Investigating Benefits and Challenges of Converting Retiring Coal Plants into Nuclear Plants

A coal-to-nuclear (C2N) transition means siting a nuclear reactor at the site of a recently retired coal power plant. Three overarching questions from the C2N transition guide this research: where in the United States are retired coal facilities located and what factors make a site feasible for transition; what factors of technology, cost, and project timeline drive investor economics over such a decision; and how will C2N impact local communities? The study team evaluated the siting characteristics of recently retired plants and those operating coal-fired power plant sites run by a utility or an independent power producer utilizing publicly available data to screen U.S. coal power plant sites to nuclear-feasible locations. After screening all retired coal sites to a set of 157 potential candidates and screening operating sites to a set of 237 candidates, the study team estimates that 80% of retired and operating coal power plant sites that were evaluated have the basic characteristics needed to be considered amenable to host an advanced nuclear reactor. For the recently retired plant sites evaluated, this represents a capacity potential of 64.8 GWe to be backfit at 125 sites. For the operating plant sites evaluated, this represents a capacity potential of 198.5 GWe to be backfit at 190 sites. This report evaluates a case study for the detailed impacts and potential outcomes from a C2N transition. Based on the nuclear technology choices and sizes evaluated to replace a large coal plant of 1,200 MWe generation capacity at the case study site, nuclear overnight costs of capital could decrease by 15% to 35% when compared to a greenfield construction project, through the reuse of infrastructure from the coal facility. Nuclear replacement designs can have a lower capacity size because nuclear power plants run at higher capacity factors than coal power plants. In the case study replacing coal capacity with 924 GWe of nuclear capacity, the study team found regional economic activity could increase by as much as $\$275 million$ and add 650 new, permanent jobs to the region of analysis. The evaluated site choice in the report is hypothetical for analysis purposes only and based on available data and documented assumptions. Consequently, the findings only inform at a general level. A community, investor, or other interested stakeholder can use these results to set up a detailed, in-depth analysis for a specific application of interest, such as evaluating a C2N transition of a specific coal power plant and a specific nuclear technology design. The report was subjected to independent peer reviews by experts in systems engineering and regional economic modeling to evaluate analysis and assumptions.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Demonstration of the Plant Fuel Reload Process Optimization for an Operating PWR

The United States (U.S.) nuclear industry is facing a strong challenge to maintain regulatory-required levels of safety while ensuring economic competitiveness to stay in business. Safety remains a key parameter for all aspects related to the operation of light water reactor (LWR) nuclear power plants (NPPs) and can be achieved more economically by using a risk-informed ecosystem such as that being developed by the Risk-Informed Systems Analysis (RISA) Pathway under the U.S. Department of Energy (DOE) Light Water Reactor Sustainability (LWRS) Program. The LWRS Program is promoting a wide range of research and development (R&D) activities with the goal to maximize both the safety and economically efficient performance of NPPs through improved scientific understanding, especially given that many plants are considering second license renewal. The RISA Pathway has two main goals: (1) the deployment of methodologies and technologies that enable better representation of safety margins and the factors that contribute to cost and safety; and (2) the development of advanced applications that enable cost-effective plant operation. This report summarizes the research outcomes in FY-2021, which the project progressed from the planning and methodology development phase to the early demonstration phase. The highlights of these activities are: (1) the development of a multi-objective optimization process using Genetic Algorithms (GAs); (2) the development and test of an approach for optimization process acceleration using artificial intelligence (AI) that significantly reduces the computational burden; (3) the demonstration of the fuel reload optimization framework for a generic pressurized water reactor (PWR); and (4) the demonstration of limiting design basis accident (DBA) scenarios for evaluation of the transition from deterministic to risk-informed approach for fuel reload optimization.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Estimating value of information for heliostat washing operations at solar thermal plants

Concentrating solar power (CSP) plants depend on thousands of heliostats whose reflectance declines as dust accumulates. Operators routinely measure reflectance to estimate soiling and, in turn, inform cleaning schedules, but the value of collecting more frequent or more accurate data has not been formally quantified. This study introduces a Monte Carlo discrete event simulation framework that integrates stochastic models of soiling, weather, and measurement error with a dynamic cleaning dispatch policy to estimate annual energy production and operations costs. Applied to two representative central-receiver field configurations, the results show that both the frequency and accuracy of reflectance measurements can meaningfully impact plant performance. In both case studies, reducing measurement intervals yields significant returns, with the energy gains greatly exceeding the cost of more frequent data collection. The simulation framework serves as a decision-support tool for CSP operators, allowing them to input site-specific soiling conditions, measurement accuracy, and survey frequency to evaluate the tradeoffs between data collection cost and energy recovery, and to identify measurement strategies that maximize plant profit.

14 SOLAR ENERGY↗

Uncertainty-Aware and Explainable Human Error Detection in the Operation of Nuclear Power Plants

The timely and accurate identification of incidents, such as human factor error, is important to restore nuclear power plants (NPPs) to a stable state. However, the identification of abnormal operating conditions is difficult because of the existence of multiple scenarios. In addition, to implement mitigation actions rapidly after an incident occurs, operators must accurately identify an incident by monitoring the trends of many variables. The mental burden posed by this can increase human error and cause failure in identifying incidents. Failure to identify incidents directly results in erroneous mitigation measures, which are detrimental to NPPs. In this study, we leverage uncertainty-aware models to identify such errors and thereby increase the chances of mitigating them. We use the data collected from a physical test bed. The goal is to identify both certain and accurate models. For this, the two main aspects of focus in this study are explainable artificial intelligence (XAI) and uncertainty quantification (UQ). While XAI elucidates the decision pathway, UQ evaluates decision reliability. Their integration paints a comprehensive picture, signifying that understanding decisions and their confidence should be interlinked. Thus, in this study we leverage UQ measures (e.g. entropy and mutual information) along with Shapley additive explanations to gain insights into the features contributing to both accuracy and uncertainty in error identification. Furthermore, our results show that uncertainty-aware models combined with XAI tools can explain the artificial intelligence–prescribed decisions, with the potential of better explaining errors for the operators.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

CERF: IM3 Projected Western US Power Plant Locations

Overview The Capacity Expansion Regional Feasibility (CERF) model is an open-source geospatial python package that provides new power plant locations at a 1km resolution. The model ingests U.S. state or regional-scale electricity system capacity expansion plans, such as those produced by the Global Change Analysis Model (GCAM-USA), and identifies feasible, site-specific locations for individual new power plants (renewable and non-renewable). CERF combines high-resolution geospatial suitability analyses with an economic algorithm that selects individual plant siting locations based on grid interconnection costs and the locational marginal value of new generation. The model incorporates a wide range of dynamic constraints and opportunities, such as protected lands, population density, existing infrastructure, and water availability. This dataset provides CERF power plant siting results for IM3 Phase 2 simulations across eight different scenarios for the Western US through 2055. The scenarios include combinations of two Shared Socioeconomic Pathways (SSP3 and SSP5) with four high-resolution climate projections specific to the United States (see, https://tgw-data.msdlive.org/). These climate projections include "hotter" and "cooler" variants for two Representative Concentration Pathways (RCP4.5 and RCP8.5). The resulting eight simulations are: rcp45cooler_ssp3 rcp45cooler_ssp5 rcp45hotter_ssp3 rcp45hotter_ssp5 rcp85cooler_ssp3 rcp85cooler_ssp5 rcp85hotter_ssp3 rcp85hotter_ssp5 CERF siting results in this dataset correspond to capacity expansion plans in the GCAM-USA IM3 Phase 2 simulation data and are available for each of the above scenarios. Data Details Temporal Range: 2015-2055 in 5-year timesteps. Note that 2015 is the experiment base year and 2020 and beyond represent model simulation years. Spatial Range: Plant locations are provided for the eleven states in the Western US including Arizona, California, Colorado, Idaho, Montana, New Mexico, Nevada, Oregon, Utah, Washington, and Wyoming. Spatial Resolution: 1 km-squared, provided in x and y coordinates Geospatial Projection: Albers Equal Area Conic (ESRI:102003) File Type: csv The dataset contains subdirectories for each of the eight scenarios described in the overview. Each scenario folder contains two subfolders with the following information: 1. Power Plant Data This directory contains a single .csv file of power plant locations for both pre-existing (non-CERF sited plants in operation in 2015) and new (CERF-sited) power plants across the temporal range along with additional CERF model output parameters for CERF-sited plants. Plant with a siting year earlier than 2020 correspond to facilities that are operational leading into the first timestep CERF simulation. For a more detailed description of CERF model output parameters, see the CERF model documentation. Note that the cerf_plant_id parameter is unique within each scenario file but not across scenario files. Parameter Descriptions scenario - Name of scenario cerf_plant_id - Unique siting identifier cerf_sited - If True, indicates that plant was sited by CERF model. If False, indicates pre-existing facility region_name - Name of region (state) tech_id - Technology ID tech_name - Full generation technology name inclusive of cooling type (if applicable) and additional characteristics tech_simple - Simplified generation technology type unit_size_mw - Power plant unit size (MW) xcoord - X coordinate in the default CRS (meters) ycoord - Y coordinate in the default CRS (meters) index - Index position in the flattend 2D array buffer_in_km - Exclusion buffer around site (km) sited_year - Year of siting retirement_year - Year of retirement lmp_zone - Locational marginal price (LMP) zone ID locational_marginal_price_usd_per_mwh - Locational marginal price ($/MWh) generation_mwh_per_year - Generation output (MWh/yr) operating_cost_usd_per_year - Cost of plant operations ($/yr) net_operational_value - Net operational value based on LMP and and operating costs ($/yr) interconnection_cost - Cost of interconnection for transmission & gas pipeline (if applicable) net_locational_cost -- Difference of interconnection cost and operating value ($/yr) capacity_factor_fraction - Capacity factor (fraction) carbon_capture_rate_fraction - Carbon capture rate (fraction) fuel_co2_content_tons_per_btu - Fuel CO2 content (tons/Btu) fuel_price_usd_per_mmbtu - Fuel price ($/MMBtu) fuel_price_esc_rate_fraction - Fuel price escalation rate (fraction) heat_rate_btu_per_kWh - Heat rate (Btu/kWh) lifetime_yrs - Technology lifetime for annuity (years) operational_life_yrs - Operational lifetime for retirement (years) variable_om_usd_per_mwh - Variable operation and maintenance costs of yearly capacity use ($/MWh) variable_om_esc_rate_fraction - Variable operation and maintenance costs escalation rate (fraction) carbon_tax_usd_per_ton - Carbon tax ($/ton) carbon_tax_esc_rate_fraction - Carbon tax escalation rate (fraction) 2. Storage Data This directory contains information on new and pre-existing energy storage facilities operational in each timestep along with various storage operational parameters. The 2015 timestep provides pre-existing energy storage data and corresponds with facilities that are operational leading into the first model simulation timestep. Note that coordinates in the storage files correspond to the interconnection point on the grid (substation location), not individual energy storage locations. Energy storage is added in a cumulative process at each given interconnection point. That is, each individual file provides the total operational storage capacity interconnected to the specified substation for the given timestep, inclusive of previously installed storage at that location and new storage installed in that timestep at that location. Parameters scenario - Name of scenario timestep - Simulation timestep name - Unique storage identifier s_typ - Type of energy storage technology (battery or pumped storage hydro) s_node - Node ID of interconnecting substation xcoord - X coordinate in the default CRS (meters) ycoord - Y coordinate in the default CRS (meters) charge_rate - Maximum charge rate (power capacity) of storage system (MW) discharge_rate - Maximum discharge rate (power capacity) of storage system (MW) duration - Duration of storage system (hours) max_SoC - Allowed maximum state of charge (energy capacity) of storage system (MWh) min_SoC -Allowed minimum state of charge (energy capacity) of storage system (MWh) charge_eff - Efficiency of charge (fraction between 0 and 1) discharge_eff - Efficiency of discharge (fraction between 0 and 1) Acknowledgment IM3 is a multi-institutional effort led by Pacific Northwest National Laboratory and supported by the U.S. Department of Energy's Office of Science as part of research in MultiSector Dynamics, Earth and Environmental Systems Modeling Program.

CERF↗

Mid Infra-Red Laser Sensor for Continuous Sulfur Trioxide Monitoring to Improve Coal-Fired Power Plant Performance during Flexible Operations

During the course of this project, we performed exhaustive research and development of SO3/H2SO4 sensing technology for coal-fired power plant applications (Figure 1). The development culminated in a successful field campaign of a prototype continuous real-time H2SO4 monitor at a coal-fired power plant (TRL 6) accomplishing the primary goal of the project. The developed sensors utilize tunable laser absorption spectroscopy (TLAS) operating in the mid-infrared (Mid-IR) wavelength region, which is the so-called “molecular fingerprint” region. Systems operating in the Mid-IR have orders of magnitude more sensitivity than systems operating at shorter wavelengths, such as near-infrared (NIR). However, NIR systems are more widespread due to more mature supporting technology (e.g., fiber optics, optical components, etc.). In this project, we not only produced a specific Mid-IR sensor, we also advanced Mid-IR sensor technology in general through the development and demonstration of such supporting technology. In this project, we also developed proprietary broad tuning lasers enabling the ability to effectively measure SO3, H2SO4, H2O, and SO2. Different molecular species have unique spectral signatures that can be probed with lasers operating at different wavelengths. Standard TLAS uses relatively narrow wavelength tuning distributed feedback (DFB) lasers, which can typically only target a single species with narrow features, and are not appropriate for species with broad features, such as SO3 or H2SO4. In contrast, by developing unique, broad-tuning laser technology, we were able to measure these species, as well as SO2 and H2O simultaneously. Furthermore, to enable real-time analysis at a power plant, we modified a commercially available heated gas cell to operate in the Mid-IR wavelength range and fiber coupled the lasers to enable remote delivery of the beams. To generate reference data (library spectra), our collaborators at the University of California Irvine (UCI) developed a catalytic SO3 generation facility. It is worth mentioning that representative H2SO4 and SO3 Mid-IR spectra are not a part of any publicly available database and the data generated under this project is a valuable resource in and of itself. In addition, based on the UCI study we determined that detection of SO3 is complicated by the very strong SO2 absorption. For that reason, we concentrated on H2SO4 detection. Since SO3 and H2SO4 exist in a flue gas in a state of equilibrium, which depends on temperature and humidity, by measuring water concentration and controlling the temperature of the gas cell, we developed an approach to determine SO3 concentration from the H2SO4 measurement. During the development phase of the project, we performed three testing campaigns at our collaborator’s FERCo flue gas facility with conditions representative of the coal-fired power plant (~ 40ppm SO3, 1700ppm to 2800 ppm SO2, 10% water) with the exception of particulate matter. After three test campaigns at FERCo we performed field testing at Harrison Power Station. The final system was mounted on a duct and measured H2SO4, SO2 and water. The tests were highly successful with a demonstrated real-time H2SO4 precision of 1 ppm with a 1 second update. Our collaborators at EPRI conducted an industry survey and determined that there is a very high interest for the SO3/H2SO4 monitoring in the power generation industry as well as in heavy industries in general. Furthermore, work performed by OptoKnowledge beyond the scope of this project under a synergistic DOE SBIR determined another approach to SO3 detection. We applied for Phase II on this SBIR for development a of versatile SO3/H2SO4 sensor but were not selected. We are currently looking for another opportunity to leverage all the technological advancements produced by this project including but not limited to the flue gas facility at UCI, the hardware and software developed, and relationships with FERCo, EPRI CEMTEK, and Harrison Station.

01 COAL, LIGNITE, AND PEAT↗

Digitalization Guiding Principles and Method for Nuclear Industry Work Processes

The commercial U.S. light-water reactor fleet has been operating at historical efficiency, reliability, and safety over the last decade. Nuclear power has the highest capacity factor of any other power generation technology while also serving as the largest baseload source for carbon-free energy. Despite this remarkable achievement, continued operations for many plants are threatened due to fierce electricity market competition and rising operations and maintenance costs of which continued maintenance of obsolete analog equipment is a contributor. The digital age and associated technologies are where the future lies in process control, and nuclear has yet to take full advantage of the capabilities offered therein. The Light Water Reactor Sustainability Program (LWRS) at Idaho National Laboratory (INL), sponsored by the Department of Energy, has a mission to help the light-water reactor fleet manage its foundational capabilities to continue providing safe and reliable carbon-free power. LWRS helps support that mission by providing scientific, technology-based solutions for advanced concepts of operations with a more viable business model that will allow the fleet to continue to operate at peak levels through extended plant operation. The LWRS Digitalization Project at INL seeks to leverage digital technologies to synthesize and transform work processes. We provide a state-of-the-art analysis of digitalized work processes in nuclear power and investigate ways in which researchers at INL and the nuclear industry can work together to identify what data to access, how to access it, what to do with the data, and most importantly, how to use the insights for decision-making across all levels within the business. Borne from these considerations, we present four guiding principles for digitalization: develop a coherent digitalization plan, apply human factors engineering, establish data governance, and anticipate unintended consequences. Together, these principles form a method that plants can use to effectively to digitalize nuclear industry work processes. Our guiding principles are informed by multiple knowledge sources. First, we document activities from the Work Digitalization Initiative, which was conceived as a means for nuclear organizations to help define and standardize the industry’s approach to digitalizing work. Second, we detail primary research conducted with industry professionals regarding drivers and barriers to digitalization adoption. We present survey results that demonstrate what the industry hopes to get out of digitalization and the ways that INL can continue to support the industry’s digital transformation. Third, we present a digitalization use case with industry partners NextAxiom Technology and Xcel Energy. The project objective was to transform the current condition report work process from paper to digital, incorporating digitalized principles. We report the development of the application and lessons learned. The accomplishments achieved by this research and development serve to identify critical needs for plant guidance in support of digitalization implementation and contribute to the knowledge and strategies available for utilities considering or undertaking digitalization.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Verification and validation of developed short-term forecasting models

Recent advancements in machine learning (ML) and artificial intelligence (AI) technologies provide an opportunity for leveraging data-driven algorithms to predict future nuclear power plant (NPP) operating conditions by using recorded plant process data. Successfully implementing these models can lead to cost-reducing, conditioned-based predictive maintenance through optimized maintenance schedules and a reduction of unnecessary maintenance activities. This report discusses the verification and validation of short-term forecasting processes (i.e., data cleaning, feature selection, model optimization, and forecasting) developed in previous reports. The verification and validation (V&V) process demonstrates the expected precision and accuracy when the ML model encounters new datasets from different systems. Shapley additive explanations were used as the primary means of feature selection across these different data set. Individual models were trained for each data set, then validated through a cross-validation procedure. In this report, two different ML models were tasked to predict variables from three different plant process data sets with varying prediction horizons. The results indicate that support vector regression (SVR) outperformed long short-term memory (LSTM) neural networks in regard to each data set and each prediction horizon in this study, but further tuning and optimization could improve long short-term memory results. However, each forecasting model showed reduced performance as the prediction horizon was extended from 1 hour to 1 day ahead. Research is ongoing to evaluate the optimal input variable space, which is based on a given set of process parameters, to further improve forecasting accuracy.

46 INSTRUMENTATION RELATED TO NUCLEAR SCIENCE AND ↗

CSP Plant Construction, Start-Up, and O&M Best Practices Study

There are currently 90 operational CSP plants of 10 MW or larger located throughout the world, primarily in Spain, U.S., MENA region, South Africa, and China. In 2018, the U.S. Department of Energy (DOE) funded Solar Dynamics, under subcontract to NREL, to investigate and document lessons learned and best practices associated with the construction, start-up, and operations phases of a majority of these plants. DOE funding for the effort was leveraged by additional funds provided through SolarPACES and the World Bank. This information was obtained by interviewing key stakeholders representing CSP plant owners, operators, construction companies, vendors, technical advisors and financers of these systems, and will be published as an NREL Technical Report at the completion of the project. This paper provides an overview of key challenges facing today's CSP parabolic trough and power tower technologies during all the phases mentioned above.

41 EE - Solar Energy Technologies Office (EE-4S)↗

Technical Language Processing of Nuclear Power Plants Equipment Reliability Data

Operating nuclear power plants (NPPs) generate and collect large amounts of equipment reliability (ER) element data that contain information about the status of components, assets, and systems. Some of this information is in textual form where the occurrence of abnormal events or maintenance activities are described. Analyses of NPP textual data via natural language processing (NLP) methods have expanded in the last decade, and only recently the true potential of such analyses has emerged. So far, applications of NLP methods have been mostly limited to classification and prediction in order to identify the nature of the given textual element (e.g., safety or non-safety relevant). In this paper, we target a more complex problem: the automatic generation of knowledge based on a textual element in order to assist system engineers in assessing an asset’s historical health performance. The goal is to assist system engineers in the identification of anomalous behaviors, cause–effect relations between events, and their potential consequences, and to support decision-making such as the planning and scheduling of maintenance activities. “Knowledge extraction” is a very broad concept whose definition may vary depending on the application context. In our particular context, it refers to the process of examining an ER textual element to identify the systems or assets it mentions and the type of event it describes (e.g., component failure or maintenance activity). In addition, we wish to identify details such as measured quantities and temporal or cause–effect relations between events. This paper describes how ER textual data elements are first preprocessed to handle typos, acronyms, and abbreviations, then machine learning (ML) and rule-based algorithms are employed to identify physical entities (e.g., systems, assets, and components) and specific phenomena (e.g., failure or degradation). A few applications relevant from an NPP ER point of view are presented as well.

97 MATHEMATICS AND COMPUTING↗

Using National-Scale Data to Inform Coal Power Plant Redevelopment and Coal Community Revitalization Planning

In the United States, individual coal plants have high variation in their construction and operation. Coal plants commonly have multiple units, with different commissioning ages, operational position, and maintenance conditions – even multiple fuels. These units may be in changing states of utilization, with variation in productivity depending on economic contexts. Coal plants themselves may be temporarily offline, mothballed, retired, or decommissioned due to owner/operator portfolios or market conditions, and the current posture of the plant may be difficult to ascertain without local news sources (Tarekegne et al. 2021). Anticipated dates of plant closures are prospectively represented to regulators and to the Energy Information Administration (EIA), but may also experience uncertainty due to the engineering, environmental, economic and social complexity of closing a very large power plant. As noted in this report, closure of the first unit to the last within a single plant may span more than 20 years. Yet tracking and predicting the position of our nation’s coal fleets on a national scale is deeply important. In developing a case for federal datasets and an approach to building and curating these data, this report identified that data must have high fidelity at the plant-level to be meaningful in aggregate. Plant-scale detail is also a match for its application: national priorities in federal investment range from economic revitalization for coal plant communities to maintaining reliable electric grid operations. This document is organized into a statistical review of coal plant retirements, past and prospective, in the United States; trends in the relationship between closures and existing federal investment programs for community revitalization; and potential methods for accelerating site redevelopment through advanced geospatial analysis based on federal data.

01 COAL, LIGNITE, AND PEAT↗

Yield stress and flow behavior of enzyme liquefied slurries from corn cobs and corn stover pellets

With the increase in population, the world will depend on renewable sources to meet the increasing energy needs. The use of lignocellulosic biomass as a renewable source has been proven efficient for conversion to cellulosic ethanol and capable of contributing to thresholds for energy demand while reducing greenhouse gases by 90% when compared with fossil fuels. However, limitations in feeding and flow within biorefineries is encountered when system plugging occurs due to biomass compaction and a high yield stress for slurries formed during its processing, thereby preventing transport of biomass materials between plant unit operations. In some cases, this leads to unexpected plant shutdowns increasing industrial operational costs. As an alternative, enzyme-assisted liquefaction for slurry creation from corn stover at solids loadings up to 30% is reported in this work. Two different kinds of biomass (pelleted corn stover and cobs) were liquefied in a fed-batch process using commercial enzymes Celluclast 1.5L or Ctec-2 at 1FPU or 3 FPU per gram of dry solids in 10 mM sodium citrate buffer solution (pH 4.8). Pellets were fed into a 1 L stirred bioreactor according to a pre-defined fed-batch protocol over the first 5 hours until reaching 30% of solids loading. After 6, 24 and 96 hours, samples were taken and characterized with respect to their sugar composition, rheology and water absorption. Successful slurry creation with dramatically reduced yield stress was achieved for corn stover for both assessed enzymes. Yield stresses of 178±7 Pa (3 FPU, Celluclast 1.5L) and 79±6 Pa (3 FPU, Ctec-2) were measured for corn stover at 24 hours, compared to 6,000 Pa for samples without enzyme. Yield stress was 155± 29 Pa (3FPU, Ctec-2) and 257 ± 72 Pa (1 FPU,Celluclast 1.5L) for corn cobs at 24 hours. Yield stress decreased when residence time increased with an enhanced fluidity noted for higher enzyme concentrations. A profile for 6, 24 and 96h of yield stress measurements is presented.

Guitierrez, Diana↗

Extended Low Load Boiler Operation to Improve Performance and Economics of an Existing Coal Fired Power Plant (Final Report)

The overall goal is to improve the performance and economics of existing coal fired power plants by extending low load boiler operation to lower loads than is currently achievable. The objective of this program is to develop and validate sensor hardware and analytical algorithms to lower plant operating expenses (OPEX) for the currently operating pulverized coal utility boiler fleet. Coal fired utility boilers are increasingly under grid dispatch pressure. In some cases, the coal fired cost of generation is noncompetitive with respect to natural gas generation and subsidized renewable sources. To remain profitable and remain fully compliant with existing environmental regulations, the installed coal fired fleet must find technologies which allow it to move into a more flexible cyclic load dispatch model. Today the installed coal fired utility fleet must be cost of generation competitive, fully emissions compliant, and responsive to the variability inherent in renewable energy generation sources. In the Phase I of the project, GE Steam Power, Inc. (GE) performed modeling of different operating scenarios for low load operation using an existing full plant dynamic model developed for a 660MW steam power plant. Sensors and analytic algorithms to enable a stable and steady coal supply for low load pulverizer operation were identified and tested at the Pulverizer Development Facility (PDF) at GE’s Clean Energy Center in Bloomfield, Connecticut. Sensors and analytic algorithms to enable stable combustion for low load operation were identified and tested at the 15 MWth Industrial Scale Burner facility (ISBF) at GE’s Clean Energy Center. A concept was developed to test the sensors and control algorithms, down selected after testing, at a full-scale coal fired power plant. A budget estimate was then developed, and the concept was implemented at an existing utility power plant. The specific objectives of the experimental work were to: • Identify and select sensors and analytic algorithms for monitoring coal pulverizer operation at lower loads to provide stable operation and appropriate coal fineness at lower coal throughput; Identify and select sensors and analytic algorithms for a Boiler Flame Stability Monitor to better balance air and fuel at each burner. This enables a reduction in a coal boiler’s safe low load power level while maintaining stable flame characteristics; Develop a concept in Phase I for low load operation of a full-scale power plant and develop a budget estimate for testing and execute the test plan at an existing plant in Phase II; Validate the capability of the extended low load boiler system to extend the minimum load operating point in a safe and reliable manner on an existing full-scale utility boiler. At the completion of this experimental study, GE has developed a set of sensors and analytic algorithms, down selected after testing, that have the potential to enable safe low load operation of a utility boiler. GE has also identified a host site for testing these identified sensors and analytic algorithms. GE has generated a full set of deliverables that provide sufficient information to proceed with the next step of testing at a host site. This includes a potential host site and budget estimate for concept testing at host site. In the Phase II of the project, a series of field tests were completed to validate the extended low load boiler operation, which consisted of detailed engineering, installation, commissioning, and testing the additional sensors and analytics for the coal-fired combustion system on an existing full-scale utility boiler. The optimization work has been supported by the host plant and endorsed by their engineering and operation staff.

01 COAL, LIGNITE, AND PEAT↗

Report on Retrieval of the Reactor Pressure Vessel A-60 Surveillance Capsule from Palisades Nuclear Generating Station

Located on the shores of Lake Michigan, the Palisades Nuclear Generating Station (PNGS) was a nuclear power plant that operated in Covert Township, Michigan. The plant had a single pressurized water reactor that produced electricity for the region. The PNGS was shut down in 2022 after more than four decades of service. The PNGS included in its surveillance program a surveillance capsule, designated A-60, containing specimens of a weld metal with nickel content of about 1.36 wt% and copper content of about 0.20 wt%. The capsule was removed from its surveillance position in the early 1995 and has been resident in the spent fuel pool since that time. This capsule was irradiated to a fluence of 1.87×10 20 n/cm 2 (E> 1MeV) that is equivalent for more than 120 effective full power year (EFPY) for the US reactor pressure vessel (RPV) fleet. The material is also of special interest because of its very high nickel content and potential for development of NiMnSi (nickel-manganese-silicon) precipitates. Combination of very high fluence and very high Ni and Cu content makes the material in this capsule of the great interest as benchmark for currently developing embrittlement trend curves (ETC) aiming to predict embrittlement at high fluences. Thus, several years ago the Light Water Reactor Sustainability Program (LWRSP) initiated negotiations with Entergy to harvest this high fluence capsule since it did not present any regulatory interest for PNGS but could play a very important role for LWRSP efforts for developing ETC for very long-term operation. The negotiations resumed once PNGS ownership moved to the Holtec International in June 2022 which was very supportive to the LWRSP efforts to harvest the A-60 capsule from the spent fuel pool. As a result, the contract was placed with the Westinghouse Electric Company (WEC) to come to PNGS site, retrieve the A-60 capsule, bring it to WEC Churchill hot cell facility, open the capsule and send all surveillance specimens in the capsule to ORNL for future characterization. These specimens from the PNGS A-60 capsule have arrived to ORNL in July 2023 and this report summarizes activities to retrieve and deliver specimens to ORNL site for future evaluation.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Charpy Impact Characterization of Surveillance Specimens Harvested from Palisades High Fluence A-60 Capsule

Located on the shores of Lake Michigan, the Palisades Nuclear Generating Station (PNGS) was a nuclear power plant that operated in Covert Township, Michigan. The plant had a single pressurized water reactor that produced electricity for the region. The PNGS was shut down in 2022 after more than four decades of service. The PNGS included in its surveillance program a surveillance capsule, designated A-60, containing specimens of a weld metal with nickel content of about 1.36 wt% and copper content of about 0.25 wt%. The capsule was removed from its surveillance position in early 1995 and has been resident in the spent fuel pool since that time. This capsule was irradiated to a fluence of 1.96×10 20 n/cm 2 (E>1MeV) that is equivalent for more than 150 effective full power years (EFPYs) for the US reactor pressure vessel (RPV) fleet. The material is also of special interest because of its very high nickel content and potential for development of NiMnSi (nickel-manganese-silicon) precipitates. Combination of very high fluence and very high Ni and Cu content makes the material in this capsule of great interest as benchmark for currently developing embrittlement trend curves (ETC) aiming to predict embrittlement at high fluences. Multi-year efforts by the Light Water Reactor Sustainability (LWRS) Program personnel from the Materials Research Pathway (MRP) to harvest this capsule finally succeeded in 2023. As a result, the Westinghouse Electric Company (WEC) through contract with Oak Ridge National Laboratory (ORNL) came to PNGS site, retrieved the A-60 capsule, brought it to WEC Churchill hot cell facility, opened the capsule and sent all surveillance specimens in the capsule to ORNL for future characterization by July 2023. Total of 9 tensile and 48 Charpy specimens were inventoried in the ORNL hot cells. Testing plan has been developed based on available specimens. It includes hardness, tensile, Charpy impact, Mini-CT fracture toughness testing, in-situ thermal annealing, and microstructural characterization, including Atom Probe Tomography (APT). Charpy impact testing has been completed and results are presented in this report. Moreover, negotiations with Pressurized Water Reactors Owners Group (PWROG) and Westinghouse resulted in Westinghouse donating to ORNL a piece of archive weld and base metal such that unirradiated characterization of these materials can be performed as part of this project. Comparison of measured hardening and embrittlement has been performed and data are compared to available large database.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

A Dividend in Food Safety

When NASA faced the problem of how and what to feed an astronaut in a sealed capsule under weightless conditions while planning for manned space mission, they enlisted the aid of The Pillsbury Company. There were two principal concerns: barring crumbs of food that might contaminate the spacecraft's atmosphere or float their way into sensitive instruments; and assuring absolute freedom from potentially catastrophic disease-producing bacteria and toxins. Pillsbury quickly solved the first concern, but the other part of the problem was not as easy. They found that with using standard methods, there was no way to be assured there would not be any bacteria. It was concluded that the only way to succeed was to establish control over the entire process, the raw materials, the processing environment and the people involved. Pillsbury developed the Hazard Analysis and Critical Control Point (HACCP) concept. The HACCP is designed to prevent food safety problems rather than to catch them after they have occurred. Three other government agencies are taking preliminary steps toward extending HACCP to meat/poultry and seafood inspection operations. Today, Pillsbury plants are still operating under HACCP.