At least 379 records · Page 21

JUSTIFI: Software for Improving Performance Objectives via Energy Efficiency

With growing energy supply concerns and rising costs, energy efficiency is a critical component of industrial energy resilience and competitiveness by directly reducing energy operating costs. Energy efficiency projects in manufacturing also yield valuable benefits to other key metrics, such as improved quality, reduced maintenance costs, improved safety, decreased pollution, and enhanced productivity. However, it is difficult to receive approval for energy efficiency projects, so implementation rates are low, even when meeting capital project payback period criteria. The inclusion and quantification of non-energy benefits (NEBs) in the decision-making process for energy efficiency projects can improve the overall financial payback period while demonstrating a positive impact on the firm's key performance metrics and business strategy. Despite their significant financial and strategic value, NEBs are rarely factored into decision-making due to lack of tools to effectively identify and quantify them. Therefore, a comprehensive and integrative approach is needed for the rapidly evolving energy landscape. To address these challenges, through funding from U.S. Department of Energy, our new assessment methodology integrates common continuous improvement six sigma concepts, such as the DMAIC process, and a protocol of guiding questions, into energy efficiency assessments to identify NEBs. We have also developed open-source software, JUSTIFI, to guide users through this process, data collection, and quantification. It is designed to be used concurrently with DOE energy system analysis software suite, MEASUR. Our methodology and tools inform energy assessors, firm engineering, decision makers, and workforce seeking to increase energy resilience and to maximize benefits aligned with performance metrics.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

USE OF COGNITIVE WORK ANALYSIS IN DEVELOPING A NUCLEAR POWER PLANT NEW STATE VISION

The United States nuclear industry is in need of identifying and implementing a new strategy that will lower operating and maintenance costs while maintaining safety for existing plants. The industry must also have a clear and strategic vision of their transformative new state that focuses on ways in which technologies can be integrated to maximize the benefits of technology and people. While there are ongoing efforts in this area, this work discusses how the use of cognitive work analysis may further support these current efforts. This paper provides an overview of cognitive work analysis, as well as the state of current new state development efforts. The use of cognitive work analysis, as a tool to enhance existing practices, is presented in ensuring that the development of a new state vision is systematic and complete.

99 GENERAL AND MISCELLANEOUS↗

A Custom Machine to Convey Radiologically Impacted Cohesive Soils to the Orion ScanSortSM System - 20382

An established method to reduce the volume of material required to be disposed of as radioactive waste is conveyor-based sorting of potentially radiologically impacted soils. With the Orion ScanSortSM system, potentially impacted soils are conveyed beneath radiation detectors and sorted into above and below criteria bins based on the detectors' response. Confident measurements can only be efficiently achieved when the soil column being conveyed has a reasonably consistent geometry. Highly cohesive soils present a very significant challenge as they tend to clump and adhere to the conveyor hopper, strike-off bar, and belt skirting. This causes voids and valleys in the soil column that affect the measurement geometry and reduce the confidence in the measurement. The reduction in confidence necessitates a longer residence time (i.e. reduction in conveyor belt speed and processing rates) or that the soils in highly unfavorable geometries be dispositioned as impacted or segregated for resurvey (should site logistics support that option). These outcomes may increase the volume of material required to be dispositioned as radiological waste and have a negative impact on project cost and schedule. To minimize impact to sorting operations, Wood designed and built a customized Extruder, to optimize the soil column prior to assay. The design was developed and refined to minimize the volume of highly cohesive soils presented in highly unfavorable geometries in the soil column in order to confidently assess and disposition such soils in a high-production environment. The Extruder is a customized 90 cm wide flat conveyor that has an oversized hopper with a pair of motor-driven rollers that force the soils in the hopper through an opening of adjustable height. The soils are extruded through the opening to produce a soil column that is ∼75 cm wide and ∼8-18 cm deep with a design rate of 225 metric tons/hr. The Extruder was recently deployed with the Orion ScanSort{sup SM} System to a site in northeast Ohio. The site has highly cohesive soils that result from the weathering of glacial sediments and consist of clay and clay loam, resulting in poor drainage and high moisture content. The project infrastructure only supported two bins of material (above and below criteria), which necessitated that soils with unfavorable geometries be discharged into the above criteria bin, along with material determined to have been contaminated. The Extruder was extremely successful in producing a stable soil column with favorable geometries for radiological assay. During production, less than 0.5% (by mass) of the soils processed were presented in unsatisfactory geometries requiring disposition as radioactive waste. The Extruder did not get clogged due to the cohesive soils (as is typical with conventional conveyors) and required very little maintenance, again minimizing impacts to sorting operations. The conveyor belt speed was operated at 14 cm/s with a typical belt loading of ∼109 kg/m resulting in a mean process rate of ∼49 metric tons/hr. The process rate was constrained by other project logistics, rather than by the capabilities of the Extruder, which was operated at less than 20% of the maximum design speed (75 cm/s). It is concluded that the Extruder is highly likely to produce a stable highly cohesive soil column suitable for efficient and confident radiological assay in production environments of 250 short tons/hr or more. The Extruder has the capability to drastically reduce the duration and costs of projects with radiologically impacted highly cohesive soils. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Implement and Test 3D Mortar Contact in BISON

We leverage the extension of the generation of mortar segment meshes to three dimensions in MOOSE’s framework to extend thermomechanical modeling capabilities to problems with three dimensions. A modular approach to gap heat transfer physics using the mortar finite element method was created and documented, mechanical contact was extended to three dimensions—including frictional behavior, performance and ease of use were improved, and steps towards scalability of solid mechanics problems involving contact were taken. Many of these new developments are demonstrated in the simulation of 3D light-water reactor (LWR) problems, where the thermomechanical interface problem is solved using the mortar finite element method. Usage of the mortar framework has improved convergence in 2D problems and has enabled employing friction in 3D problems, of which we show results of a short, local stack of 3D pellets. Consequently, the benefits of mortar in terms of solution convergence and quality are extended to three dimensions. Section 2 discusses fundamental developments that enabled the simulation of practical mortar problems in three dimensions and other general improvements, including the reduction of the derivative container size, the modification of dual basis computations when edge dropping (lack of secondary element projection) takes place, the improvement of conditioning when employing the VCP in-edge dropping conditions, and code usability and quality improvements. These latter code enhancements include the migration of tests using “old” mortar contact constraints to using dual mortar with a semi-smooth Newton solution strategy and the reuse of lower dimensional domains for straightforwardly setting up a mortar thermomechanical LWR problem, i.e. the MOOSE action is employed for mechanical contact and the thermal LWR action is employed to capture the gas conductance, contact, and radiation components of gap heat transfer physics. Independently of the mortar LWR thermal action, we developed a modular approach to gap heat transfer that resides in MOOSE and can be leveraged, e.g., in metallic fuel problems. This approach, whose code design based on MOOSE’s user objects to model specific physics was proposed by the maintenance activity, is detailed in Section 3. Based on the dual mortar finite element method, the frictional contact constraints were extended to three dimensions. A block sheared in two directions in and out of contact with a rigid plane is employed in Section 4 to show the way the approach handles changes in frictional states (e.g. stick to slip) within a competitive number of Newton iterations. Equations and numerical results on the use of the VCP with Cartesian Lagrange multipliers, whose combination enables their direct condensation, are described in Section 5.3. Two-dimensional and three-dimensional BISON LWR simulations are discussed in Section 6. Particularly, a stack of five eccentric pellets with a surface defect is simulated and the effect of pellet-cladding friction is assessed. Finally, conclusions are outlined in Section 7.

42 ENGINEERING↗

Implementation and Operation of Power Flow Control Solutions for Transmission Systems

Power-flow controls (PFCs) technologies provide a suite of alternatives to more-efficiently direct the flow of power on the grid, improving flexibility and enabling the grid to be more responsive and resilient. PFCs can be used in many cases to mitigate overloads and consequently defer the installation of grid-expansion projects. They can also be suitable options in situations where new transmission lines cannot be built because of environmental constraints, land use, or other types of restrictions. Other uses include mitigation of loop or unintended flows, forcing of contractual or scheduled flows, reduction of congestion, and mitigation solutions during large maintenance or construction projects. While many studies have demonstrated the potential economic benefits of PFC for different types of applications, the implementation implications of using multiple PFCs for system operation and reliability have not been analyzed in detail. The lack of information and practical experience on these aspects hinders adoption of this technology. One use case would be that multiple PFCs are required to coordinate congestion management. In such cases, multiple PFCs are deployed in a meshed power system to control power flows across a wide area. The challenges are associated with PFC interaction—namely, the self and mutual power-flow sensitivity of each PFC, which must be accounted for in the calculation of the respective operating setpoints. This report analyzes implementation and operation that must be considered in evaluating transmission solutions using PFCs. The report first analyzes attributes with which PFC-based solutions should comply, based on the objective and characteristics of each particular use case. It then describes different approaches for coordinated control of multiple PFC devices for different applications, including options to avoid adverse interactions and reduce risks due to inappropriate coordination. Control and operation are illustrated through case studies performed on both generic and actual power system models. This report provides insights for transmission planners and operation engineers about the implementation of PFC-based transmission solutions; consequently, it will help them make informed decisions about the adoption of the technology.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Heliostat Sizing Methodology for Solar Heat for Industrial Processes

This study presents a method to obtain a heliostat size that minimizes the levelized cost of a heliostat-based concentrating solar thermal system for industrial process heat (IPH) applications at operating temperatures from 565 to 1550 degrees Celsius. The method extends prior work by embedding a routine for system design that obtains near-optimal subsystem sizes, increasing the fidelity of drive cost functions, and adding an optical performance model. An illustrative business case is developed for Daggett, California, targeting specified annual thermal energy outputs of 50 to 400 GWhth. Optical performance is modeled using verified estimates from the literature. A surrogate heliostat cost model, derived from commercial heliostat designs and scaled for production volume, installation, and operations and maintenance costs, is used to develop cost functions. Results show that heliostat size strongly affects the levelized cost of heat (LCOH), producing a characteristic U-shaped trend with a robust near-optimal window of 8 - 12 m2; the heliostat size producing the lowest project cost in our study grows slightly as the project size increases, and is reduced as the operating temperature increases. The findings in this study are consistent with the general trend of smaller heliostats under deployment at existing projects for high-temperature industrial process heat and reflect the significant reduction in power electronics and other per-heliostat costs. The methodology we propose is general and can be tailored to revised cost curves as the technology continues to evolve.

14 SOLAR ENERGY↗

Liquid Core Detection and Strand Condition Monitoring in a Continuous Caster Using Optical Fiber

Real-time monitoring of the liquid core position during the continuous casting of steel has been demonstrated using low-cost distributed optical-fiber-based strain sensors. These sensors were installed on the containment roll support structures in the segments of a production continuous caster to detect the position of the solid–liquid interface and monitor the strand condition during the continuous casting. Distributed Fiber Bragg Grating sensors (FBGs) were used in this work to monitor strain at six roll positions in the caster. The sensor performance was first validated by comparing optical strain measurements with conventional strain gauge measurements in the lab. Next, optical strain measurements were performed on an isolated caster segment in a segment maintenance facility using hydraulic jacks to simulate the presence of a liquid core under the roll. Finally, the sensors were evaluated during caster operation. The sensors successfully detected the load increase associated with the presence of a liquid core under each instrumented roll location. Incidents of bulging and roll eccentricity were also detected using frequency analysis of the optical strain signal. The liquid core position measurements were compared using predictions from computer models (digital twins) in use at the production site. The measurements were in good agreement with the model predictions, with a few exceptions. Under certain transient caster operating conditions, such as spraying practice changes and SEN exchanges, the model predictions deviated slightly from the liquid core position determined from strain measurements.

47 OTHER INSTRUMENTATION↗

Digitalization Guiding Principles and Method for Nuclear Industry Work Processes

The commercial U.S. light-water reactor fleet has been operating at historical efficiency, reliability, and safety over the last decade. Nuclear power has the highest capacity factor of any other power generation technology while also serving as the largest baseload source for carbon-free energy. Despite this remarkable achievement, continued operations for many plants are threatened due to fierce electricity market competition and rising operations and maintenance costs of which continued maintenance of obsolete analog equipment is a contributor. The digital age and associated technologies are where the future lies in process control, and nuclear has yet to take full advantage of the capabilities offered therein. The Light Water Reactor Sustainability Program (LWRS) at Idaho National Laboratory (INL), sponsored by the Department of Energy, has a mission to help the light-water reactor fleet manage its foundational capabilities to continue providing safe and reliable carbon-free power. LWRS helps support that mission by providing scientific, technology-based solutions for advanced concepts of operations with a more viable business model that will allow the fleet to continue to operate at peak levels through extended plant operation. The LWRS Digitalization Project at INL seeks to leverage digital technologies to synthesize and transform work processes. We provide a state-of-the-art analysis of digitalized work processes in nuclear power and investigate ways in which researchers at INL and the nuclear industry can work together to identify what data to access, how to access it, what to do with the data, and most importantly, how to use the insights for decision-making across all levels within the business. Borne from these considerations, we present four guiding principles for digitalization: develop a coherent digitalization plan, apply human factors engineering, establish data governance, and anticipate unintended consequences. Together, these principles form a method that plants can use to effectively to digitalize nuclear industry work processes. Our guiding principles are informed by multiple knowledge sources. First, we document activities from the Work Digitalization Initiative, which was conceived as a means for nuclear organizations to help define and standardize the industry’s approach to digitalizing work. Second, we detail primary research conducted with industry professionals regarding drivers and barriers to digitalization adoption. We present survey results that demonstrate what the industry hopes to get out of digitalization and the ways that INL can continue to support the industry’s digital transformation. Third, we present a digitalization use case with industry partners NextAxiom Technology and Xcel Energy. The project objective was to transform the current condition report work process from paper to digital, incorporating digitalized principles. We report the development of the application and lessons learned. The accomplishments achieved by this research and development serve to identify critical needs for plant guidance in support of digitalization implementation and contribute to the knowledge and strategies available for utilities considering or undertaking digitalization.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

NFE-24-10417: Durability and Life-time Energy Performance Enhancement of Vapor Compression Systems

This project investigated the use of a Centrifugal Particle Separation (CPS) system to improve the durability and operational reliability of outdoor heat exchangers in vapor-compression based heating, ventilation, air conditioning, and refrigeration (HVACR) systems. The developed method introduced a novel dust and fouling mitigation approach by integrating an ambient air pre-cleaner that employs centrifugal forces to remove particulate matter from incoming air before it reaches the heat exchanger. By reducing the accumulation of dust and debris on coil surfaces, the CPS system aims to lower maintenance requirements and extend equipment lifespan. The project specifically involves coupling a centrifugal air pre-cleaner with a single-zone ductless mini-split system and evaluating its effectiveness in maintaining cleaner coil surfaces. Additionally, the study examined the impact of CPS integration on system energy performance. Through controlled experimental testing and performance monitoring, this work seeks to validate CPS-based air pre-cleaning as a practical, efficient solution for mitigating outdoor coil dust accumulation and fouling in both residential and commercial HVACR applications.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Supercritical Carbon Dioxide Primary Power Large-Scale Pilot Plant

The United States electrical power generation fleet encompasses a wide range of technologies, ranging from traditional combustion-based power generation, to nuclear power, to renewable energy. While the distribution of these assets continues to shift due to economic and regulatory influences, coal combustion continues to be a key part of the US energy portfolio. Despite the relative maturity of coal combustion technology, improvements in overall fuel-to-power efficiency and generation flexibility are still possible and will improve both the economic and environmental factors of coal combustion. Echogen Power Systems proposes to lead a world-class team including the University of Missouri, Electric Power Research Institute and Louis Perry Associates in the design, construction and operation of a 10MWe coal-fired supercritical carbon dioxide (sCO 2 ) large-scale pilot. This transformational technology uses sCO 2 as a working fluid instead of water to achieve high thermodynamic efficiencies that can significantly exceed advanced steam-Rankine cycles. Further, the compact nature of sCO 2 turbomachinery offers capital cost and footprint advantages, and the low maintenance of a water-free power cycle can significantly reduce operation and maintenance (O&M) costs over conventional steam-Rankine systems. Recent integration studies of sCO 2 with coal combustion power plants highlight the significant improvements in plant efficiency that sCO 2 can offer relative to even advanced steam Rankine cycles. At commercial scales, coal-sCO 2 plant net efficiency is predicted to be 39-44.0% (HHV), or 10-20% higher output than conventional steam-Rankine systems, which will significantly improve the competitiveness of coal-fired generation. This proposal builds upon projects previously funded by the Department of Energy, including DE-FE0025959 (High-Efficiency Thermal Integration of Closed Supercritical CO 2 Brayton Power Cycles with Oxy-Fired Heaters) and DE-NE0008470 (Conceptual Design for sCO 2 Power Cycle Test Facility). An appropriately-scaled and properly designed and operated pilot project is essential to overcome the natural risk-aversion of the power generation industry and project financing community. The 10 MWe coal-fired sCO 2 pilot power plant proposed herein will reduce the technical and economic risk of this transformational technology, enabling commercial deployment at the conclusion of the project. For the second phase of this project, Echogen lead a team that completed and refined the pilot system conceptual system and key component designs resulting in the completion of a front-end-engineering-design (FEED) study, completed the NEPA review process, completed the permitting process for construction and operation, refined the techno-economic analysis of the proposed system at commercial scale and received commitments for Phase III cost share. The end result of the program will be to demonstrate the technical and economic superiority of the sCO 2 power cycle for coal-fired operation. Major risk elements will have been retired with sufficient operation at high power to enable the power generation industry to move forward with the first commercial deployment of this transformational system.

01 COAL, LIGNITE, AND PEAT↗

Recent Progress of JT-60SA Project toward Plasma Operation

Superconducting tokamak JT-60SA plays an essential role in fusion research and development by supporting and complementing ITER project, providing directions to the DEMO design activity and fostering next generation scientists and engineers. Since the incident of the Equilibrium Field coil #1 during the Integrated Commissioning (IC) in March 2021, both EU and JA Implementing agencies (IAs) have examined how to ensure safety operation of JT-60SA by mitigating the risk of possible discharge occurrence inside the cryostat. Based on the experience of the Global Paschen tests, the IAs have established a strategy of risk mitigation measures, which is a combination of (i) reinforcement of insulation, (ii) avoiding unnecessary voltage application to the coil systems and (iii) immediate de-energization of the coils when deteriorated vacuum condition is detected. Thanks to the considerable efforts of the Integrated Project Team (IPT) members, the IC restarted in May 2023. After the confirmation of superconducting state of coil systems (TF, EF and CS), the coil energization test and the plasma operation (OP-1) starts. The first plasma was successfully achieved on 23 October 2023 with a limited value of applied voltage and current to the coils. The plasma configuration control will be also confirmed with low plasma current and low auxiliary heating power conditions. Based on the IO-F4E-QST collaboration, activities of JT-60SA have been shared with the IO and provided an important lesson learned for ITER assembly and commissioning, and will provide an outstanding contribution to fusion research at large. After OP-1, Maintenance & Enhancement phase 1 (M/E-1) starts from January 2024, in which in-vessel components are installed, and heating system and diagnostic system are extensively upgraded to allow high power heating experiment planned in OP-2. In order to make the best use of JT-60SA, newly organized JT-60SA experiment team will refine the research plan in the future high heating power operation phase.

Broader Approach activities↗

Next-Generation Sequencing Data from a CUT&RUN Study of R. toruloides IFO0880 Cse4 and Orc1 Binding Sites

Rhodotorula toruloides has been increasingly explored as a host for bioproduction of lipids, fatty acid derivatives and terpenoids. Various genetic tools have been developed, but neither a centromere nor an autonomously replicating sequence (ARS), both necessary elements for stable episomal plasmid maintenance, has yet been reported. In this study, cleavage under targets and release using nuclease (CUT&RUN), a method used for genome-wide mapping of DNA–protein interactions, was used to identify R. toruloides IFO0880 genomic regions associated with the centromeric histone H3 protein Cse4, a marker of centromeric DNA. Fifteen putative centromeres ranging from 8 to 19 kb in length were identified and analyzed, and four were tested for, but did not show, ARS activity. These centromeric sequences contained below average GC content, corresponded to transcriptional cold spots, were primarily nonrepetitive and shared some vestigial transposon-related sequences but otherwise did not show significant sequence conservation. Future efforts to identify an ARS in this yeast can utilize these centromeric DNA sequences to improve the stability of episomal plasmids derived from putative ARS elements.

Genome Engineering↗

Dragonstone Strategy – State of Cybersecurity in the Oil & Natural Gas Sector

The oil & natural gas (ONG) system touches every corner of the nation and increased communications & control capabilities have not only allowed for greater efficiency of system operation, but have also created a massive target for adversaries to launch cyber-attacks. Like any other heavy industrial process, the ONG system relies on a complex system of information technology (IT) and operational technology (OT) devices. The current state of cyber-preparedness across the ONG industry varies from organization to organization. Among the most common challenges that ONG companies face are remote locations, longlived field assets, and lacking capabilities to find and track malware on their systems. ONG companies tend to be concerned with lack of cyber-awareness from employees, risk stemming from remote access for operations & maintenance, and software vulnerabilities within third-party equipment. Various industry and government organizations are performing research and development activities to address some of these challenges, but in many cases industry stakeholders are not aware of solutions that already exist. It is clear that a need exists for a coherent, comprehensive, multi-layered strategy for assuring the security and resilience of the nation's pipeline infrastructure against cyber threats. For a variety of reasons, the general consensus from stakeholders interviewed by LLNL is that the state of cyber-security within the electric grid is currently outpacing its ONG cousin. Existing strategies for the resilience and cyber-security of the electric grid can and should be leveraged to provide immediate benefits to the ONG system. In LLNL’s view, there are two key factors currently limiting the development of necessary cyber-practices within the ONG industry: The sheer number of differing regulatory bodies and trade groups offering both standards and best-practice recommendations for ONG cyber-security makes it difficult to create a comprehensive, directed, and coherent strategy that is applicable to all players within the ONG industry. The ONG industry is unaware of potentially useful technologies that have been developed for ensuring cyber-security of other infrastructure systems, such as the electric grid. Leveraging these technologies—and the science and engineering behind them—can provide some low-hanging fruit that can greatly improve cyber-security in the ONG industry without significant investments in terms of time and money. In the months following this report, LLNL will continue to perform outreach to key oil & gas industry stakeholders in a continual effort to identify the most pressing cyber-resilience issues in the industry. This outreach will be supplemented with LLNL’s threat intelligence capabilities to begin painting a clearer picture of the overall threat landscape faced by this sector. This assessment will be threat-informed and while the strategy itself will not be classified we will leverage intelligence analysis and adversary capabilities to identify gaps in current cybersecurity practices for oil & gas pipeline systems. Recommended efforts will be compiled into a cyber-resilience roadmap for the oil & gas pipeline sector, in which LLNL will highlight priority activities to immediately improve the state of cyber-resilience in the industry.

02 PETROLEUM↗

Titanium-Cerium Electrode-Decoupled Redox Flow Batteries Integrated With Fossil Fuel Assets For Load-Following, Long-Duration Energy Storage

Operation of fossil plants at partial capacity with frequent cycling results in decreased efficiency, increased emissions and increased wear and maintenance. The objective of this project is to advance the integration of a titanium-cerium electrode-decoupled redox flow battery (RFB) system with conventional fossil-fueled power plants through technical and economic system-level studies and component scale-up and R&D. The Ti-Ce chemistry has a pathway to meet the DOE cost targets of $\$$100/kWh and $\$$0.05/kWh-cycle owing to the use of low-cost, earth abundant elemental actives and incorporation of inexpensive carbon felt electrodes and non-fluorinated anion exchange membrane (AEM) separators. The initial unit cell design was scaled up, with some modifications made to improve ease of manufacturing, from 25 cm 2 cell area to 400 cm 2 . Electrochemical tests demonstrated operation at a current density up to 50 mA/cm 2 , which is on par with other commercial RFB offerings. Furthermore, the Ti-Ce technology developed by WashU was evaluated and tested by industrial team partner, Giner, Inc., in their modular 3-cell stack. Several cell design modifications and alternate component material selections were successfully implemented to accommodate this chemistry while reducing polarization and leakage. Results from stack testing show high columbic efficiency and indicate that further optimization of cell compression and components will lead to successful operation of the Ti-Ce ED-RFB over longer duration at the multi-cell stack level. Engineering and cost analysis showed that an RFB system with power output on the order of 100 MW and with a charge/discharge duration of approx. 12 hours is the most cost effective for integration with fossil plants. At this scale, projected cycling of fossil fuel power plants can be significantly reduced. The use of a storage system is shown to reduce the fossil plant standalone cost of electricity by $\$$7/MWh, through increased capacity factor and improved average efficiency, in the scenario of high penetration of renewable power.

20 FOSSIL-FUELED POWER PLANTS↗

Opportunities to Implement Solutions to Achieve Remedial Action Objectives in Consideration of Stakeholder Interests - 20365

A case study in the implementation of a soils excavation and removal project conducted at a Formerly Utilized Sites Remedial Action Program (FUSRAP) Maywood Superfund Site (FMSS) vicinity property; an active commercial business, in a densely populated area, with significant operational, technical and, logistical constraints that were expected to limit areas that could be remediated. The United States Army Corps of Engineers-led (USACE) team successfully navigated complex overlapping stakeholder interests to achieve a more efficient and complete removal of contaminated soils and debris while minimizing unnecessary excess costs to the Government. This paper centers on FUSRAP activities at the FMSS vicinity property located at 149-151 Maywood Avenue, Maywood, Bergen County, New Jersey. For most of its FUSRAP history, this ∼109,000 square meter (27-acre) property housed a now-demolished ∼26,000 square meter (6.5-acre) warehouse operated by Sears Logistics Services, a unit of the Sears Roebuck Company (Figure 2). Sears ended its property lease and vacated the warehouse in December 2016. Given that long history and for the purposes of this paper, the property will be referred to as the 'Sears property' or simply 'the property.' The Sears property is approximately 109,000 square meters (27-acres) and is currently zoned for commercial use. The property is bound to the north and northwest by 100 West Hunter Avenue (the Stepan Company), to the northeast by 205 Maywood Avenue, to the east by Maywood Avenue, to the south by 23 West Howcroft Road, and to the west by businesses on NJ Route 17 and the NJ Route 17 roadway. Until December 2016, the property housed a warehouse and distribution center operated by Sears Logistical Services. On-site structures were demolished by the property owner in 2017. The warehouse covered the north section of the property along the Stepan Company property line. A railroad spur from the adjacent property now known as the Maywood Interim Storage Site (MISS) ended at the northeast corner of the warehouse. Wetlands were located east of the warehouse; the rest of the property was covered with paved parking lots and grassed areas. During remediation at the property, opportunities frequently arose where the project team was able to coordinate effectively with stakeholders to sequence remediation activities to facilitate removal of otherwise inaccessible soils and identify opportunities for materials reuse when supported by residual radiological and chemical levels. Some specific opportunities include: - remediating individual truck loading dock bays to maintain tenant operations; - working along a busy highway and in a utility corridor containing a 30-inch high pressure gas main; - remediating Lodi Brook and associated wetlands requiring bypass pumping and other diversionary structures to maintain local community stormwater drainage; - protecting during remediation and supporting access to facilitate tenant/owner maintenance of critical fire protection and water supply system service lines buried in contaminated soils and necessary for safe warehouse operations; and - coordinating with stakeholders to ensure non-radiological contaminants of concern for the site (unaffiliated with FUSRAP) were addressed by the responsible party in a manner that maximized benefit to all parties while supporting an efficient overall site remediation program. Once the property was vacant and the warehouse structure and radiologically non-impacted above-grade structures were demolished, the project identified an opportunity to significantly reduce the volume of waste associated with the foundation of the former warehouse, a foundation suspected of being partially constructed in radiologically contaminated soils. The project developed and implemented supplemental radiological verification survey and sampling strategies based on radiological cross-contamination risk potential with process flow-charts and screening-level based decision points; a program that classified saw-cut sections of concrete based on observed residual surface radioactivity conditions using a combination of gamma sensitive sodium-iodide scans and beta sensitive Geiger-Muller direct measurements. The proposed approach was reviewed with stakeholders with feedback, including consideration of applicable State of New Jersey Site Remediation Program criteria and guidance before implementation. Once classified, additional sampling was performed at frequencies driven by screening. The sampling methods, stockpile sampling frequencies, criteria and, approach to data evaluation were developed in consideration of existing site cleanup standards, regional background ranges, State of New Jersey radiological remediation program guidance, and specific stakeholder input With the property remediation and survey efforts nearly completed, it is relevant to examine retrospectively the objectives, assumptions and limitations in the remedial design (i.e., what was planned) versus what was able to be accomplished through effective teaming. Benefits to other environmental remediation site programs include better understanding of how to work effectively with stakeholders to achieve win-win outcomes, and approaches to site remediation, waste minimization and materials reuse that were successful in their overall outcomes. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Investigation of INL Site Implementation of ARG-US

The Packaging Certification and Life Cycle Management department at Argonne National Laboratory (ANL) developed a suite of monitoring systems collectively referred to here as ARG-US. ARG-US is used to provide necessary data for nuclear facility and system operation and maintenance. ARG-US has been previously demonstrated in hot cells, radioactive material (RAM) storage areas, and RAM shipment trucks. It has also been installed directly on RAM storage and shipment containers. ARG-US offers some unique advantages over other commercially available systems by using wireless data connections, battery power supplies, and customizable monitoring methods. Idaho National Laboratory (INL) has been tasked with investigating applications for ARG-US at INL site facilities, which are operated by several different contractors. The initial investigation scope centered on CPP-603 Wet & Dry Fuel Storage Facility in relation to the upcoming DOE Spent (SNF) Packaging Demonstration. The investigation has been led by the Used Fuel Management Department in the Nuclear Science and Technology Directorate. This investigation is expected to recommend processes or facilities at the INL site at which to implement ARG-US systems. INL has engaged local site technical and oversite representatives, security, nuclear safeguards, and program management to identify good candidates for ARG-US test implementations. INL has identified high-level goals for any INL site implementation of ARG-US: provide unique testing environments, prompt development of new monitoring methods/techniques for the ARG-US suite, and acquire useful monitoring for the user facility. To these ends, INL suggests 3 program areas for further investigation: CPP-603 Fuel Handling Cave (FHC), legacy mixed waste storage systems at Idaho Nuclear Technology & Engineering Center (INTEC) known as the “tank farm”, and periodic and emergency environmental monitoring. This progress report relates activities undertaken in this investigation, describes the preliminary areas of interest for limited scope ARG-US testing or implementation, and relays expected actions needed to complete the task scope. This report offers an opportunity to the program sponsor, technical leads at ANL, and INL site representatives to give feedback on the initial assessment and make recommendations on the forthcoming activities.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

On the Language of Reliability: A System Engineer Perspective

In its classical definition, risk is defined by three elements: what can go wrong, what are its consequences, and how likely is it to occur? While this definition makes sense in a regulatory-based framework where for the current fleet of operating light water reactors (LWRs), the risks associated with nuclear power plants typically are characterized in terms of core damage and large early release frequency (LERF), this approach does not provide a useful snapshot of the health of the plant from a broader perspective. This is due to the very narrow context in which the term “risk” typically is defined as nuclear safety aspects that have the potential to impact public health. In this paper, we take the viewpoint of nuclear safety that is reflective of the current fleet of operating LWRs for which core damage frequency and LERF are appropriate metrics. For other advanced reactor designs, other more applicable technology neutral metrics of reactor safety metrics would be specified. A possible alternate path would start by redefining the word risk with a broader meaning that better reflects the needs of a system health and asset management decision-making process. Rather than asking how likely an event could occur (in probabilistic terms), we can ask how far this event is from occurring. Our approach starts by defining and quantifying component and system health in terms of a “distance” between its actual and limiting conditions, i.e., determination of the margin that exists between the current state/condition and the state where the component/system is no longer capable of achieving its intended function. A margin is a measure that is more reflective of the current state or performance of a component, and therefore more closely tied to decisions that are made on an ongoing basis. Further, we will show how, given the data available from plant equipment reliability and monitoring (e.g., pump vibration data) and prognostic (e.g., component remaining useful life estimation) data, a margin can be described and determined for all types of maintenance approaches (e.g., corrective or predictive maintenance). We show how classical reliability models (e.g., fault trees) can be used to quantify the system margin provided component margin values. In the approach described in this paper, the propagation of margin values through classical reliability models are not performed using classical probabilistic calculations applied to sets (as performed in a typical plant probabilistic risk assessment). Instead, we show how it is possible to propagate margin values through Boolean logic gates (i.e., AND and OR operators) through distance-based operations.

97 MATHEMATICS AND COMPUTING↗

FY2020 Savannah River Site Composite Analysis Annual Summary Review

This document provides the Department of Energy (DOE) Order 435.1 and its manual, Radioactive Waste Management (DOE 2021a, 2021b) required Annual Review for the Savannah River Site (SRS) Composite Analysis (CA). Progress made to-date toward addressing the secondary issue from the LFRG review of the 2010 SRS CA has focused primarily upon inventory estimate improvements. Inventory impacts dose in a linear fashion and reduces the uncertainty with the CA conclusions. Maintenance items are addressed, as funding allows, based on the relative risk associated with meeting the performance objectives. Currently, there is minimal risk in exceeding the DOE 100 mrem/yr CA primary dose limit or the DOE 30 mrem/yr dose constraint (administrative limit). Proposed activities, discoveries, new information and changes potentially affecting the 2010 SRS CA are documented in this and earlier Annual Summary reports, and a consolidated list of changes since the 2010 CA is documented in this report. The impact to the CA of changes arising from updated performance assessment (PA) baselines [i.e., Saltstone Disposal Facility (SDF), E-Area Low-Level Waste Facility (ELLWF), and F & H Tank Farm (FTF & HTF) closures] is expected to be minor for the following reasons: The primary contributors to the SRS CA dose impact at the Upper Three Runs (UTR) point of assessment (POA) are the H-Canyon and Mixed Waste Management Facility (MWMF), contributing 68% and 9%, respectively, to the dose impact at that POA. The combined contribution to the UTR dose impact from all PA’s (SDF, ELLWF, FTF and HTF) is ~2% of this total. The 2010 SRS CA model validation performed indicates that the CA projected dose, while generally conservative, provides a reasonable representation of the maximum annual doses. Doses evaluated are well below the SRS established 15 mrem/yr administrative limit (Crapse et al. 2011). Based on the assessment presented within this annual review and collective engineering judgement, the conclusions of the 2010 SRS CA remain valid and there is reasonable assurance that SRS will meet the performance objectives delineated in DOE Manual 435.1-1. The 2010 SRS CA should be updated to incorporate PA changes, proposed changes to inventories and sources and model improvements accumulated since the 2010 CA. The timing will be dependent on the completion of the ongoing E-Area PA revision.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗