Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “operational challenges”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 379 records · Page 21

Operability on the Europa Clipper Mission: Challenges and Opportunities

Flight and ground system operability has been a focus area on the Europa Clipper Project since early in its formulation phase. This has given the operations team the opportunity to influence the design, with a goal of increasing overall system operability. This paper presents example operability challenges, opportunities, and solutions arising from the pre-Critical Design Review (CDR) system design. The integrated wing assembly design directly couples a scientific instrument (the REASON sounding radar) to the spacecraft’s power source (solar array wing panels). Impacts to mission operations of this design include: increased slew durations; solar array pointing constraints during inner cruise, Europa flybys, and orbit trim maneuvers; and stray light intrusions into the stellar reference units’ keep out zones. The use of CCSDS File Delivery Protocol (CFDP) Class-2 for reliable downlink of the large volume of Europa Clipper science data is described, along with nominal and off-nominal use cases. The effort to improve post-launch spacecraft visibility by adding a third low-gain antenna to the spacecraft is detailed. The design of the bulk data store has necessitated the implementation of accountable data products (ADPs), accountability identifiers (AIDs), and metadata packets to provide end-to-end science data accountability. To streamline and automate the flight rules generation and checking process, a first order and temporal logic-based solution of expressing flight rules without ambiguity, and whose programmatic implementation can be automated, is proposed. The focus on operability has had a positive influence on Europa Clipper design decisions, although cost, schedule, budget, heritage, and other technical concerns have many times outweighed operability concerns. However, experience to date demonstrates that this approach to operability results in more thorough, balanced consideration of the effect of early design trades and decisions on the operations phase of a mission than seen in many previous missions, and provides operations development insight into prioritizing work to go.

Signorelli, Joel↗

The Europa Lander Mission: A Space Exploration Challenge for Autonomous Operations

NASA has proposed a Europa Lander Mission, with a notional launch date in the 2024-2025 timeframe. Key features of the mission are: Take 5 samples from 10 cm under the Europa surface; Mission duration is expected to be 20 (Earth) days; Data will be telemetered data back to Earth via a dedicated Carrier Relay Orbiter (CRO) spacecraft. Some information about the Europa surface is available from Cassini, indicating the presence of mountains, ridges, and other complex features, and simulations of planet-wide lighting can be performed, but this information is available only at 6m per pixel resolution (Galileo imagery). While surface temperatures are exceedingly cold (average of 114 degrees Kelvin, or minus 160 degrees Centigrade at the equator), this need not translate to solid (and hard) ice. The possible presence of small grain features (snow-like), penitentes (inverse-icicles), plumes, and other complex terrain features, will complicate operations. The time delay for such a mission is 30-60 minutes. The CRO is in view of the Lander for roughly 8 hours, and is in view of Earth for roughly 10 hours, meaning significant autonomy will be needed. A compelling case can be made for the use of aggressive autonomous operations of the *entire* mission. In this talk we will describe the Europa mission and its objectives, as well as similar Icy Worlds missions of the future. We will then describe the autonomy challenges of such a mission, using examples of similar missions and specific autonomy technologies that have been used in the past to address these challenges. We will make the case that despite some technologies that may be suitable, Europa lander presents a unique, and unaddressed, challenge for autonomy.

Plan Execution↗

Challenges of designing, operating, and managing brine extraction at a carbon dioxide storage site

Developing and deploying commercial-scale carbon dioxide (CO 2 ) storage at a site requires operational strategies to manage pressure and CO 2 plume distribution. In the natural gas storage and oil and gas industries, fluid extraction has been successfully implemented as a strategy to manage pressure and control fluid distribution (i.e., hydrocarbon recovery and natural gas storage efficiency, respectively). The technical challenges of integrating brine extraction at CO 2 storage sites are expected to be similar, if not identical, to those in the natural gas storage and petroleum industries. Major technical challenges of using brine extraction to manage storage in a storage unit include (1) designing and completing the brine extraction wells, (2) locating the brine extraction well, (3) assessing the efficacy of brine extraction, and (4) handling the extracted brine. The design and completion of the brine extraction well include the well type (i.e., vertical or horizontal) and perforated interval. The location of the well is influenced by the timing of extraction operations (i.e., prior or after CO 2 injection starts) and project objectives (i.e., desired directional movement of the CO 2 plume and avoid or minimize CO 2 extraction). The efficacy of brine extraction requires a baseline projection of the pressure and CO 2 plume distribution. Options for handling extracted brine include subsurface disposal, surface disposal, and industrial use. Here this paper addresses means of overcoming technical challenges that may likely be encountered before or after CO 2 injection starts.

25 ENERGY STORAGE↗

SRF Challenges for Improving Operational Electron Linacs

The performance of the operational SRF-based electron linacs CEBAF, ELBE, and S-DALINAC continues to evolve positively. These facilities are exploiting opportunities to improve operational capability by both remediation of past limitations and also construction of new capacity using state-of-the-art designs and processes. A project to rework the weakest ten cryomodules in CEBAF was completed and enabled robust operation for physics at 6 GeV. The 12 GeV Upgrade of CEBAF is now underway and involves construction of ten new CW >100 MV cryomodules with 80 new 7-cell low-loss cell shaped fine-grained niobium cavities, all electropolished. The technical challenges associated with the preparation of these cavities will be reviewed and their performance in both individual acceptance testing and cryomodule testing to date will be summarized. The ELBE facility at Helmhotz Zentrum Dresden Rossendorf continues to develop its source with an SRF gun system. The long-running S-DALINAC at Technische Universität Darmstadt is operating reliably and is evolving in the direction of reduced energy spread and use of polarized electrons for nuclear physics and astrophysics research. *Authored by Jefferson Science Associates, LLC under U.S. DOE Contract No. DE-AC05-06OR23177.

Reece, Charles↗

Leadership Challenges in ISS Operations: Lessons Learned from Junior and Senior Mission Control Personnel

The International Space Station (ISS) is operated by a multi-national, multi-organizational team that is dispersed across multiple locations, time zones, and work schedules. At NASA, both junior and senior mission control personnel have had to find ways to address the leadership challenges inherent in such work, but neither have had systematic training in how to do so. The goals of this study were to examine the major leadership challenges faced by ISS mission control personnel and to highlight the approaches that they have found most effective to surmount them. We pay particular attention to the approaches successfully employed by the senior personnel and to the training needs identified by the junior personnel. We also evaluate the extent to which responses are consistent across the junior and senior samples. Further, we compare the issues identified by our interview survey to those identified by a standardized questionnaire survey of mission control personnel and a contrasting group of space station crewmembers. We studied a sample of 14 senior ISS flight controllers and a contrasting sample of 12 more junior ISS controllers. Data were collected using a semi-structured qualitative interview and content analyzed using an iterative process with multiple coders and consensus meetings to resolve discrepancies. To further explore the meaning of the interview findings, we also conducted new analyses of data from a previous questionnaire study of 13 American astronauts, 17 Russian cosmonauts, and 150 U.S. and 36 Russian mission control personnel supporting the ISS or Mir space stations. The interview data showed that the survey respondents had substantial consensus on several leadership challenges and on key strategies for dealing with them, and they offered a wide range of specific tactics for implementing these strategies. Interview data from the junior respondents will be presented for the first time at the meeting. The questionnaire data showed that the US mission control sample reported a level of support from their management that compared favorably to national norms. American mission control personnel and Russian crewmembers reported higher supervisor support than American crewmembers and Russian mission control personnel. We will present the specific issues underlying these findings and compare and contrast the results from the two datasets. Although specific to space station personnel, our results are consistent with recent management, cultural, and aerospace research. We aim to use our results to improve training for current and future mission control personnel.

Clement, James L.↗

Challenges and Solutions in Operation and Lay-Up of the Modular Caustic- Side Solvent Extraction Unit - 20078

The Modular Caustic-Side Solvent Extraction (CSSX) Unit (MCU) was designed and constructed to provide interim salt waste processing so that the Liquid Waste Disposition Program (LWDP) could continue waste removal and tank closure until start-up of the Salt Waste Processing Facility (SWPF). MCU processes Clarified Salt Solution (CSS), or salt solution (SS) that has undergone actinide removal/filtration, to produce two waste streams: the cesium laden Strip Effluent (SE), which is incorporated into glass at the Defense Waste Processing Facility (DWPF), and the cesium depleted Decontaminated SS (DSS), which is incorporated into grout at the Saltstone Production Facility (SPF). MCU completed start-up in 2008 with an initial operating life of 3 years and design life of 5 years. Prior to reaching the end of the design life, multiple critical components were upgraded and/or replaced to mitigate risks associated with any delays in SWPF start-up. During the remainder of operation (until June 2019), MCU was challenged to maximize processing with minimal additional modifications to repair/improve aging infrastructure, while maintaining low levels of risk to workers and the environment. Notable challenges during the extended operating life of the facility involved both mechanical and operational issues. Two of the most significant issues were the increased frequency of Process Vessel Ventilation (PVV) High Efficiency Particulate Air (HEPA) filter change-outs and the biofouling of the SE coalescer (SEC). The major impacts of both issues were that replacement of these components 1) resulted in high exposure to workers, and 2) required substantial downtime, thus hindering achievement of processing goals. PVV HEPA filter replacements are required based on dose rate and differential pressure (dP) limits. After introducing a higher-curie feed to MCU, the operating time between change outs was reduced by approximately half. SEC replacements are required based on dP limits. After restarting from an extended outage, the operating life of the SEC was significantly reduced by more than half due to biofouling. As a result of extensive troubleshooting and process improvements, the facility was able to recover performance and extend the operating life of the PVV HEPA filters and the SEC media. Through troubleshooting both of these issues, the facility was also able to learn from prior experience and adapt in order to minimize down time and maintain throughput. Although the facility took advantage of short periods of downtime to perform nonintrusive troubleshooting and minor corrective/preventative maintenance activities, longer outages were periodically required for corrective maintenance involving process cell entry. During these outages, remote tools and specialized shield plates were employed to minimize dose to workers. Mock-ups of non-routine maintenance activities were critical to early identification of potential issues and improvements, which shortened outage duration. Consistent with the facility's operational strategy, evolutions needed for MCU layup were identified and sequenced to ensure safe conditions within the facility, meet pre-defined criteria for lay-up configuration, and protect workers, while minimizing the impact to SWPF integration. De-inventory and flushing of process areas was prioritized so that the total residual inventory was reduced as efficiently as possible. This paper discusses lessons learned and best practices from troubleshooting unique issues, performing complex maintenance activities, and implementing a layup strategy that best supports the overall system mission. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

12 GeV CEBAF Initial Operational Experience and Challenges

The 12 GeV Upgrade for the Continuous Electron Beam Accelerator Facility (CEBAF) achieved CD-4B, or Project Completion, on September 27, 2017. The 13-year $338M project doubled the beam energy of the CEBAF accelerator while also adding a fourth experimental hall. The scope of work for the accelerator complex was completed in 2014. Over the subsequent three years the upgrades for the experimental halls were completed, beamlines and spectrometers commissioned and transitions made to production running for the Nuclear Physics program. This paper will present an overview of the operational experience gained during initial accelerator commissioning through the recent achievements of simultaneous 4-Hall operations at full beam power.

Spata, Michael F.↗

Digital Motion Imagery, Interoperability Challenges for Space Operations

With advances in available bandwidth from spacecraft and between terrestrial control centers, digital motion imagery and video is becoming more practical as a data gathering tool for science and engineering, as well as for sharing missions with the public. The digital motion imagery and video industry has done a good job of creating standards for compression, distribution, and physical interfaces. Compressed data streams can easily be transmitted or distributed over radio frequency, internet protocol, and other data networks. All of these standards, however, can make sharing video between spacecraft and terrestrial control centers a frustrating and complicated task when different standards and protocols are used by different agencies. This paper will explore the challenges presented by the abundance of motion imagery and video standards, interfaces and protocols with suggestions for common formats that could simplify interoperability between spacecraft and ground support systems. Real-world examples from the International Space Station will be examined. The paper will also discuss recent trends in the development of new video compression algorithms, as well likely expanded use of Delay (or Disruption) Tolerant Networking nodes.

Grubbs, Rodney↗

Opportunities and Challenges for Remote Microreactor Operations

The nuclear industry is developing new advanced reactor technologies, and many companies are embracing this advancement by pursuing the development of microreactors. The term microreactor generally refers to a nuclear reactor with an operating power of 20 MW or less. The power range of microreactors makes them appealing for many use cases, such as powering remote communities, mining sites, and military bases. Most of the microreactor designs being pursued will incorporate remote facility operations into the final product. However, no framework has yet been developed to determine what remote operations systems require for reliable, resilient, and secure operation of a microreactor. This work identifies the challenges unique to remote operations and monitoring for microreactors specifically regarding instrumentation and control, communication methods, regulatory requirements, and operational policies. The types of commands and sensor measurements that must be transmitted between the facilities as well as methods for verifying the trustworthiness of these signals are assessed. This work evaluates the security, reliability, and performance requirements that must be met when considering the selection of communication hardware and protocols for use in remote operations. Also, an assessment was performed to study how remote operations fit within current regulatory requirements and what may need to be updated in regulatory policy to allow for remote operation. Finally, the operational contingencies unique to remote operations that must be in place for response to abnormal events are identified. This paper details these challenges and research opportunities to provide a foundation for the design of remote operation systems.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Challenging Implementation and Operations Traditions

The Deep Space Network (DSN) that provides for the communications link between the deep space missions and the science users currently consists of a small set of very large monolithic tracking antennas. This ground-based network includes a total of 12 antennas located in three roughly equidistant longitudes around the earth and utilizes a decentralized approach to it operations. Recently, however, studies have suggested that the number, complexity, and data throughput of the future set of space probes will be increasing dramatically. This demands more performance from the DSN than is currently available. In identifying the architecture for the future DSN required to support this mission set, one concept that proves promising is one that consists of a great many number of much smaller antennas configured in an array. This concept has been supported by the developments in antenna manufacturing technology and the consistent decrease in the cost of electronics required to receive, amplify, and combine signals from deep space probes. Furthermore, it is clear that past developments in the DSN have not benefited from the applications of economies of scale.

ANTENNA ARRAYS↗

SAGE III on ISS: Mission Update and Science Milestone Results and Future Plans

The Stratospheric Aerosol and Gas Experiment III on the International Space Station (SAGE III/ISS) has been collecting data on the stratosphere almost continuously for 4 years since the first light milestone was achieved on March 17, 2017. In that time, the SAGE III/ISS data products have withstood robust assessments both internal and external, using comparisons to data sets both in-situ and spaceborne, and incorporated improvements into the retrieval algorithm and the science data products themselves. With the new v5.2 release of the SAGE III/ISS science data product algorithm, improvements made to the aerosol and water vapor products have produced better correlations with both MLS and balloonsonde data. At this 4-year milestone, we will look back on the last 4 years of data collection highlighting SAGE III/ISS ozone and aerosol data from 2017-2020 in a 6-minute video highlighting the SAGE III mission. An overview of mission operations and the challenges of operating a science mission on the ISS will highlight lessons learned and the mission science objectives completed during the first three years of the mission. The future goals for the SAGE III/ISS mission, as we continue operations and science collection, will round out the presentation.

Marilee M Roell↗

The expanded role of computers in Space Station Freedom real-time operations

The challenges that NASA and its international partners face in their real-time operation of the Space Station Freedom necessitate an increased role on the part of computers. In building the operational concepts concerning the role of the computer, the Space Station program is using lessons learned experience from past programs, knowledge of the needs of future space programs, and technical advances in the computer industry. The computer is expected to contribute most significantly in real-time operations by forming a versatile operating architecture, a responsive operations tool set, and an environment that promotes effective and efficient utilization of Space Station Freedom resources.

Crawford, R. Paul↗