antarctic as the test bed.

Hunt, Maribeth E.↗

The Los Angeles 100% Renewable Energy Study (LA100): Chapter 9. Air Quality and Public Health

The City of Los Angeles has set ambitious goals to transform its electricity supply, aiming to achieve a 100% renewable energy power system by 2045, along with aggressive electrification targets for buildings and vehicles. To reach these goals, and assess the implications for jobs, electricity rates, the environment, and environmental justice, the Los Angeles City Council passed a series of motions directing the Los Angeles Department of Water and Power (LADWP) to determine the technical feasibility and investment pathways of a 100% renewable energy portfolio standard. The Los Angeles 100% Renewable Energy Study (LA100) is a first-of-its-kind objective, rigorous, and science-based power systems analysis to determine what investments could be made to achieve these goals. The LA100 final report is presented as a collection of 12 chapters and an executive summary, each of which is available as an individual download. This chapter summarizes changes to air quality (fine particulate matter and ozone) and public health (premature mortality, emergency room visits due to asthma, and hospital admissions due to cardiovascular diseases), and the potential economic value of public health benefits.

100% Renewable↗

HIPPO – A Software Platform for Electricity Market Research and Development

The goal of this project is to provide Regional transmission organizations (RTOs) and independent system operators (ISOs) a market design and prototyping software, High-Performance Power-Grid Optimization (HIPPO), that they can evaluate electricity market design options, calculate market planning strategies and operational performance. With the high standards and strict reliability requirements for operating power systems, impacts of new technologies need to be fully investigated prior to any consideration for adoption. A market design and prototyping software tool which can be used to prototype electricity market design options, to calculate market planning strategies and operational performance with high precision, and to investigate the impacts for integrating future power grid technologies will be valuable to RTOs/ISOs who operate power systems, to vendors like GE and ABB who provide the market solvers, and to market participants and researchers who are actively doing market research. HIPPO is a such tool that can be used to improve the current market operations and provide capabilities for rigorous forward-looking design and prototyping of next-generation energy markets. HIPPO has a high-resolution model for the day-ahead SCUC, which was validated with MISO and GE-Grid Solutions. HIPPO is built with parallel and distributed computing capabilities and can be executed in both multi-thread and high-performance computing (HPC) settings. This capability provides fast solution speed necessary to handle the larger and more complex SCUC problems of real-world cases and the potentially growing size and complexity of future scenarios. In addition, HIPPO has a concurrent optimizer (CO) which manages multiple algorithm executions simultaneously and leverages the advantages from different algorithms. This structure provides flexibility to better benchmark competing approaches. Highly accurate market model, fast solution technologies and flexible model and algorithm control are the features which will make HIPPO an extensible platform for developing and testing multiple approaches to meet a wide range of future market needs.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Design, Development and Testing Plan for Energy Efficiency Algorithms Related to Building-Integrated Cooling, Heating, and Power Systems

Building-integrated cooling, heating and power (CHP) systems are more efficient than conventional systems at providing local power and thermal energy, and favorable fuel prices are bound to spur their increased adoption. It is estimated that the total CHP technical potential in the commercial building sector is approximately 76 GW, but only a small fraction of it is actually deployed. Advanced control and monitoring systems that realize the full potential of these CHP systems can transform this capacity into an asset for both the owner and the grid and also accelerate the adoption of these systems in the building sector. However, to realize the full benefit of the CHP systems, we must ensure persistence of energy efficient operations. It has been demonstrated by several studies that as much as 30% of building energy use is wasted. Much of the waste results from the inability to anticipate load variations (design day vs. non-design day operations; diurnal variation of loads), identify improper operation, and efficiently operate, control and maintain building systems. Moreover, many buildings, even those with adequate control infrastructure, lack knowledgeable staff to operate and maintain energy systems. Operators of buildings with CHP systems will constantly need to make tradeoffs (economic dispatch) between onsite power generation and purchasing power, between onsite heat production from distributed generation versus heating/cooling from conventional systems, and different passive and active load management measures. Much of the inefficiency in the current building operations can be eliminated by use of automated performance monitoring (PM), real-time commissioning verification (CxV) and automated fault detection and diagnostic (AFDD) tools. Automation can help system operators make intelligent decisions. Remote and continuous monitoring of system conditions and performance will enable better management and integration of CHP with existing building systems. Continuous PM, real-time CxV and AFDD could alleviate burdens for operations staff, enhance operations and maintenance (O&M), and improve reliability of building and CHP systems. To address the O&M challenges and to provide a means to maximize the rate-of-return of building-integrated CHP systems, the Building Technologies Office (BTO) within the U.S. Department of Energy’s (DOE’s) Office of Energy Efficiency and Renewable Energy (EERE) initiated a project to design, develop, and field test a VOLTTRON™-based supervisory controller and associated open-source algorithms. These algorithms will ensure real-time optimal operation of a building-integrated CHP system, support electric grid reliability, and lead to achieving the goal of a clean, efficient, reliable and affordable next-generation integrated energy systems. This report lists the components for which PM, real-time CxV and AFDD algorithms will be developed, how the algorithms will be tested, and metrics that will be used to validate the algorithms and easy of deployment. Deployment of these algorithms in the field will result in savings reduction in energy consumption of between 10% and 20%.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

The Los Angeles 100% Renewable Energy Study (LA100): Chapter 7. Distribution System Analysis

The City of Los Angeles has set ambitious goals to transform its electricity supply, aiming to achieve a 100% renewable energy power system by 2045, along with aggressive electrification targets for buildings and vehicles. To reach these goals, and assess the implications for jobs, electricity rates, the environment, and environmental justice, the Los Angeles City Council passed a series of motions directing the Los Angeles Department of Water and Power (LADWP) to determine the technical feasibility and investment pathways of a 100% renewable energy portfolio standard. The Los Angeles 100% Renewable Energy Study (LA100) is a first-of-its-kind objective, rigorous, and science-based power systems analysis to determine what investments could be made to achieve these goals. The LA100 final report is presented as a collection of 12 chapters and an executive summary, each of which is available as an individual download. This chapter summarizes the growth in distribution-connected energy resources and provides a detailed review of impacts to the distribution grid of growth in customer electricity demand, solar, and storage, as well as required distribution grid upgrades and associated costs.

100% Renewable↗

Fission Surface Power Systems (FSPS) Project Final Report for the Exploration Technology Development Program (ETDP): Fission Surface Power, Transition Face to Face

The Fission Surface Power Systems Project became part of the ETDP on October 1, 2008. Its goal was to demonstrate fission power system technology readiness in an operationally relevant environment, while providing data on fission system characteristics pertinent to the use of a fission power system on planetary surfaces. During fiscal years 08 to 10, the FSPS project activities were dominated by hardware demonstrations of component technologies, to verify their readiness for inclusion in the fission surface power system. These Pathfinders demonstrated multi-kWe Stirling power conversion operating with heat delivered via liquid metal NaK, composite Ti/H2O heat pipe radiator panel operations at 400 K input water temperature, no-moving-part electromagnetic liquid metal pump operation with NaK at flight-like temperatures, and subscale performance of an electric resistance reactor simulator capable of reproducing characteristics of a nuclear reactor for the purpose of system-level testing, and a longer list of component technologies included in the attached report. Based on the successful conclusion of Pathfinder testing, work began in 2010 on design and development of the Technology Demonstration Unit (TDU), a full-scale 1/4 power system-level non-nuclear assembly of a reactor simulator, power conversion, heat rejection, instrumentation and controls, and power management and distribution. The TDU will be developed and fabricated during fiscal years 11 and 12, culminating in initial testing with water cooling replacing the heat rejection system in 2012, and complete testing of the full TDU by the end of 2014. Due to its importance for Mars exploration, potential applicability to missions preceding Mars missions, and readiness for an early system-level demonstration, the Enabling Technology Development and Demonstration program is currently planning to continue the project as the Fission Power Systems project, including emphasis on the TDU completion and testing.

Palac, Donald T.↗

The Los Angeles 100% Renewable Energy Study (LA100): Chapter 3. Electricity Demand Projections

The City of Los Angeles has set ambitious goals to transform its electricity supply, aiming to achieve a 100% renewable energy power system by 2045, along with aggressive electrification targets for buildings and vehicles. To reach these goals, and assess the implications for jobs, electricity rates, the environment, and environmental justice, the Los Angeles City Council passed a series of motions directing the Los Angeles Department of Water and Power (LADWP) to determine the technical feasibility and investment pathways of a 100% renewable energy portfolio standard. The Los Angeles 100% Renewable Energy Study (LA100) is a first-of-its-kind objective, rigorous, and science-based power systems analysis to determine what investments could be made to achieve these goals. The LA100 final report is presented as a collection of 12 chapters and an executive summary, each of which is available as an individual download. This chapter explores how electricity is consumed by customers now, how that might change through 2045, and potential opportunities to better align electricity demand and supply.

100% Renewable↗

Methods for Representing Flexible, Energy-Constrained Technologies in Utility Planning Tools

Capacity expansion models are widely used by power system researchers, planners, and policy analysts to evaluate alternative power system investment scenarios. With the increasing deployment of wind and solar in the US, there has been much focus on improving the representations of variable generation (VG) technologies within capacity expansion models. Models that capture the variable net-load profiles and larger reserve requirements associated with high penetration VG systems represent an improvement to classic capacity expansion models, but fall short of capturing the complexities associated with storage technologies, such as battery energy storage (BES) and concentrating solar power with thermal energy storage (CSP with TES). While difficult to model in a capacity expansion setting, these technologies are potentially competitive sources of flexibility with the intriguing characteristics of being able to absorb VG that would otherwise be curtailed and directly contribute to renewable energy goals, respectively. In this paper we present methods for accurately representing these technologies in a large-scale capacity expansion model with high electrical and geospatial resolution. VG modeling techniques, including novel methods for capturing curtailment due to unit commitment and other hourly dispatch phenomena, are also reviewed. Modeling for a region in the southwestern United States demonstrates the economic relevance of being able to explicitly trade off the costs and capabilities of energy-constrained technologies, especially BES, against other resources in the near-term, in time to make plans for the coming decade

24 POWER TRANSMISSION AND DISTRIBUTION↗

Advanced Computing Annual Report 2024

In fiscal year (FY) 2024, the National Renewable Energy Laboratory (NREL) took a major leap forward with the completed full buildout of Kestrel, the Office of Energy Efficiency and Renewable Energy's newest high-performance computing (HPC) system. Kestrel is already supporting science across the portfolio, bringing roughly 44 petaflops of computing power, which is more than five times the capacity of our previous supercomputer, Eagle. By delivering greater GPU capacity, Kestrel enables faster progress in artificial intelligence (AI) and opens new avenues in energy research - from defining long-term planning scenarios to accommodate a growing power system to material discovery to improving energy efficiency in photovoltaics (PV). Across the portfolio, research is being accelerated by Kestrel's impressive power. During FY24, 427 projects and more than 700 researchers used NREL's HPC, supporting the U.S. Department of Energy's Office of Energy Efficiency and Renewable Energy across 13 funding areas. Through these collaborations, researchers produced more than 450 technical outputs, including 195 articles in peer-reviewed publications, pushing the boundaries of science and engineering. This year's report features new sections spotlighting the expanding roles of Artificial Intelligence and Accelerated Computing. We also introduce an early career section to celebrate the accomplishments of our up-and-coming researchers, whose pioneering work is shaping the future of energy. We hope you enjoy the new insights and discoveries highlighted in these pages.

97 MATHEMATICS AND COMPUTING↗

13kW Advanced Electric Propulsion Flight System Development and Qualification

The next phase of robotic and human deep space exploration missions requires high performance, high power solar electric propulsion systems for large-scale science missions and cargo transportation. Aerojet Rocketdyne's Advanced Electric Propulsion System (AEPS) program is completing development and qualification of a 13kW flight EP system to support NASA exploration. The first use of the AEPS is planned for the NASA Power & Propulsion Element, which is the first element of NASA's cis-lunar Gateway. The flight AEPS system includes a magnetically shielded long-life Hall thruster, power processing unit (PPU), and xenon flow controller (XFC). The Hall thruster, originally developed and demonstrated by NASA's Glenn Research Center and the Jet Propulsion Laboratory, operates at input powers up to 13.3kW while providing a specific impulse over 2600s at an input voltage of 600V. The power processor is designed to accommodate an input voltage range of 95 to 140V, consistent with operation beyond the orbit of Mars. The integrated system is continuously throttleable between 3 and 13.3kW. The program has completed testing of the Technology Development Units and is progressing into the Engineering Development Unit test phase and the final design phase to Critical Design Review (CDR). This paper will present the high power AEPS system capabilities, overall program and design status and the latest test results for the 13kW flight system development as well as the plans for the development and qualification effort of the EP string.

in-space propulsion↗

13kW Advanced Electric Propulsion Flight System Development and Qualification

The next phase of robotic and human deep space exploration missions requires high performance, high power solar electric propulsion systems for large-scale science missions and cargo transportation. Aerojet Rocketdyne's Advanced Electric Propulsion System (AEPS) program is completing development and qualification of a 13kW flight EP system to support NASA exploration. The first use of the AEPS is planned for the NASA Power & Propulsion Element, which is the first element of NASA's cis-lunar Gateway. The flight AEPS system includes a magnetically shielded long-life Hall thruster, power processing unit (PPU), and xenon flow controller (XFC). The Hall thruster, originally developed and demonstrated by NASA's Glenn Research Center and the Jet Propulsion Laboratory, operates at input powers up to 13.3kW while providing a specific impulse over 2600s at an input voltage of 600V. The power processor is designed to accommodate an input voltage range of 95 to 140V, consistent with operation beyond the orbit of Mars. The integrated system is continuously throttleable between 3 and 13.3kW. The program has completed testing of the Technology Development Units and is progressing into the Engineering Development Unit test phase and the final design phase to Critical Design Review (CDR). This paper will present the high power AEPS system capabilities, overall program and design status and the latest test results for the 13kW flight system development as well as the plans for the development and qualification effort of the EP string.

in-space propulsion↗

Mission management, planning, and cost: PULSE Attitude And Control Systems (AACS)

The Pluto unmanned long-range scientific explorer (PULSE) is a probe that will do a flyby of Pluto. It is a low weight, relatively low costing vehicle which utilizes mostly off-the-shelf hardware, but not materials or techniques that will be available after 1999. A design, fabrication, and cost analysis is presented. PULSE will be launched within the first decade of the twenty-first century. The topics include: (1) scientific instrumentation; (2) mission management, planning, and costing; (3) power and propulsion systems; (4) structural subsystem; (5) command, control, and communication; and (6) attitude and articulation control.

Source record↗

VIPER: Virtual Intelligent Planetary Exploration Rover

Simulation and visualization of rover behavior are critical capabilities for scientists and rover operators to construct, test, and validate plans for commanding a remote rover. The VIPER system links these capabilities. using a high-fidelity virtual-reality (VR) environment. a kinematically accurate simulator, and a flexible plan executive to allow users to simulate and visualize possible execution outcomes of a plan under development. This work is part of a larger vision of a science-centered rover control environment, where a scientist may inspect and explore the environment via VR tools, specify science goals, and visualize the expected and actual behavior of the remote rover. The VIPER system is constructed from three generic systems, linked together via a minimal amount of customization into the integrated system. The complete system points out the power of combining plan execution, simulation, and visualization for envisioning rover behavior; it also demonstrates the utility of developing generic technologies. which can be combined in novel and useful ways.

Edwards, Laurence↗

European Union's Action Plan for Power Sector Decarbonisation

A collaborative report from the Clean Energy Ministerial (CEM) on Lessons Learned for Rapid Decarbonization of Power Sectors was delivered to energy ministers and presented at CEM13 in the United States in September 2022. In light of these lessons learned and discussed at CEM13, several countries signaled intent to develop Action Plans for power sector decarbonization that will be presented at CEM14 in India. These action plans complement - but are differentiated from - other international power sector initiatives such as the Breakthrough Agenda - whose broad purpose is to raise collective ambition - and the Global Power System Transformation (G-PST) Consortium - whose goals are to convene power system operators to accelerate research innovations and foster peer learning. These action plans, supported by the 21st Century Power Partnership (21CPP) and other CEM workstreams via direct technical assistance and capacity building, are instead intended to focus on implementation actions given each country's existing power sector goals and activities and are an opportunity for countries to display leadership in power sector decarbonization. These action plans are voluntary, developed by each country individually, and can be viewed as a living document that is subject to change.

decarbonization↗

Chile's Action Plan for Power Sector Decarbonization

A collaborative report from the Clean Energy Ministerial (CEM) on Lessons Learned for Rapid Decarbonization of Power Sectors was delivered to energy ministers and presented at CEM13 in the United States in September 2022. In light of these lessons learned and discussed at CEM13, several countries signaled intent to develop Action Plans for power sector decarbonization that will be presented at CEM14 in India. These action plans complement but are differentiated from - other international power sector initiatives such as the Breakthrough Agenda whose broad purpose is to raise collective ambition and the Global Power System Transformation (G-PST) Consortium whose goals are to convene power system operators to accelerate research innovations and foster peer learning. These action plans, supported by the 21st Century Power Partnership (21CPP) and other CEM workstreams via direct technical assistance and capacity building, are instead intended to focus on implementation actions given each country's existing power sector goals and activities and are an opportunity for countries to display leadership in power sector decarbonization. These action plans are voluntary, developed by each country individually, and can be viewed as a living document that is subject to change.

Chile↗