At least 379 records · Page 21

Lessons learned at 208K: Towards Debugging Millions of Cores

Petascale systems will present several new challenges to performance and correctness tools. Such machines may contain millions of cores, requiring that tools use scalable data structures and analysis algorithms to collect and to process application data. In addition, at such scales, each tool itself will become a large parallel application--already, debugging the full Blue-Gene/L (BG/L) installation at the Lawrence Livermore National Laboratory requires employing 1664 tool daemons. To reach such sizes and beyond, tools must use a scalable communication infrastructure and manage their own tool processes efficiently. Some system resources, such as the file system, may also become tool bottlenecks. In this paper, we present challenges to petascale tool development, using the Stack Trace Analysis Tool (STAT) as a case study. STAT is a lightweight tool that gathers and merges stack traces from a parallel application to identify process equivalence classes. We use results gathered at thousands of tasks on an Infiniband cluster and results up to 208K processes on BG/L to identify current scalability issues as well as challenges that will be faced at the petascale. We then present implemented solutions to these challenges and show the resulting performance improvements. We also discuss future plans to meet the debugging demands of petascale machines.

99 GENERAL AND MISCELLANEOUS↗

Hanford site asbestos management lessons learned - 15183

The U.S. Department of Energy (DOE) is responsible for the environmental cleanup of the Hanford Site central plateau. As part of this responsibility, DOE contractors conduct deactivation, decommissioning, decontamination, and demolition (D4) of retired/inactive facilities, including very large chemical processing facilities. To date, DOE contractors have demolished hundreds of facilities, reducing baseline site maintenance costs and reducing the environmental threats and hazards that the degrading buildings present. Many of these Hanford facilities include asbestos-containing materials (as well as other hazardous components), which must be managed in compliance with applicable regulations and standards. In most cases, the facilities are demolished as Comprehensive Environmental Response, Compensation and Liability Act (CERCLA) removal or remedial actions. In an effort to streamline cleanup operations and to utilize site cleanup funding more efficiently, while still being protective of personnel and the environment, agreements were reached between the US Environmental Protection Agency (EPA) Hanford Project Office, the Washington Department of Ecology (Ecology), the Benton Clean Air Agency (BCAA) and the US Department of Energy Richland Operations Office (DOE-RL) on approaches to be utilized for demolition. One of these approaches would involve leaving cement asbestos board siding (e.g. transite), an EPA National Emissions Standards for Hazardous Air Pollutants (NESHAP) Category II non-friable asbestos-containing material, in place during demolition using heavy equipment, employing a set of controls that would maintain protection of personnel and the environment. This agreement was documented in a number of formal communications, including Notices of Intent issued as required by the asbestos NESHAP regulation, letters between the various agencies, CERCLA work plans, and the approved contractor baselines. A large number of buildings were demolished with transite siding in place, using the agreed upon controls and approaches. Personnel breathing zone and work area perimeter monitoring verified that the controls employed were protective in that there were no exceedances of permissible exposure limits during or after the demolition operations. EPA later reconsidered their previous concurrence with demolishing transite materials in place and issued a joint letter with Ecology revoking concurrence on any of the aforementioned CERCLA decision documents and associated work plans. DOE and their contractors took action to comply with the approach to demolition preferred by EPA for future demolitions, and initiated a series of actions to modify asbestos management practices in their operations accordingly. This paper will discuss both the actions taken to address EPA concerns with sites where transite materials were left in place for demolition and actions taken to ensure that the central plateau D4 program complies with the 40 CFR 61 Subpart M, National Emission Standard for Asbestos, (Asbestos NESHAP) methods for asbestos management. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Collaboratory=Collaborate+Laboratory: The Mid-Columbia STEM Education Collaboratory

Pacific Northwest National Laboratory created a network focused on collaboration in STEM education to design and deliver projects, resources, and professional learning opportunities in a testbed environment. How do you uncover and fill gaps in equitable access to high-quality science, technology, engineering, and math (STEM) education offerings in your local region? Where might you deploy strategies to improve STEM workforce preparation and increase public understanding of STEM-oriented issues? And how can you help to ensure that students, educators, parents, and the community are aware of these programs and know how to access them in schools, colleges, and community venues? If you are the Pacific Northwest National Laboratory (PNNL), you take on the huge goal of designing and implementing an innovative STEM education collaboration project that impacts all levels of local education, both inside and outside of school settings. PNNL is one of the 17 national laboratories funded by the U.S. Department of Energy. Operated by Battelle, PNNL has a vested interest in preparing the next generation of scientists and engineers for their future careers, thus building a STEM-capable workforce and creating a STEM-literate community. One of Battelle’s core principles is a commitment to STEM education and its role in business competitiveness and quality of life. PNNL has been active in STEM education for decades, providing internships for future scientists, giving educators in-house lab experiences, and engaging its researchers in STEM outreach activities in classrooms and the community. The Collaboratory is a relatively recent outcome of Battelle’s longstanding efforts in STEM education. The original Collaboratory planning documents, developed by PNNL’s Office of STEM Education (OSE), state the objective to “design, implement, and mature a local STEM education collaboration zone that highlights the power of PNNL and Battelle to impact the educational ecosystem and serve as a model for amplifying and accelerating progress in addressing our STEM education and workforce challenges” (PNNL 2013). In other words, we (the OSE) sought to create a zone of collaboration in which members co-design and deliver STEM education programs, share findings and lessons learned from their experiences, and co-manage and sustain the organization. We started by identifying possible collaborators located nearby in the largely rural southeast corner of Washington State. Recognizing that our potential collaborators had differing norms, values, and relationships within the community, as well as their own areas of expertise and purpose, we convened representatives from K–12 public and private schools, higher education, community-based learning providers, and local business and industry to brainstorm a unified vision to resolve gaps in local STEM education needs. Through discussions with these collaborators, we started hunting for gaps where STEM efforts were lacking but a desire to improve existed. We gave ourselves permission to try things out and built a testbed space where we could experiment with new ideas, gather evidence of feasibility, and treat failures as constructive learning opportunities. Through this generative process and with seed funding from Battelle, inter-organizational teams now work together, both virtually and in real time, to develop, test, and deploy resources to support student success, educators’ effectiveness, and community engagement in STEM. Thus, the Mid-Columbia STEM Education Collaboratory (Collaboratory) was born. This is the story of our beginnings: our challenges, our lessons learned, and emerging indicators of success. For those interested in launching an education–business–community STEM learning ecosystem, we share our story.

Collaboratory↗

Lessons Learned from FUSRAP

The US DOE Office of Legacy Management (LM) is the long-term steward for 90 sites remediated under numerous regulatory regimes including the Formerly Utilized Sites Remedial Action Program (FUSRAP) sites. In addition, LM holds considerable historical information, gathered in the 1970s, to determine site eligibility for remediation under FUSRAP. To date, 29 FUSRAP sites are in LM’s inventory of sites for long-term surveillance and maintenance (LTS&M), and 25 are with the US Army Corps of Engineers (USACE) for remediation or in the process of being transitioned to LM. It is forecasted that 13 FUSRAP sites will transfer from the USACE to LM over the next 10 years; however, the timing of the transfers is strongly dependent upon federal funding of the ongoing remedial actions. Historically, FUSRAP sites were generally cleaned up for “unrestricted” industrial use or remediated to the “cleanup standards” at that time, and their use remained unchanged. Today, these sites as well as the adjacent properties are now changing or envisioned to have changes in land use, typically from industrial to commercial or residential uses. The implication of land-use change affects DOE’s LTS&M responsibility for the sites under LM stewardship as well as the planning for the additional sites scheduled to transition in time. Coinciding with land-use changes at or near FUSRAP sites is an increased community awareness of these sites. As property development increases near FUSRAP sites, the general public and interested stakeholders regularly inquire about the sufficiency of cleanups that impact their neighborhoods and communities. LM has used this experience to address a series of lessons learned to improve our program management in light of the changing conditions of our sites. We describe these lessons learned as (1) improved stakeholder relations, (2) enhanced LTS&M requirements for the sites, and (3) greater involvement in the transition process.

54 ENVIRONMENTAL SCIENCES↗

Carbon Nanotube Chopped Fiber for Enhanced Properties in Additive Manufacturing

Nanocomp Technologies, Inc. is working with Oak Ridge National Laboratory to develop carbon nanotube (CNT) composite materials and evaluate their use in additive manufacturing (3D printing). The first phase demonstrated feasibility and improvements for carbon nanotube (CNT)- acrylonitrile butadiene styrene (ABS) composite filaments use in additive manufacturing, with potential future work centering on further improvements. By focusing the initial phase on standard processing methods (developed mainly for the incorporation of carbon fibers in ABS) and characterization techniques, a basis of knowledge for the incorporation of CNTs in ABS was learned. The ability to understand the various processing variables is critical to the successful development of these composites. From the degradation effects on ABS (caused by excessive temperatures), to the length of time the ABS is in the melt state, to the order of addition of constituents, and also to the many possible mixing approaches, a workable flow sequence that addresses each processing step is critical to the final material properties. Although this initial phase could not deal with each of these variables in-depth, a future study is recommended that will build on the lessons learned for this effort.

77 NANOSCIENCE AND NANOTECHNOLOGY↗

Decommissioning the Belgonucleaire Dessel MOX plant: presentation of the project and situation end august 2013

Belgonucleaire has been operating the Dessel MOX plant at an industrial scale between 1986 and 2006. During this period, 40 metric tons of plutonium (HM) have been processed into 90 reloads of MOX fuel for commercial light water reactors. The decision to stop the production in 2006 and to decommission the MOX plant was the result of the shrinkage of the MOX fuel market due to political and commercial factors. As a significant part of the decommissioning project of the Dessel MOX plant, about 170 medium-sized glove-boxes and about 1.200 metric tons of structure and equipment outside the glove-boxes are planned for dismantling. The license for the dismantling of the MOX plant was granted by Royal Decree in 2008 and the dismantling started in March 2009. The dismantling works are carried out by an integrated organization under leadership and responsibility of Belgonucleaire; this organization includes 3 main contractors, namely Tecnubel N.V., the THV ('Tijdelijke HandelsVereniging') Belgoprocess / SCK-CEN and Studsvik GmbH and Tractebel Engineering as project manager. In this paper, after having described the main characteristics of the project, the authors review the different organizational and technical options considered for the decommissioning of the glove-boxes; thereafter the main decision criteria (qualification of personnel and of processes, confinement, cutting techniques and radiation protection, safety aspects, alpha-bearing waste management) are analyzed as well. Finally the progress, the feedback and the lessons learned at the end of August 2013 are presented, giving the principal's and contractors point of view. (authors)

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

New Approaches to Distributed PV Interconnection: Implementation Considerations for Addressing Emerging Issues

As the cost of installing distributed solar photovoltaics (PV) has fallen, the number of requests to interconnect PV systems to distribution grids has risen substantially in many utility service areas. In response, states and utilities are modifying their interconnection practices to address new DER challenges. This report examines emerging issues associated with interconnecting residential- and commercial-scale PV to facilitate sharing of lessons learned and best practices across jurisdictions. It covers issues related to allocating and understanding costs, understanding grid conditions to inform PV siting, interconnecting storage, automating processes, and requiring the availability of advanced inverter functions that can help increase PV hosting capacity. This report builds on an earlier study that reviews interconnection practices and costs across the western states (Bird et al. 2018). Both reports were developed as part of a larger, joint project between the Western Interstate Energy Board and the National Renewable Energy Laboratory, funded by the U.S. Department of Energy's Solar Energy Technologies Office, that examines barriers to distributed PV in the 11 states within the Western Interconnection.

14 SOLAR ENERGY↗

US/UK Loan Account Project Status PMOD477

The viewgraphs describe the status of PMOD477 for LANL. The meeting will occur at DOE-HQ with NA-11 and Military Applications personnel in attendance. Serves to repatriate material with a balance to zero by December 2012. Phase 1 -- Establish formality of operations for War Reserve (WR): Complete surrogate taskings to A90 through a Materials Channel and perform US/UK lessons learned; Complete the US/UK agreed Quality Acceptance Plan, Materials Plan, Shipping procedure, and establish the formal UK/US point of contacts. Phase 2 -- Metal Manufacture (WR): Process material and store material as electrorefined metal (ER) rings, with initial assay and isotopic analysis, prior to manufacturing. Material is cast into accepted configuration and appropriate acceptance document for each aliquot will be generated. Phase 3 -- Intermediate Material Manufacture, Packaging and Shipping (WR): Continue processing of the material in accepted configuration with appropriate acceptance documentation for each aliquot. Provide an initial tasking of the material owed to UK including appropriate quality acceptance documentation. Phase 4 -- Complete Tasking (WR). Phase 5 -- Residue Processing (Non-WR): Complete processing of residue material and waste into accepted configuration with appropriate acceptance document for disposal.

CONFIGURATION↗

Normal operation and maintenance safety lessons from the ITER US PbLi test blanket module program for a US FNSF and DEMO

A leading power reactor breeding blanket candidate for a fusion demonstration power plant (DEMO) being pursued by the US Fusion Community is the Dual Coolant Lead Lithium (DCLL) concept. The safety hazards associated with the DCLL concept as a reactor blanket have been examined in several US design studies. These studies identify the largest radiological hazards as those associated with the dust generation by plasma erosion of plasma blanket module first walls, oxidation of blanket structures at high temperature in air or steam, inventories of tritium bred in or permeating through the ferritic steel structures of the blanket module and blanket support systems, and the 210Po and 203Hg produced in the PbLi breeder/coolant. What these studies lack is the scrutiny associated with a licensing review of the DCLL concept. An insight into this process was gained during the US participation in the International Thermonuclear Experimental Reactor (ITER) Test Blanket Module (TBM) Program. In this paper we discuss the lessons learned during this activity and make safety proposals for the design of a Fusion Nuclear Science Facility (FNSF) or a DEMO that employs a lead lithium breeding blanket.

70 PLASMA PHYSICS AND FUSION TECHNOLOGY↗

Added value for integrated marine energy data systems

Launched in 2019, the Portal and Repository for Information on Marine Renewable Energy (PRIMRE) provides centralized access, standardization, community building, and integration of United States (U.S.) databases, tools and codes, and other resources that cover a range of marine energy information. The PRIMRE universe contains a series of Knowledge Hubs that represent data and information on testing of marine energy devices (MHKDR); environmental effects (Tethys); engineering and technical papers (Tethys Engineering); descriptions of marine energy companies and technologies (Marine Energy Projects Database); codes and models (Marine Energy Software); and guidance on testing and measurements (Telesto). Content is added to PRIMRE by applying a set of Guidelines and Best Practices (PRIMRE Guidelines). An aggregate search across the PRIMRE site enables users to find data and information from all the PRIMRE Knowledge Hubs simultaneously, using a single entry-point (PRIMRE Search). In addition to providing access to a range of data and information on marine energy development, testing, and effects, PRIMRE allows for the development of value added products and processes that will help move the marine energy industry forward. The PRIMRE team has recently launched two key initiatives in the U.S.—Signature Projects and Lessons Learned. Outputs and outcomes from these two initiatives will be highlighted in this paper. The Signature Projects initiative is intended to bring focus to a selection of ongoing and completed marine energy projects funded by the U.S. Department of Energy’s Water Power Technologies Office (WPTO), and to inform the marine energy community of what investigations have been undertaken, what tools are available, and where gaps in information persist. Each Signature Project tags papers, reports, and data from large marine energy research projects, providing easy access and attention to all the output and associated products from each project. The Lessons Learned initiative is intended to ensure that hard-won achievements are recognized and available for those who come later, that missteps and unfortunate outcomes can be prevented in future, and that efficiencies and effective shortcuts can be publicized and used as the marine energy industry moves forward. This initiative builds off the Knowledge Hubs and reaches out to members of the marine energy community, particularly technology developers and researchers, to integrate experience in the development, deployment, assessment, success, and challenges while creating this new industry and field of study.

Copping, Andrea E.↗

Added value for integrated marine energy data systems

Launched in 2019, the Portal and Repository for Information on Marine Renewable Energy (PRIMRE) provides centralized access, standardization, community building, and integration of United States (U.S.) databases, tools and codes, and other resources that cover a range of marine energy information. The PRIMRE universe contains a series of Knowledge Hubs that represent data and information on testing of marine energy devices (MHKDR); environmental effects (Tethys); engineering and technical papers (Tethys Engineering); descriptions of marine energy companies and technologies (Marine Energy Projects Database); codes and models (Marine Energy Software); and guidance on testing and measurements (Telesto). Content is added to PRIMRE by applying a set of Guidelines and Best Practices (PRIMRE Guidelines). An aggregate search across the PRIMRE site enables users to find data and information from all the PRIMRE Knowledge Hubs simultaneously, using a single entry-point (PRIMRE Search). In addition to providing access to a range of data and information on marine energy development, testing, and effects, PRIMRE allows for the development of value added products and processes that will help move the marine energy industry forward. The PRIMRE team has recently launched two key initiatives in the U.S.—Signature Projects and Lessons Learned. Outputs and outcomes from these two initiatives will be highlighted in this paper. The Signature Projects initiative is intended to bring focus to a selection of ongoing and completed marine energy projects funded by the U.S. Department of Energy’s Water Power Technologies Office (WPTO), and to inform the marine energy community of what investigations have been undertaken, what tools are available, and where gaps in information persist. Each Signature Project tags papers, reports, and data from large marine energy research projects, providing easy access and attention to all the output and associated products from each project. The Lessons Learned initiative is intended to ensure that hard-won achievements are recognized and available for those who come later, that missteps and unfortunate outcomes can be prevented in future, and that efficiencies and effective shortcuts can be publicized and used as the marine energy industry moves forward. This initiative builds off the Knowledge Hubs and reaches out to members of the marine energy community, particularly technology developers and researchers, to integrate experience in the development, deployment, assessment, success, and challenges while creating this new industry and field of study.

Copping, Andrea E.↗

Added Value for Integrated Marine Energy Data Systems (February 2021)

Launched in 2019, the Portal and Repository for Information on Marine Renewable Energy (PRIMRE) provides centralized access, standardization, community building, and integration of United States (U.S.) databases, tools and codes, and other resources that cover a range of marine energy information. The PRIMRE universe contains a series of Knowledge Hubs that represent data and information on testing of marine energy devices (MHKDR); environmental effects (Tethys); engineering and technical papers (Tethys Engineering); descriptions of marine energy companies and technologies (Marine Energy Projects Database); codes and models (Marine Energy Software); and guidance on testing and measurements (Telesto). Content is added to PRIMRE by applying a set of Guidelines and Best Practices (PRIMRE Guidelines). An aggregate search across the PRIMRE site enables users to find data and information from all the PRIMRE Knowledge Hubs simultaneously, using a single entry-point (PRIMRE Search). In addition to providing access to a range of data and information on marine energy development, testing, and effects, PRIMRE allows for the development of valueadded products and processes that will help move the marine energy industry forward. The PRIMRE team has recently launched two key initiatives in the U.S.-Signature Projects and Lessons Learned. Outputs and outcomes from these two initiatives will be highlighted in this paper. The Signature Projects initiative is intended to bring focus to a selection of ongoing and completed marine energy projects funded by the U.S. Department of Energy's Water Power Technologies Office (WPTO), and to inform the marine energy community of what investigations have been undertaken, what tools are available, and where gaps in information persist. Each Signature Project tags papers, reports, and data from large marine energy research projects, providing easy access and attention to all the output and associated products from each project. The Lessons Learned initiative is intended to ensure that hard-won achievements are recognized and available for those who come later, that missteps and unfortunate outcomes can be prevented in future, and that efficiencies and effective shortcuts can be publicized and used as the marine energy industry moves forward. This initiative builds off the Knowledge Hubs and reaches out to members of the marine energy community, particularly technology developers and researchers, to integrate experience in the development, deployment, assessment, success, challenges while creating this new industry and field of study.

data sharing↗

Vitrification assistance program: international co-operation on vitrification technology

With 10 vitrification lines in operation (3 on WVP in Sellafield, 1 on AVM in Marcoule and 6 on AVH in La Hague), Sellafield Ltd and Areva NC benefit from the most in-depth experience worldwide in the vitrification of highly active liquors within a framework of commercial operations. Based on the two-step process design, using a calciner and an induction-heated hot melter, which was initially deployed in Marcoule in 1978, core vitrification equipment has been continuously improved by the independent development programmes of the two companies. In March 2005, Sellafield Ltd and Areva NC signed the Vitrification Assistance Program (hereafter referred to as VAP); a co-operative project lasting 4 years during which Areva NC is to share some areas of their experience and expertise with Sellafield Ltd. Now at the halfway point of this project, this paper summarises the work performed by the VAP team to date, highlighting the early benefits and lessons learned. The following points will be developed: - Equipment delivery and preparation for implementation on WVP - Training organization and dissemination to WVP teams - Lessons learned from the early changes implemented in operations (Calciner, Melter, Dust Scrubber and Primary off gas system), and initial feedback from the first campaign using a VAP equipped line. In conclusion: The vitrification process and technology implemented at Sellafield and at La Hague, based on the two-step process, have proved to be efficient in treating high active liquor of various types. Ten lines based on this principle have been successfully operated for more than 15 years in France and in the UK. The process has also been demonstrated to be sufficiently versatile to benefit from continuous improvement and development programmes. VAP, as a complete package to support vitrification technology and knowledge transfer from AREVA NC to Sellafield Ltd, has provided the framework for fruitful technical exchanges and discussions between the two companies. From equipment delivery to knowledge embedding within the WVP teams, both companies have worked hard together to respect the tight schedule of the contract, despite growing external constraints. This has been closely managed in order to achieve the best results for the VAP without jeopardizing the continuing production operations on both the Sellafield and La Hague sites. For future campaigns, WVP1 will be equipped with an automatic heating control system similar to the one used at La Hague (i.e. based on 4 kHz). This will facilitate the work of the WVP operators and finalise the conversion of WVP melter control systems from manual to automatic, meaning that the melters on all 3 lines will be automatically controlled. Further implementation of VAP equipment is also planned on the other lines. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Generic Argillite/Shale Disposal Reference Case

Radioactive waste disposal in a deep subsurface repository hosted in clay/shale/argillite is a subject of widespread interest given the desirable isolation properties, geochemically reduced conditions, and widespread geologic occurrence of this rock type (Hansen 2010; Bianchi et al. 2013). Bianchi et al. (2013) provides a description of diffusion in a clay-hosted repository based on single-phase flow and full saturation using parametric data from documented studies in Europe (e.g., ANDRA 2005). The predominance of diffusive transport and sorption phenomena in this clay media are key attributes to impede radionuclide mobility making clay rock formations target sites for disposal of high-level radioactive waste. The reports by Hansen et al. (2010) and those from numerous studies in clay-hosted underground research laboratories (URLs) in Belgium, France and Switzerland outline the extensive scientific knowledge obtained to assess long-term clay/shale/argillite repository isolation performance of nuclear waste. In the past several years under the UFDC, various kinds of models have been developed for argillite repository to demonstrate the model capability, understand the spatial and temporal alteration of the repository, and evaluate different scenarios. These models include the coupled Thermal-Hydrological-Mechanical (THM) and Thermal-Hydrological-Mechanical-Chemical (THMC) models (e.g. Liu et al. 2013; Rutqvist et al. 2014a, Zheng et al. 2014a) that focus on THMC processes in the Engineered Barrier System (EBS) bentonite and argillite host hock, the large scale hydrogeologic model (Bianchi et al. 2014) that investigates the hydraulic connection between an emplacement drift and surrounding hydrogeological units, and Disposal Systems Evaluation Framework (DSEF) models (Greenberg et al. 2013) that evaluate thermal evolution in the host rock approximated as a thermal conduction process to facilitate the analysis of design options. However, the assumptions and the properties (parameters) used in these models are different, which not only make inter-model comparisons difficult, but also compromise the applicability of the lessons learned from one model to another model. The establishment of a reference case would therefore be helpful to set up a baseline for model development. A generic salt repository reference case was developed in Freeze et al. (2013) and the generic argillite repository reference case is presented in this report. The definition of a reference case requires the characterization of the waste inventory, waste form, waste package, repository layout, EBS backfill, host rock, and biosphere. This report mainly documents the processes in EBS bentonite and host rock that are potentially important for performance assessment and properties that are needed to describe these processes, with brief description other components such as waste inventory, waste form, waste package, repository layout, aquifer, and biosphere. A thorough description of the generic argillite repository reference case will be given in Jové Colon et al. (2014).

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Lessons Learned from FUSRAP - 16200

The US DOE Office of Legacy Management (LM) is the long-term steward for 90 sites remediated under numerous regulatory regimes including the Formerly Utilized Sites Remedial Action Program (FUSRAP) sites. In addition, LM holds considerable historical information, gathered in the 1970's, to determine site eligibility for remediation under FUSRAP. To date, 29 FUSRAP sites are in LM's inventory of sites for long-term surveillance and maintenance (LTS and M), and 25 are with the US Army Corps of Engineers (USACE) for remediation or in the process of being transitioned to LM. It is forecasted that 13 FUSRAP sites will transfer from the USACE to LM over the next 10 years; however, the timing of the transfers is strongly dependent upon federal funding of the ongoing remedial actions. Historically, FUSRAP sites were generally cleaned up for unrestricted industrial use or remediated to the cleanup standards at that time, and their use remained unchanged. Today, these sites as well as the adjacent properties are now changing or envisioned to have changes in land use, typically from industrial to commercial or residential uses. The implication of land-use change affects DOE's LTS and M responsibility for the sites under LM stewardship as well as the planning for the additional sites scheduled to transition in time. Coinciding with land-use changes at or near FUSRAP sites is an increased community awareness of these sites. As property development increases near FUSRAP sites, the general public and interested stakeholders regularly inquire about the sufficiency of cleanups that impact their neighborhoods and communities. LM has used this experience to address a series of lessons learned to improve our program management in light of the changing conditions of our sites. We describe these lessons learned as (1) improved stakeholder relations, (2) enhanced LTS and M requirements for the sites, and (3) greater involvement in the transition process. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Energy Efficiency Collaboratives

Collaboratives for energy efficiency have a long and successful history and are currently used, in some form, in more than half of the states. Historically, many state utility commissions have used some form of collaborative group process to resolve complex issues that emerge during a rate proceeding. Rather than debate the issues through the formality of a commission proceeding, disagreeing parties are sent to discuss issues in a less-formal setting and bring back resolutions to the commission. Energy efficiency collaboratives take this concept and apply it specifically to energy efficiency programs—often in anticipation of future issues as opposed to reacting to a present disagreement. Energy efficiency collaboratives can operate long term and can address the full suite of issues associated with designing, implementing, and improving energy efficiency programs. Collaboratives can be useful to gather stakeholder input on changing program budgets and program changes in response to performance or market shifts, as well as to provide continuity while regulators come and go, identify additional energy efficiency opportunities and innovations, assess the role of energy efficiency in new regulatory contexts, and draw on lessons learned and best practices from a diverse group. Details about specific collaboratives in the United States are in the appendix to this guide. Collectively, they demonstrate the value of collaborative stakeholder processes in producing successful energy efficiency programs.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Lessons Learned from Ecosystem-Scale Experimental Field Studies (Workshop Report)

Efforts to understand and predict ecosystem responses to environmental change require long-term, large-scale, spatially representative experiments and observations that capture natural variability, test predictive models, and generate transferable knowledge. Such studies are indispensable for unraveling the complexities of terrestrial ecosystems and their responses to disturbances and evolving environmental conditions, while generating the data necessary for developing mechanistic models and predictive tools that inform decision-making processes. Having a rich history of designing and executing large-scale ecosystem experiments, the U.S. Department of Energy’s Environmental System Science program convened a workshop in January 2025 that brought together leaders in the field to distill critical lessons from decades of experience in large-scale experiments. The workshop aimed to (1) provide an ecosystem experiment primer for best practices, thus ensuring a high scientific return on investment for funding agencies, and (2) offer a robust framework for the design and management of future research initiatives. This report synthesizes insights and experiences from workshop participants and is structured to capture the entire research life cycle, from goal setting and design to operations, adaptive management, team dynamics, collaborations, and the often overlooked aspect of decommissioning. By synthesizing decision-making and lessons learned across diverse research approaches, the report aims to provide a template of essential factors to consider when designing successful long-term, large-scale ecosystem experiments.

54 ENVIRONMENTAL SCIENCES↗

Salt disposal of heat-generating nuclear waste.

This report summarizes the state of salt repository science, reviews many of the technical issues pertaining to disposal of heat-generating nuclear waste in salt, and proposes several avenues for future science-based activities to further the technical basis for disposal in salt. There are extensive salt formations in the forty-eight contiguous states, and many of them may be worthy of consideration for nuclear waste disposal. The United States has extensive experience in salt repository sciences, including an operating facility for disposal of transuranic wastes. The scientific background for salt disposal including laboratory and field tests at ambient and elevated temperature, principles of salt behavior, potential for fracture damage and its mitigation, seal systems, chemical conditions, advanced modeling capabilities and near-future developments, performance assessment processes, and international collaboration are all discussed. The discussion of salt disposal issues is brought current, including a summary of recent international workshops dedicated to high-level waste disposal in salt. Lessons learned from Sandia National Laboratories' experience on the Waste Isolation Pilot Plant and the Yucca Mountain Project as well as related salt experience with the Strategic Petroleum Reserve are applied in this assessment. Disposal of heat-generating nuclear waste in a suitable salt formation is attractive because the material is essentially impermeable, self-sealing, and thermally conductive. Conditions are chemically beneficial, and a significant experience base exists in understanding this environment. Within the period of institutional control, overburden pressure will seal fractures and provide a repository setting that limits radionuclide movement. A salt repository could potentially achieve total containment, with no releases to the environment in undisturbed scenarios for as long as the region is geologically stable. Much of the experience gained from United States repository development, such as seal system design, coupled process simulation, and application of performance assessment methodology, helps define a clear strategy for a heat-generating nuclear waste repository in salt.

02 PETROLEUM↗