Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “planning scheduling optimization”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 379 records · Page 21

Towards a Decision Support System for Space Flight Operations

The Mission Operations Directorate (MOD) at the Johnson Space Center (JSC) has put in place a Model Based Systems Engineering (MBSE) technological framework for the development and execution of the Flight Production Process (FPP). This framework has provided much added value and return on investment to date. This paper describes a vision for a model based Decision Support System (DSS) for the development and execution of the FPP and its design and development process. The envisioned system extends the existing MBSE methodology and technological framework which is currently in use. The MBSE technological framework currently in place enables the systematic collection and integration of data required for building an FPP model for a diverse set of missions. This framework includes the technology, people and processes required for rapid development of architectural artifacts. It is used to build a feasible FPP model for the first flight of spacecraft and for recurrent flights throughout the life of the program. This model greatly enhances our ability to effectively engage with a new customer. It provides a preliminary work breakdown structure, data flow information and a master schedule based on its existing knowledge base. These artifacts are then refined and iterated upon with the customer for the development of a robust end-to-end, high-level integrated master schedule and its associated dependencies. The vision is to enhance this framework to enable its application for uncertainty management, decision support and optimization of the design and execution of the FPP by the program. Furthermore, this enhanced framework will enable the agile response and redesign of the FPP based on observed system behavior. The discrepancy of the anticipated system behavior and the observed behavior may be due to the processing of tasks internally, or due to external factors such as changes in program requirements or conditions associated with other organizations that are outside of MOD. The paper provides a roadmap for the three increments of this vision. These increments include (1) hardware and software system components and interfaces with the NASA ground system, (2) uncertainty management and (3) re-planning and automated execution. Each of these increments provide value independently; but some may also enable building of a subsequent increment.

Meshkat, Leila↗

Implication of production tax credit on economic dispatch for electricity merchants with storage and wind farms

The production tax credit (PTC) promotes wind energy development, reduces power generation costs, and can affect merchants’ joint economic dispatch, particularly for electricity merchants with both energy storage and wind farms. Two common PTC policies are studied – in the first policy, a wind farm receives PTC by selling wind generation to the market and its storage can be used to store energy from the wind generation and energy purchased from the grid but the energy released from the storage cannot receive PTC; in the second policy, the energy released from the storage can also qualify for PTC but purchasing energy from the grid is not allowed. We then employ dynamic programming to study merchants' optimal decision-making while considering PTC and the physical characteristics of storage systems. We analytically show that the state of charge (SOC) range can be segmented into different regions by SOC reference points under two PTC policies. The merchant's optimal action can be conveniently and uniquely determined based on the region within which the current SOC falls. Moreover, this study illustrates that PTC could substantially alter the optimal scheduling policy structures by affecting reference points and their relationships. The results showed that the frequencies for charging and discharging storage decisions decreased with an increase in PTC subsidy. Last, we confirm that, although the first policy allows merchants to buy electricity from the market, the second policy can bring more profits when the PTC is large at the current PTC rates. Furthermore, the findings can provide multistage decision-making guidance to electricity merchants in the wholesale power market.

17 WIND ENERGY↗

SBIR Phase II Final Report - A Robust Wireless Communication System for Harsh Environments Including Nuclear Facilities

This is the Final Report for the DOE Phase II SBIR project “A Robust Wireless Communication System for Harsh Environments Including Nuclear Facilities.” The topics covered herein include technical progress made, progress against the planned milestones and deliverables, project outcomes, and a discussion on future expectations of deployment and impacts of the results of this work. In brief, all planned work for the project was successfully completed, on or ahead of schedule and on budget. The major accomplishment was the successful development of new sensor/communications systems with wideband (WB)/ultra-wideband (UWB) communications based on the software-defined-radio (SDR) technology to improve sensing and control in nuclear power plants and then a broad range of similar sensing applications. The impacts of these disciplines/focuses of this SBIR include: A new multi-frequency SDR-based architecture with WB/UWB communications integrated with sensors was developed, utilizing 310 MHz, 450 MHz, 915 MHz, and 5 GHz frequencies; Secure communications using Advanced Encryption Standard (AES) algorithm; Sensing possibilities not effectively addressed by previous technologies was addressed; and, The newly developed wireless sensor communications system can adapt its communications parameters to its operational environment for optimal performance. The performance of this system has been evaluated by systematic laboratory and field testing. The field testing was conducted at Massachusetts Institute of Technology (MIT)’s Nuclear Test Reactor, and the McClellan Nuclear center at the University of California Davis (UC Davis), as well as at Oak Ridge National Laboratory (ORNL). The success in this project resulted in DSI being awarded “The DOE’s 2018 SBIR/STTR Small Business of the Year”. This technology has attracted interest from The Rolls Royce company with ongoing discussions under NDA for potential strategic partnership between DSI and Rolls Royce in providing wireless sensor communications in nuclear facilities. Furthermore, the success of this project has attracted significant interest from the United Nations International Atomic Agency (IAEA) in Vienna, Austria, as well as other DOE and DOD offices. Currently, per request from IAEA, DOE’s office of International Safeguards has funded DSI to develop a WB/UWB wireless communication system for real-time transmission of images from IAEA’s safeguards cameras in various nuclear facilities. DSI also has received a Phase II and Phase II.5 SBIR awards from ARMY and NAVY for wireless communications capability for various DOD aircraft.

46 INSTRUMENTATION RELATED TO NUCLEAR SCIENCE AND ↗

Hybrid Solar System (Final Scientific/Technical Report)

GTI Energy (GTI) teamed with the University of California at Merced (UCM) to scaleup the hybrid solar system (HSS) technology for demonstrating its performance at the US Gypsum (USG) plant in Plaster City, California. The technology integrates two-stage concentrating solar collector with matching particle thermal transport and storage (TSS) system to deliver cost-effective, and on-demand distributed high temperature industrial process heat up to 600°C with solar thermal, in this case to a gypsum kettle, to reduce its fuel use and carbon footprint. Current solar technologies, which reach these temperatures, are not distributable (towers) or cost-effective (dish). The research team developed a conceptual system design for host site retrofit, including preliminary heat balance, process flow diagram, particle to process heat exchanger and equipment placements at the site. Subsequently, parallel efforts were carried out at UCM to design, build and test a 12 m long commercial scale prototype concentrating thermal-only collector system and at GTI to design, build and test a matching 650°C capable particle TTS system. The nominal 50 kWth collector consists of a parabolic trough and three 4 m long two-stage receivers in series. Prior to on-sun testing, a 4 m long receiver was fabricated and successfully tested at 650 °C in a laboratory setting for 100 hrs of continuous operation showing less than 15% radiation loss. A 7 m wide x 17 m long parabolic trough was then installed at UCM for on-sun testing of the 12 m long receiver, and concurrently several 4 m long receivers were built. The optics of the parabolic trough were calibrated, and on-sun test were carried out on 12 m long receivers. During tests, the intense solar radiation (53x) caused the absorber tubes in the receivers to bend, reducing the overall optical efficiency. To address the bending issue, a self-consistent algorithm that includes ray tracing, thermal and deformation models was developed to perform thermal stress analysis on absorbers for parabolic solar collectors. Results obtained with this algorithm showed a dramatic rise in deformation as absorber tube length increases. A combined efficiency parameter that includes the occluded area for the mounts was developed to obtain an optimized tube length obtained. Based on the results, a length of 2.7 m for the absorber + 0.2 m for the coupler was chosen to minimize any bending and optimize optical efficiency while maintaining ease of mounting. The associated particle TTS system was designed, built and successfully tested at GTI. It includes storage, receiving and lock hoppers and piping that simulates the transfer of captured solar energy to an actual industrial furnace. Tests over 77 charge-discharge cycles demonstrated <2% particle degradation, with no problematic particle accumulations and no flow interruptions. The piping pressure drop was about 5 psi. The team also worked with Stanley Consultants (Stanley) to prepare conceptual and preliminary engineering packages to facilitate follow-on development and commercialization efforts. These include process and instrumentation diagram’s (P&ID’s), general arrangements, electrical one-line, project definitions document, equipment data sheets, schedule, and construction cost estimate for 2 MWth system. Updated HSS technology commercialization and customer engagement plans and detailed costs and evaluated market trade-offs and manufacturing.

03 NATURAL GAS↗

Approximation algorithms for planning and control

A control system operating in a complex environment will encounter a variety of different situations, with varying amounts of time available to respond to critical events. Ideally, such a control system will do the best possible with the time available. In other words, its responses should approximate those that would result from having unlimited time for computation, where the degree of the approximation depends on the amount of time it actually has. There exist approximation algorithms for a wide variety of problems. Unfortunately, the solution to any reasonably complex control problem will require solving several computationally intensive problems. Algorithms for successive approximation are a subclass of the class of anytime algorithms, algorithms that return answers for any amount of computation time, where the answers improve as more time is allotted. An architecture is described for allocating computation time to a set of anytime algorithms, based on expectations regarding the value of the answers they return. The architecture described is quite general, producing optimal schedules for a set of algorithms under widely varying conditions.

Boddy, Mark↗

Integrated Traffic Flow Management Decision Making

A generalized approach is proposed to support integrated traffic flow management decision making studies at both the U.S. national and regional levels. It can consider tradeoffs between alternative optimization and heuristic based models, strategic versus tactical flight controls, and system versus fleet preferences. Preliminary testing was accomplished by implementing thirteen unique traffic flow management models, which included all of the key components of the system and conducting 85, six-hour fast-time simulation experiments. These experiments considered variations in the strategic planning look-ahead times, the replanning intervals, and the types of traffic flow management control strategies. Initial testing indicates that longer strategic planning look-ahead times and re-planning intervals result in steadily decreasing levels of sector congestion for a fixed delay level. This applies when accurate estimates of the air traffic demand, airport capacities and airspace capacities are available. In general, the distribution of the delays amongst the users was found to be most equitable when scheduling flights using a heuristic scheduling algorithm, such as ration-by-distance. On the other hand, equity was the worst when using scheduling algorithms that took into account the number of seats aboard each flight. Though the scheduling algorithms were effective at alleviating sector congestion, the tactical rerouting algorithm was the primary control for avoiding en route weather hazards. Finally, the modeled levels of sector congestion, the number of weather incursions, and the total system delays, were found to be in fair agreement with the values that were operationally observed on both good and bad weather days.

Grabbe, Shon R.↗

Water Use Optimization Toolset Project: Development and Demonstration Phase Draft Report

This report summarizes the results of the development and demonstration phase of the Water Use Optimization Toolset (WUOT) project. It identifies the objective and goals that guided the project, as well as demonstrating potential benefits that could be obtained by applying the WUOT in different geo-hydrologic systems across the United States. A major challenge facing conventional hydropower plants is to operate more efficiently while dealing with an increasingly uncertain water-constrained environment and complex electricity markets. The goal of this 3-year WUOT project, which is funded by the U.S. Department of Energy (DOE), is to improve water management, resulting in more energy, revenues, and grid services from available water, and to enhance environmental benefits from improved hydropower operations and planning while maintaining institutional water delivery requirements. The long-term goal is for the WUOT to be used by environmental analysts and deployed by hydropower schedulers and operators to assist in market, dispatch, and operational decisions.

13 HYDRO ENERGY↗

Towards a decision support system for space flight operations

The Mission Operations Directorate (MOD) at the Johnson Space Center (JSC) has put in place a Model Based Systems Engineering (MBSE) technological framework for the development and execution of the Flight Production Process (FPP). This framework has provided much added value and return on investment to date. This paper describes a vision for a model based Decision Support System (DSS) for the development and execution of the FPP and its design and development process. The envisioned system extends the existing MBSE methodology and technological framework which is currently in use. The MBSE technological framework currently in place enables the systematic collection and integration of data required for building an FPP model for a diverse set of missions. This framework includes the technology, people and processes required for rapid development of architectural artifacts. It is used to build a feasible FPP model for the first flight of spacecraft and for recurrent flights throughout the life of the program. This model greatly enhances our ability to effectively engage with a new customer. It provides a preliminary work breakdown structure, data flow information and a master schedule based on its existing knowledge base. These artifacts are then refined and iterated upon with the customer for the development of a robust end-to-end, high-level integrated master schedule and its associated dependencies. The vision is to enhance this framework to enable its application for uncertainty management, decision support and optimization of the design and execution of the FPP by the program. Furthermore, this enhanced framework will enable the agile response and redesign of the FPP based on observed system behavior. The differences between the anticipated system behavior and the observed behavior may be due to the processing of tasks internally, or due to external factors such as changes in program requirements or conditions associated with other organizations that are outside of MOD. The paper provides a roadmap for the four increments of this vision. These increments include (1) the existing capabilities (2) hardware and software system components and interfaces with the NASA ground system, (3) uncertainty management and (4) re-planning and automated execution. Each of these increments provides value independently; but some may also enable building of a subsequent increment.

Ruszkowski, James↗

Waste Management Project Success - Regulatory Assurance Systems - 20118

Waste management (WM) and remediation projects are essential within a restorative environmental culture. Despite years of experience, challenges and obstacles associated with efficient and effective WM project execution remain. Although some obstacles are project specific, a common challenge is navigating the regulatory landscape from planning through execution, particularly with first of a kind (FOAK) and first in a while (FIAW) projects. The absence of a comprehensive regulatory assurance strategy places significant hurdles in the path of project success. To clear a path for the successful execution of increasingly complex WM projects, this paper focuses on development of a comprehensive regulatory assurance strategy and implementation plan that effectively engages stakeholders, agencies, and performers to produce project plans that fully and cost effectively integrate applicable regulatory requirements. The most reliable way to align regulatory processes and decisions needed for mission success is through a regulatory assurance system. This system establishes a healthy interface with regulatory decision makers, to work in a collaborative manner, to create a common vision for regulatory decisions on an agreed upon schedule. A regulatory assurance system consists of several elements. Although the mission may vary from cleanup to site closure to nuclear component production, the elements of a regulatory assurance system remain essentially constant and must include: 1) identifying a common vision or end state, 2) developing a long-term, integrated strategy and schedule, 3) establishing a regulatory partnering team consisting of key decision-makers, 4) regular and frequent communication with decision-makers, 5) ensuring consistent surveillance for early identification of issues and changes that may impact the project, 6) quick resolution of emerging issues to prevent schedule impact, 7) identifying core compliance functions, 8) periodically assessing progress of the project as it relates to regulatory assurance and, 9) providing constructive feedback to improve the process. A regulatory assurance system provides a living, multi-faceted approach to planning, visioning, communicating and tracking to avoid surprises and ensure smooth and timely progress to the project. The overall success measures will be whether the system produces common sense regulatory decisions supporting the vision on time without appeal. Effective regulatory frameworks rarely happen on their own. Balanced, common-sense regulatory decisions stem from teams that are trained to work together to achieve shared goals. In this paper, particular attention is placed on the importance of starting with a shared vision for a regulatory assurance and execution strategy that leverages experience to establish optimal approaches. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

DEPLOYING FAST CHARGING INFRASTRUCTURE FOR ELECTRIC VEHICLES IN URBAN NETWORKS: AN ACTIVITY-BASED APPROACH

This paper explores an important problem under the domain of network modeling, the optimal configuration of charging infrastructure for electric vehicles (EVs) in urban networks considering EV users' daily activities and charging behavior. This study proposes a charging behavior simulation model considering different initial state of charge (SOC), travel distance, availability of home chargers, and the daily schedule of trips for each traveler. The proposed charging behavior simulation model examines the complete chain of trips for EV users as well as the interdependency of trips traveled by each driver. The problem of finding the optimum charging configuration is then formulated as a mixed-integer nonlinear programming problem that considers the dynamics of travel time and travel distance, the interdependency of trips made by each driver, limited range of EVs, remaining battery capacity for recharging, waiting time in queue, and detour to access a charging station. This problem is solved using a metaheuristic approach for a large-scale case network. A series of examples are presented to demonstrate the model efficacy and explore the impact of energy consumption on the final SOC and the optimum charging infrastructure.

Chain of Trips↗

An interactive computer approach to performing resource analysis for a multi-resource/multi-project problem

New planning techniques and supporting computer tools are needed for the optimization of resources and costs for space transportation and payload systems. Heavy emphasis on cost effective utilization of resources has caused NASA program planners to look at the impact of various independent variables that affect procurement buying. A description is presented of a category of resource planning which deals with Spacelab inventory procurement analysis. Spacelab is a joint payload project between NASA and the European Space Agency and will be flown aboard the Space Shuttle starting in 1980. In order to respond rapidly to the various procurement planning exercises, a system was built that could perform resource analysis in a quick and efficient manner. This system is known as the Interactive Resource Utilization Program (IRUP). Attention is given to aspects of problem definition, an IRUP system description, questions of data base entry, the approach used for project scheduling, and problems of resource allocation.

Schlagheck, R. A.↗

Scheduling Mission Reconfiguration for an Interferometry Synthetic Aperture Radar Using Deep Reinforcement Learning

This paper presents a method to intelligently adapt the baseline of a synthetic aperture radar based on Deep Rein- forcement Learning to help create plans for missions that use formation flight for Earth observation purposes. The main contribution of this paper is the initial results we have found from applying the tool to a toy mission: measuring the ver- tical structure of forests by using a synthetic aperture radar mounted on a formation of 7 satellites orbiting the Earth in a Sun Synchronous Orbit. We have found that with a reward function based on expected science return over time and fuel usage, the Deep Reinforcement Learning planner is able to create plans with positive scientific returns while minimizing fuel usage. We also find that fuel usage and collision avoid- ance planning is better done with traditional methods, as Deep Reinforcement Learning does not converge to optimal solutions.

Viros-i-Martin, Antoni↗

TU-F-BRF-08: Intensity Modulation Expanded to Spatio-Temporal Space; IMRT Combined with Optimal Fractionation Schedule

Purpose: Past efforts to improve the therapeutic ratio have focused on a spatial approach where highly conformal radiation dose is given to tumors while minimizing dose to normal tissues, e.g., IMRT, VMAT, and IGRT. However, the fractionation schedule, i.e., a temporal approach to radiotherapy, has been largely overlooked so far in maximizing the therapeutic ratio. We establish a rigorous mathematical spatio-temporal approach to systematically investigate the feasibility and potential benefits of simultaneously optimizing radiation dose distribution in space and time. Methods: Stochastic control formalism is constructed to maximize the average tumor BED by choosing an optimal radiation dose distribution for an optimal number of fractions subject to normal tissue BED constraints. Three separate simulations are run on two groups of phantom cases; 5 cases with prostate cancer and 5 cases with head-and-neck cancer. (1) Conventional IMRT with 70Gy/35fx for head-and-neck, and 81Gy/45fx for prostate, (2) IMRT is done independently from the fractionation schedule optimization (S-model), (3) integrated spatio-temporal approach (I-model) where radiation intensities are simultaneously optimized for the first time ever in space and time. Final tumor BEDs from the three trials are compared in prostate and head-and-neck cases. Results: Numerical simulations show that final tumor BED from I-model is 20–90% larger than conventional IMRT, and 20-50% larger than S-model for head-and-neck cancer with α/β=10 and Tdouble=2–50 days. Final tumor BED from I-model is also 90–140% larger than conventional IMRT, and 20–30% larger than S-model for prostate cancer with α/β=2 and Tdouble=5–80 days. Conclusion: Our spatio-temporal optimization of radiotherapy allows an expansion of search space for the optimal treatment plans to include the temporal distribution of radiation dose in addition to the spatial distribution. Such spatio-temporal approach shows great potential to improve the therapeutic ratio, particularly with fast growing, aggressive tumors with short doubling time and/or low α/β.

60 APPLIED LIFE SCIENCES↗

Progress towards Managing Residential Electricity Demand: Impacts of Standards and Labeling for Refrigerators and Air Conditioners in India

The development of Energy Efficiency Standards and Labeling (EES&L) began in earnest in India in 2001 with the Energy Conservation Act and the establishment of the Indian Bureau of Energy Efficiency (BEE). The first main residential appliance to be targeted was refrigerators, soon to be followed by room air conditioners. Both of these appliances are of critical importance to India's residential electricity demand. About 15percent of Indian households own a refrigerator, and sales total about 4 million per year, but are growing. At the same time, the Indian refrigerator market has seen a strong trend towards larger and more consumptive frost-free units. Room air conditioners in India have traditionally been sold to commercial sector customers, but an increasing number are going to the residential sector. Room air conditioner sales growth in India peaked in the last few years at 20percent per year. In this paper, we perform an engineering-based analysis using data specific to Indian appliances. We evaluate costs and benefits to residential and commercial sector consumers from increased equipment costs and utility bill savings. The analysis finds that, while the BEE scheme presents net benefits to consumers, there remain opportunities for efficiency improvement that would optimize consumer benefits, according to Life Cycle Cost analysis. Due to the large and growing market for refrigerators and air conditioners in India, we forecast large impacts from the standards and labeling program as scheduled. By 2030, this program, if fully implemented would reduce Indian residential electricity consumption by 55 TWh. Overall savings through 2030 totals 385 TWh. Finally, while efficiency levels have been set for several years for refrigerators, labels and MEPS for these products remain voluntary. We therefore consider the negative impact of this delay of implementation to energy and financial savings achievable by 2030.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

EVA Swab Kit: Tools and Techniques for Collecting Aseptic Samples from Crewed Space Missions

Introduction: When we send humans to search for life on other planets, we'll need to know what we brought with us versus what may already be there. To ensure our crewed spacecraft meet planetary protection requirements—and to protect our science from human contamination—we'll need to assess and verify whether micro-organisms may be leaking/venting from our spacesuits. This requires collecting samples under Extravehicular Activity (EVA) conditions. Detailed, systematic research on forward contamination from robotic spacecraft has been steadily progressing since the Viking missions, but systematic studies of contamination from space suits has not been conducted in many years. The modern EMU (Extravehicular Mobility Unit) suit used by NASA is designed to leak at rates as high as 100 cc/min. Before humans land on Mars there is a critical need to understand the types and quantities of microbes that could be introduced via space suits. The Human Forward Contamination Assessment team at NASA’s Johnson Space Center (JSC) has developed a prototype EVA swab tool [1,2,3,4] designed for use in space to sample cleaned and uncleaned space suits to determine the present day microbial load and eventually the rate of leakage. The ability to assess microbial leakage early in advanced space suit and life support system design cycles will help avoid costly hardware redesign later. Test Objectives: The primary objective of EMU testing was to characterize the type of micro-organisms typically found on or near selected suit pressure joints under suit differential pressure conditions. Most human-borne microbes can fit through a 0.5 to 1.0 µm gap. Knowing which joints are more likely to leak will inform hardware design decisions. Knowing which types of micro-organisms may leak from EVA suits provides a basis for subsequent studies to characterize the viability of those organisms under destination conditions, as well as how far they might spread through natural or human-influenced processes. That data, in turn, will inform exploration mission operations and hardware design. The secondary objective of testing was to evaluate the interface between a fully suited test subject and the EVA swab tool at vacuum. Bulky EVA suits can restrict movement and limit visibility through the helmet visor. Fully suited testing is important for identifying tool design issues prior to flight. At exploration destinations, such as Mars, suited crew may be required to periodically sample their suits as part of an environmental monitoring protocol. Suit Microbial Sampling Results: This report details results of microbial swabs collected from current flight suit configurations worn by crew members assigned to upcoming ISS expedition missions as well as swabs collected from prototype suits intended for use on the Orion spacecraft. These tests were intended to characterize the types of contaminants found on flight suits under current, typical handling conditions. No attempt was made to change suit handling procedures, provide additional sterilization, or to limit typical potential contaminant sources. Using culture based techniques, we cultivated 235 CFU (colony forming units) comprised of 26 bacterial species and one fungal species on the outside of the suits. The fungal species and 14 of the bacterial species were unique to the suit surfaces and were not detected in any of the background samples collected within the chambers. We sequenced 755,434 ribosomal fragments on all of the suit surfaces from swab samples. 557,016 of these sequences represent DNA that survived at least 4 hours at vacuum. These sequences formed 2,464 OTU's (Operational Taxonomic Units, 97% similarity) showing low diversity in the samples. The most abundant sequences that survived vacuum belong to the genera Staphyloccocus, Ralstona, Bacillus and Rhodobacter all of which are common to the human microbiome. [5] See Danko et al., (2021) for more complete details of these first analyses. Further analysis of EVA suit materials with respect to the efficacy of various cleaning protocols and engineered containment solutions is planned to inform suit design for NASA’s Artemis Moon to Mars program crew testing. Swab Tool Function Results: The kit was demonstrated for fit and function in suited subject vacuum tests to determine how well the tool worked as an aseptic microbial sampling device as well as to identify any design elements that could be upgraded for EVA task specific improvement. It was found that sample acquisition efficacy could be enhanced by redesign of the sample canister to end-effector interface. Several modifications of the sample caddy assemblies to optimize EVA safety and functionality were also identified. Consequently, fabrication of the redesigned sample canister to end-effector assembly interfaces and and the sample caddy assemblies are required. Fabrication of sixteen flight sample canister assemblies (8 per each of two EVA Swab Kits) and two sample caddy assemblies are in process to be followed by hardware testing and certification to produce two flight-certified EVA Swab Kits for transport to ISS no earlier than summer of 2022. Sampling Strategy: The International Space Station is an ideal testbed for systematic studies of contamination from crewed vehicles since it has been continuously occupied for 20 years and exposed to non-terrestrial conditions. We will sample the exterior of the ISS during EVA using a purpose-built swab tool capable of maintaining sterility while undergoing temperature changes from -151 to +121°C under hard vacuum. Prior to each EVA, the project team will work with ISS mission managers to identify precise sampling locations, which will vary by EVA based on the translation paths and worksites scheduled for that particular EVA. Ideally, translation path handrails and areas near ECLSS (Environmental Control and Life Support System) external vent openings on a spacecraft would be assessed. There are currently more than a dozen ECLSS external vents on the ISS. Some are connected to systems that vent waste products, while others are intended to equalize cabin pressure. As EVA opportunity allows, microbial samples from any of these external vents would provide a valuable data point, though some will be more useful than others. Four criteria have been identified to help prioritize sampling sites near vents: • EVA Accessibility: To minimize cost, it is desired to piggy-back onto a planned EVA. Therefore, the sampling location must be readily accessible by an EVA crew • Type of Vented Products: Vent products that have been in direct contact with crew, such as cabin air, are more likely to contain microorganisms than vent products associated with isolated systems, such as experiment module combustion products. • Mass of Vented Products: Higher-flow vents are more likely to contain detectible levels of microbial contaminants than lower-flow vents. • Local Environment: Sample locations with relatively benign local conditions, such as warm surfaces shielded from direct ultraviolet (UV) radiation exposure, may be more likely to support microbial growth than locations with harsher local environmental conditions. Because EVA accessibility is the most important criteria, the proposal team worked with an astronaut and flight controllers using the Dynamic Onboard Ubiquitous Graphics (DOUG) tool. The DOUG virtual environment allows an operator to “fly” around the current ISS vehicle configuration to assess EVA translation paths, attach points, and keep-out zones. While analysis on station or rapid return to Earth would be preferable, samples collected from the exterior of the ISS have already been exposed to temperature variations between -157 and +121 °C as well as hard vacuum. Therefore, they should be fairly stable and robust. We hypothesize that samples collected from the ISS exterior could be stored for up to 6 months at -80°C without degradation. Sample canisters will be returned to Earth while frozen at -80°C for analysis, and sterilized canisters can be re-flown back to ISS to support additional sampling opportunities Relevance to NASA Exploration Objectives: These data will allow us to identify new or improved methods, technologies, and procedures for spacecraft sterilization and leakage mitigation to minimize the amount of contamination introduced to the environment by human explorers. This work is funded by NASA research grant: NNH18ZDA001N-PPR References: [1] Bell, M.S. et al. (2015) LPS XLVI, Abst. #1832 [2] Rucker et al. (2018) 42nd COSPAR (PPP.3) [3] Bell, M.S. et al. (2019) Mars Extant Life Conference, Abst. #5096.[4] Bell, M.S. et al., (2020) 43rd COSPAR (BO.2).[5] Danko D, et.al.,(2021)Front.Microbiol.12:608478.

Mary Suzanne Bell↗

Continuation of the University of Michigan Sounding Rocket Program

This interim report gives the activity on this grant through 31 October 1998, and the planned activities for the next fiscal year. A Project Initiation Conference (PIC) was held at the Wallops Flight Facility (WFF), with planning for the launch of flight 36.174 in Fall 1998. However, following the PIC, the WFF personnel decided that the experiment telemetry system had to be completely rewired, which required substantial design and wiring changes on the experiment side of the payload. These costs had not been anticipated in the FY98 budget, and used up considerable resources of the experimenters. In addition, the telemetry re-design was not completed until Fall 1998, so that there was no opportunity for a launch in 1998 (the Jupiter window closes in late November 1998 and it will reopen in late summer 1999). A Design Review was held by telecon with WFF personnel on 26 October 1998, with plans for the 36.174 launch now in late August 1999 with a launch window which extends into winter 2000. On a more positive note, we have been developing a vacuum UV calibration chamber in Michigan's Space Physics Research Lab, for future measurements of our experiment components, and this facility is now undergoing initial measurements of various calibration lamps in preparation for testing of the telescope UV reflective efficiency. This facility will greatly increase our ability to optimize our experiment for UV efficiency, which has been lacking in the past, and it will be made available for support of other NASA missions at Michigan and for visitors from other institutions. For the next flight 36.174, the following activities will be accomplished: (1) prepare the experiment, including replacement and upgrading of critical components, at University of Michigan; (2) pre-integrate the payload at the Wallops Flight Facility; (3) perform final far-UV calibration of instrument (4) perform final alignment, integration, and electrical checks at WSMR; (5) launch payload from WSMR and check condition of recovered payload; (6) perform post-flight calibration, if necessary and applicable (7) reduce and analyze flight data. The following pages contain information from the experimenter package for the Design Review for the next flight, 36.174, listing the plans, changes, and schedule for this flight.

Clarke, John↗

Improvements to Integrated Tradespace Analysis of Communications Architectures (ITACA) Network Loading Analysis Tool

NASA's SCENIC project aims to simplify and reduce the cost of space mission planning by replicating the analysis capabilities of commercially licensed software which are integrated with relevant analysis parameters specific to SCaN assets and SCaN supported user missions. SCENIC differs from current tools that perform similar analyses in that it 1) does not require any licensing fees, 2) will provide an all-in-one package for various analysis capabilities that normally requires add-ons or multiple tools to complete. As part of SCENIC's capabilities, the ITACA network loading analysis tool will be responsible for assessing the loading on a given network architecture and generating a network service schedule. ITACA will allow users to evaluate the quality of service of a given network architecture and determine whether or not the architecture will satisfy the mission's requirements. ITACA is currently under development, and the following improvements were made during the fall of 2017: optimization of runtime, augmentation of network asset pre-service configuration time, augmentation of Brent's method of root finding, augmentation of network asset FOV restrictions, augmentation of mission lifetimes, and the integration of a SCaN link budget calculation tool. The improvements resulted in (a) 25% reduction in runtime, (b) more accurate contact window predictions when compared to STK(Registered Trademark) contact window predictions, and (c) increased fidelity through the use of specific SCaN asset parameters.

analysis↗

Materials for Advanced Ultrasupercritical Steam Turbines Task 4: Cast Superalloy Development

The Steam Turbine critical stationary structural components are high integrity Large Shell and Valve Casing heavy section Castings, containing high temperature steam under high pressures. Hence to support the development of advanced materials technology for use in an AUSC steam turbine capable of operating with steam conditions of 760°C (1400°F) and 35 Mpa (5000 psia), Casting alloy selection and evaluation of mechanical, metallurgical properties and castability with robust manufacturing methods are mandated. Alloy down select from Phase 1 based on producability criteria and creep rupture properties tested by NETL-Albany and ORNL directed the consortium to investigate cast properties of Haynes 282 and Haynes 263. The goals of Task 4 in Phase 2 are to understand a broader range of mechanical properties, the impact of manufacturing variables on those properties. Scale up the size of heats to production levels to facilitate the understanding of the impact of heat and component weight, on metallurgical and mechanical behavior. GE Power & Water Materials and Processes Engineering for the Phase 2, Task 4.0 Castings work, systematically designed and executed casting material property evaluation, multiple test programs. Starting from 15 lbs. cylinder castings to world’s first 17,000 lbs. poured weight, heavy section large steam turbine partial valve Haynes 282 super alloy casting. This has demonstrated scalability of the material for steam Turbine applications. Activities under Task 4.0, Investigated and characterized various mechanical properties of Cast Haynes 282 and Cast Nimonic 263. The development stages involved were: 1) Small Cast Evaluation: 4 inch diam. Haynes 282 and Nimonic 263 Cylinders. This provided effects of liquidus super heat range and first baseline mechanical data on cast versions of conventional vacuum re-melted and forged Ni based super alloys. 2) Step block castings of 300 lbs. and 600 lbs. Haynes 282 from 2 foundry heats were evaluated which demonstrated the importance of proper heat treat cycles for Homogenization, and Solutionizing parameters selection and implementation. 3) Step blocks casting of Nimonic 263: Carried out casting solidification simulation analysis, NDT inspection methods evaluation, detailed test matrix for Chemical, Tensile, LCF, stress rupture, CVN impact, hardness and J1C Fracture toughness section sensitivity data and were reported. 4) Centrifugal Casting of Haynes 282, weighing 1400 lbs. with hybrid mold (half Graphite and half Chromite sand) mold assembly was cast using compressor casing production tooling. This test provided Mold cooling rates influence on centrifugally cast microstructure and mechanical properties. Graphite mold section out performs sand mold across all temperatures for 0.2% YS; %Elongation, %RA, UTS at 1400°F. Both Stress-LMP and conditional Fracture toughness plots data were in the scatter band of the wrought alloy. 5) Fundamental Studies on Cooling rates and SDAS test program. Evaluated the influence of 6 mold materials Silica, Chromite, Alumina, Silica with Indirect Chills, Zircon and Graphite on casting solidification cooling rates. Actual Casting cooling rates through Liquidus to Solidus phase transition were measured with 3 different locations based thermocouples placed in each mold. Compared with solidification simulation cooling rates and measurement of SDAS, microstructure features were reported. The test results provided engineered casting potential methods, applicable for heavy section Haynes 282 castings for optimal properties, with foundry process methods and tools. 6) Large casting of Haynes 282 Drawings and Engineering FEM models and supplemental requirements with applicable specifications were provided to suppliers for the steam turbine proto type feature valve casing casting. Molding, melting and casting pouring completed per approved Manufacturing Process Plan during 2014 Q4. The partial valve casing was successfully cast after casting methods were validated with solidification simulation analysis and the casting met NDT inspection and acceptance criteria. Heat treated and sectioned to extract trepan samples at different locations comparing with cast on coupons test data. Material properties requisite for design, such as tensile, creep/rupture, LCF, Fracture Toughness, Charpy V-notch chemical analysis testing were carried out. The test results will be presented in the final report. The typical Haynes 282 large size Steam Turbine production casting from Order to Delivery foundry schedule with the activity break up is shown in Figures 107 and 108. • From Purchase Order placement to Casting pouring ~ 26 weeks. 1. Sales and commercial review 3 2. Engineering Drawings/models review 4 3. Pattern and core box manufacturing 6 4. Casting process engineering review 4 5. FEM and solidification simulation analysis 4 6. Gating & Feeder Attachments, Ceramic tiling 2 7. Molding and coremaking production scheduling 6 8. Melting planning and schedule 3 9. Pouring, cooling and shake out 2 • From Pouring to casting Delivery ~ 29 weeks 10. Shot blast and riser cutting, gates removal 3 11. Homogenizing , solutionizing HT furnace prep 4 12. Grinding, Fettling 2 13. Aging HT Cycle, cooling 2 14. VT and LPT NDT inspections 2 15. Radiographic inspection 4 16. Mechanical testing, Chemical analysis test certs 4 17. Casting weld repair upgrades and Aging PWHT 4 18. NDT after weld repairs and casting upgrades 3 19. Casting Final Inspection and test certifications 3 20. Package and delivery 2 Hence the Total Lead time from P.O to Casting delivery is approximately 55 weeks. The Task 4.2 and Task 4.3 activities and reporting completed.

Thangirala, Mani↗