Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “integrated planning and scheduling”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 379 records · Page 21

Third Report of the Task Force on the Shuttle-Mir Rendezvous and Docking Missions

In May 1994, the Task Force on the Shuttle-Mir Rendezvous and Docking Missions was established by the NASA Advisory Council. Its purpose is to review Phase 1 (Shuttle-Mir) planning, training, operations, rendezvous and docking, and management and to provide interim reports containing specific recommendations to the Advisory Council. Phase 1 represents the building block to create the experience and technical expertise for an International Space Station. The Phase 1 program brings together the United States and Russia in a major cooperative and contractual program that takes advantage of both countries' capabilities. The content of the Phase 1 program consists of the following elements as defined by the Phase 1 Program Management Plan, dated October 6, 1994: Shuttle-Mir rendezvous and docking missions; astronaut long duration presence on Mir Requirements for Mir support of Phase 1 when astronauts are not on board; outfitting Spektr and Priroda modules with NASA science, research, and risk mitigation equipment Related ground support requirements of NASA and the Russian Space Agency (RSA) to support Phase 1 Integrated NASA and RSA launch schedules and manifests The first meeting of the Task Force was held at the Johnson Space Center (JSC) on May 24 and 25, 1994 with a preliminary report submitted to the NASA Advisory Council on June 6, 1994. The second meeting of the Task Force was held at JSC on July 12 and 13, 1994 and a detailed report containing a series of specific recommendations was submitted on July 29, 1994. This report reflects the results of the third Task Force meeting which was held at JSC on 11 and 12 October, 1994. The briefings presented at that meeting reviewed NASA's response to the Task Force recommendations made to date and provided background data and current status on several critical areas which the Task Force had not addressed in its previous reports.

Source record↗

Design Tools for Cost-Effective Implementation of Planetary Protection Requirements

Since the Viking missions to Mars in the 1970s, accounting for the costs associated with planetary protection implementation has not been done systematically during early project formulation phases, leading to unanticipated costs during subsequent implementation phases of flight projects. The simultaneous development of more stringent planetary protection requirements, resulting from new knowledge about the limits of life on Earth, together with current plans to conduct life-detection experiments on a number of different solar system target bodies motivates a systematic approach to integrating planetary protection requirements and mission design. A current development effort at NASA's Jet Propulsion Laboratory is aimed at integrating planetary protection requirements more fully into the early phases of mission architecture formulation and at developing tools to more rigorously predict associated cost and schedule impacts of architecture options chosen to meet planetary protection requirements.

mission architecture↗

Integrated Tests and Evaluations

NASA has developed a project plan to address issues related to UAS access to the NAS The plan is being formulated with inputs from our stakeholders. NASA will work with our stakeholders to develop ConOps and a national roadmap to determine key research technologies and policy issues to enable UAS access to the NAS. NASA will use ConOps and roadmap to either validate current NASA research investment areas and make any necessary changes to proposed UAS research portfolio. NASA will conduct integration and testing of key research areas to enable UAS access to the NAS. Use phase I to do detailed test planning for phase II Assist subelements with test planning Assist with documenting test objectives, data and facilities/infrastructure requirements, and detailed test planning Provide facilities/infrastructure to meet test requirements Provide interfaces between tools Develop, document, and execute data handling and dissemination plans Provide a test engineer to facilitate scheduling of facilities, support specific equipment and software needs, track schedule progress, and monitor changes to schedule Provide guidance for alternative facilities or equipment to mitigate risk associated with loss of availability Provide opportunities for subelements to gather data in relevant and increasingly complex environments

Bixby, C. J.↗

Commissioning of the IOTA Proton Injector

The IOTA Proton Injector (IPI) at the Fermilab Accelerator Science and Technology facility (FAST) is a machine capable of delivering up to 14 mA pulses of protons at 2.5 MeV to the Integrable Optics Test Accelerator (IOTA) ring. Its construction was completed in the fall of 2025, followed by a successful commissioning run scheduled to conclude at the end of May 2026. It operates alongside the existing electron injector beamline to facilitate further beam physics research and continued development of novel accelerator technologies at the IOTA ring. This report details the current operational profile, known challenges, and future plans for the proton program development at FAST.

Romanov, A. [Fermilab] (ORCID:0000000287065709)↗

The Delta Launch Vehicle Model 2914 Series

The newest Delta launch vehicle configuration, Model 2914 is described for potential users together with recent flight results. A functional description of the vehicle, its performance, flight profile, flight environment, injection accuracy, spacecraft integration requirements, user organizational interfaces, launch operations, costs and reimbursable users payment plan are provided. The versatile, relatively low cost Delta has a flight demonstrated reliability record of 92 percent that has been established in 96 launches over twelve years while concurrently undergoing ten major upratings to keep pace with the ever increasing performance and reliability requirements of its users. At least 40 more launches are scheduled over the next three years from the Eastern and Western Test Ranges.

Gunn, C. R.↗

An Assessment of Alternate Thermal Protection Systems for the Space Shuttle Orbiter: Executive Summary - Volume 1

Alternate thermal protection system (TPS) concepts to the Space Shuttle Orbiter were assessed. Metallic, ablator, and carbon-carbon concepts which are the result of some previous design, manufacturing and testing effort were considered. Emphasis was placed on improved TPS durability, which could potentially reduce life cycle costs and improve Orbiter operational characteristics. Integrated concept/orbiter point designs were generated and analyzed on the basis of Shuttle design environments and criteria. A merit function evaluation methodology based on mission impact, life cycle costs, and risk was developed to compare the candidate concepts and to identify the best alternate. Voids and deficiencies in the technology were identified, along with recommended activities to overcome them. Finally, programmatic plans, including ROM costs and schedules, were developed for all activities required to bring the selected alternate system up to operational readiness.

Hays, D.↗

National Aero-Space Plane

An account is given of the technology development management objectives thus far planned for the DOD/NASA National Aero-Space Plane (NASP). The technology required by NASP will first be developed in ground-based facilities and then integrated during the design and construction of the X-30 experimental aircraft. Five airframe and three powerplant manufacturers are currently engaged in an 18-month effort encompassing design studies and tradeoff analyses. The first flight of the X-30 is scheduled for early 1993.

Piland, William M.↗

An intelligent planning and scheduling system for the HST servicing missions

A new, intelligent planning and scheduling system has been delivered to NASA-Goddard Space Flight Center (GSFC) to provide support for the up-coming Hubble Space Telescope (HST) Servicing Missions. This new system is the Servicing Mission Planning and Replanning Tool (SM/PART). SM/PART is written in C and runs on a UNlX-based workstation (IBM RS/6000) under Motif. SM/PART effectively automates the complex task of building or rebuilding integrated timelines and command plans which are required by HST Servicing Mission personnel at their consoles during the missions. SM/PART is able to quickly build or rebuild timelines based on information stored in a Knowledge Base (KB) by using an Artificial Intelligence (AI) tool called the Planning And Resource Reasoning (PARR) shell. After a timeline has been built in the batch mode, it can be displayed and edited in an interactive mode with help from the PARR shell. Finally a detailed command plan is generated. The capability to quickly build or rebuild timelines and command plans provides an additional safety factor for the HST, Shuttle and Crew.

Johnson, Jay↗

An analytical investigation of acquisition techniques and system integration studies for a radar aircraft guidance research facility, phase 2

A review of user requirements and updated instrumentation plans are presented for the aircraft tracking and guidance facility at NASA Wallops Station. User demand has increased as a result of new flight research programs; however, basic requirements remain the same as originally reported. Instrumentation plans remain essentially the same but with plans for up- and down-link telemetry more firm. With slippages in the laser acquisition schedule, added importance is placed on the FPS-16 radar as the primary tracking device until the laser is available. Limited simulation studies of a particular Kalman-type filter are also presented. These studies simulated the use of the filter in a helicopter guidance loop in a real-time mode. Disadvantages and limitations of this mode of operation are pointed out. Laser eyesafety calculations show that laser tracking of aircraft is readily feasible from the eyesafety viewpoint.

Thompson, W. S.↗

Vehicle management and mission planning in support of shuttle operations.

An operational approach to shuttle mission planning during high flight frequency years (20 or more flights per year) is described wherein diverse mission planning functions interface via an interactive computer system and common data base. The Vehicle Management and Mission Planning System (VMMPS) is proposed as a means of helping to accomplish the mission planning function. The VMMPS will link together into an interactive system the major mission planning areas such as trajectory, crew, vehicle performance, and launch operations. A common data base will be an integral part of the system and the concept of standard mission types and phases will be used to minimize mission to mission uniqueness. The use of this system will eliminate much redundancy and replanning, shorten interface times between functions, and provide a means to evaluate unplanned events and modify schedules.

Pruett, W. R.↗

NGST Optical Testing

An Integrated Product Team (IPT) was formed to develop a detailed optical test methodology for testing of the Next Generation Space Telescope (NGST) mirrors and the optical system on the ground. Optical testing is a significant cost driver therefore the testing has to be planned in detailed fashion early. This paper will discuss the preliminary metrology test plan at the mirror component and telescope system level. Instrumentation, facilities and schedule will also be addressed.

Keski-Kuha, Ritva↗

Augmented Method to Improve Thermal Data for the Figure Drift Thermal Distortion Predictions of the JWST OTIS Cryogenic Vacuum Test

The JWST Optical Telescope Element (OTE) assembly is the largest optically stable infrared-optimized telescope currently being manufactured and assembled, and is scheduled for launch in 2018. The JWST OTE, including the 18 segment primary mirror, secondary mirror, and the Aft Optics Subsystem (AOS) are designed to be passively cooled and operate near 45K. These optical elements are supported by a complex composite backplane structure. As a part of the structural distortion model validation efforts, a series of tests are planned during the cryogenic vacuum test of the fully integrated flight hardware at NASA JSC Chamber A. The successful ends to the thermal-distortion phases are heavily dependent on the accurate temperature knowledge of the OTE structural members. However, the current temperature sensor allocations during the cryo-vac test may not have sufficient fidelity to provide accurate knowledge of the temperature distributions within the composite structure. A method based on an inverse distance relationship among the sensors and thermal model nodes was developed to improve the thermal data provided for the nanometer scale WaveFront Error (WFE) predictions. The Linear Distance Weighted Interpolation (LDWI) method was developed to augment the thermal model predictions based on the sparse sensor information. This paper will encompass the development of the LDWI method using the test data from the earlier pathfinder cryo-vac tests, and the results of the notional and as tested WFE predictions from the structural finite element model cases to characterize the accuracies of this LDWI method.

Thermal Modeling↗

Mars Reconnaissance Orbiter, Ground Data System, Receivables and Deliverables (REC/DELs)

This paper presents one JPL element manager's approach to describe a complex Ground Data System (GDS) with its receivables and deliverables (REC/DEL). The Mars Reconnaissance Orbiter (MRO) Ground Data System is the integrated set of ground software, hardware, facilities and networks that support mission operation. REC/DEL is a powerful tool for specifying hierarchy of commitments among systems and teams. Receivable of a system is a deliverable of another system. Focusing on tangible products enables the manager to objectively measure progress in a schedule. Jet Propulsion Laboratory mandates the use of REC/DEL for flight projects. Tutorial and training is provided for managers to create integrated REC/DEL database using automated systems. Project schedules are based on REC/DELs. This paper is not focusing on the mechanics of REC/DEL database creation, but it provides a guideline how one systematically creates categories of deliverables and receivables for ground data system components.

guidelines↗

A mechanical, thermal and electrical packaging design for a prototype power management and control system for the 30 cm mercury ion thruster

A prototype Electric Power Management and Thruster Control System for a 30 cm ion thruster has been built and is ready to support a first mission application. The system meets all of the requirements necessary to operate a thruster in a fully automatic mode. Power input to the system can vary over a full two to one dynamic range (200 to 400 V) for the solar array or other power source. The Power Management and Control system is designed to protect the thruster, the flight system and itself from arcs and is fully compatible with standard spacecraft electronics. The system is designed to be easily integrated into flight systems which can operate over a thermal environment ranging from 0.3 to 5 AU. The complete Power Management and Control system measures 45.7 cm x 15.2 cm x 114.8 cm and weighs 36.2 kg. At full power the overall efficiency of the system is estimated to be 87.4 percent. Three systems are currently being built and a full schedule of environmental and electrical testing is planned.

Sharp, G. R.↗

Developmental and Cryogenic Thermal Vacuum (TVAC) Testing Lessons Learned

Developmental thermal vacuum (TVAC) testing is a critical step in maturing hardware designs and validating performance prior to flight qualification. Unlike qualification or acceptance testing, developmental testing provides flexibility to explore design margins, uncover integration challenges, and refine test approaches before formal verification activities begin. This presentation highlights the value of developmental testing while sharing common pitfalls encountered during developmental TVAC campaigns. Lessons learned from hands-on testing experience, including extensive developmental testing at cryogenic temperatures, will be shared in this presentation. Topics include test planning and preparation, instrumentation strategies, contamination control considerations, troubleshooting unexpected anomalies, and approaches for staying on schedule while meeting test objectives. The audience will gain practical insights and best practices that can improve test efficiency, reduce risk, and enhance the overall success of future developmental TVAC efforts.

Mackenzie Byrnes↗

Orion GN and C Overview and Architecture

The Crew Exploration Vehicle, named Orion, is a critical element in the Constellation Program to develop the transportation system needed to send humans back to the moon and then beyond. Lockheed Martin is the prime contractor for the Orion spacecraft, which is managed by the Johnson Space Center. The Orion GN&C sub-system is being jointly developed by NASA and Lockheed Martin through a mode team approach. The GN&C is a critical element of the Orion mission to carry astronauts to low earth orbit to service the International Space Station and then on later flights to transfer and return a crew of four to the moon. The Orion GN&C system must perform monitoring and abort functions during ascent, rendezvous and docking in both low earth and lunar orbits, perform uncrewed lunar loiter operations, perform trans earth injection and atmospheric entry and landing. The Orion also must be integrated with the Ares I Crew Launch Vehicle, the Earth Departure Stage of the Ares V and the Lunar Surface Access Module. This paper provides an overview of the Orion GN&C system. The functional capabilities of the Orion GN&C will be provided in the context of Constellation architecture, the key GN&C requirements will be summarized, the GN&C architecture will be presented, the development schedule and plans will summarized and finally conclusions will be presented.

Hu, Howard↗

Actuator and Motor Control End-to-End V&V on the Mars 2020 Rover

The Mars 2020 Perseverance rover is the most advanced robotic exploration system ever sent to another planet. To support the complex scientific and mobility needs of the mission, the rover utilizes 33 actuators, three multi-degree-of-freedom force-torque sensors, fifteen single or dual-speed resolvers, two solenoid valves, and twelve contact switches. The control for these actuators and sensors is achieved by several levels of flight software, coordinated between two computers with varying bandwidth control loops. Furthermore, the actuators and sensors were integrated into multiple larger robotic mechanisms that were delivered by different organizations at various points in the Integration and Test (I&T) timeline. All of this created a very complex Verification and Validation (V&V) scenario involving multiple subsystems and teams, several hardware and software testbeds with varying levels of fidelity, and significant systems engineering to ensure the overall I&T schedule could be maintained while ensuring system hardware safety.This paper details the integrated V&V effort across multiple teams and venues to provide full coverage of all necessary functionality, performance, and fault protection. First, it provides an overview of how the V&V campaign was subdivided among teams and venues and provides descriptions of the various hardware configurations used to support the testing. The Mars 2020 implementation of the plan incorporates many of the lessons learned from Mars Science Laboratory’s test campaign, and these value-added modifications are discussed here. Also included in this section is the system-level environmental testing approach used for mechanisms. Second, the paper describes the phased approach used by the teams to support new hardware and software deliveries to testbed and Systems I&T. In this approach the test campaign was built upon higher-level mechanism needs for performance, functionality, and safety at specific times in the campaign. Finally, the paper discusses lessons learned from the V&V campaign that should be applied to future large-scale motion control testing efforts.

Borne, Davis↗

Intelligent Resource Management for Local Area Networks: Approach and Evolution

The Data Management System network is a complex and important part of manned space platforms. Its efficient operation is vital to crew, subsystems and experiments. AI is being considered to aid in the initial design of the network and to augment the management of its operation. The Intelligent Resource Management for Local Area Networks (IRMA-LAN) project is concerned with the application of AI techniques to network configuration and management. A network simulation was constructed employing real time process scheduling for realistic loads, and utilizing the IEEE 802.4 token passing scheme. This simulation is an integral part of the construction of the IRMA-LAN system. From it, a causal model is being constructed for use in prediction and deep reasoning about the system configuration. An AI network design advisor is being added to help in the design of an efficient network. The AI portion of the system is planned to evolve into a dynamic network management aid. The approach, the integrated simulation, project evolution, and some initial results are described.

Meike, Roger↗