Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “grid integration planning”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 379 records · Page 21

State Indicators for Advancing Demand Flexibility and Energy Efficiency in Buildings - Part I [Slides]

This slide deck report identifies objectives and key indicators for state activities that advance demand flexibility in buildings — legislation, utility regulatory proceedings, executive orders and programs. It also illustrates progress to date and identifies trends, gaps, and opportunities. Part I of the report focuses on (1) demand response and (2) energy efficiency targeted to reduce peak demand or integrate with demand response. This section covers building energy codes, appliance and equipment standards, resource standards, utility planning, utility programs, advanced metering infrastructure and meter data, rate design, state programs, state energy planning, and related state policies and regulations. Part II of the report addresses traditional energy efficiency indicators, including utility and state programs, codes, and standards that support annual energy savings. See the additional links for an infographic, library of cited state documents on demand flexibility, and presentation to the NASEO-NARUC Grid-Interactive Efficient Buildings Working Group.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Concrete Thermal Energy Storage Enabling Flexible Operation without Coal Plant Cycling

The work described in this report is responsive to the Office of Fossil Energy program “Energy Storage for Fossil Power Generation.” The pilot plant built as a result of this project demonstrated the feasibility and performance of a concrete thermal energy storage (CTES) system integrated with a supercritical coal power plant. The 10 MWh electrical (>25 MWh thermal) CTES unit, developed by Storworks Power, was designed to enable flexible operation of coal plants without cycling damage. The project's key technical achievements showcase a significant advancement in energy storage technology. A modular CTES system using 42 “Bolderblocs” units was successfully designed and constructed at Alabama Power’s Plant Gaston Unit 5, with each block containing embedded stainless-steel coils in specialized, cost-effective high-temperature concrete. The system interfaced seamlessly with the plant's 3500 psig (241 barg), 1000°F (538°C) supercritical steam, demonstrating operational flexibility. Over 86 full cycles, the CTES exhibited rapid charging and discharging capabilities, effectively mimicking steam turbine feed conditions and handling varying load profiles and storage durations. Performance validation confirmed the system's ability to consistently meet design target steam conditions of 75 bar-a and ~400°C for nominal baseline discharge. The concrete material withstood repeated thermal cycling without degradation, validating earlier lab-scale tests. Integration of balance of plant components, including a condensate management system with storage tank and air-cooled condenser, minimized plant interfaces and water consumption. A robust control scheme ensured safe, automated operation across various scenarios. Key learnings from the project were invaluable: 1. Initial concrete drying and commissioning procedures were refined for future deployments, enhancing efficiency in subsequent installations. 2. System flexibility exceeded expectations, with rapid response to changing conditions. 3. Design improvements were identified including optimized insulation and piping that will enhance overall system efficiency in future deployments 4. Full cycle thermal roundtrip efficiencies exceeded 88%. While the roundtrip electrical efficiency was somewhat limited by known challenges using input steam, such constraints may be mitigated by swapping steam for hot air as thermal input. 5. A summary of key performance parameters for the pilot test and predicted performance of a full scale commercial system with specified improvements determined from the pilot are shown in Section 8. The project faced challenges, including COVID-19 delays and host plant availability constraints. However, these were overcome through adaptive planning and execution. The successful management of these obstacles demonstrated the resilience and adaptability of the project team and the robustness of the CTES technology. This successful pilot demonstrates the potential for CTES to enhance coal plant flexibility, supporting grid stability as renewable penetration increases. The validated design and operational data provide a solid foundation for scaling up to utility-scale implementations, potentially transforming how thermal plants operate in evolving energy landscapes. The system's ability to rapidly respond to changing grid conditions while maintaining high efficiency makes it a promising solution for balancing intermittent renewable energy sources. Furthermore, the project highlighted the potential for even greater efficiencies in future iterations. The use of air as an input medium could potentially eliminate the limitations observed with steam input, opening new possibilities for energy storage applications beyond coal plant integration. In conclusion, this pilot project not only achieved its primary goals but also uncovered additional benefits and potential applications of the CTES technology. It represents a significant step forward in addressing the challenges of grid stability and flexibility in an increasingly renewable-driven energy landscape.

01 COAL, LIGNITE, AND PEAT↗

Model Agnostic Bayesian Framework for Online Anomaly/Event Detection in PMU Data

Phasor measurement units (PMU) are integral to the modernization and automation plan of the electric power industry. A PMU data signature contains system-level events (e.g., faults, generation/load change, etc.) and any measurement/device-related errors. Therefore, the reliable and resilient operation of power systems is equivalent to the quality of the PMU data and the situation awareness provided by its data signature. Despite recent progress, current state-of-the-art methods are not fool-proof and have certain limitations tracing an error/abnormality to sensor sub-components and grid systems. This is because of technical challenges imposed by the scarcity of the labeled information, loss of data quality, and non-stationarity of data. In this paper, we consider the online PMU data stream as an output of a stochastic process and pose the anomaly/event detection as a changepoint detection problem dealing with detecting parameter changes in the underlying stochastic processes. The proposed model-agnostic framework relies on: (a) feature extraction utilizing the minimum volume enclosing ellipsoids (MVEE) method from raw PMU observations and (b) a Bayesian framework of changepoint detection. The validity of the proposed methodology is discussed through numerical experiments on real-world utility-scale PMU data.

Hossain, Ramij Raja↗

Potential of Data Center Controls in Grid Services

The rapid proliferation of large data centers brings both challenges and opportunities for grid reliability. The data center resources and their potential flexibility have the potential to contribute resources to grid operations. Through capabilities like energy shifting and resource coordination, data centers can help reduce their net demand on the transmission network, as well as provide additional grid services to support reliable operation on the grid. While transient and long-term grid planning and operations are the scenarios that draw most attention, the quasi-steady state timeseries (QSTS) operation of data centers and grid bring interesting scenarios that can help evaluate the data center controls to aid grid services. This work is focused on modeling data centers for QSTS applications – incorporating the AI data center load profiles and building on the PNNL digital twin model for the thermal management loads to enable simulation studies to reveal the impact of data center controls on grid performance. This includes the integration of a QSTS battery and natural gas generator model to incorporate local resource impacts to the system. The simulation study is performed with a modified IEEE 24-Bus transmission system. Scenarios are focused on evaluating the data center load impacts on the transmission system and leveraging both data center and local generation controls to mitigate those impacts and provide additional grid services. The data center controls revealed the ability to contribute to two main kinds of grid services: preventing congestion on a weak grid by coordinating the data center resources with the collocated BESS and onsite generation; and the ability to help the grid operations during stressed times of operation like during a contingency. Leveraging these and other capabilities has the potential to help data centers become grid responsive assets, aiding in both their integration into the power system and grid reliability.

power grid simulation↗

CyDER: A Cyber Physical Co-simulation Platform for Distributed Energy Resources in Smartgrids

The CyDER project aimed at developing an open-source, modular and scalable co-simulation platform for power grids with large shares of Distributed Energy Resources (DERs). The project partners are the Lawrence Berkeley National Lab (LBNL), Lawrence Livermore National Lab (LLNL), PG&E, SolarCity, and ChargePoint. The prime recipient is LBNL; SolarCity and ChargePoint were partners for the project’s first two years. Increased DER integration introduces a number of challenges in power grid operation including a more dynamic interaction between the transmission grid and distribution grids, and increased modeling complexity. Although specialized software exists to precisely model different components of the power system, it is far from trivial to integrate all various models and perform a holistic simulation. Instead of replicating all models in a common simulation program, a commonly accepted approach to tackle this model diversity is to couple third-party simulators and models through a co-simulation platform that coordinates information exchange among the various components. Following this line of research, this project’s objective was to develop a co-simulation platform based on a widely accepted industrial standard called Functional Mockup Interface (FMI). Within this process, the project developed models compliant with the FMI standard, called Functional Mockup Units (FMUs), and used them to perform various operational and planning power system analyses. Relying and building upon an industrial standard is the main differentiation of this project compared with previous or parallel efforts in the co-simulation area. Particular emphasis was put on delivering software utilities to facilitate setting up and running co-simulations by end-users. Furthermore, a strong aspect of this project is demonstrating that co-simulation techniques can be used to perform Hardware-in-the-Loop (HIL) simulations that couple software components (e.g., simulated models) with hardware components (e.g., real devices such PV systems and batteries). The long-term goal of CyDER project is to help establish FMI as a powerful standard for co-simulation and promote adoption by electric utilities and other interested stakeholders. The main accomplishments of the project include the development of several FMUs including distribution and transmission grid models, PV inverters with Volt/Var/Watt controllers, batteries, and predictive optimal controllers. Additionally, a unique software package was developed, called SimulatorToFMU, which is capable of exporting any Python-driven simulator or Python script as an FMU. This is an important contribution towards establishing FMI as one of the main co-simulation standards, because more and more third-party programs for sub-system modeling and simulation are delivered with Python APIs. The CyDER platform was used to perform PV hosting capacity analyses in real utility feeders with and without smart inverter controls, battery storage, and EV charging. Smart inverter controls include conventional Volt/Var/Watt controls for reactive power support and active power curtailment, but also predictive controls that optimize the charging and discharging profile of the battery connected on the DC side in order to minimize the customer’s economic benefit. Finally, an important result of this project is delivering an experimental setup that consists of residential-scale PV inverters with battery storage, a real-time grid simulator with an ideal voltage source as grid emulator, and micro Phasor Measurement Units (PMUs). All these components and additional software modules are coupled to one another using the FMI standard and can be co-simulated with the CyDER platform.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Intelligent Partitioning based Fully Parallel AC Security-Constrained Optimal Power Flow

Today’s power grid is becoming more diverse and integrated with high-level distributed energy resources and smart control technologies that is creating a new set of grid management challenges in terms of large-scale, nonlinear, and non-convex problem modeling, complex and time-consuming computation, as well as difficult uncertainty handling. This project focused on solving a challenging multi-period security-constrained generation scheduling problem, which is of great importance for maximizing the social welfare of real-time dispatch, day-ahead market, as well as weekly planning of power systems. Our developed software explored parallel optimization algorithms for complex and realistic power system models, and develop fast, efficient, and robust grid optimization solutions on the high-performance computing platform that will enable increased grid economics, flexibility, resilience, as well as energy security in the United States.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Control and Optimization of Energy Storage System in Power Distribution System

The widespread adoption of electric vehicles (EVs) and transportation electrification is encumbered by two chief barriers: i) the limited driving range of EVs in the market today and ii) inadequate fast-charging infrastructure for long-distance trips. Extreme fast charging (XFC) technology can recharge EVs in less than 10 minutes for 200 miles range. Firstly, a novel robust optimization-based mixed integer linear programming model is proposed to size a battery energy storage system (BESS) and PV system in an XFCS. In this part, it is assumed that the sizing and location of the XFCS are known. Secondly, the aforesaid assumption is relaxed, and a strategic multi-period coordinated planning model is proposed to optimally site and size BESS-assisted charging stations in a highway transportation network and PV systems in a power distribution network by considering the coupling between both networks. Optimal operation and control of BESS-assisted EV charging stations are vital to alleviate the adverse impact of extreme fast charging of EVs on the host power network. A joint solution is proposed to mitigate the steady state and transient impact of extremefast charging of EVs and ensure grid-friendly integration of XFCSs with the host grid. Lastly, to make the operation of the XFCS cost-effective, a multi-layered energy management framework is proposed for the XFCS by considering forecast uncertainties, monthly demand charges reduction, and BESS degradation.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Distribution Integration Solution Cost Options (DISCO) [Slides]

DISCO is a Python-based NREL software tool for conducting scalable, repeatable distribution analyses. Although DISCO was originally developed to support photovoltaic impact analyses, it can also be used to understand the impact of other distributed energy resources and load changes on distribution systems. This presentation took place on April 9, 2024, and included NREL power grid researchers Sherin Ann Abraham and Shibani Ghosh.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Restoration Hydro: A Watershed Approach to Standard Modular New Hydropower

The objectives of FOA DE- FOA-0001836- “Standard Modular Hydropower” included designing a standardized, modular, and environmentally compatible hydropower schematic for implementation in greenfield sites that generate up to 10 MW of capacity. Utilizing funds competitively awarded under DOE’s Water Power Technologies Office, the Natel Energy team developed a concept for modular new stream reach (NSR) hydropower that incorporates multi species upstream and downstream fish passage, improved river channel connectivity, and recreational modules. The in-stream design of the collective modules minimized site specific design and maximized the opportunities for modularity. Financial data was also presented using actual costs from regional suppliers, with figures provided in 2022 dollars. While the project team did not address potential permitting process improvements, the site selection criteria did consider established barriers to hydropower development such as tribal and preserved lands, interconnection proximity, and endangered species to exclude or deprioritize. The project’s design schematic met the objectives of the FOA, and presented a unique solution that targets alluvial pockets as natural features for sustainable development. Natel’s concept also incorporated the company's fish-safe Restoration Hydro Turbine for safe downstream passage, while featuring a rock arch that integrates fish passage, water, recreation, and grade control modules (including sediment). Alignment with the Department of Energy Office of Energy Efficiency and Renewable Energy (EERE) “Innovative Design Concepts for Standard Modular Hydropower and Pumped-Storage Hydropower” Program: According to the Hydropower Vision (DOE, 2016), approximately 16 GW of hydropower growth is possible with the development of technology solutions that balance efficiency, economics, and environmental sustainability. The desired outcome of the SMH program is transformational innovation specifically in the site identification, conceptual, and detailed design phases of technology development lifecycles (DOE, 2018). In developing the SMH design schematic, the team aimed to address the opportunities outlined in the Vision through an inverted design philosophy; rather than singularly prioritizing efficiency and power production, the team focused on integrating hydropower with restoration of degraded streams to optimal ecosystem function and provision of exceptional recreation value as design criteria. To achieve this, Restoration Hydro incorporates the principles of nature-based engineering (WWAP, 2018) and biomimicry (Biomimicry NL.) to strategically deploy complementary combinations of permanent, semi-permanent, and ephemeral low-head structures - such as natural and engineered log jams - that harness geomorphological and hydrological processes at the landscape-scale. Primary applications of Restoration Hydro include: 1) restoration of degraded watersheds’ natural ecological function and enhancement of hydrological connectivity; and 2) creation of associated co-benefits to hydro production, including increased groundwater recharge, improved sediment transport and management, improved water security and water quality. Restoration Hydro projects build upon proven watershed restoration engineering techniques by integrating hydropower turbines into low-head structures using innovative and evolving civil works concepts that facilitate fish and sediment passage, and in some cases create additional revenue-generating recreational opportunities. Powering low-head structures creates a directly monetizable layer of economic value in the form of flexible, reliable, renewable energy on top of the already high-value water, environmental and recreational benefits of watershed and river restoration. The approach aims to create a virtuous, self-reinforcing cycle whereby Restoration Hydro projects support the scaling of ecosystem restoration activities, creating a water-energy-carbon multiplier effect that, through the principles of adaptive change management: 1) improves the resilience of landscapes and downstream population centers for changing hydrological cycles; 2) creates a reliable energy resource that facilitates the integration of intermittent renewable power sources into grids; and 3) supports climate change mitigation through grid decarbonization and enhanced ecosystem carbon capture and retention.

13 HYDRO ENERGY↗

High-Resolution Synthetic Solar Irradiance Sequence Generation: An LSTM-Based Generative Adversarial Network

The rapid growth of renewable energy resources penetration is bringing more challenges to power system planning and operation. Relevant renewable energy integration studies, such as the capability and dynamic performance of inverter-based resources' primary frequency response and fast frequency response, require high-resolution renewable generation output data that are representative of renewable energy resources. This paper focuses on creating synthetic but realistic solar irradiance data and proposes a long short-term memory-based generative adversarial network to generate high-resolution (second-level) solar irradiance sequences from low-resolution (minute-level) measurements. Combined with a classifier to recognize the solar irradiance patterns, the proposed model is trained using multi-loss functions to accurately capture the temporal correlations among both high-resolution and low-resolution sequences. Verification of the proposed approach is performed on the data set of the Oahu Solar Measurement Grid collected through the National Renewable Energy Laboratory. The results of the case studies demonstrate the proposed approach's capability to capture the statistical characteristics of different solar irradiance patterns and to generate high-quality synthetic solar irradiance sequences in high resolution.

dynamic scheduling↗

Economic Dispatch Optimization of Multi-Unit SMR Site

With the increase of integration of variable renewable into the grid, grid resilience can be compromised without flexible electricity suppliers. Flexible operation of NPP can expand the scope of integration of new nuclear power plants in regions with high share of renewables. It also provides opportunity to increase profits through participation in ancillary services. In this research, NuScale modules are used as the case study. NuScale is an integrated pressurized water reactor with thermal power of 250 MWth. Having multiple units can provide higher flexibility in changing power levels and supplying the grid with electricity all year long. Additionally, load-following might perturbate the ordered sequence of refueling (every 24 months for NuScale). To maintain the 2 year refueling cycles, the loading patterns will need to be adjusted in a year-to-year basis, resulting in additional unnecessary costs. Another solution is to find the optimal outage schedule. This will also shift the focus of the planned outage to a more optimized predictive outages and maintenance. Results from short-term optimization (i.e., daily participation in energy and ancillary services markets) shows that average commitment to regulation down ancillary service markets during late night and early morning hours can increase revenues. Participating in upward reserves during pre-work commuting hours and early evening hours can also generate additional revenues due to high ramp up of electricity demand. Having multiple units at a single site can also help operate flexibly. Results from long-term optimization show that daily fluctuation in electric power is usually handled by few units while other units operate on base-load profile. It is possible to combine base-load operation with flexible operation to extend component remaining useful life in some units and find optimal outage schedule for the units.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Electrifying Airport GSE: Monte Carlo Grid Impacts

Airports globally are shifting from ICE-powered to electric Ground Support Equipment (eGSE) to enhance efficiency, reduce operational costs, and improve operator health. Leveraging predictable routes, flat terrain, and low operational speeds, airports provide ideal conditions for electrification. This study evaluates freight GSE electrification at Dallas-Fort Worth International Airport (DFW), USA, using the Agile@ platform, which integrates three analytical methods: Freight Facility Model (FFM), Activity-Structure-Intensity-Fuel (ASIF), and Monte Carlo simulations. Results from 10,000 simulations indicate modest but critical increases in electricity demand and significant variability in GSE energy consumption. These insights emphasize the importance of data-driven scheduling, targeted maintenance, and strategic infrastructure planning. For high-uncertainty scenarios, airports are advised to deploy buffer energy storage systems (battery banks), implement demand-response charging strategies, schedule flexible workforce shifts, and prioritize proactive maintenance-particularly for equipment with higher operational uncertainty, such as tug tractors with trailers. Agile@ thus offers a robust, scalable, and data-driven framework to optimize long-term GSE planning and enhance reliability across diverse airport environments.

Bose, Ranjan [ORNL] (ORCID:0009000791026327)↗

A surrogate-model-based approach for estimating the first and second-order moments of offshore wind power

Power curve, the functional relationship that governs the process of converting a set of weather variables experienced by a wind turbine into electric power, is widely used in the wind industry to estimate power output for planning and operational purposes. Existing methods for power curve estimation have three main limitations: (i) they mostly rely on wind speed as the sole input, thus ignoring the secondary, yet possibly significant effects of other environmental factors, (ii) they largely overlook the complex marine environment in which offshore turbines operate, potentially compromising their value in offshore wind energy applications, and (ii) they solely focus on the first-order properties of wind power, with little (or null) information about the variation around the mean behavior, which is important for ensuring reliable grid integration, asset health monitoring, and energy storage, among others. In light of that, this study investigates the impact of several wind-and wave-related factors on offshore wind power variability, with the ultimate goal of accurately predicting its first two moments. Further, our approach couples OpenFAST—a multi-physics wind turbine simulator—with Gaussian Process (GP) regression to reveal the underlying relationships governing offshore weather-to-power conversion. We first find that a multi-input power curve which captures the combined impact of wind speed, direction, and air density, can provide double-digit improvements, in terms of prediction accuracy, relative to univariate methods which rely on wind speed as the sole explanatory variable (e.g. the standard method of bins). Wave-related variables are found not important for predicting the average power output, but interestingly, appear to be extremely relevant in describing the fluctuation of the offshore power around its mean. Tested on real-world data collected at the New York/New Jersey bight, our proposed multi-input models demonstrate a high explanatory power in predicting the first two moments of offshore wind generation, testifying their potential value to the offshore wind industry.

17 WIND ENERGY↗

Five grand challenges of offshore wind financing in the United States

Offshore wind energy has the potential to play a critical role in fostering a renewable energy transformation in the United States. This owes to its massive technical potential, strategic location near densely populated coastlines, and - relative to onshore wind and solar - high capacity factors and consistent production. The Biden Administration's target to build 30 GW of offshore wind capacity by 2030 (from 0.04 GW today) requires the creation and swift development of a new industry that interlinks the wind and power industries with the maritime sector. Critical to its success is financing. While financial capital is abundant, deploying it for offshore wind faces major challenges. We identify and describe five grand challenges affecting offshore wind finance in the U.S. Failing to address these challenges may put deployment targets at risk. The challenges include (1) Early years financing: navigating the complexities, timing mismatches, and high costs of projects in the development phase; (2) Policy support for project financial solvency: addressing the uncertainty and systematic transfers of tax credits away from offshore wind, characteristic of the U.S. Investment Tax Credit; (3) Workforce development: building a skilled workforce for an emerging market; (4) Transmission and integration barriers: upgrading the power grid to reliably support large scale offshore wind integration; and (5) Floating wind development: financing the development and scale-up of floating offshore wind technologies. The second challenge has already been solved to a large extent by the Inflation Reduction Act.

17 WIND ENERGY↗

reVRt (reV Routing) [SWR-25-112]

The reV Routing (reVRt) tool is a computational framework for modeling and optimizing transmission infrastructure requirements for electrical grid connections. By employing a spatially-aware least-cost-path methodology, it allows users to incorporate a wide range of factors including siting constraints, regional component costs, land composition costs, point-of-interconnection costs, and network upgrade costs. Additionally, the tool enables advanced follow-on analyses, such as land characterization for potential transmission line routes, to support informed decision-making. Although it's designed to integrate seamlessly with the reV model, the reV Routing tool is versatile and can also be utilized independently for standalone analyses in transmission planning and resource assessment scenarios.

Pinchuk, Pavlo (Paul) [National Renewable Energy L↗

Summary of a Workshop on Integrating Energy Equity into Power System Planning and Operation

On November 29 and 30, 2023, the Energy Systems Integration Group convened a one-and-a-half-day workshop in Arlington, Virginia, to improve knowledge and practices for integrating energy equity considerations into power system planning and operation. Workshop participants were invited to discuss approaches for integrating energy equity aspects into models and tools and to explore possible pathways for enhanced technical practices. Participants included utility planning and modeling practitioners, social science and energy justice academics, representatives from energy and environmental justice nongovernmental organizations, non-profits, consumer advocates, and representatives from the U.S. Department of Energy, national labs, and other government agencies. This report summarizes the discussion points and outcomes of the workshop, which prioritized the technical aspects of incorporating the challenges and solutions identified by electricity-futures stakeholders and communities. These technical activities include the fundamental grid structure and hardware, detailed modeling approaches that benchmark energy system performance and justify future investments, and engineering designs and limitations for potential solutions to meet energy equity goals in communities.

energy equity↗

Dataset of Generative AI Workload Power Profiles

This dataset provides a collection of high-resolution (5/10 Hz or every 0.2/0.1 seconds) power consumption profiles for generative artificial intelligence (GenAI) workloads executed on NLR's High Performance Computing (HPC) platform Kestrel. The dataset also includes examples of representative whole-facility power profiles generated using a bottom-up, event-driven, data center energy model . This dataset is designed to support research in energy modeling, infrastructure planning, energy system integration, and sustainability analysis for AI-driven computing systems. The dataset captures time-resolved electrical power measurements across a diverse set of configurations, including variations in job type (inference vs. training), workload (LLM vs. image generation), datasets, and number of compute nodes. Power traces are provided in a standardized format and include both raw/instantaneous and aggregated files. Each profile is accompanied by metadata describing workload parameters, enabling reproducibility and cross-study comparison. The dataset is intended for use in applications such as data center infrastructure planning, energy modeling, demand response and grid impact studies, and development and validation of system-level simulation tools. By making these workload-specific power profiles publicly available, this dataset aims to address the current lack of open, empirical energy data for generative AI systems and to facilitate transparent, reproducible research on the energy and environmental impacts of large-scale AI deployment. If you use this dataset, please cite the associated publication: Vercellino et al., “Measurement of Generative AI Workload Power Profiles for Whole-Facility Data Center Infrastructure Planning,” arXiv:2604.07345 (2026).

97 MATHEMATICS AND COMPUTING↗