Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “installed capacity”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 379 records · Page 21

Best Practices for Equitable Solar Workforce Development

The Midwest Renewable Energy Association (MREA) was selected to serve as a lead organization for the U.S. Department of Energy Solar Energy Technology Office’s Equitable Solar Communities of Practice initiative. This project, facilitated through a partnership with ENERGYWERX, aimed to develop strategies to support the expansion of equitable benefits in solar adoption across the U.S. Specifically, the MREA was chosen to lead the solar workforce development community of practice, focusing on scaling the U.S. solar workforce, to meet growing industry demands and ensure that these opportunities are accessible and beneficial to all communities. For the purpose of this initiative, we define the solar workforce in line with the National Solar Jobs Census, which defines a solar worker as someone who spends a majority of their time on solar-related work. This also includes workers who spend a plurality of their time on solar tasks. It’s important to note that manufacturing jobs were not included in this research, as the focus is primarily on solar installation, development, and related roles. To achieve the goals of the Equitable Solar Communities of Practice initiative, the MREA leveraged existing resources and engaged a diverse core team and group of stakeholders including industry professionals, educators, policymakers, and community leaders. The MREA began with a literature review and gap analysis to identify existing best practices and gaps in the solar workforce. This was followed by a community convening to gather insights from a wide range of stakeholders. The findings informed the best practices and pathways to scale the benefits of solar workforce development, focusing on training programs, workforce services, apprenticeship, and justice, inclusion, and sustainability. This report outlines the background, methodology, findings, and conclusions drawn from the landscape and gap analysis, providing valuable insights into workforce needs and training program capacities across the U.S. The outcomes of this research are presented in this report and contain recommendations for optimizing workforce development and training funding to support the equitable growth of the solar industry, ensuring that the transition to solar energy is inclusive and beneficial for all communities.

14 SOLAR ENERGY↗

The Land Sparing, Water Surface Use Efficiency, and Water Surface Transformation of Floating Photovoltaic Solar Energy Installations

Floating photovoltaic solar energy installations (FPVs) represent a new type of water surface use, potentially sparing land needed for agriculture and conservation. However, standardized metrics for the land sparing and resource use efficiencies of FPVs are absent. These metrics are critical to understanding the environmental and ecological impacts that FPVs may potentially exhibit. Here, we compared techno-hydrological and spatial attributes of four FPVs spanning different climatic regimes. Next, we defined and quantified the land sparing and water surface use efficiency (WSUE) of each FPV. Lastly, we coined and calculated the water surface transformation (WST) using generation data at the world’s first FPV (Far Niente Winery, California). The four FPVs spare 59,555 m2 of land and have a mean land sparing ratio of 2.7:1 m2 compared to ground-mounted PVs. Mean direct and total capacity-based WSUE is 94.5 ± 20.1 SD Wm−2 and 35.2 ± 27.4 SD Wm−2, respectively. Direct and total generation-based WST at Far Niente is 9.3 and 13.4 m2 MWh−1 yr−1, respectively; 2.3 times less area than ground-mounted utility-scale PVs. Our results reveal diverse techno-hydrological and spatial attributes of FPVs, the capacity of FPVs to spare land, and the utility of WSUE and WST metrics.

14 SOLAR ENERGY↗

Commissioning of Extended Electron Beam Ion Source at Brookhaven National Laboratory

Here, the Extended Electron Beam Ion Source (EEBIS) has been installed and commissioned at Brookhaven National Laboratory (BNL) hadron accelerator complex in the spring of 2023. EEBIS has replaced its predecessor, RhicEBIS, which provided ions for BNL hadron facilities for over a decade since 2009. The motivations for the source upgrade are to provide higher intensities of the Au 32+ ion beam for the Relativistic Heavy Ion Collider (RHIC) and to provide of an intense source of polarized 3 He 2+ ions for the future Electron Ion Collider (EIC) at BNL. EEBIS is and will continue to be the primary source for a variety of different ion species for the NASA Space Radiation Laboratory (NSRL) at BNL. EEBIS utilizes two identical, two-meter-long unshielded 5T warm bore superconducting solenoids, and it is operated with electron beam current up to 10 A, providing a high-capacity ion traps to fulfill the requirement for high intensity ion beams. The upstream solenoid contains a “short ion trap” with a length of 95 cm, while the “long ion trap” with a length of 178 cm is located inside the downstream solenoid bore. The main features of EEBIS are: * A Gas injection and ionization cell equipped with a Lorenz pulse valve * High-capacity ZAO non-evaporable getter (NEG) custom linear pumping units * In situ apparatus for pumping speed measurements to monitor NEG activation and saturation * “External drift tube” construction with differential pumping stages to provide space for Lorentz pulse valve and 3 He high-field polarization cell * A Ba oxide electron gun cathode. The design of EEBIS as well as the results of its commissioning and first-year operation are presented and discussed.

43 PARTICLE ACCELERATORS↗

Front-End Engineering Design for Piperazine with the Advanced Stripper

This Department of Energy (DOE) funded project was executed with the goal of preparing a Front-End Engineering Design (FEED) for the capture and compression of 90% of the CO2 that would normally be emitted from an existing natural gas combined cycle (NGCC) plant. The FEED focused on the application of the piperazine advanced stripper (PZAS) process at Mustang Station of the Golden Spread Electric Cooperative (GSEC), which consists of two gas turbines with common heat recovery steam generator (HRSG). The University of Texas at Austin (UT) served as the prime contractor, and subcontracted AECOM Technical Services and Trimeric Corporation to support FEED development. This project team has worked together to advance PZAS for more than a decade. ExxonMobil, Chevron, and Total provided project co-funding. The objectives of this work included: 1. To advance engineering design such that a comprehensive estimate for the total installed cost of a full-scale PZAS CO2 Capture Plant with CO2 compression can be developed on an existing NGCC power plant. a. These detailed costs can also be used to qualify PZAS and other related second generation (2G) amine scrubbing processes for use on cogeneration facilities in refineries and chemical plants that use gas turbines with HRSGs to produce steam. b. These detailed costs will help qualify 2G amine scrubbing for use on NGCC power plants and establish a more accurate baseline cost to be used as a target by other capture technologies. 2. To provide cost details to be used in the economic optimization of the process features of PZAS and other 2G amine scrubbing processes. 3. To provide DOE with a more detailed understanding of carbon capture costs in a commercial application, enabling DOE to better design its R&D program to improve the economics for carbon capture. 4. To provide the host site and cost share partners with the information necessary to determine whether a commercial project to capture and use CO2 for enhanced oil recovery (EOR) or for sequestration can be justified (when accounting for the 45Q tax credit). A key component of the FEED is the estimated total installed cost, which provides a basis for the likely capital investment necessary to implement the PZAS carbon capture process at this location and scale. In combination with the included economic analysis, which accounts for potential revenue from the produced CO2, potential avenues to profitability are explored. The major findings of the FEED are as follows: The Mustang Station PZAS CO2 Capture Plant estimated total project cost of $698 MM of which $384 MM was direct costs. The annual operating costs were $32.6 MM. The total investment for a PZAS facility at Mustang Station is $725 MM. This estimate includes owner’s cost of $25 million and a contingency of $110 MM. • The study estimated the CO2 capture plant at Mustang Station would generate CO2 at $110/tonne for EOR, assuming a 12% IRR (internal rate of return) and an 85% capacity factor. For CO2 storage, the same case would achieve a 12% IRR at about $114/tonne. At a capacity factor of 52%, the storage and EOR cases would break even when carbon is priced ~$150/tonne. The economic analysis determined that the capacity factor and utility pricing, among other variable factors, had a significant effect on the economics and will need additional studied. • The energy penalty of the PZAS plant would be about 46 MW in connected power and 35 MW in operating load. The natural gas requirement (for the Gas Boiler package) would be about 354 MMBTU/hr. • The FEED revealed no major risks in process maturity. However, some areas were outlined for further engineering during detailed design, which included the Gas Boiler system, general arrangement and site layout, air coolers, schedule development, and optimization of the process for higher CO2 removal. • If PZAS were to be implemented at another host site, additional opportunities for cost reduction for would include cost reduction through use of cooling water and steam extraction.

03 NATURAL GAS↗

Hydrogen Production Cost with Alkaline Electrolysis

Rigorous stakeholder-vetted techno-economic analysis was performed to assess the cost of hydrogen (H 2 ) produced using state-of-the-art Liquid Alkaline (LA) electrolysis. Projected high-volume, untaxed levelized cost of hydrogen (LCOH) range from 2020US $\$ 1.84$ to $\$ 2.88$/kg-H 2 depending on technology year, process design, and electrolyzer project scale, assuming an electricity price of $\$ 0.03$/kWh. The total installed capital cost for a LA electrolysis plant was estimated from bottom-up stack and installed cost models that account for purchased equipment, installation costs, site preparation, and general overhead costs. For this study, the LA electrolysis plant is assumed to be a stick-built, greenfield project developed by an EPC firm with electrolysis stacks purchased directly from an electrolysis stack manufacturer. The price of the electrolysis stacks is based on a bottom-up cost assessment with business markup for the electrolysis company fabricator. Methods from the Hydrogen Analysis (H 2 A) production model, a peer-reviewed national laboratory-developed discounted cash flow model, were used to calculate the LCOH production in 2020$/kg-H 2 . The baseline electricity price case ($\$ 0.03$/kWh) corresponds to average wholesale electricity prices currently possible in U.S. markets with plentiful wind. Similar low-cost electricity pricing is possible from solar Power Purchase Agreements (PPA) although these prices are typically limited by renewable energy capacity factors.

08 HYDROGEN↗

A Clean Energy Deployment Baseline for the Energy Community and Low-Income Tax Credit Bonuses [Slides]

The Inflation Reduction Act of 2022 introduced, for the first time, place-based federal tax incentives for projects sited in “Energy Communities,” potentially changing the economic calculus of where projects are best sited. Storage projects can qualify for a 10-percentage-point bonus to the Investment Tax Credit (e.g., from 30% to 40%), while wind and solar projects may qualify for either the ITC bonus or a 10% bonus to the Production Tax Credit (e.g., from $\$27.5$ to $\$30.25$/MWh). Energy Communities are areas with historical ties to fossil fuel industries and above average unemployment levels (FFEU), with closed coal mines or power plants, or contaminated properties. They seek to identify locations across the US that could especially benefit from economic revitalization. This report explores how the new federal tax credit incentives are impacting clean energy deployment patterns and establishes historical baselines against which future changes can be compared. We include a few case studies of clean energy projects going specifically to areas that were recently impacted by coal power plant closures to provide concrete examples of investments in Energy Communities. However, this publication does not assess how much of the incentive benefits pass from clean energy developers to hosting communities, nor does it offer a comprehensive view of the economic effects of clean energy deployment on Energy Communities. Key highlights include: - As clean energy projects take multiple years to conceptualize and develop, it is likely too early to see shifts towards Energy Community locations either among newly built projects or those that entered interconnection queues in 2023. - Approximately 35% of onshore wind, 50% of solar, and 60% of storage capacity built in 2023 and the first half of 2024 are located in Energy Communities, making them likely eligible for bonus incentives. While these bonus incentives were not available to projects coming online before 2023, we used 2023 Energy Community definitions to classify whether past projects were built in what is now considered an Energy Community. The deployment levels for 2023-2024 are similar to recent years (2020-2022) for solar and storage but slightly lower for wind. - Clean energy capacity has surged in the interconnection queues over the last few years, with about 45-50% of both recently proposed and total queued capacity being located in Energy Communities. While the amount of capacity in Energy Communities has also grown, its relative share is either stable (solar and storage) or slightly lower (wind) among projects that entered the queue in 2023. - Clean energy projects can be built at lower costs in Energy Communities. The levelized cost of energy after incentives was on average $\$9$/MWh (24%) lower for solar projects and $\$2$/MWh (6%) lower for wind projects built in 2023, relative to projects not located in Energy Communities. Wholesale electricity values at Energy Community locations relative to the rest of the market vary by region. The average value was often higher for wind projects (-$\$3$ to $\$11$/MWh) but lower for solar projects (-$\$6$ to 0/MWh). - Distributed solar that is owned by commercial entities is eligible for the Energy Community bonus and also, potentially, a Low-Income Community bonus. Residential solar installations in qualifying Energy Communities that are third-party owned represent about 10% of the total residential market. Larger commercial and industrial solar installations in Energy Communities make up 17% of the total market in 2023. Nearly 2 GW of distributed solar was built in areas qualifying as Low-Income Communities in 2023, exceeding the available annual program cap of 700 MW. Continued tracking of these trends will be important for system planners, investors, and local communities.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Solar +: Clean Energy Strategies for the Sunshine State (Final Technical Report (FTR) of the Florida Alliance for Accelerating Solar and Storage Technology Readiness (FAASSTeR))

This reports on a four-year effort to provide foundational research, analysis, strategies and assistance to help Florida, and other states that might learn from this work, to grow solar energy in conjunction with other distributed energy resources by addressing and overcoming existing barriers, and in way that delivers increased value. The start of this effort coincided with an inflection point of sorts into a new dawn for solar energy in Florida, where the Sunshine state’s national ranking in total installed solar, according to the Solar Energy Industries Association (SEIA), has rose from 13th to 4th. Florida has now become the national leader in annual utility-scale solar growth as dozens of large plants have come online. Also, during this time, Florida utilities have expressed a strong and growing interest in understanding the role of energy storage and how to best plan for and deploy this unique resource as part of strategies to grow solar. The utility-scale solar growth experienced has been fueled by the economics of solar cost-parity with natural gas combined cycle plants and Florida Public Service Commission’s (PSC) approval of cost-recovery for the Investor-Owned Utilities (IOU’s), primarily through the Solar Base Rate Adjustment (SoBRA) mechanism. This has led to gigawatts (GW’s) of rate-based solar capacity additions over several years, along with fairly significant amounts of energy storage. Meanwhile, municipal electric utilities, which, collectively, are the third largest source of power in the state, have been increasing solar considerably through power purchase agreements (PPA’s) and are on track to have close to 1 GW of grid-connected solar by 2024. Florida’s municipal utilities and the Florida Municipal Electric Association (FMEA) have been key partners in the Florida Alliance for Accelerating Solar and Storage Technology Readiness (FAASSTeR), formed to carry out this effort. The six largest of these have been Core Team utilities, engaging throughout the project in weekly calls, discussions, and project direction, participating in and hosting workshops and benefiting from technical assistance in several areas.

14 SOLAR ENERGY↗

Hydrogen Based Energy Storage System for Integration with Dispatchable Power Generator (Phase I Feasibility Study)

This project examined the feasibility of integrating hydrogen generation, storage, and use as a means to decarbonize campus activities while retaining the ability to utilize the existing natural gas fired combined heat and power system installed at the campus of the University of California @ Irvine. Analysis of specific potential sites for the integrated system identified a location adjacent to the existing central plant which resulted in minimization of interconnections. A strategy based on use of commercial electrolyzers and gas storage was identified. Primary technology advancements are required for the gas turbine to accommodate higher levels of hydrogen and the integrated controls. The project indicated challenges for adopting the proposed strategy with the present rates and constraints. The availability of a relatively low-cost biogas resource by the campus already decarbonizes the gas turbine to some extent. In the absence of this resource, procurement of electricity directly from large scale renewable operations could facilitate lower electricity costs. Additional solar resources on campus could also help in this regard. The gas turbine cannot be operated below 50% capacity due to air permit constraints. Using the otherwise curtailed gas turbine operation to generate hydrogen via electrolysis by consuming natural gas is not highly efficient and therefore leads to relatively high costs of electricity returned. Several scenarios demonstrate potential for effective decarbonization, yet most involve lower and lower capacity factor for the legacy gas turbine which is not a good use of the asset. A small gas turbine output with higher efficiency operation would help. As would ability to export electricity to the grid. Certainly current rate structures and operational scenarios are less attractive than other possible future structures which should be pushed for in the future.

03 NATURAL GAS↗

Advancing Post-Combustion CO 2 Capture through Increased Mass Transfer and Lower Degradation

The over-arching goal of the proposed project is to develop three techniques to enable aqueous post-combustion CO 2 capture technologies to meet the DOE performance and cost targets of 90% CO 2 capture, 95% purity, at a cost of less than $30/tonne CO 2 captured. This will be accomplished by the development of materials and processes to increase mass transfer in the absorber and reduce the environmental impacts. While constantly working to reduce the cost of CO 2 capture via solvent development and process & heat integration, increasing CO 2 mass transfer through development of custom dynamic packing materials and tuning solvent physical properties may offer a route to increased solvent capacity, lower energy consumption and reduced aerosol formation. The environmental concerns that have been identified in amine-based CO 2 capture systems, nitrosamines specifically, are another critical element that will be addressed in this project. The specific objectives of the project were to: 1) conduct detailed studies to understand how solvent physical properties and aerosol formation are impacted by additives; 2) quantify the CO 2 mass transfer improvement from the dynamic polarity packing in the absorber and the additive-modified solvent using the existing UK bench-scale CO 2 capture unit; 3) quantify the energy consumption savings associated with enhanced mass transfer; 4) quantify the benefits of the UK’s electrochemical cell to decompose nitrosamines; and 5) collect the necessary information/data to conduct a high-level TEA assessment of the proposed technologies. The project involved the fabrication and installation of customized dynamic polarity packing and an investigation into the understanding of the impact of chemical additives on solvent properties to increase CO 2 mass transfer in the absorber column, and lastly the design of an electrochemical cell to decompose nitrosamines in a water wash. After both systems were fabricated, they were tested at UK facilities, including on the bench-scale CO 2 capture unit under parametric and long-term operation.

20 FOSSIL-FUELED POWER PLANTS↗

Hybrid Power Plants: Status of Installed and Proposed Projects [Slides]

As battery prices fall and wind and solar generation rises, power plant developers are increasingly combining wind and solar projects with on-site batteries, creating “hybrid” power plants. But hybrid or co-located plants have been part of the U.S. electricity mix for decades, with widely ranging configurations that extend beyond pairing a generator with a battery. This new summary tracks and maps existing hybrid and co-located plants across the United States while also synthesizing data from generation interconnection queues to illustrate developer interest in the next wave of plants. The scope is inclusive of co-located hybrid plants that pair two or more generators and/or that pair generation with storage at a single point of interconnection, and also full hybrids that feature co-location and co-control. The focus is on larger, 1 MW+ systems: smaller (often behind-the-meter) projects are also increasingly common, but are not included in the data synthesis. Based in part on EIA Form 860 data, there were at least 125 co-located hybrid plants (>1 MW) already operating across the United States at the end of 2019, totaling over 14 GW of aggregate capacity. Some of the most common configurations include wind+storage (13 projects, 1,290 MW wind, 184 MW storage), PV+storage (40 projects, 882 MW PV, 169 MW storage), and fossil+storage (10 projects, 2,414 MW fossil, 91 MW storage). Data from interconnection queues demonstrates the considerable commercial interest that exists in hybrid power plants, especially solar co-located with storage. By the end of 2019, there were at least 367 GW of solar plants in the nation’s queues; 102 GW (~28%) of this capacity was proposed as a hybrid, most typically pairing PV with battery storage. For wind, 225 GW of capacity sat in the queues, with 11 GW (~5%) proposed as a hybrid, again most-often pairing wind with storage. The proposed solar+storage plants are located throughout the United States, but with California and the non-ISO West being the most prominent areas of commercial interest. Proposed wind+storage and standalone storage plants also center to a degree on these regions of the country.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Impact of the fluorination degree of ether-based electrolyte solvents on Li-metal battery performance

Electrolytes using fluorinated solvents have proven effective in improving the cycling life of Li-metal batteries, by forming a robust solid–electrolyte interphase through decomposition of anion and fluorinated solvent molecules. Herein, we modulated the fluorination degree of ether-based electrolyte solvents to investigate their performance in Li-metal batteries. Here, we tuned the fluorination degree by installing a monofluoro substituent on one ethoxy group of 1,2-diethoxyethane (DEE) and varying the fluorination degree on the other one, providing three fluorinated DEE solvent molecules (i.e., F1F0, F1F1 and F1F2) with a relatively low fluorination degree. All three electrolytes showed improved solvation strength and ionic conductivities compared with previous highly fluorinated DEE electrolytes while retaining good oxidative stability. A full cell test using the Li-metal anode and nickel-rich cathode revealed that a higher degree of fluorination is beneficial to the cycling performance, and the cycling stability follows F1F0 < F1F1 < F1F2. Specifically, F1F0 exhibited poor cycling stability due to its instability against both the anode and cathode. While F1F1 and F1F2 both showed good stability against the Li metal anode, their relative long-term oxidative stability was responsible for the distinct performance, in which the cycle numbers at 80% capacity retention for F1F1 and F1F2 were ~20 and ~80, respectively. Finally, we demonstrated that F1F2 was able to achieve 90 cycles before reaching 80% capacity retention in practical lithium iron phosphate (LFP) pouch cells. This work shows the importance of modulating the fluorination degree of electrolyte solvents, and this approach is suitable for various cathode materials.

25 ENERGY STORAGE↗

Enhanced convection for higher module and system efficiency (Final Technical Report)

The goal of this work is to develop new solar photovoltaic (PV) modules and solar system-scale designs that promote an increase of the convective heat transfer coefficient of at least 40%, reducing the operating temperature of the solar PV panels, and leading to a boost on the annual energy yield by at least 5%. By achieving this goal, we further foresee decreasing solar panel degradation by +0.3%/year, reducing the LCOE by 2.9-4.5¢/kWh. Currently, this question and/or approach is not considered though it is a relevant factor in performance/efficiency. The technology proposed will be at a mature stage by the end of the project and could be aligned to be proven on a full-field test. PV users, installers and manufacturers will be interested in the technology due to the aforementioned benefits. The work was conducted through a suite of wind tunnel experiments, numerical simulations and field experiments. These were then evaluated through a correlation encompassing the entire data set and implementing findings into NREL SAM. The work resulted in eight peer reviewed publications with three others in preparation. The key results of the project are 1.) Showing the capability of increasing the solar farm power production by increasing the heat transfer coefficient; 2.) Providing strategies for achieving this through large scale arrangement manipulation (heights, spacings, angles), flow deflectors and vortex generators; 3.) Demonstrating scalability of results by comparing numerical simulations, wind tunnel experiments and field experiments; 4.) Providing a correlation to be able to capture the various arrangements while exploiting the heat transfer coefficient; and 5.) Proving the feasibility of such strategies and their capacity through a comprehensive techno-economic analysis. For the heat transfer coefficients, gains of 40% were attained and increases in power in the excess of 5% were observed. For heat mitigation strategies, consideration at the PV array scale were inter-panel spacing, panel height and panel angles while at the module level, wind breaks such as solid walls and selected gaps were evaluated as well as vortex generators on the panel. All proposed strategies saw an increase in heat transfer coefficient. For scalability, results were compared against field experiments and a correlation for the heat transfer quantity was attained leading to a parametric understanding of the variations and impact in the heat transfer coefficient independent of tools implemented (wind tunnel/numerical simulations). The strategies were also further assessed by a technoeconomic analysis finding improvements based on LCOE with respect to location (several states with varies atmospheric conditions/geographic locations) yielded different results. Improvements on this end were also observed especially towards the colder climates and when considering bi-facial modules. The quantitative demonstrations of such conclusions are provided in the main portion of this document with complementary results and their narration. Milestones and go/no-go points were successfully met in the project.

14 SOLAR ENERGY↗

Active Aerodynamic Load Control for Wind Turbines

The goal of this project was to develop and demonstrate an advanced dielectric barrier discharge (DBD) plasma actuator technology. We set out to demonstrate the efficacy and impact of the new actuator technology as a key component of an active load control system for wind turbines. A DBD plasma actuator consists of a thin layer of dielectric material separating a pair of offset electrodes. One of those electrodes is embedded between the dielectric layer and a non-conductive substrate, while the other is exposed to air. When driven by an appropriate high voltage waveform, the device ionizes the air near the surface of the dielectric and adjacent to the exposed electrode. Collisions between the ions in the plasma and neutral air molecules result in a wall-jet – a region of induced air velocity that can be used to modify the flow around a lifting body. Use of the device near the trailing edge of a wind turbine blade, designed in such a way as to amplify the effects of the flow-modifying device, can result in large changes to the global forces experienced by the blade. Because of the fast response time of the device, it can allow the turbine to react in real time to changes in the wind associated with turbulence, wind shear, gusts, and the like, when paired with appropriate sensors and control algorithms. The goal of this project was to increase the capacity of the device to induce velocity on its surface at the levels required by large, utility-scale wind turbines. The first technical goal was to increase the induced velocity from the current industry-best of about 4 m/s to 10 m/s by modifying the electrical waveform used to drive the device and by introducing a semi-conductive surface coating to control electrostatic charge build-up on the surface. The second goal was to use the device to modify the lift on a representative airfoil in a wind tunnel, demonstrating a reduction in lift coefficient of 0.2 or better. The third goal was to produce an actuator-induced velocity of 20 m/s. Alongside our partners at the University of Texas at Dallas, we also applied modern, advanced design methods to optimize the impact of the technology on the design of wind turbines. We also had planned to install a segmented, active load control system on a test turbine to demonstrate the ability to reduce unsteady aerodynamic forces on the turbine associated with changes in the wind. The highest induced velocity achieved during this research was 11 m/s. However, practical design constraints limited the change in lift coefficient to about 0.12 for a representative airfoil in the wind tunnel at a Reynolds number of 400,000. The primary conclusion is that the plasma actuator control authority remains insufficient for practical purposes when extrapolated to Reynolds numbers over 1 million. The potential impact of the active lift control concept was evaluated through detailed simulations for three wind turbine sizes: a 3.4MW onshore turbine, a 10MW offshore turbine, and a 15MW offshore turbine. A feedback control system was designed for each turbine within two scenarios: one where the active lift control is used as a retrofit capability on the baseline design, and the other where the designers were permitted to “upscale” the turbines in order increase annual energy production. The levelized cost of energy was then evaluated for the range of turbine sizes and design configuration. It was found that the LCOE reduction associated with active lift control fell in the range of 0.7% to 7.2%, with the highest reduction associated with upscaling the 3.4MW turbine.

17 WIND ENERGY↗

Impacts of photovoltaic solar energy on soil carbon: A global systematic review and framework

Globally, solar energy is anticipated to be the primary source of electricity as early as 2050, and the greatest additions in capacity are currently in the form of large, ground-mounted photovoltaic solar energy facilities (GPVs). Growing interest lies in understanding and anticipating opportunities to increase soil carbon sequestration across the footprint and perimeter of both conventional and multi-use GPVs (e.g., ecovoltaics, agrivoltaics, and rangevolatics), especially as operators increasingly deputize as land managers. To date, studies on the relationship between soils and PV solar energy are limited to unique, localized sites. This study employed a systematic review to (i) identify a global corpus of 18 studies on interactions between GPVs and soils, (ii) collect and characterize 113 soil and soil-related experimental variables interacting with GPVs from this corpus, and (iii) synthesize trends among these experimental variables. Next, this study combined data from the systematic review with an iterative, knowledge co-production approach to produce a conceptual model for the study of soil and GPV interactions that applies to multiple installation types, scales, and contexts where GPVs are deployed, and identified research opportunities, threats, and priorities. This study's baseline understanding, conceptual model, and co-produced knowledge confer unique insight into the feasibility of combining soil carbon sequestration with the climate change mitigation potential of PV solar energy.

agrivoltaics↗

Structural basis for Tpt1-catalyzed 2'-PO 4 transfer from RNA and NADP(H) to NAD +

Tpt1 is an essential agent of fungal and plant tRNA splicing that removes an internal RNA 2'-phosphate generated by tRNA ligase. Tpt1 also removes the 2'-phosphouridine mark installed by Ark1 kinase in the V-loop of archaeal tRNAs. Tpt1 performs a two-step reaction in which the 2'-PO 4 attacks NAD + to form an RNA-2'-phospho-(ADP-ribose) intermediate, and transesterification of the ADP-ribose O2" to the RNA 2'-phosphodiester yields 2'-OH RNA and ADP-ribose-1",2"-cyclic phosphate. Here, we present structures of archaeal Tpt1 enzymes, captured as product complexes with ADP-ribose-1"-PO 4 , ADP-ribose-2"-PO 4 , and 2'-OH RNA, and as substrate complexes with 2',5'-ADP and NAD + , that illuminate 2'-PO 4 junction recognition and catalysis. We show that archaeal Tpt1 enzymes can use the 2'-PO 4 -containing metabolites NADP + and NADPH as substrates for 2'-PO 4 transfer to NAD + . A role in 2'-phospho-NADP(H) dynamics provides a rationale for the prevalence of Tpt1 in taxa that lack a capacity for internal RNA 2'-phosphorylation.

37 INORGANIC, ORGANIC, PHYSICAL, AND ANALYTICAL CH↗

Techno-Economic Analysis and Optimization of a Compressed-Air Energy Storage System Integrated with a Natural Gas Combined-Cycle Plant

To address the rising electricity demand and greenhouse gas concentration in the environment, considerable effort is being carried out across the globe on installing and operating renewable energy sources. However, the renewable energy production is affected by diurnal and seasonal variability. To ensure that the electric grid remains reliable and resilient even for the high penetration of renewables into the grid, various types of energy storage systems are being investigated. In this paper, a compressed-air energy storage (CAES) system integrated with a natural gas combined-cycle (NGCC) power plant is investigated where air is extracted from the gas turbine compressor or injected back into the gas turbine combustor when it is optimal to do so. First-principles dynamic models of the NGCC plant and CAES are developed along with the development of an economic model. The dynamic optimization of the integrated system is undertaken in the Python/Pyomo platform for maximizing the net present value (NPV). NPV optimization is undertaken for 14 regions/cases considering year-long locational marginal price (LMP) data with a 1 h interval. Design variables such as the storage capacity and storage pressure, as well as the operating variables such as the power plant load, air injection rate, and air extraction rate, are optimized. Results show that the integrated CAES system has a higher NPV than the NGCC-only system for all 14 regions, thus indicating the potential deployment of the integrated system under the assumption of the availability of caverns in close proximity to the NGCC plant. The levelized cost of storage is found to be in the range of 136–145 $/MWh. Roundtrip efficiency is found to be between 74.6–82.5%. A sensitivity study with respect to LMP shows that the LMP profile has a significant impact on the extent of air injection/extraction while capital expenditure reduction has a negligible effect.

25 ENERGY STORAGE↗

Combustion Performance and Emissions Optimization through Integration of Miniaturized High Temperature Multi Process Monitoring System

The main objective of this research program is to design, manufacture, and demonstrate a miniaturized, multi-process, monitoring system (mMPMS) for boiler condition management and easy system deployment to obtain a higher spatial resolution. This system will facilitate a Condition-Based Maintenance (CBM) philosophy that actively monitors the health of assets to predict and prevent failures and maximize availability and generating capacity at a reduced cost. CBM systems can provide boiler data that the advanced process control (APC) system can utilize for plant performance optimization, which is increasingly relevant as coal power plants shift from predominantly base-load operation to predominantly transient operation involving large load swings. The mMPMS is based on an electrochemical sensor that provides a real-time indication of the risk of damage to key locations in the radiant or convective section of a coal-fired boiler such as metal loss rates, heat flux, metal surface temperature, and deposit thickness. These indications can be utilized to optimize boiler performance as well as improve boiler availability in conjunction with corresponding operating conditions. This monitoring system was developed and tested in the high-temperature regions of coal-fired utility boilers in this project but can be applied to many other industries and applications as well. The new sensor design, leveraging the existing electrochemical noise-based monitoring system, is small enough to be installed through the webbing of the waterwalls without the need for long shut-downs to bend tubes and to make it feasible to obtain high spatial resolution in the boiler. Data can be transferred to the plant distributed control system (DCS) and any other control system. The sensor body that houses the sensor assembly was designed to ensure good conductive contact with boiler tubes to ensure the sensor is held at an identical temperature to the tube surface temperature. The data acquisition and signal conditioning modules were redesigned into a small footprint with optimized cooling of the module. System software was developed specifically for the new signal conditioning module and is compatible with plant PLCs. After the preliminary testing at a pilot-scale facility, five mMPMS were installed at a full-scale pulverized coal-fired plant, Basin Electric Power Cooperative’s Leland Olds Unit 1. The systems were demonstrated over a 6-week period during typical operation. Sensor measurements of deposit thickness were validated during the demonstration and subsequently leveraged to determine sensor-based boiler cleaning strategies. These strategies have the benefit of reduced thermal stresses on boiler tubes from over-cleaning and improved boiler water management. At the end of the project, continued development of the sensor technology was carried out at PacifiCorp’s Hunter Station. REI leveraged the permanent installation of the mMPMS in Unit 3 made possible by DOE funding on a separate program. The work at Hunter Plant focused on application of machine learning and artificial intelligence-based models for integration of sensor signals into control and optimization of Hunter Unit 3 processes.

Advanced Sensors, Corrosion, Ash Deposition, Optim↗

Combustion Performance and Emissions Optimization Through Integration of a Miniaturized High-Temperature Multi Process Monitoring System

The main objective of this research program is to design, manufacture, and demonstrate a miniaturized, multi-process, monitoring system (mMPMS) for boiler condition management and easy system deployment to obtain a higher spatial resolution. This system will facilitate a Condition-Based Maintenance (CBM) philosophy that actively monitors the health of assets to predict and prevent failures and maximize availability and generating capacity at a reduced cost. CBM systems can provide boiler data that the advanced process control (APC) system can utilize for plant performance optimization, which is increasingly relevant as coal power plants shift from predominantly base-load operation to predominantly transient operation involving large load swings. The mMPMS is based on an electrochemical sensor that provides a real-time indication of the risk of damage to key locations in the radiant or convective section of a coal-fired boiler such as metal loss rates, heat flux, metal surface temperature, and deposit thickness. These indications can be utilized to optimize boiler performance as well as improve boiler availability in conjunction with corresponding operating conditions. This monitoring system was developed and tested in the high-temperature regions of coal-fired utility boilers in this project but can be applied to many other industries and applications as well. The new sensor design, leveraging the existing electrochemical noise-based monitoring system, is small enough to be installed through the webbing of the waterwalls without the need for long shut-downs to bend tubes and to make it feasible to obtain high spatial resolution in the boiler. Data can be transferred to the plant distributed control system (DCS) and any other control system. The sensor body that houses the sensor assembly was designed to ensure good conductive contact with boiler tubes to ensure the sensor is held at an identical temperature to the tube surface temperature. The data acquisition and signal conditioning modules were redesigned into a small footprint with optimized cooling of the module. System software was developed specifically for the new signal conditioning module and is compatible with plant PLCs. After the preliminary testing at a pilot-scale facility, five mMPMS were installed at a full-scale pulverized coal-fired plant, Basin Electric Power Cooperative’s Leland Olds Unit 1. The systems were demonstrated over a 6-week period during typical operation. Sensor measurements of deposit thickness were validated during the demonstration and subsequently leveraged to determine sensor-based boiler cleaning strategies. These strategies have the benefit of reduced thermal stresses on boiler tubes from over-cleaning and improved boiler water management. At the end of the project, continued development of the sensor technology was carried out at PacifiCorp’s Hunter Station. REI leveraged the permanent installation of the mMPMS in Unit 3 made possible by DOE funding on a separate program. The work at Hunter Plant focused on application of machine learning and artificial intelligence-based models for integration of sensor signals into control and optimization of Hunter Unit 3 processes.

Advanced Sensors, Corrosion, Ash Deposition, Optim↗