Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “grid connected”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 379 records · Page 21

A Review on Protection Challenges of Transmission Lines Connected to Inverter-Based Resources

The increased penetration of inverter-based resources (IBRs) connected to transmission grids is challenging how traditional electric power systems operate. Such systems were originally designed based on the dominant presence of synchronous generators. Some main challenges include the increased concerns about system stability due to the reduced system inertia caused by IBRs and the reduced protection reliability caused by the non-deterministic fault current response of IBRs. The protection relays’ algorithms have been designed and validated based on well-known fault current characteristics of synchronous generations, while the short-circuit responses of IBRs heavily depend on their vendor-specific control schemes, which are mainly set to protect inverter semiconductor switches and DC components. The magnitude of short current that IBRs contribute is typically between 1.1–1.5 times the rated current that may behave unstably and incoherently with the voltages. The control scheme of the IBRs also controls the active (P) and reactive (Q) support during system voltage sag and swell conditions. These characteristics challenge not only protective relay schemes but also existing short-circuit software tools to correctly model IBRs for fault studies and protection coordination analyses

14 SOLAR ENERGY↗

Hydropower Black Start: A Guidebook for Retrofitting Grid Dependent Hydropower

Not all United States (US) hydropower plants were designed to provide black start, but they are increasingly needed to uphold resilience in the evolving electric grid. This guidance is designed to help understand the minimal retrofits required for grid dependent hydropower (GDH) plants behind the point of interconnection (POI). For distribution connected hydropower plants or those with dedicated cranking paths, such upgrades can be sufficient for the plant to provide black start. For others, more coordination with the transmission system operator will be needed. This guidebook answers a number of questions relevant to retrofitting hydropower plants with black start capabilities. For example, the guidebook answers: • How flexible do the wicket gate controls need to be? • Who needs to do hydro governor model validation, why, and how? • How robust and flexible do the excitation and AVR controls need to be? • What protection settings need to be adjusted? • What relay(s) will need to be bypassed or overridden and at what risk? • What is the electrical energy demand of the station load or auxiliary power systems? • What should the strategy to energize transformer(s) along cranking path to address inrush currents be? • How should the critical load restoration be sequenced? In addition to outlining the specifications that hydropower plants need to meet for each component to be able to perform black start, this guidebook provides a set of case studies for specific upgrades needed at actual plants. Between the case studies of plants that have already performed black start retrofits and the examples of how this guidebook can be applied to scope future retrofits, five key themes have been identified for retrofit needs. 1. Protection needs “black start” mode: hydropower plants that are not designed with black start capabilities will have protections that prevent them from interconnecting to a “dead bus.” These protections will need to be overridden in every retrofit case and a separate black start mode should be established so that operators can safely switch between black start and grid connected modes, minimizing the risk to the plant. 2. Wicket gates need modern controls: digital governors accelerate the parameter tuning process and gate position sensors improve controllability, so plants with mechanical governors should be upgraded. Furthermore, a black start and islanding mode should be established for controls to maximize plant performance. 3. Robust excitation support: the DC system or excitation generator needs to be reliable enough to form and sustain the rotor electromagnetic field. These systems are typically undersized in plants that were not designed for black start, so they will need to be upgraded. 4. Turbine-governor model validation and operator training: validation of a standard hydro governor model is needed to characterize the dynamic response (i.e., inertial and primary frequency response) of the GDH. This is required for control development and old hydropower plants often have outdated or incorrect models. Operator training is also typically required to ensure the hardware retrofits are utilized correctly during the black start process. 5. Transformer and cranking path energization: any upgradation and control adjustment in front of the POI will depend upon the existing interconnection. Coordination with the transmission or distribution operator may be required.

13 HYDRO ENERGY↗

Existing Methods for Grid Strength Assessment and Role of Hydropower in Future Grids

The power system is undergoing rapid evolution with increasing penetration of inverter-based resources (IBRs), large loads, microgrids, and power electronic devices. Ensuring reliable and stable operation of the modern power grid is a multi-faceted challenge that requires detailed understanding of this complex system. Dynamic stability is a major concern in maintaining the security of power grids as the generation mixes and large loads transitions to include high shares of power electronic devices. The operation of IBRs in regions with low system strength and higher grid impedances has been found to be the main reason behind many of the power system instabilities that manifest themselves in various types of oscillations and interactions that, if not properly addressed and damped, can jeopardize the reliable operation of the power system. Weak grid conditions compound such stability problems, particularly when many IBRs operate in proximity to and connect to weak power grids. Therefore, it is important to assess grid strength for planning, integration and operation of IBRs for a given power system. In this report, we aim to understand and classify existing methodologies for grid strength assessment, along with their limitations and future needs. Further, we aim to utilize the huge untapped potential in utilizing hydro energy resources in addressing some of the pertinent challenges of grid strength and reliable operation of modern power systems. Hydropower, historically valued for its flexibility and dispatchability, now faces new constraints due to reduced share of synchronous machines in the generation mix and seasonal variability of available water resources. Yet, these same plants present untapped potential beyond energy generation - notably, as providers of critical grid services. This report explores how hydropower plants, particularly through operation as synchronous condensers, can play a pivotal role in strengthening the grid amid evolving system dynamics.

13 HYDRO ENERGY↗

Grid Application and Controls Development for Medium-Voltage SiC-Based Grid Interconnects

This paper studies, the grid-interconnection requirements of directly connected medium-voltage (MV) Silicon Carbide-based (SiC-based) converters and details the necessary control implementations. These power electronic converters follow the interconnection standard IEEE 1547-2018, but can also have additional controls supported by the microgrid standards in IEEE 2030.7, which is demonstrated in this work. Additionally, this paper defines the grid applications realized by these directly connected medium-voltage power electronic converters at the distribution scale and demonstrates results. The controls for the studied grid applications are then developed and implemented on the controller. The paper also includes details of the control algorithm development and validations of the control algorithm through hardware-in-the-loop results.

28 EE - Advanced Manufacturing Office (EE-5A)↗

On the Feasibility of Market Manipulation and Energy Storage Arbitrage via Load-Altering Attacks

Around the globe, electric power networks are transforming into complex cyber–physical energy systems (CPES) due to the accelerating integration of both information and communication technologies (ICT) and distributed energy resources. While this integration improves power grid operations, the growing number of Internet-of-Things (IoT) controllers and high-wattage appliances being connected to the electric grid is creating new attack vectors, largely inherited from the IoT ecosystem, that could lead to disruptions and potentially energy market manipulation via coordinated load-altering attacks (LAAs). In this article, we explore the feasibility and effects of a realistic LAA targeted at IoT high-wattage loads connected at the distribution system level, designed to manipulate local energy markets and perform energy storage (ES) arbitrage. Realistic integrated transmission and distribution (T&D) systems are used to demonstrate the effects that LAAs have on locational marginal prices at the transmission level and in distribution systems adjacent to the targeted network.

25 ENERGY STORAGE↗

Medium Voltage Energy Hub Based on Multilevel Cascaded H Bridge-Dual Active Bridge Back-to-Back Converter for Power Distribution Feeders Interconnection and Multiple Simultaneous Grid Services

This paper presents a medium voltage energy hub based on a modular design of a multilevel cascaded H bridge (CHB)-dual active bridge (DAB) converter. The energy hub composed of the two CHB-DAB modules with a back-to-back topology can be utilized as a grid interconnection component between distribution feeders. The energy hub can provide multiple simultaneous grid services such as voltage regulation, power factor correction, as well as active power flow control between the connected feeders, contributing to grid flexibility, efficiency, reliability, and resilience. Circuit structure and control schemes for the energy hub including both local controllers for each converter and outer loop controllers are proposed to enable simultaneous grid services with coordination to prevent the overloading of the hub. To validate the performance of the hub, the hub system is interconnected between two IEEE 4-bus feeders and provides voltage regulation for both feeders, while controlling active power flow between them. The system and the feeders are implemented in Real-Time Digital Simulator (RTDS) for real-time simulation verification.

Choi, Jongchan↗

Identification of a Delay Attack in the Secondary Control of Grid-Tied Inverter Systems

This work is developed for the identification of a denial-of-service cyberattack on the secondary controller of inverter systems which is connected to the power grid. The identification is made through the dynamic response of the reactive power (Q) of the system under attack. By observing the dynamic characteristic of Q, it is possible to correlate the attack with the nominal response of the hierarchical controller. The article shows that the occurrence of the attack can be identified through a supervisory control that runs a model in parallel. The article argues that after an early identification of the attack, a local controller can take action to mitigate its effects on the system’s response.

Roig Greidanus, Mateo D.↗

Methods and systems for evaluating data transportability in distribution grids

This document describes systems and techniques for evaluating and improving distribution-grid data transportability. These systems and techniques allow engineers to quantify the data transportability of a communication system within or connected to a distribution grid, which represents an ability to transport in real-time telemetry from source locations (e.g., sensors in the distribution grid) to control mechanisms. Distribution engineers can use the sensor readings to perform grid analytics, control operating parameters, and operate protection systems. Distribution engineers can also use the transportability of the communication system to evaluate the observability of the distribution grid, which represents an ability to combine actual measurements and various types of computations (e.g., analytics, estimators, forecasters) from a system model. Distribution engineers can then generate a sensor allocation plan that indicates the number and location of sensors to maximize observability for a fixed sensor cost and/or minimize sensor cost for predetermined observability.

Taft, Jeffrey D.↗

NGEE Arctic Integrated Modeling (IM2): Improved subgrid hillslope hydrologic connectivity

This data product represents the integration of new code capability for arctic tundra hillslope hydrologic processes into the Energy Exascale Earth System Model (E3SM), through the E3SM Land Model (ELM) component. This code integration is the result of collaborative effort between the NGEE Arctic project and the E3SM project. The current ELM represents water movement primarily through vertical processes, such as precipitation, canopy interception, evaporation, infiltration, and soil water movement. Lateral water movement—such as surface runoff, subsurface flow, and river transport—plays a significant role in the hydrological cycle, especially in regions with varied topography. While E3SM includes a runoff routing component representing water transport in the river network, the lateral transport of water at the subgrid scale within the land model has previously not been taken into account. With the recent development of topographic units within the ELM subgrid data structure, there is an opportunity to simulate hillslope hydrologic connectivity by introducing water transport along topographic gradients. We expect that more realistic representation of hillslope hydrologic processes will lead to improved predictions of both soil water content and river network flows. Lateral transport of water at and near the surface is represented as a sub-grid process in this new code development. Water is tracked as it moves from higher to lower elevations within a gridcell. This capability uses the nested hierarchical sub-grid scheme within ELM to connect water fluxes from sub-grid elements with higher elevation to those with lower elevation. This data record consists of a single document (pdf format) that describes the theoretical basis for the hillslope hydrology processes added to ELM, and describes the modifications made to the ELM code. The Methods section of this metadata record includes a link to the public E3SM code repository where the exact code modifications as integrated in E3SM can be accessed. The Next-Generation Ecosystem Experiments: Arctic (NGEE Arctic), was a research effort to reduce uncertainty in Earth System Models by developing a predictive understanding of carbon-rich Arctic ecosystems and feedbacks to climate. NGEE Arctic was supported by the Department of Energy's Office of Biological and Environmental Research. The NGEE Arctic project had two field research sites: 1) located within the Arctic polygonal tundra coastal region on the Barrow Environmental Observatory (BEO) and the North Slope near Utqiagvik (Barrow), Alaska and 2) multiple areas on the discontinuous permafrost region of the Seward Peninsula north of Nome, Alaska. Through observations, experiments, and synthesis with existing datasets, NGEE Arctic provided an enhanced knowledge base for multi-scale modeling and contributed to improved process representation at global pan-Arctic scales within the Department of Energy's Earth system Model (the Energy Exascale Earth System Model, or E3SM), and specifically within the E3SM Land Model component (ELM).

Thornton, Peter E [ORNL] (ORCID:0000000247595158)↗

Cybersecurity at the Grid Edge: Protecting LA's Energy Systems in a Connected World

Join SoCalGas and the National Laboratory of the Rockies (NLR) for an insightful webinar on securing operational technology and energy systems. Los Angeles has the second-largest metro by population in the nation, making it vital to protect the energy infrastructure that powers day-to-day life. However, cybersecurity for energy systems is an immense challenge due to an increasing number of interconnected devices and stakeholders. While there was traditionally a limited need to secure energy infrastructure, the grid is only becoming smarter and more software-defined. Amid aging infrastructure and evolving cyber threats, the need to ensure the security of energy is at an all-time high. Together, SoCalGas and NLR are assessing the current state-of-the-art of the energy ecosystem to understand gaps in current best practices and technologies relevant to powering the city of Los Angeles.

97 MATHEMATICS AND COMPUTING↗

A Robust Method to Secure Multi-Inverter Grid Tied PV and Battery Energy Storage Systems Against Cyber Intrusions

This paper details a robust method to secure a multi-inverter grid tied system that interfaces photovoltaic (PV) and battery energy storage against potential cyber-attacks. The method can be applied to any third-party inverter systems without a need to modify their internal controls. A small random private excitation signal termed "watermark" is injected into the DC input voltage terminals (via a series transformer) connected to the PV/battery inverter system. An external robust cyber intrusion detector (CID) hardware consisting of a digital signal processor (DSP) generates the "watermark" and also receives the sensor signals that control the setpoints of the PV/battery grid tied system. The CID algorithm is shown to detect all possible cyber intrusions (such as false data injection(FDI)) on external sensor signals such as P and Q measured by a smart meter that control the overall system operation. The proposed CID computes online system ID and two variance tests in real time on each sensor signal and is able pinpoint intrusion location in a multi-inverter system. Results on a hardware in the loop (HIL) of a two-inverter grid connected system demonstrate effectiveness of the proposed CID system for FDI and unobservable FDI. Test results on a laboratory prototype will be discussed in the conference presentation.

Ibrahim, Hasan↗

Queued Up: 2026 Edition, Characteristics of Power Plants Seeking Transmission Interconnection As of the End of 2025 [Slides]

Electric transmission system operators (ISOs, RTOs, or utilities) require proposed power plants seeking to connect to the transmission grid to undergo a series of impact studies before they can be built. This process establishes what new transmission equipment or upgrades may be needed before a project can connect to the system and assigns the costs of that equipment. The lists of projects in this process are known as “interconnection queues”. In collaboration with https://www.interconnection.fyi. Berkeley Lab compiled, aggregated, and cleaned interconnection queue data from >50 transmission grid operators (7 ISO/RTOs and 50 non-ISO balancing areas), which collectively represent ~98% of currently installed U.S. electric generating capacity.

24 POWER TRANSMISSION AND DISTRIBUTION↗

20-kW Bi-directional Wireless Power Transfer System with Energy Storage System Connectivity

The severity of the economic impact caused by grid outages has been the driving factor for creating innovative solutions that increases interest for the deployment of distributed energy resources to reduce the impact of grid outages. This study presents a novel way of providing export power using bi-directional wireless power transfer (WPT) systems for ac grid side power and mobile energy storage systems (ESSs) connectivity. The proposed concept here interfaces the EV batteries to the AC grid and also can redirect the power from the stationary ESS to grid, to EV batteries, or both simultaneously; providing the capabilities of an uninterrupted power supply (UPS). Results demonstrate the performance and the functionality of the system with overall efficiencies 93% to 97%, depending on the operating mode.

Onar, Omer↗

Behavior of Multiple PV Plants in Future Power Grids During Events

As the integration of multiple photovoltaic (PV) plants into power grids grows, the dynamic response of each plant and their interactions during transient events demands a deeper understanding. In this paper, the dynamic behavior of multiple PV plants connected to future power grids is comprehensively explored using site-specific high-fidelity electromagnetic transient (EMT) PV plant models and generic high-fidelity EMT PV plant models. This research demonstrates the need to employ multiple high-fidelity EMT PV plant models to understand the intricate interactions between multiple PV plants during grid events. These models, developed in Fortran within the PSCAD environment, encompass a range of operational scenarios and plant configurations, offering invaluable insights crucial for future system planning with multiple PV plants to enhance grid stability.

Marthi, Phani Ratna Vanamali [ORNL] (ORCID:0000000↗

Parallel transport sweeps on two-dimensional cartesian and hexagonal grids

This paper aims to provide a proof of concept for parallel transport sweeps on two-dimensional hexagonal grids for the discrete ordinates transport equation. While the method is an extension of the popular and well-established Koch-Baker-Alcoulffe (KBA) algorithm, there are significant differences between the cartesian and hexagonal grid and thereafter sweep. The most important is the three-way connectivity of hexagons within the grid which creates greater dependencies between the elements. The KBA method in structured orthogonal grids was first implemented in the DRAGON5 code and the method is first described here. The differences in implementation for the hexagonal grid are also described. Benchmark results are also presented, showing roughly 10 times speedup in computational times with roughly 100 processors, in both cases. (authors)

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Control and Grid Support Function Evaluation for a Three-Phase Back-to-Back Modular Multilevel Converter System

This paper focuses on the evaluation of advanced inverter controls for a 500kW back-to-back (B2B), silicon carbide, multilevel modular converter (MMC) used as a direct-connected medium-voltage grid intertie. A decentralized hierarchical controller architecture for the MMC system is presented, which uses the main controller to implement higher level grid interconnection functions per the IEEE 1547–2018 standards and the local controllers to execute lower level closed-loop functionality of the MMC stages. This paper presents and elaborates on the grid functionalities are elaborated and presented. The back-to-back converter system is equipped with local controllers and their corresponding functionalities are presented. Case study results for the corresponding functionalities presented show the effectiveness of the proposed architecture. To enhance the operation capabilities of the system, a parameter update scheme has been implemented and utilized in unison with the controller.

decentralized control↗

Towards Optimal and Executable Distribution Grid Restoration Planning With a Fine-Grained Power-Communication Interdependency Model

Distribution service restoration (DSR) under natural disasters is always a critical and challenging problem for utility companies. An effective solution must not ignore the power-communication interdependency as various systems are getting increasingly connected in the Smart Grid era. In this paper, we propose a two-layer distribution system model with both power and communication components. Based on this model, we formulate the restoration process as a routing problem that schedules the path and action sequence of utility crews that involves repairing damaged components, closing power switches, and enabling communication paths between the control center and remote field devices. Further, we develop a simulation-based method to quantitatively evaluate the restoration process with public reference models of large-scale power systems. The experimental results show that our method improves the total restored energy up to 57.6% and reduces the recovery time up to 63% by considering the power-communication interdependency.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Security and Trust Metrics for Edge Computing

The present state of edge computing is an environment of different computing capabilities connected via a wide variety of communication paths. The energy grid is relying upon distributed energy devices connected at the edge of the internet. Consider the scenario where each edge device is customer-owned distributed energy resource (DER) that is connected via a trustworthy link to a grid service provider. Each DER keeps a local simple trust record of interactions. Information protection is provided by internet https standards, however, trust must be evaluated throughout operation. This paper presents a model for representing and evaluating trust in general and applied to the energy grid as a key example. Actors on the edge may interact with each other as well as with a central datacenter.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗