Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “operating reserve”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 379 records · Page 21

Trends and Options in the Disposal of Launch Vehicle Orbital Stages

An increasing number of agencies and organizations around the world provide guidelines for the disposal of launch vehicle stages placed in Earth orbit. The limitation of orbital lifetime following the satellite delivery mission, particularly in low Earth orbit, is viewed as one of the most important space debris mitigation measures. For higher altitude missions, orbital stages may be maneuvered into more rapidly decaying orbits or may be left in longer-term disposal orbits. This paper summarizes the recent disposal practices of all launch vehicle types and evaluates their compliance with existing national standards. Although the owners and operators of some satellite systems, e.g., Iridium and Globalstar, have levied orbital stage disposal requirements on launch service providers, in general, insufficient attention and communication is given to this topic. Sunsynchronous and geosynchronous missions may pose some of the most difficult challenges for the responsible disposal of orbital stages. A variety of disposal options are normally available, some of which may even influence the design of the spacecraft to be deployed. Also at issue is whether normal launch vehicle propellant reserves can be relied upon for post-mission disposal of orbital stages.

Johnson, Nicholas L.↗

2020 Annual Report of Available Drawdowns for Each Oil Storage Cavern in the Strategic Petroleum Reserve

The Department of Energy maintains an up-to-date documentation of the number of available full drawdowns of each of the caverns owned by the Strategic Petroleum Reserve (SPR). This information is important for assessing the SPR's ability to deliver oil to domestic oil companies expeditiously if national or world events dictate a rapid sale and deployment of the oil reserves. Sandia was directed to develop and implement a process to continuously assess and report the evolution of drawdown capacity, the subject of this report. A cavern has an available drawdown if after that drawdown, the long-term stability of the cavern, the cavern field, or the oil quality are not compromised. Thus, determining the number of available drawdowns requires the consideration of several factors regarding cavern and wellbore integrity and stability, including stress states caused by cavern geometry and operations, salt damage caused by dilatant and tensile stresses, the effect of enhanced creep on wellbore integrity, and the sympathetic stress effect of operations on neighboring caverns. A consensus has now been built regarding the assessment of drawdown capabilities and risks for the SPR caverns. The process involves an initial assessment of the pillar-to-diameter (P/D) ratio for each cavern with respect to neighboring caverns. A large pillar thickness between adjacent caverns should be strong enough to withstand the stresses induced by closure of the caverns due to salt creep. The first evaluation of P/D includes a calculation of the evolution of P/D after a number of full cavern drawdowns. The most common storage industry standard is to keep this value greater than 1.0, which should ensure a pillar thick enough to prevent loss of fluids to the surrounding rock mass. However, many of the SPR caverns currently have a P/D less than 1.0 or will likely have a low P/D after one or two full drawdowns. For these caverns, it is important to examine the structural integrity with more detail using geomechanical models. Finite-element geomechanical models have been used to determine the stress states in the pillars following successive drawdowns. By computing the tensile and dilatant stresses in the salt, areas of potential structural instability can be identified that may represent "red flags" for additional drawdowns. These analyses have found that many caverns will maintain structural integrity even when grown via drawdowns to dimensions resulting in a P/D of less than 1.0. The analyses have also confirmed that certain caverns should only be completely drawn down one time. As the SPR caverns are utilized and partial drawdowns are performed to remove oil from the caverns (e.g., for occasional oil sales authorized by the Congress or the President), the changes to the cavern caused by these procedures must be tracked and accounted for so that an ongoing assessment of the cavern's drawdown capacity may be continued. A proposed methodology for assessing and tracking the available drawdowns for each cavern was presented in Sobolik et al. (2018). This report includes an update to the baseline drawdowns for each cavern, and provides an initial assessment of the evolution of drawdown expenditure for several caverns

02 PETROLEUM↗

Available Drawdowns for Each Oil Storage Cavern in the Strategic Petroleum Reserve (2021 Annual Report)

The Department of Energy maintains an up-to-date documentation of the number of available full drawdowns of each of the caverns owned by the Strategic Petroleum Reserve (SPR). This information is important for assessing the SPRs ability to deliver oil to domestic oil companies expeditiously if national or world events dictate a rapid sale and deployment of the oil reserves. Sandia was directed to develop and implement a process to continuously assess and report the evolution of drawdown capacity, the subject of this report. A cavern has an available drawdown if after that drawdown, the long-term stability of the cavern, the cavern field, or the oil quality are not compromised. Thus, determining the number of available drawdowns requires the consideration of several factors regarding cavern and wellbore integrity and stability, including stress states caused by cavern geometry and operations, salt damage caused by dilatant and tensile stresses, the effect of enhanced creep on wellbore integrity, and the sympathetic stress effect of operations on neighboring caverns. A consensus has now been built regarding the assessment of drawdown capabilities and risks for the SPR caverns (Sobolik et al., 2014; Sobolik 2016). The process involves an initial assessment of the pillar - to - diameter (P/D) ratio for each cavern with respect to neighboring caverns. A large pillar thickness between adjacent caverns should be strong enough to withstand the stresses induced by closure of the caverns due to salt creep. The first evaluation of P/D includes a calculation of the evolution of P/D after a number of full cavern drawdowns. The most common storage industry standard is to keep this value greater than 1.0, which should ensure a pillar thick enough to prevent loss of fluids to the surrounding rock mass. However, many of the SPR caverns currently have a P/D less than 1.0 or will likely have a low P/D after one or two full drawdowns. For these caverns, it is important to examine the structural integrity with more detail using geomechanical models. Finite-element geomechanical models have been used to determine the stress states in the pillars following successive drawdowns. By computing the tensile and dilatant stresses in the salt, areas of potential structural instability can be identified that may represent red flags for additional drawdowns. These analyses have found that many caverns will maintain structural integrity even when grown via drawdowns to dimensions resulting in a P/D of less than 1.0. The analyses have also confirmed that certain caverns should only be completely drawn down one time. As the SPR caverns are utilized and partial drawdowns are performed to remove oil from the caverns (e.g., for occasional oil sales , purchases, or exchanges authorized by the Congress or the President), the changes to the cavern caused by these procedures must be tracked and accounted for so that an ongoing assessment of the caverns drawdown capacity may be continued. A proposed methodology for assessing and tracking the available drawdowns for each cavern was presented in Sobolik et al. (2018). This report is the latest in a series of annual reports, and it includes the baseline available drawdowns for each cavern, and the most recent assessment of the evolution of drawdown expenditure for several caverns .

02 PETROLEUM↗

Available Drawdowns for Each Oil Storage Cavern in the Strategic Petroleum Reserve (2022 Annual Report)

The Department of Energy maintains an up-to-date documentation of the number of available full drawdowns of each of the caverns owned by the Strategic Petroleum Reserve (SPR). This information is important for assessing the SPR's ability to deliver oil to domestic oil companies expeditiously if national or world events dictate a rapid sale and deployment of the oil reserves. Sandia was directed to develop and implement a process to continuously assess and report the evolution of drawdown capacity, the subject of this report. A cavern has an available drawdown if after that drawdown, the long-term stability of the cavern, the cavern field, or the oil quality are not compromised. Thus, determining the number of a vailable drawdowns requires the consideration of several factors regarding cavern and wellbore integrity and stability, including stress states caused by cavern geometry and operations, salt damage caused by dilatant and tensile stresses, the effect of enhanced creep on wellbore integrity, and the sympathetic stress effect of operations on neighboring caverns. A consensus has now been built regarding the assessment of drawdown capabilities and risks for the SPR caverns (Sobolik et al., 2014; Sobolik 2016). The process involves an initial assessment of the pillar-to-diameter (P/D) ratio for each cavern with respect to neighboring caverns. A large pillar thickness between adjacent caverns should be strong enough to withstand the stresses induced by closure of the caverns due to salt creep. The first evaluation of P/D includes a calculation of the evolution of P/D after a number of full cavern drawdowns. The most common storage industry standard is to keep this value greater than 1.0, which should ensure a pillar thick enough to prevent loss of fluids to the surrounding rock mass. However, many of the SPR caverns currently have a P/D less than 1.0 or will likely have a low P/D after one or two full drawdowns. For these caverns, it is important to examine the s tructural integrity with more detail using geomechanical models. Finite - element geomechanical models have been used to determine the stress states in the pillars following successive drawdowns. By computing the tensile and dilatant stresses in the salt, areas of potential structural instability can be identified that may represent "red flags" for additional drawdowns. These analyses have found that many caverns will maintain structural integrity even when grown via drawdowns to dimensions resulting in a P/D of less than 1.0. The analyses have also confirmed that certain caverns should only be completely drawn down one time. As the SPR caverns are utilized and partial drawdowns are performed to remove oil from the caverns (e.g., for occasional oil sales , purchases, or exchanges authorized by the Congress or the President), the changes to the cavern caused by these procedures must be tracked and accounted for so that an ongoing assessment of the cavern's drawdown capacity may be continued. A proposed methodology for assessing and tracking the available drawdowns for each cavern was presented in Sobolik et al. (2018). This report is the latest in a series of annual reports, and it includes the baseline available drawdowns for each cavern, and the most recent assessment of the evolution of drawdown expenditure for several caverns.

02 PETROLEUM↗

Preliminary Assessment of the Impact on the V-Band Oxygen Channels From Satellite Communication Uplinks

We calculate the percentage of time that an ATMS-like instrument [1] will be illuminated by the uplink beam of one of the proposed V-band communication system and estimate the damage resulting from such exposure. Using a combination of openly available information and educated guesses about the location and characteristics of the up/down link terminals, we constructed the ground segment of a hypothetical high-speed communication network. The space segment of the network was constructed from the orbital data of the existing Starlink constellation [2] of 6223 communication satellites (comsats) which is used as strawman to represent any other possible constellation of communication satellites. It is shown that without a very delicate balance of frequency allocations (science vs telecommunications), coupled with extremely steep and deep bandpass-defining filters, and strict adherence to the agreed limits (i.e. no out-of-band transmissions) the deployment of the telecommunication network leads to almost-complete loss of some important geophysical data. For the analysis we use the spectral characteristics of the ATMS instrument with the ephemeris for the NOAA-21 satellite [3]. The analysis is conducted for the USA and the simulation covers 8 consecutive days in July 2024. Effective and accurate microwave remote sensing of the atmosphere depends on the availability of interference-free spectrum windows at frequencies which are prescribed by physical processes [e.g. 4]. The family of resonant lines of the oxygen molecule near 60 GHz provides a unique opportunity to sample the vertical distribution of temperature and density from space, and it has been exploited for weather and climate studies from polar-orbiting satellites since 1978 (MSU on TIROS-N [5]). It remains a staple in the payloads operated by Russia, China, USA, Japan, France, India, UK, Ukraine [6] which are built around a common blueprint: a few wide-band (hundreds of MHz) channels around 50 GHz to sample the atmosphere and the surface while several more channels with high spectral resolution (few MHz) sample the individual resonant lines. Accurate retrieval of the environmental parameters depends upon the data provided by both sets of channels, and the their location in frequency space is not arbitrary and cannot be altered at will [7, 8]. The introduction of 5G technology in 2019 has driven telecommunication companies to request more bandwidth to be dedicated to their devices. This additional bandwidth is only available in spectral regions traditionally reserved for environmental and astrophysical research, such as the V-band between 50 and 60 GHz for up/downlink between satellites in low-earth orbits and terminals connected to fiberoptics network for distribution to high-speed local internet services. The power broadcast by the uplink communication leg is many orders of magnitude greater than the natural thermal signal emitted from the Earth scene. If the ground antenna were to perfectly align with the passive instrument’s antenna, the spaceborne receiver would suffer permanent, irreparable damage. While a direct boresight-to-boresight conjunction is extremely unlikely (even with a large constellation of satellites the fraction of the celestial sphere occupied by the satellites remains minuscule) the finite size of the ground station’s antenna beam in the sky suggests that the ATMS will be in the near background (as seen from the ground station) of one of the communication satellites and will be illuminated by either the main lobe or the near sidelobes of the uplink antenna more often than it is desirable. For our analysis we first calculate the position of the ATMS with respect to each of the ground stations at a resolution of 0.2 sec, then calculate the position of each of the comsats which are at least 25 deg above the station’s local horizon; finally we calculate the angle between the line-of-sight of the ATMS and the line-of-sight of the comsat. We assume that the gain pattern of the ground station is circularly symmetric; the angle-off-station-boresight then provides an attenuation of the uplink power which we use to assess the likely effect upon the passive instrument’s operations. We assume that each ground station can communicate with all the comsats in its field of view; this implies that, on average, a ground station can engage with 46 comsats simultaneously. The analysis is repeated for the case when the uplink broadcast within the ATMS passive channels (in-band scenario) and for the case when the uplink is limited to frequencies adjacent to the ATMS channels (out-of-band scenario). The antenna of the ground station is modelled as having a HPBW (Half-Power Beam Width) of 0.16 deg and EIRP (Equivalent Isotropic Radiated Power) of 70 dBW. We account for the geometric dissipation of the signal caused by the satellite orbital altitude, the attenuation induced by atmospheric gasses at 51 GHz and the mismatch between the circular polarization of the ground-based transmitting antenna and the linear polarization of the satellite-borne receiving antenna. The damages on ATMS are estimated from bench-level measurement conducted at the ATMS’ manufacturer facilities [unpublished].

passive microwave↗

A Multi-Stage Stochastic Risk Assessment With Markovian Representation of Renewable Power

Probabilistic forecasts provide a distribution of possible outputs and so can capture the uncertainty and variability of Variable Renewable Energy (VRE). However, taking advantage of uncertainty information has practical challenges that make it difficult to integrate probabilistic forecasting into control room decision-making. This paper proposes a novel use-case for probabilistic forecasts by incorporating them into the hour-ahead operations for situational awareness via a risk-averse multi-stage stochastic program. We employ a Markovian representation of the probabilistic forecasts that enables the formulation of the multi-stage problem and avoids a scenario generation phase. We test the model on a realistically sized system to assess risk and showcase the capability of using probabilistic renewable forecast as input to produce probabilistic output forecasts of future system states. The results show that the model can capture time consistency in the reserves and Area Control Error (ACE) forecast. The solution times are adequate for risk profiling in hour-ahead timescales.

forecasting↗

High-Temperature Gas Sensor Array (Electronic Nose) Demonstrated

The ability to measure emissions from aeronautic engines and in commercial applications such as automotive emission control and chemical process monitoring is a necessary first step if one is going to actively control those emissions. One single sensor will not give all the information necessary to determine the chemical composition of a high-temperature, harsh environment. Rather, an array of gas sensor arrays--in effect, a high-temperature electronic "nose"--is necessary to characterize the chemical constituents of a diverse, high-temperature environment, such as an emissions stream. The signals produced by this nose could be analyzed to determine the constituents of the emission stream. Although commercial electronic noses for near-room temperature applications exist, they often depend significantly on lower temperature materials or only one sensor type. A separate development effort necessary for a high-temperature electronic nose is being undertaken by the NASA Glenn Research Center, Case Western Reserve University, Ohio State University, and Makel Engineering, Inc. The sensors are specially designed for hightemperature environments. A first-generation high-temperature electronic nose has been demonstrated on a modified automotive engine. This nose sensor array was composed of sensors designed for hightemperature environments fabricated using microelectromechanical-systems- (MEMS-) based technology. The array included a tin-oxide-based sensor doped for nitrogen oxide (NOx) sensitivity, a SiC-based hydrocarbon (CxHy) sensor, and an oxygen sensor (O2). These sensors operate on different principles--resistor, diode, and electrochemical cell, respectively--and each sensor has very different responses to the individual gases in the environment. A picture showing the sensor head for the array is shown in the photograph on the left and the sensors installed in the engine are shown in the photograph on the right. Electronics are interfaced with the sensors for temperature control and signal conditioning, and packaging designed for high temperatures is necessary for the array to survive the engine environment.

Hunter, Gary W.↗

Integrated CMOS photodetectors and signal processing for very low-level chemical sensing with the bioluminescent bioreporter integrated circuit

We report an integrated CMOS microluminometer optimized for the detection of low-level bioluminescence as part of the bioluminescent bioreporter integrated circuit (BBIC). This microluminometer improves on previous devices through careful management of the sub-femtoampere currents, both signal and leakage, that flow in the front-end processing circuitry. In particular, the photodiode is operated with a reverse bias of only a few mV, requiring special attention to the reset circuitry of the current-to-frequency converter (CFC) that forms the front-end circuit. We report a sub-femtoampere leakage current and a minimum detectable signal (MDS) of 0.15 fA (1510 s integration time) using a room temperature 1.47 mm2 CMOS photodiode. This microluminometer can detect luminescence from as few as 5000 fully induced Pseudomonas fluorescens 5RL bacterial cells. c2002 Elsevier Science B.V. All rights reserved.

Non-NASA Center↗

Physically Realistic Estimates of Electric Water Heater Demand Response Resource

Multiple grid integration studies have examined the value of demand response, including from water heaters, to bulk power systems. Common shortcomings of these studies include physically unrealistic assumptions. For example, studies often assume that all electric water heater load can be shed for up to an hour to provide capacity or contingency service, that all electric water heater load is shiftable, and that round-trip efficiencies for shifting service are 100%. Another issue is that simply summing up estimates of individual water heaters' flexibility bounds, an attractive idea for constructing the MW-scale resources necessary for direct inclusion in grid investment and operational models, can result in significant overestimates of actual resource, because, e.g., a water heater with the ability to reduce load may not be able sustain the reduction for as long as the aggregate model suggests is possible. This presentation demonstrates the impact of estimating the flexibility of electric water heaters with physically realistic models suitable for grid service analysis. Electric water heater flexibility representations are constructed based on ResStock simulations of New England. Specifically, we examine contingency resource (related to capacity, shed, and contingency reserve services) and energy shifting resource from electric resistance and heat pump water heaters. Different estimation methods are compared; and the surrogate models' event responses are validated against events directly simulated in EnergyPlus. We also demonstrate the impact of using electric water heaters for contingency reserves and energy shifting in detailed models of possible future ISO New England power systems.

building energy modeling↗

High-resolution in-beam video rate imaging with the ClearXCam for synchrotron beamlines

The ClearXCam detector is a new video rate imaging in-beam monitor based on a diamond sensor. Imaging with 2304 effective pixels is achieved by sequentially biasing one of 48 metal stripes on one side of a diamond sensor, while reading out the current from 48 stripes on the other side of the sensor. This system was characterized for real-time X-ray beam diagnostics at synchrotron beam­line 17-BM at the National Synchrotron Light Source II. Significant results include: detection of in-beam structure via the imaging mode, beam focusing in one minute with real-time imaging feedback during a focusing event, linearity over five orders of magnitude, validation of a fast mode operating at 100 Hz, and sub-micron beam-positioning resolution. The system is now available commercially.

36 MATERIALS SCIENCE↗

Section 3 Reporting: Preserve America

Brookhaven National Laboratory (BNL) is a multidisciplinary laboratory with seven Nobel Prize-winning discoveries, 37 R&D 100 Awards, and countless advances in science and technology. For over 75 years, the Laboratory has played a leading role in the Department of Energy (DOE) Science and Technology mission and continues to contribute to the DOE’s missions in energy resources, environmental quality, and national security. The Laboratory is operated and managed by Brookhaven Science Associates (BSA), which was founded by the Research Foundation for the State University of New York on behalf of Stony Brook University, and Battelle, a non-profit applied science and technology organization. BNL is committed to longstanding partnerships with researchers, academic institutions, industry, students, teachers, and the surrounding community. BNL is located near the center of Suffolk County on Long Island, New York within Brookhaven Township, about 60 miles east of New York City. Most of BNL’s principal facilities are located near the center of the 5,265-acre (8.23 square mile) site (Figure 1). The developed area encompasses approximately 1,820 acres, consisting of: ▪ 500 acres originally developed by the Army (as part of WW II Camp Upton) and still used for offices and other operational buildings. ▪ 200 acres occupied by large, specialized research facilities. ▪ 520 acres occupied by outlying facilities, such as the Sewage Treatment Plant, research agricultural fields, housing facilities, and fire breaks. ▪ 400 acres of roads, parking lots, and connecting areas. ▪ 200 acres developed for the Long Island Solar Farm. The balance of the site, approximately 3,400 acres, is largely wooded and represents a native pine barrens ecosystem. In November 2000, DOE set aside 530 acres of undeveloped land at BNL as the Upton Ecological and Research Reserve. The Upton Reserve preserves this portion of the pine barrens ecosystem and provides an area for ecological research and education activities.

99 GENERAL AND MISCELLANEOUS↗

The Interplanetary Internet: a communications infrastructure for Mars exploration

A strategy is being developed whereby the current set of internationally standardized space data communications protocols can be incrementally evolved so that a first version of an operational "Interplanetary Internet" is feasible by the end of the decade. This paper describes its architectural concepts, discusses the current set of standard space data communications capabilities that exist to support Mars exploration and reviews proposed new developments. We also speculate that these current capabilities can grow to support future scenarios where human intelligence is widely distributed across the Solar System and day-to-day communications dialog between planets is routine. c2003 American Institute of Aeronautics and Astronautics. Published by Elsevier Science Ltd. All rights reserved.

Internet/standards↗

Improving the performance of first- and last-mile mobility services through transit coordination, real-time demand prediction, advanced reservations, and trip prioritization

Socio-demographic trends and recent economic development patterns have resulted in travel behavior changes that call for more flexible and accessible public transit options. Because flexible transit services vary in scope, size, and service type, new data-informed methods are useful to optimize services based on the specific needs of local communities and riders. In this study, real-world demand and vehicle trajectory data were used to evaluate and optimize system performance for an existing first-mile–last-mile (FMLM) service in Robinson Township, PA. A general FMLM model for arbitrary demand and service supply was then developed to quantify system performance—both travel time costs and day-to-day reliability—for various operational polices considering spatio-temporal demand variation and transportation network dynamics. Heuristics were used for optimal real-time vehicle routing in sizable real-world networks accommodating various service types and scopes. In this case study, total user costs were reduced by 18.6% when rides were coordinated with mainline fixed-route transit. Predictive routing strategies were shown to marginally improve system performance under sparse and variable spatio-temporal demand. The case study also highlights potentially large travel time and user reliability improvements—reductions of 51% and 53.8%, respectively—when trip requests were made in advance of their desired pickup time. Finally, we show that travel time reliability can be improved for time-inflexible trips with trip prioritization without increasing total user costs. These results were stable to changes in demand density.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Insights Into On-Demand Transit: A Case Study of Houston METRO's curb2curb Transit Services: Preprint

As modern on-demand transit (ODT) deployments increase, the insights gained from studying real-world systems prove more useful. In this study, a shared ODT system called "METRO curb2curb" in the suburbs of Houston, Texas was studied, with a particular focus on the Missouri City zone, which has the highest ridership out of the four total zones in which the system operates. The Missouri City zone spans 18 square miles with an average daily ridership of nearly 400 as of November 2024. In order to gain a passenger perspective, data collection was performed through using the ODT system first-hand, completing 50 rides in March and April of 2023. These rides included a mix of three different types of on-demand travel accommodations - 1.) advance bookings (30 min - 2 hours ahead), 2.) as-soon-as-possible / real-time dispatch bookings, and 3.) no-reservation trips at two designated "anchor points." Wait and travel time were collected for each ride. Anecdotal findings related to ease of locating the driver/vehicle, the process of booking a ride, and popular trip purposes were also documented. This study provides an overview of the METRO curb2curb system, including its history, service provider, service area, ridership, booking options, wait time, and travel time. Intricacies related to different definitions of wait time are included. Finally, relevant considerations for automating the on-demand transit system and discussed.

33 ADVANCED PROPULSION SYSTEMS↗

The MELISSA pilot plant facility as as integration test-bed for advanced life support systems

The different advances in the Micro Ecological Life Support System Alternative project (MELISSA), fostered and coordinated by the European Space Agency, as well as in other associated technologies, are integrated and demonstrated in the MELISSA Pilot Plant laboratory. During the first period of operation, the definition of the different compartments at an individual basis has been achieved, and the complete facility is being re-designed to face a new period of integration of all these compartments. The final objective is to demonstrate the potentiality of biological systems such as MELISSA as life support systems. The facility will also serve as a test bed to study the robustness and stability of the continuous operation of a complex biological system. This includes testing of the associated instrumentation and control for a safe operation, characterization of the chemical and microbial safety of the system, as well as tracking the genetic stability of the microbial strains used. The new period is envisaged as a contribution to the further development of more complete biological life support systems for long-term manned missions, that should be better defined from the knowledge to be gained from this integration phase. This contribution summarizes the current status of the Pilot Plant and the planned steps for the new period. c2004 COSPAR. Published by Elsevier Ltd. All rights reserved.

Waste Management/instrumentation/methods↗

Web-Based Requesting and Scheduling Use of Facilities

Automated User's Training Operations Facility Utilization Request (AutoFUR) is prototype software that administers a Web-based system for requesting and allocating facilities and equipment for astronaut-training classes in conjunction with scheduling the classes. AutoFUR also has potential for similar use in such applications as scheduling flight-simulation equipment and instructors in commercial airplane-pilot training, managing preventive- maintenance facilities, and scheduling operating rooms, doctors, nurses, and medical equipment for surgery. Whereas requesting and allocation of facilities was previously a manual process that entailed examination of documents (including paper drawings) from different sources, AutoFUR partly automates the process and makes all of the relevant information available via the requester s computer. By use of AutoFUR, an instructor can fill out a facility-utilization request (FUR) form on line, consult the applicable flight manifest(s) to determine what equipment is needed and where it should be placed in the training facility, reserve the corresponding hardware listed in a training-hardware inventory database, search for alternative hardware if necessary, submit the FUR for processing, and cause paper forms to be printed. Auto-FUR also maintains a searchable archive of prior FURs.

Yeager, Carolyn M.↗

Space shuttle engineering and operations support: Dispersion analysis for the first orbital flight test (OFT-1) mission

A dispersion analysis considering 3—sigma (3σ) uncertainties (or perturbations) in platform, vehicle, and environmental parameters has been performed for the first orbital flight test (OFT-1) mission. The dispersion analysis is based on the nominal trajectory for the OFT-1 reference flight profile (RFP) which is described in Reference 1. The analysis has been performed to determine state vector and performance dispersions (or variations) which result from the indicated 3σ uncertainties. The dispersions are determined at major mission events and fixed times from Liftoff (time slices). The dispersion results will be used to evaluate the capability of the vehicle to perform the mission within a 3σ Level of confidence and to determine flight performance reserves. (FPR).

L.S. Snow↗

Multi-scale variation in spatial heterogeneity for microbial community structure in an eastern Virginia agricultural field

To better understand the distribution of soil microbial communities at multiple spatial scales, a survey was conducted to examine the spatial organization of community structure in a wheat field in eastern Virginia (USA). Nearly 200 soil samples were collected at a variety of separation distances ranging from 2.5 cm to 11 m. Whole-community DNA was extracted from each sample, and community structure was compared using amplified fragment length polymorphism (AFLP) DNA fingerprinting. Relative similarity was calculated between each pair of samples and compared using geostatistical variogram analysis to study autocorrelation as a function of separation distance. Spatial autocorrelation was found at scales ranging from 30 cm to more than 6 m, depending on the sampling extent considered. In some locations, up to four different correlation length scales were detected. The presence of nested scales of variability suggests that the environmental factors regulating the development of the communities in this soil may operate at different scales. Kriging was used to generate maps of the spatial organization of communities across the plot, and the results demonstrated that bacterial distributions can be highly structured, even within a habitat that appears relatively homogeneous at the plot and field scale. Different subsets of the microbial community were distributed differently across the plot, and this is thought to be due to the variable response of individual populations to spatial heterogeneity associated with soil properties. c2003 Federation of European Microbiological Societies. Published by Elsevier Science B.V. All rights reserved.

NASA Discipline Life Support Systems↗