At least 379 records · Page 21

Sci-Fri AM: Quality, Safety, and Professional Issues 03: The Increasing Costs of Shielding Diagnostic CT Scanners in Ontario

Purpose: In Ontario, shielding for all X-ray machines, including CT scanners, must be evaluated according to Safety Code 20A (Health Canada, 1983) which is based on NCRP-49 (NCRP, 1976). NCRP-147 (NCRP, 2004) is the international standard for shielding calculations of CT scanners and is also referenced in Safety Code 35 (Health Canada, 2008) which, was published to supersede SC20A. The goal of this work is to demonstrate the cost effectiveness of NCRP-147 for CT scanner shielding. Methods: CT scanner shielding calculations are performed using SC20A and NCRP-147: A room located on the third floor with the nearest building 75m away A room with high occupancy uncontrolled adjacent spaces Two side by side rooms on the main floor Results: 1. SC20A: The exterior windows required 0.1mm of Pb to protect the public who may occupy the building at 75m. 1. NCRP-147: No additional shielding required. 2. SC20A: Two walls adjacent to high occupancy uncontrolled space required an additional 1.58mm Pb. 2. NCRP-147: No additional shielding required. 3. SC20A: The entire floor and ceiling slabs in both rooms required an additional 0.79mm Pb. In addition, 0.79mm Pb was added to the walls from the ceiling to overlap the existing Pb shielding in the walls. 3. NCRP-147: No additional shielding required. Conclusion: The application of NCRP Report No. 147 affords the required protection to staff and the public, in the true spirit of the ALARA principle, taking into account relevant social and economic factors.

60 APPLIED LIFE SCIENCES↗

Ecological succession and viability of human-associated microbiota on restroom surfaces

Human-associated bacteria dominate the built environment (BE). Following decontamination of floors, toilet seats, and soap dispensers in four public restrooms, in situ bacterial communities were characterized hourly, daily, and weekly to determine their successional ecology. The viability of cultivable bacteria, following the removal of dispersal agents (humans), was also assessed hourly. A late-successional community developed within 5 to 8 h on restroom floors and showed remarkable stability over weeks to months. Despite late-successional dominance by skin- and outdoor-associated bacteria, the most ubiquitous organisms were predominantly gut-associated taxa, which persisted following exclusion of humans. Staphylococcus represented the majority of the cultivable community, even after several hours of human exclusion. Methicillin-resistant Staphylococcus aureus (MRSA)-associated virulence genes were found on floors but were not present in assembled Staphylococcus pan-genomes. Viral abundances, which were predominantly enterophages, human papilloma virus, and herpesviruses, were significantly correlated with bacterial abundances and showed an unexpectedly low virus-to-bacterium ratio in surface-associated samples, suggesting that bacterial hosts are mostly dormant on BE surfaces.

59 BASIC BIOLOGICAL SCIENCES↗

Floorspace.js

Floorspace.js is a 2D geometry editor. Users can define an explicit floor plan for each story of a building. A story-by-story interface makes it easy to develop space geometry and assign properties. Referencing satellite imagery or floor plan images, when available, speeds up geometry entry. Conversion of 2D to 3D geometry is currently out of scope for Floorspace.js, a reference implementation is available in the OpenStudio® SDK. Explicit floor plans allow more building-specific information than parameterized shoe-boxes but less information than a full 3D BIM model. Sloped walls, complex roofs, detailed shading structures, and other complex 3D structures are out of FloorspaceJS's scope. In general, if users have a 3D BIM model in a tool that can export a useful BEM representation then it is better to use that export than to recreate a new model using FloorspaceJS. Re-usability and minimal dependencies were key design considerations for software developers. Web technologies can be used in both online and desktop applications. The editor was written in pure JavaScript for maximum portability and re-usability. A custom JavaScript Object Notation (JSON) file format was developed to ease integration with other applications. Custom JSON schema design was a key part of FloorspaceJS development.

Noland, Katie↗

Vertical Structure of Phyllosphere Fungal Communities in a Tropical Forest in Thailand Uncovered by High-Throughput Sequencing

Phyllosphere fungi harbor a tremendous species diversity and play important ecological roles. However, little is known about their distribution patterns within forest ecosystems. We examined how species diversity and community composition of phyllosphere fungi change along a vertical structure in a tropical forest in Thailand. Fungal communities in 144 leaf samples from 19 vertical layers (1.28–34.4 m above ground) of 73 plant individuals (27 species) were investigated by metabarcoding analysis using Ion Torrent sequencing. In total, 1,524 fungal operational taxonomic units (OTUs) were detected among 890,710 reads obtained from the 144 leaf samples. Taxonomically diverse fungi belonging to as many as 24 orders of Ascomycota and 21 orders of Basidiomycota were detected, most of which inhabited limited parts of the lowest layers closest to the forest floor. Species diversity of phyllosphere fungi was the highest in the lowest layers closest to the forest floor, decreased with increasing height, and lowest in the canopy; 742 and 55 fungal OTUs were detected at the lowest and highest layer, respectively. On the layers close to the forest floor, phyllosphere fungal communities were mainly composed of low frequency OTUs and largely differentiated among plant individuals. Conversely, in the canopy, fungal communities consisted of similar OTUs across plant individuals, and as many as 86.1%–92.7% of the OTUs found in the canopy (≥22 m above ground) were also distributed in the lower layers. Overall, our study showed the variability of phyllosphere fungal communities along the vertical gradient of plant vegetation and environmental conditions, suggesting the significance of biotic and abiotic variation for the species diversity of phyllosphere fungi.

59 BASIC BIOLOGICAL SCIENCES↗

ANSI/ASHRAE/IES Standard 90.1-2010 Final Determination Quantitative Analysis

The U.S. Department of Energy (DOE) conducted a final quantitative analysis to assess whether buildings constructed according to the requirements of the American National Standards Institute (ANSI)/American Society of Heating, Refrigerating and Air-Conditioning Engineers (ASHRAE)/Illuminating Engineering Society of North America (IESNA) Standard 90.1-2010 (ASHRAE Standard 90.1-2010, Standard 90.1-2010, or 2010 edition) would result in energy savings compared with buildings constructed to ANSI/ASHRAE/IESNA Standard 90.1-2007(ASHRAE Standard 90.1-2007, Standard 90.1-2007, or 2007 edition). The final analysis considered each of the 109 addenda to ASHRAE Standard 90.1-2007 that were included in ASHRAE Standard 90.1-2010. All 109 addenda processed by ASHRAE in the creation of Standard 90.1-2010 from Standard 90.1-2007 were reviewed by DOE, and their combined impact on a suite of 16 building prototype models in 15 ASHRAE climate zones was considered. Most addenda were deemed to have little quantifiable impact on building efficiency for the purpose of DOE's final determination. However, out of the 109 addenda, 34 were preliminarily determined to have a measureable and quantifiable impact. A suite of 240 computer energy simulations for building prototypes complying with ASHRAE 90.1-2007 was developed. These prototypes were then modified in accordance with these 34 addenda to create a second suite of corresponding building simulations reflecting the same buildings compliant with Standard 90.1-2010. The building simulations were conducted using the DOE EnergyPlus building simulation software. The resulting energy use from the complete suite of 480 simulation runs was then converted to energy use intensity (EUI, or energy use per unit floor area) metrics (Site EUI, Primary EUI, and energy cost intensity [ECI]) results for each simulation. For each edition of the standard, these EUIs were then aggregated to a national basis for each prototype using weighting factors based on construction floor area developed for each of the 15 U.S. climate zones using commercial construction data. When compared, the resulting weighted EUIs indicated that each of the 16 building prototypes used less energy under Standard 90.1-2010 than under Standard 90.1-2007 on a national basis when considering site energy, primary energy, or energy cost. The EUIs were also aggregated across building types to a national commercial building basis using the same weighting data. On a national basis, the final quantitative analysis estimated a floor-space-weighted national average reduction in new building energy consumption of 18.2 percent for source energy and 18.5 percent when considering site energy. An 18.2 percent savings in energy cost, based on national average commercial energy costs for electricity and natural gas, was also estimated.

03 NATURAL GAS↗

The Final Demise of East Tennessee Technology Park Building [Slides]

Building K-33 was constructed in 1954 as the final section of the five-stage uranium enrichment cascade at the Oak Ridge Gaseous Diffusion Plant (ORGDP). The two original building (K-25 and K-27) were used to produce weapons grade highly enriched uranium (HEU). Building K-29, K-31, and K-33 were added to produce low enriched uranium (LEU) for nuclear power plant fuel. During ORGDP operations K-33 produced a peak enrichment of 2.5%. Thousands of tons of reactor tails fed into gaseous diffusion plants in the 1950s and early 1960s introducing some fission products and transuranics. Building K-33 was a two-story, 25-meters (82-feet) tall structure with approximately 30 hectare (64 acres) of floor space. The Operations (first) Floor contained offices, change houses, feed vaporization rooms, and auxiliary equipment to support enrichment operations. The Cell (second) Floor contained the enrichment process equipment and was divided into eight process units (designated K-902-1 through K-902-8). Each unit contained ten cells, and each cell contained eight process stages (diffusers) for a total of 640 enrichment stages. 1985: LEU buildings were taken off-line after the anticipated demand for uranium enrichment failed to materialize. 1987: LEU buildings were placed in permanent shutdown. Process equipment were maintained in a shutdown state. 1997: DOE signed an Action Memorandum for equipment removal and decontamination of Buildings K-29, K-31, K-33; BNFL awarded contract to reindustrialize the buildings under the Three Buildings D&D and Recycle Project. 2002: Equipment removal complete and effort shifts to vacuuming, chemical cleaning, scabbling, etc. 2005: Decontamination efforts in K-33 cease. Building left with significant 99 Tc contamination on metal structures and PCB contamination in concrete. Uranium, transuranics, and fission products also present on building shell. 2009: DOE targets Building K-33 for demolition. 2010: ORAU contracted to characterize Building K-33 for final disposition at the Environmental Management Waste Management Facility (EMWMF) in Oak Ridge. ORAU collected 439 samples from May and June. LATA Sharp started removing transite panels in September. 2011: LATA Sharp began demolition in January and expects the last waste shipment to EMWMF in September. Approximately 237,000 m 3 (310,000 yd 3 , bulked) of waste taken to EMWMF in 23,000 truckloads expected by project completion.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Record of Technical Change 1 for Closure Report for Corrective Action Unit 543: Liquid Disposal Units, Nevada Test Site, Nevada, Revision 0

ROTC-1: Downgrade FFACO UR at CAU 543, CAS 06-07-01, Decon Pad to an Administrative UR. CAS 06-07-01, Decon Pad, is located at the Decontamination Facility in Area 6. The CAS consists of the effiuent collection and distribution systems for Buildings 6-605, 6-606, and 6-607, which include two 1,000-gallon (gal) septic tanks, two ground-level sumps and associated piping, the concrete foundation of Building 6-605, floor drains, drain trenches, and cleanouts. The Area 6 Decontamination Facility was built in 1971 and was designed to decontaminate vehicles, equipment, and clothing that had become radiologically contaminated during nuclear testing activities. Additionally, the facility managed mixed and radioactive waste generated from these decontamination processes. The Area 6 Decontamination Facility is located along the southwest edge of Yucca Lake in Area 6 of the NNSS. From 1971through1992, hazardous, radioactive, and sanitary wastes were generated within several buildings and originally discharged via process waste lines, septic systems, and sumps to the Area. 6 Decontamination Pond. The Area 6 Decontamination Facility remained operational until 2001, and is currently inactive and abandoned. Additionally, a portion of the facility yard was used as a contaminated materials storage area where equipment and materials awaited decontamination. As a result, portions of the facility yard are posted as "Contamination Areas" (NNSA/NSO, 2004d). During closure activities, the use-restricted area was fenced and posted, and a UR was implemented for PCBs and radioactivity. As best management practices (BMPs ), two septic tanks, two sumps, and their contents were removed and disposed of as mixed waste; sediment from the Building 6-605 floor drain trenches was removed and disposed of as mixed waste; the floor drain trenches, a diversion box, and seven cleanouts were grouted to grade; and numerous containers and other surface debris were segregated according to waste stream and disposed of appropriately as either low-level waste or sanitary waste (NNSA/NSO, 2008). ·

54 ENVIRONMENTAL SCIENCES↗

2012 Update to the Site Discharge Pollution Prevention Plan, Rev. 1: Sandia/Mortandad Watershed Receiving Waters: Sandia Canyon, Cañada del Buey, Mortandad Canyon, and Ten-Site Canyon (Vol. 2)

Two historical industrial activity areas are associated with S001, S-SMA-0.25: Sites 03-013(a) and 03-052(f). Solid Waste Management Unit (SWMU) 03-013(a) is a 1500-ft-long corrugated metal pipe (CMP) storm drain that served building 03-0038. The storm drain ran underground around building 03-0038, east along the south side of the Otowi Building (building 03-0261) and connected to four other storm drains before daylighting 100 ft east of the Otowi Building where it became an open concrete- and rock-lined ditch. The open drain continued past transportable office buildings (buildings 03-1616 and 03-1617) and passed beneath streets and sidewalks to a point northeast of the Oppenheimer Study Center (building 03-0207) where it discharged to the SWMU 03-052(f) outfall before draining into Sandia Canyon. Most of the CMP associated with SWMU 03-013(a) was removed in 2004 to accommodate the construction of the National Security Science Building (03-1400) and a new parking structure (03-1402) east of the Otowi Building. The CMP was managed as nonhazardous/nonradioactive industrial waste. Inspection of the drainline trench showed no evidence of a release from the drainpipe. A new storm drainline was installed west of SWMU 03-052(f) to manage storm water runoff from the new parking structure. The new storm drain discharges to SWMU 03-052(f). Potential contaminants associated with industrial materials historically managed at this Site are metals and petroleum products. SWMU 03-052(f) is a formerly permitted outfall (U.S. Environmental Protection Agency [EPA] 03A023) that received wastewater from floor drains [Area of Concern (AOC) 03-013(b)], sinks, water fountains, and a storm drain [SWMU 03-013(a)], which served building 03-0038 until 1987 when the drains in building 03-0038 were rerouted to the Technical Area 03 (TA-03) sanitary sewer system. Stoddard solvents, dry acid, and caustic materials from the maintenance shop were discarded through sinks and floor drains to this outfall. Spent paint solvents and cutting oils contaminated with machined beryllium particles may also have been released to the floor drains during the 1960s and 1970s. In addition, cooling water for welding torches was discharged directly to the drains. The first spill was approximately 200 gal. of a water-waste oil mixture that was discharged when an automatic compressor blowdown mechanism failed. A second spill from a ruptured air-compressor oil line resulted in the release of approximately 1 qt of compressor oil to the drain. This spill produced an oily sheen on the surface of the water at the SWMU 03-052(f) outfall. A third spill occurred when approximately 15 gal. of diesel fuel was released from a ruptured truck fuel line into the utilities construction trench between buildings 03-1793 and 03-1794. On the same day, a clay sewer pipe in the utility trench broke, releasing approximately 2000 gal. of wastewater into the excavation. A sump was used to remove the wastewater from the excavation, and the wastewater was discharged to SWMU 03-052(f). The diesel-contaminated asphalt and soil were removed and disposed of. Runoff from parking lots and the surrounding areas also discharges to the outfall. Outfall 03A023 was removed from the National Pollutant Discharge Elimination System (NPDES) permit on July 11, 1997. Potential contaminants associated with industrial materials historically managed at this Site are volatile organic solvents, petroleum products, and metals included in discharges from the maintenance contractor’s shop in building 03-38 and three reported petroleum hydrocarbon spills.

54 ENVIRONMENTAL SCIENCES↗

Low-cost Radon Reduction Pilot Study

The U.S. Department of Energy's Building America research team Partnership for Advanced Residential Retrofits conducted a primary scoping study on the impact of air sealing between the foundation and the living space on radon transport reduction across the foundation and living space floor assembly. Fifteen homes in the Champaign, Illinois, area participated in the study. These homes were instrumented for hourly continuous radon measurements and simultaneous temperature and humidity measurements. Blower door and zone pressure diagnostics were conducted at each house. The treatments consisted of using air-sealing foams at the underside of the floor that separated the living space from the foundation and providing duct sealing on the ductwork that is situated in the foundation area. The hypothesis was that air sealing the floor system that separated the foundation from the living space should better isolate the living space from the foundation; this isolation should lead to less radon entering the living space from the foundation. If the hypothesis had been proven, retrofit energy-efficiency programs may have chosen to adopt these isolation methods for enhanced radon protection to the living space.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

RLUOB Toppled Load: Near Miss to Personnel Injury (Incident Investigation Final Report)

On Monday, February 25, 2019, at approximately 1430, the Logistics Central Shop (LOG-CS) Hoisting and Rigging (H&R) crew moved an anti-vibration table on the first floor of Technical Area 55 (TA-55), Building 400, Radiological Laboratory/Utilities/Office Building (RLUOB). The table was designed to be anchored to the facility floor on pedestals to provide vibration dampening for an electron microscope (SEM/TEM). The table was approximately 86 inches wide by 56 inches tall, an asymmetrical load. It weighed approximately 2,300 pounds. The crew was transporting the load using a lifting device, specifically a Vere Optical Table Hoist. The work control package (Integrated Work Document [IWD] and H&R Ordinary Lift Plan) included staging the table, moving the load from the loading dock through corridors into a laboratory, and installing the table. During the table move, the riggers made adjustments to the lifting device to enable the load and device to pass through security double doors. After the crew successfully passed through the security double doors, three riggers moved the load approximately ten linear feet further at which point the lifting device and load fell to the RLUOB facility floor. No injuries were sustained as a result of the toppled load and frame. The rigging crew immediately notified supervision who then notified the TA-55 Facility Operations Director (FOD). After further review, the TA-55 FOD categorized the event as a near miss to personnel injury. The scene was preserved and all H&R operations within the TA-55 directorate were paused pending a review of all lift plans with the rigging supervisor and the Chemistry and Metallurgy Research Replacement (CMRR) Construction Manager. All lift plans were to be reviewed prior to resumption of H&R lifts within the directorate. Additionally, all newly generated lift plans will be reviewed by the TA-55 FOD, the H&R supervisor and the affected manager. The Associate Laboratory Director for Weapons Production (ALDWP) appointed a team to investigate the event, identify all relevant facts, and determine the direct, contributing, and root causes. The team was also charged with reviewing other similar events to identify common causes for multiple recurring events and the organizational and management weaknesses that have led to failure to correct recurring events. (See Appendix A: Memo, Appointment of Accident Investigation Board.)

99 GENERAL AND MISCELLANEOUS↗

Dose Modeling for Harborview Research and Training Facility

The Harborview Research and Training (R&T) Facility at the University of Washington (UW) was accidently contaminated from a breached sealed source of Cesium-137. The release occurred during removal of the sealed source from its holder within a portable hot cell in the loading dock area near room 220. The loading dock and northeast corner of the building above the ground floor were impacted by the release, whereas the remaining portions of the R&T Facility were minimally affected. Detailed descriptions of the R&T Facility and the affected area/rooms are included in Section 2. The RESRAD Team in the Environmental Science Division of Argonne National Laboratory visited the site on August 12, 2019, and interviewed the R&T Facility building manager and staff working in the building at that time. Site- and building-specific data were collected including building floor plan CAD drawings, building occupants’ working hours, contaminated rooms photos and their dimensions, building air exchange rates, building materials and “curtain wall” details, and so forth. These data are being used in the dose modeling for potential occupants of the building after it is remediated. The dose modeling was performed using the RESRAD-BUILD computer code, which is designed for the evaluation of radiologically contaminated buildings (Yu et al. 2003). Two hypothetical building occupants of the Harborview R&T Facility were evaluated: a researcher occupying room 726 (a research laboratory on the seventh floor) and a custodian occupying room 220 (loading dock and trash compactor room with a rollup door). A maintenance worker that will be spending less time in impacted areas was not modeled because it will be bounded by other two hypothetical building occupants modeled. A summary description of the RESRAD-BUILD is provided in Appendix A, and the modeling of potential doses to a researcher and a custodian is described in detail in Section 3. A summary and a discussion of the dose modeling results are included in Section 4. The parameters used in the RESRAD-BUILD modeling are included in Appendix B. This report documents the dose modeling results; it does not describe measurements of the actual radioactivity levels at the Harborview R&T Facility, nor does it set any expectation for the actual final radioactivity levels. The radiation doses presented are modeling results based on the generic screening values of Cs-137 and several conservative assumptions and are meant only to assist in decision making regarding decontamination of the Harborview R&T Facility.

61 RADIATION PROTECTION AND DOSIMETRY↗

Updated Available Drawdowns for Big Hill SPR Caverns - Model Including the Caprock Fault

This report updates the estimated values of the baseline available drawdowns for the caverns at the Big Hill storage facility, and an updated table listing the available drawdowns. An updated finite element numerical analysis model, which included a fault in the caprock layers, was constructed and the daily data of actual wellhead pressures and oil-brine interfaces was used. The number of available drawdowns for each of the Big Hill SPR caverns is estimated using the new model. All caverns are predicted to have five available drawdowns remaining from a geomechanical perspective. BH-101 and 105 have a region of concern at the floor edge and/or sloping floor, where tensile and dilatant stresses are predicted to occur during each workover. The tensile state is predicted to occur because of the geometries of the edge and floor. Therefore, geomechanical examination for two caverns would be recommended after a drawdown leach. The well integrity of each cavern is not investigated in this report. The estimates for the number of baseline available drawdowns are subject to change in the future as the knowledge of physical phenomena at the sites, and the further development of the models of geomechanical behavior at the sites, evolve over time.

02 PETROLEUM↗

ANSI/ASHRAE/IES Standard 90.1-2010 Final Determination Quantitative Analysis

The U.S. Department of Energy (DOE) conducted a final quantitative analysis to assess whether buildings constructed according to the requirements of the American National Standards Institute (ANSI)/American Society of Heating, Refrigerating and Air-Conditioning Engineers (ASHRAE)/Illuminating Engineering Society (IES) Standard 90.1-2010 (ASHRAE Standard 90.1-2010, Standard 90.1-2010, or 2010 edition) would result in energy savings compared with buildings constructed to ANSI/ASHRAE/Illuminating Engineering Society of North America (IESNA) Standard 90.1- 2007(ASHRAE Standard 90.1-2007, Standard 90.1-2007, or 2007 edition). The final analysis considered each of the 109 addenda to ASHRAE Standard 90.1-2007 that were included in ASHRAE Standard 90.1- 2010. All 109 addenda processed by ASHRAE in the creation of Standard 90.1-2010 from Standard 90.1-2007 were reviewed by DOE, and their combined impact on a suite of 16 building prototype models in 15 ASHRAE climate zones was considered. Most addenda were deemed to have little quantifiable impact on building efficiency for the purpose of DOE’s final determination. However, out of the 109 addenda, 34 were preliminarily determined to have a measureable and quantifiable impact. A suite of 240 computer energy simulations for building prototypes complying with ASHRAE 90.1- 2007 was developed. These prototypes were then modified in accordance with these 34 addenda to create a second suite of corresponding building simulations reflecting the same buildings compliant with Standard 90.1-2010. The building simulations were conducted using the DOE EnergyPlus building simulation software. The resulting energy use from the complete suite of 480 simulation runs was then converted to energy use intensity (EUI, or energy use per unit floor area) metrics (Site EUI, Primary EUI, and energy cost intensity [ECI]) results for each simulation. For each edition of the standard, these EUIs were then aggregated to a national basis for each prototype using weighting factors based on construction floor area developed for each of the 15 U.S. climate zones using commercial construction data. When compared, the resulting weighted EUIs indicated that each of the 16 building prototypes used less energy under Standard 90.1-2010 than under Standard 90.1-2007 on a national basis when considering site energy, primary energy, or energy cost. The EUIs were also aggregated across building types to a national commercial building basis using the same weighting data. On a national basis, the final quantitative analysis estimated a floor-space-weighted national average reduction in new building energy consumption of 18.2 percent for source energy and 18.5 percent when considering site energy. An 18.2 percent savings in energy cost, based on national average commercial energy costs for electricity and natural gas, was also estimated.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Assessment of the Available Drawdowns for Oil Storage Caverns at the Big Hill SPR Site - Cavern Integrity

This report updates the estimated values of the baseline available drawdowns for the caverns at the Big Hill storage facility, and an updated table listing the available drawdowns. A new finite element numerical analysis model was constructed that consists of a realistic mesh capturing the sonar-measured geometries of Big Hill SPR site and used the daily data of actual wellhead pressures and oil-brine interfaces. The number of available drawdowns for each of the Big Hill SPR caverns is estimated using the new model. All caverns are predicted to have five available drawdowns remaining from a geomechanical perspective. BC-101, 105, and 110 have a region of concern at the floor edge and/or sloping floor, where tensile and dilatant stresses are predicted to occur during each workover. The tensile state is predicted to occur because of the geometries of the edge and floor. Therefore, geomechanical examination for three caverns would be recommended after a drawdown leach. The well integrity of each cavern is not investigated in this report. The estimate of the number of baseline available drawdowns for the Big Hill caverns in this report will be incorporated in future assessments of the available drawdowns for all the SPR caverns. The estimates for the number of baseline available drawdowns are subject to change in the future as the knowledge of physical phenomena at the sites, and the further development of the models of geomechanical behavior at the sites, evolve over time.

02 PETROLEUM↗

UT-GOM2-2 Drilling Fluid (Technical Note)

It is proposed that a salt-saturated, water-based mud might improve borehole stability for UT-GOM2-2 relative to a fresh-water-based mud. However, the primary objective for UT-GOM2-2 is to safely and successfully acquire uncompromised hydrate-bearing sediment cores. This can only be done if conditions stay within the hydrate stability zone, and well away from the hydrate stability boundary. The addition of salt to the drilling mud, shifts the hydrate stability boundary closer to estimated conditions. This shift, by some estimates of pressure and temperature, where conditions now fall outside of the hydrate stability zone, may result in borehole enlargement and the release of free gas into the borehole. This shift by all estimates, even when coring conditions stay inside the hydrate stability zone, shrinks the window between the estimated conditions and the hydrate stability boundary. This shift is likely to compromise the hydrate-bearing cores while they are being recovered from the bottom-hole to the rig floor. In this report we present two examples: 1) Assuming temperature and pressure from in-situ estimates: Hydrate within the target reservoirs (Orange and Blue) at Walker Ridge Block 313 (WR 313) will be outside the hydrate stability zone in the presence of a drilling mud with 9.5 wt.% salinity (the salinity of the proposed 10.5 ppg salt-based mud) at in situ pressure and temperature. Thus, the hydrate will be unstable. A 10.5 ppg salt-based mud may result in dissociation of the hydrate into its components: water and gas. 10.5 ppg salt-based mud may enlarge the borehole, release free gas into the borehole, and compromise the cores. 2) Assuming temperatures equal to the measured LWD borehole temperatures at this location: Hydrate within the target reservoirs will be stable with a salinity of 9.5 wt.% (the salinity of the proposed 10.5 ppg salt-based mud), but possibly unstable (just at the methane hydrate stability boundary) for a salinity of 17.2 wt.% (the salinity of the proposed 13.5 ppg salt-based kill mud). if the borehole has the same temperature as recorded during previous LWD drilling at this location. A 13.5 ppg salt-based kill mud may destabilize the borehole. More importantly, a 10.5 ppg salt-based mud does not provide a large enough window between the estimated conditions and the hydrate stability boundary. Core temperatures and pressures fluctuate from the bottom-hole conditions as the core is brought up from the bottom-hole to the rig floor. These fluctuations are likely to cause the hydrate in the cores to touch or cross the stability boundary. Therefore, cores captured using a 10.5 ppg salt-based mud are likely to be compromised during core recovery to the rig floor.

03 NATURAL GAS↗

Defining the Prototype Convenience Store Building Characteristics

The US Department of Energy supports the development of commercial building energy codes and standards. To support commercial building energy research activities and the development of commercial building energy codes and standards, continuous efforts have been made to convert 30 prototype building models (20 different building types), which cover 80% of US commercial building floor space, to OpenStudio prototype buildings. Additionally, the suite of prototype building models was expanded to include the addition of new building prototype models (e.g., courthouse, college building). This report documents the building and system characteristics of the prototype convenience store building model. Multiple sources, including databases, documented projects, and personal communications, were used to define the prototype convenience store building characteristics, and a one-story, 3,000 ft 2 building was considered as the prototype convenience store to represent an average-sized convenience store in the United States. The Oak Ridge National Laboratory team defined the operational hours of the convenience store as 17 hours per day. The types of exterior walls, roof, and floor were defined as brick wall, metal surfacing roof, and slab-on-grade floor, respectively. Double glazing was selected, and the window-towall ratio was set as 15% on the front side. For the system part, packaged system and centralized water heater were selected for the space heating and cooling system and water heater system, respectively. In terms of the refrigerator system, the number of refrigerators and freezers were determined as eight closed cases and two walk-in units.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Integrity Monitoring, Prediction and Assessment, Corrosion Control, and Repair of the Hanford Storage Tanks – 25213

The Hanford Nuclear Reservation site contains approximately 211 million liters of radioactive and chemically hazardous waste arising from nuclear weapons production, beginning with World War II, and continuing through the Cold War [1]. The waste is stored in 177 carbon-steel underground storage tanks, of which 149 are single-shell tanks (SSTs) and the remaining are double-shell tanks (DSTs). The mission of an ongoing River Protection Project is to retrieve the waste from the underground storage tanks and then treat and immobilize (i.e., vitrify) it for disposal. Waste from the older SSTs is being progressively retrieved into the newer DSTs for storage pending treatment, immobilization, and disposal. Figure 1 depicts a typical DST design [2]. The tank is approximately 23 m in diameter and 9 m high and has a domed structure and has a capacity of 4000 m3. The tank wall and floor vary in thickness between approximately 10 mm and 25 mm depending on location. The thicker wall sections are near the curved transition between the tank wall and the floor, while the thinner sections are located near the top of the tank wall. The tank floor thickness varies from 25 mm at the tank center to 10 mm near the tank wall. The tanks were constructed of either ASTM A516 Grade 65 or ASTM A537 Class 1 carbon steel and were post-weld heat treated to reduce the risk of SCC.

Shukla, Pavan K. [Savannah River National Laborato↗

Quantitative Analysis of the Principal-Agent Problem in Commercial Buildings in the U.S.: Focus on Central Space Heating and Cooling

We investigate the existence of the principal-agent (PA) problem in non-government, non-mall commercial buildings in the U.S. in 2003. The analysis concentrates on space heating and cooling energy consumed by centrally installed equipment in order to verify whether a market failure caused by the PA problem might have prevented the installation of energy-efficient devices in non-owner-occupied buildings (efficiency problem) and/or the efficient operation of space-conditioning equipment in these buildings (usage problem). Commercial Buildings Energy Consumption Survey (CBECS) 2003 data for single-owner, single-tenant and multi-tenant occupied buildings were used for conducting this evaluation. These are the building subsets with the appropriate conditions for assessing both the efficiency and the usage problems. Together, these three building types represent 51.9percent of the total floor space of all buildings with space heating and 59.4percent of the total end-use energy consumption of such buildings; similarly, for space cooling, they represent 52.7percent of floor space and 51.6percent of energy consumption. Our statistical analysis shows that there is a usage PA problem. In space heating it applies only to buildings with a small floor area (<_50,000 sq. ft.). We estimate that in 2003 it accounts for additional site energy consumption of 12.3 (+ 10.5 ) TBtu (primary energy consumption of 14.6 [+- 12.4] TBtu), corresponding to 24.0percent (+- 20.5percent) of space heating and 10.2percent (+- 8.7percent) of total site energy consumed in those buildings. In space cooling, however, the analysis shows that the PA market failure affects the complete set of studied buildings. We estimate that it accounts for a higher site energy consumption of 8.3 (+-4.0) TBtu (primary energy consumption of 25.5 [+- 12.2]TBtu), which corresponds to 26.5percent (+- 12.7percent) of space cooling and 2.7percent (+- 1.3percent) of total site energy consumed in those buildings.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗