Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “electric utility programs”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 379 records · Page 21

Autonomous Intelligent Charging/Discharging of Electric Vehicles using Distributed Multi-Agent ADMM Framework for Grid Ancillary Services

The increasing popularity of Electric Vehicles (EVs) in the distribution grid along with technological advancement in EV electronics such as vehicle to grid (V2G) technique has enabled them to participate in grid ancillary services. To achieve this, the EVs need to establish a contract with third-party aggregators and connect to a charging unit, either residential or commercial. At any time they are connected, the EVs can decide to take part in the ancillary services program offered to them by the aggregators. If agreed, the aggregators will use the EVs as a power source capable of charging/discharging power according to the input signal, and in return, they will be compensated. This inter-temporal nature of charging/discharging is also transforming the traditional optimal power flow (OPF) problem into a dynamic OPF problem. This chapter aims at developing a multi-layer time-dependent optimization algorithm to utilize EV potential and provide ancillary services while maximizing its utilization function. Specifically, in the upper layer, an autonomous distributed ADMM algorithm is developed to optimize the cost for charging/discharging EVs while using them to regulate the voltage at each bus in the distribution grid. The distributed ADMM algorithm is also expanded to the lower layer where the individual EVs active and reactive power is controlled for voltage regulation while maintaining the desired state of the charge of the vehicle at the end of the charging period. Here, the effectiveness and performance improvement of the proposed multi-layer algorithm is illustrated through analytical analysis and simulation results.

Rahman, Towfiq↗

Autonomous Intelligent Charging/Discharging of Electric Vehicles using Distributed Multi-Agent ADMM Framework for Grid Ancillary Services

The increasing popularity of Electric Vehicles (EVs) in the distribution grid along with technological advancement in EV electronics such as vehicle to grid (V2G) technique has enabled them to participate in grid ancillary services. To achieve this, the EVs need to establish a contract with third-party aggregators and connect to a charging unit, either residential or commercial. At any time they are connected, the EVs can decide to take part in the ancillary services program offered to them by the aggregators. If agreed, the aggregators will use the EVs as a power source capable of charging/discharging power according to the input signal, and in return, they will be compensated. This inter-temporal nature of charging/discharging is also transforming the traditional optimal power flow (OPF) problem into a dynamic OPF problem. This chapter aims at developing a multi-layer time-dependent optimization algorithm to utilize EV potential and provide ancillary services while maximizing its utilization function. Specifically, in the upper layer, an autonomous distributed ADMM algorithm is developed to optimize the cost for charging/discharging EVs while using them to regulate the voltage at each bus in the distribution grid. The distributed ADMM algorithm is also expanded to the lower layer where the individual EVs active and reactive power is controlled for voltage regulation while maintaining the desired state of the charge of the vehicle at the end of the charging period. The effectiveness and performance improvement of the proposed multi-layer algorithm is illustrated through analytical analysis and simulation results.

Rahman, Towfiq↗

PACT Center: Perovskite PV Accelerator for Commercializing Technologies (Final Technical Report)

The Perovskite PV Accelerator for Commercializing Technologies (PACT) center was established in July 2021 as a national resource to accelerate the commercialization of perovskite photovoltaic (PV) technology in the United States. Since its inception, PACT has been led by Sandia National Laboratories (Sandia) in partnership with the National Laboratory of the Rockies (NLR), formerly known as NREL. From FY20-FY23, Los Alamos National Laboratory (LANL), CFV Labs, Black & Veatch (B&V), and the Electric Power Research Institute (EPRI) were part of the project team. LANL brought expertise in perovskite PV device designs and processing, CFV Labs (now GroundWork Renewables) provided initial indoor and outdoor measurement hardware technology, B&V led the initial effort on perovskite PV bankability, and EPRI worked on reviewing testing standards, identifying commercialization gaps, and helping to run PACT’s Industry Advisory Board, a group including representatives from commercial testing labs, independent engineering firms, insurance companies, state regulators, and electric utilities. To source perovskite PV module samples, PACT contracted with the University of North Carolina (UNC), the University of Toledo, the University of Washington, and SLAC/Stanford University to provide a steady stream of research-grade perovskite mini modules, enabling protocol development in advance of commercial module availability. The project period ran from July 1, 2021, through December 31, 2025, including a No Cost Extension. Starting in FY25, the project was continued as a Core Capability in the Lab Call portfolio and continues at a reduced budget with only Sandia and NLR as funded recipients. Notably, starting in FY25 PACT expanded its scope beyond MHP modules to accept all emerging PV mini module technologies for testing, including organic PV (OPV) and all-thin-film tandems, with the aim of supporting commercialization across the broader emerging PV ecosystem. With this change in scope the program was renamed the PV Accelerator for Commercializing Technologies, dropping perovskite from the name.

14 SOLAR ENERGY↗

Deep-Learning-Based Multi-Timescale Load Forecasting in Buildings: Opportunities and Challenges from Research to Deployment

Electricity load forecasting for buildings and campuses is becoming increasingly important as the penetration of distributed energy resources (DERs) grows. Efficient operation and dispatch of DERs require reasonably accurate predictions of future energy consumption in order to conduct near-real-time optimized dispatch of on-site generation and storage assets. Electric utilities have traditionally performed load forecasting for load pockets spanning large geographic areas, and therefore, forecasting has not been a common practice by buildings and campus operators. Given the growing trends of research and prototyping in the grid-interactive efficient buildings domain, characteristics beyond simple algorithm forecast accuracy are important in determining the algorithm's true utility for smart buildings. Other characteristics include the overall design of the deployed architecture and the operational efficiency of the forecasting system. In this work, we present a deep-learning-based load forecasting system that predicts the building load at 1-hour intervals for 18 hours in the future. We also discuss challenges associated with the real-time deployment of such systems as well as the research opportunities presented by a fully functional forecasting system that has been developed within the National Renewable Energy Laboratory's Intelligent Campus program.

building load forecasting↗

Practice Summary: Improved Reliability via Optimization in Residential Microgrids

Southern Company is an electric utility that is embracing residential microgrids as a platform for distributed energy. The first residential microgrid in the southeastern United States was constructed in Hoover, Alabama, as a testbed for development. To operate the microgrid, we developed an optimization model for unit commitment and economic dispatch. We report the optimization model was implemented in a microgrid central controller and tested under various operational scenarios. Challenges also include developing a pricing algorithm to deliver price forecasts to the residential homes in the microgrid and open-source software restrictions.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

WBS 1.2.3.405 - Life Cycle Assessment of Storage Technologies

Recent commitments by the Biden administration have established targets to achieve a net-zero energy system by 2050. Meeting these targets will spur a rapid transition to clean energy technologies and a commensurate need to develop and deploy energy storage technologies at scale. Pumped Storage Hydro (PSH) is expected to be part of this solution because its ability to provide grid flexibility and stability and enable the dispatching of disparate variable renewable energy technologies. Despite PSH being a mature technology with a history of deployment dating back several decades, there is very little information on the greenhouse gas (GHG) implications of PSH as compared to other storage technologies. The objective of this project is to perform a full lifecycle assessment (LCA) of new PSH projects in the U.S. This LCA includes all project phases (resource extraction, construction, operation, maintenance, end-of-life). The functional unit for this study is 1 kWh electricity delivered by system to grid substation connection point and the estimated lifetime for our base case is 80 years. Data used in this study are based on over 30 potential PSH projects that are in preliminary planning phases and are represent a wide range of potential closed-loop PSH systems in terms of location, technology, and capacity. The project approach, data sources, and modeling assumptions have been informed by a technical review committee of stakeholders that include experts from academia, national and international government, industry, and utilities. The GHGs and energy return on investment (EROI) from PSH will be compared to other storage technologies (e.g., stationary battery storage). Results from this project will improve the PSH community's understanding of the environmental impacts and sustainability of new PSH projects and how PSH compares to other storage technologies. The approach used in this project relies on open-source programming. The analysis framework (source code and data) and will be made publicly available at the end of the project. In addition to reporting results for the base case, we will perform rigorous sensitivity analysis to identify the major drivers, understand impacts of different configurations, and future energy markets. Results from this project will be published in a suitable journal.

ENERGY PLANNING, POLICY, AND ECONOMY,HYDRO ENERGY↗

Hardware functional obfuscation with ferroelectric active interconnects

Existing circuit camouflaging techniques to prevent reverse engineering increase circuit-complexity with significant area, energy, and delay penalty. In this paper, we propose an efficient hardware encryption technique with minimal complexity and overheads based on ferroelectric field-effect transistor (FeFET) active interconnects. By utilizing the threshold voltage programmability of the FeFETs, run-time reconfigurable inverter-buffer logic, utilizing two FeFETs and an inverter, is enabled. Judicious placement of the proposed logic makes it act as a hardware encryption key and enable encoding and decoding of the functional output without affecting the critical path timing delay. Additionally, a peripheral programming scheme for reconfigurable logic by reusing the existing scan chain logic is proposed, obviating the need for specialized programming logic and circuitry for keybit distribution. Our analysis shows an average encryption probability of 97.43% with an increase of 2.24%/ 3.67% delay for the most critical path/ sum of 100 critical paths delay for ISCAS85 benchmarks.

42 ENGINEERING↗

If One GEB is Good, a Community of GEBs is Better

Energy efficient, connected, grid-interactive, smart and flexible buildings are key to decarbonization, lowering energy use and improving the nation’s electricity grid. The U.S. Department of Energy’s Connected Communities initiative works to demonstrate how coordinated groups of highly efficient buildings combined with other distributed energy resources (DERs), such as electric vehicle (EV) charging, batteries, storage, demand response and photovoltaic (PV) generation can reliably and cost-effectively serve as grid assets by strategically deploying efficiency and demand flexibility while reducing carbon emissions. In 2021, DOE competitively awarded $61 million to a diverse portfolio of 10 pilot projects to promote grid-interactive efficient buildings (GEBs) working together to reliably and cost-effectively serve as grid assets while decarbonizing. Two of the main tenets of the program are measuring the communities’ energy and carbon performance and understanding how to replicate project successes in other communities. This paper begins with a discussion of what Connected Communities are (including a brief history) and their many benefits, including reduced carbon emissions and increased building efficiency and demand flexibility. Next, it provides an overview of the 10 projects, highlighting the diversity of approaches to measure success and replicate the projects: geographic locations; building types; utility, regulatory, market environments; and building vintages that will be used to test the ability of buildings to serve as grid resources. It concludes with a discussion of anticipated project impacts and the metrics that will be used to evaluate the Connected Communities projects.

Nemtzow, David↗

SAS4A/SASSYS-1 Validation with EBR-II Tests Performed During the SHRT Testing Program

The EBR-II sodium-cooled fast reactor supported a wide range of fast reactor research activities. The final fifteen years of operations at EBR-II were used for experiments and tests to demonstrate the importance of passive safety in liquid metal reactors and the capability of such systems to provide strong passive responses during off-normal conditions. The Shutdown Heat Removal Test program at EBR-II provided test data supporting the validation of computer codes for design, licensing, and operation of LMRs, among other objectives. The program included nearly sixty tests, most of which were protected and unprotected loss of flow and loss of heat sink tests run at various initial powers and flow rates. This report documents the results of modeling and simulation of tests from the Shutdown Heat Removal Test program to support validation of Argonne’s SAS4A/SASSYS-1 fast reactor safety analysis code. SHRT-17 was a protected loss of flow test where a loss of electrical power to all sodium coolant pumps was simulated to demonstrate the effectiveness of natural circulation cooling characteristics. SHRT-45R was an unprotected loss of flow test where the control rod scram function of the plant protection system was disabled to demonstrate the effectiveness of EBR-II’s passive reactivity feedbacks. BOP-301 and BOP-302R were unprotected loss of heat sink tests that demonstrated how reactivity feedback effects driven by changes to the core inlet temperature can shut down the fission process. This validation activity leverages modeling and simulation efforts that originated under an International Atomic Energy Agency Coordinated Research Project for benchmark analysis of the EBR-II Shutdown Heat Removal Tests. The SAS4A/SASSYS-1 models originally developed for the CRP have been modernized to utilize new code features and modeling practices. Differences between the predicted and measured test data were explored and the causes of these differences were identified as being due to modeling approximations, uncertainty in transient component behavior, and instrumentation uncertainties. Overall, it was concluded that for SHRT-17, SHRT-45R, BOP-301, and BOP-302R there was good agreement between the flow, power, and temperature predictions and the measured data.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

EAGLE-I Power Outage Data 2024

The provided EAGLE-I historic dataset includes power outage information at the county level for 2024 at 15-minute intervals collected by the EAGLE-I program at ORNL. The data has been collected from utility's public outage maps using an ETL process. The dataset details FIPS code, county name, state name, total number of customers without power, total customers per county, and a date/timestamp. For detailed metadata, refer to the linked metadata DOI.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Combustion Performance and Emissions Optimization through Integration of Miniaturized High Temperature Multi Process Monitoring System

The main objective of this research program is to design, manufacture, and demonstrate a miniaturized, multi-process, monitoring system (mMPMS) for boiler condition management and easy system deployment to obtain a higher spatial resolution. This system will facilitate a Condition-Based Maintenance (CBM) philosophy that actively monitors the health of assets to predict and prevent failures and maximize availability and generating capacity at a reduced cost. CBM systems can provide boiler data that the advanced process control (APC) system can utilize for plant performance optimization, which is increasingly relevant as coal power plants shift from predominantly base-load operation to predominantly transient operation involving large load swings. The mMPMS is based on an electrochemical sensor that provides a real-time indication of the risk of damage to key locations in the radiant or convective section of a coal-fired boiler such as metal loss rates, heat flux, metal surface temperature, and deposit thickness. These indications can be utilized to optimize boiler performance as well as improve boiler availability in conjunction with corresponding operating conditions. This monitoring system was developed and tested in the high-temperature regions of coal-fired utility boilers in this project but can be applied to many other industries and applications as well. The new sensor design, leveraging the existing electrochemical noise-based monitoring system, is small enough to be installed through the webbing of the waterwalls without the need for long shut-downs to bend tubes and to make it feasible to obtain high spatial resolution in the boiler. Data can be transferred to the plant distributed control system (DCS) and any other control system. The sensor body that houses the sensor assembly was designed to ensure good conductive contact with boiler tubes to ensure the sensor is held at an identical temperature to the tube surface temperature. The data acquisition and signal conditioning modules were redesigned into a small footprint with optimized cooling of the module. System software was developed specifically for the new signal conditioning module and is compatible with plant PLCs. After the preliminary testing at a pilot-scale facility, five mMPMS were installed at a full-scale pulverized coal-fired plant, Basin Electric Power Cooperative’s Leland Olds Unit 1. The systems were demonstrated over a 6-week period during typical operation. Sensor measurements of deposit thickness were validated during the demonstration and subsequently leveraged to determine sensor-based boiler cleaning strategies. These strategies have the benefit of reduced thermal stresses on boiler tubes from over-cleaning and improved boiler water management. At the end of the project, continued development of the sensor technology was carried out at PacifiCorp’s Hunter Station. REI leveraged the permanent installation of the mMPMS in Unit 3 made possible by DOE funding on a separate program. The work at Hunter Plant focused on application of machine learning and artificial intelligence-based models for integration of sensor signals into control and optimization of Hunter Unit 3 processes.

Advanced Sensors, Corrosion, Ash Deposition, Optim↗

Combustion Performance and Emissions Optimization Through Integration of a Miniaturized High-Temperature Multi Process Monitoring System

The main objective of this research program is to design, manufacture, and demonstrate a miniaturized, multi-process, monitoring system (mMPMS) for boiler condition management and easy system deployment to obtain a higher spatial resolution. This system will facilitate a Condition-Based Maintenance (CBM) philosophy that actively monitors the health of assets to predict and prevent failures and maximize availability and generating capacity at a reduced cost. CBM systems can provide boiler data that the advanced process control (APC) system can utilize for plant performance optimization, which is increasingly relevant as coal power plants shift from predominantly base-load operation to predominantly transient operation involving large load swings. The mMPMS is based on an electrochemical sensor that provides a real-time indication of the risk of damage to key locations in the radiant or convective section of a coal-fired boiler such as metal loss rates, heat flux, metal surface temperature, and deposit thickness. These indications can be utilized to optimize boiler performance as well as improve boiler availability in conjunction with corresponding operating conditions. This monitoring system was developed and tested in the high-temperature regions of coal-fired utility boilers in this project but can be applied to many other industries and applications as well. The new sensor design, leveraging the existing electrochemical noise-based monitoring system, is small enough to be installed through the webbing of the waterwalls without the need for long shut-downs to bend tubes and to make it feasible to obtain high spatial resolution in the boiler. Data can be transferred to the plant distributed control system (DCS) and any other control system. The sensor body that houses the sensor assembly was designed to ensure good conductive contact with boiler tubes to ensure the sensor is held at an identical temperature to the tube surface temperature. The data acquisition and signal conditioning modules were redesigned into a small footprint with optimized cooling of the module. System software was developed specifically for the new signal conditioning module and is compatible with plant PLCs. After the preliminary testing at a pilot-scale facility, five mMPMS were installed at a full-scale pulverized coal-fired plant, Basin Electric Power Cooperative’s Leland Olds Unit 1. The systems were demonstrated over a 6-week period during typical operation. Sensor measurements of deposit thickness were validated during the demonstration and subsequently leveraged to determine sensor-based boiler cleaning strategies. These strategies have the benefit of reduced thermal stresses on boiler tubes from over-cleaning and improved boiler water management. At the end of the project, continued development of the sensor technology was carried out at PacifiCorp’s Hunter Station. REI leveraged the permanent installation of the mMPMS in Unit 3 made possible by DOE funding on a separate program. The work at Hunter Plant focused on application of machine learning and artificial intelligence-based models for integration of sensor signals into control and optimization of Hunter Unit 3 processes.

Advanced Sensors, Corrosion, Ash Deposition, Optim↗

Combustion Performance and Emissions Optimization Through Integration of a Miniaturized High-Temperature Multi Process Monitoring System

The main objective of this research program is to design, manufacture, and demonstrate a miniaturized, multi-process, monitoring system (mMPMS) for boiler condition management and easy system deployment to obtain a higher spatial resolution. This system will facilitate a Condition-Based Maintenance (CBM) philosophy that actively monitors the health of assets to predict and prevent failures and maximize availability and generating capacity at a reduced cost. CBM systems can provide boiler data that the advanced process control (APC) system can utilize for plant performance optimization, which is increasingly relevant as coal power plants shift from predominantly base-load operation to predominantly transient operation involving large load swings. The mMPMS is based on an electrochemical sensor that provides a real-time indication of the risk of damage to key locations in the radiant or convective section of a coal-fired boiler such as metal loss rates, heat flux, metal surface temperature, and deposit thickness. These indications can be utilized to optimize boiler performance as well as improve boiler availability in conjunction with corresponding operating conditions. This monitoring system was developed and tested in the high-temperature regions of coal-fired utility boilers in this project but can be applied to many other industries and applications as well. This project leveraged the existing electrochemical noise-based monitoring system and the new sensor design is small enough to be installed through the webbing of the waterwalls without the need for long shut-downs to bend tubes and to make it feasible to obtain high spatial resolution in the boiler. Data is transferred to the plant distributed control system (DCS) and any other control system. The sensor body that houses the sensor assembly was designed to ensure good conductive contact with boiler tubes to ensure the sensor is held at an identical temperature to the tube surface temperature. The data acquisition and signal conditioning modules were redesigned into a small footprint with optimized cooling of the module. System software was developed specifically for the new signal conditioning module and is compatible with plant PLCs. After the preliminary testing at a pilot-scale facility, five mMPMS were installed at a full-scale pulverized coal-fired plant, Basin Electric Power Cooperative’s Leland Olds Unit 1. The systems were demonstrated over a 6-week period during typical operation. Sensor measurements of deposit thickness were validated during the demonstration and subsequently leveraged to determine sensor-based boiler cleaning strategies. These strategies have the benefit of reduced thermal stresses on boiler tubes from over-cleaning and improved boiler water management. At the end of the project, continued development of the sensor technology was carried out at PacifiCorp’s Hunter Station. REI leveraged the permanent installation of the mMPMS in Unit 3 made possible by DOE funding on a separate program. The work at Hunter Plant focused on application of machine learning and artificial intelligence-based models for integration of sensor signals into control and optimization of Hunter Unit 3 processes.

Advanced Sensors, Corrosion, Ash Deposition, Optim↗

Combustion Performance and Emissions Optimization Through Integration of a Miniaturized High-Temperature Multi Process Monitoring System

The main objective of this research program is to design, manufacture, and demonstrate a miniaturized, multi-process, monitoring system (mMPMS) for boiler condition management and easy system deployment to obtain a higher spatial resolution of wall conditions in utility boilers. This system will facilitate a Condition-Based Maintenance (CBM) philosophy that actively monitors the health of assets to predict and prevent failures and maximize availability and generating capacity at a reduced cost. CBM systems can provide boiler data that the advanced process control (APC) system can utilize for plant performance optimization, which is increasingly relevant as coal power plants shift from predominantly base-load operation to predominantly transient operation involving large load swings. The mMPMS is based on an electrochemical sensor that provides a real-time indication of the risk of damage to key locations in the radiant or convective section of a coal-fired boiler such as metal loss rates, heat flux, metal surface temperature, and deposit thickness. These indications can be utilized to optimize boiler performance as well as improve boiler availability in conjunction with corresponding operating conditions. This monitoring system was developed and tested in the high-temperature regions of a coal-fired utility boiler in this project but can be applied to many other industries and applications as well. The new sensor design, leveraging the existing electrochemical noise-based monitoring system, is small enough to be installed through the webbing of the waterwalls without the need for long shut-downs to bend tubes and to make it feasible to obtain high spatial resolution in the boiler. Data can be transferred to the plant distributed control system (DCS) and any other control system. The sensor body that houses the sensor assembly was designed to ensure good conductive contact with boiler tubes to ensure the sensor is held at an identical temperature to the tube surface temperature. The data acquisition and signal conditioning modules were redesigned into a small footprint with optimized cooling of the module. System software was developed specifically for the new signal conditioning module and is compatible with plant PLCs. After the preliminary testing at a pilot-scale facility, five mMPMS were installed at a full-scale pulverized coal-fired plant, Basin Electric Power Cooperative’s Leland Olds Unit 1. The systems were demonstrated over a 6-week period during typical operation. Sensor measurements of deposit thickness were validated during the demonstration and subsequently leveraged to determine sensor-based boiler cleaning strategies. These strategies have the benefit of reduced thermal stresses on boiler tubes from over-cleaning and improved boiler water management. At the end of the project, continued development of the sensor technology was carried out at PacifiCorp’s Hunter Station. REI leveraged the permanent installation of the mMPMS in Unit 3 made possible by DOE funding on a separate program. The work at Hunter Plant focused on application of machine learning and artificial intelligence-based models for integration of sensor signals into control and optimization of Hunter Unit 3 processes.

42 ENGINEERING↗

High-Temperature Multi-Process Sensor Development and Demonstration at a Full-scale PC Combustion System

The main objective of this research program is to design, manufacture, and demonstrate a miniaturized, multi-process, monitoring system (mMPMS) for boiler condition management and easy system deployment to obtain a higher spatial resolution of wall conditions in utility boilers. This system will facilitate a Condition-Based Maintenance (CBM) philosophy that actively monitors the health of assets to predict and prevent failures and maximize availability and generating capacity at a reduced cost. CBM systems can provide boiler data that the advanced process control (APC) system can utilize for plant performance optimization, which is increasingly relevant as coal power plants shift from predominantly base-load operation to predominantly transient operation involving large load swings. The mMPMS is based on an electrochemical sensor that provides a real-time indication of the risk of damage to key locations in the radiant or convective section of a coal-fired boiler such as metal loss rates, heat flux, metal surface temperature, and deposit thickness. These indications can be utilized to optimize boiler performance as well as improve boiler availability in conjunction with corresponding operating conditions. This monitoring system was developed and tested in the high-temperature regions of a coal-fired utility boiler in this project but can be applied to many other industries and applications as well. The new sensor design, leveraging the existing electrochemical noise-based monitoring system, is small enough to be installed through the webbing of the waterwalls without the need for long shut-downs to bend tubes and to make it feasible to obtain high spatial resolution in the boiler. Data can be transferred to the plant distributed control system (DCS) and any other control system. The sensor body that houses the sensor assembly was designed to ensure good conductive contact with boiler tubes to ensure the sensor is held at an identical temperature to the tube surface temperature. The data acquisition and signal conditioning modules were redesigned into a small footprint with optimized cooling of the module. System software was developed specifically for the new signal conditioning module and is compatible with plant PLCs. After the preliminary testing at a pilot-scale facility, five mMPMS were installed at a full-scale pulverized coal-fired plant, Basin Electric Power Cooperative’s Leland Olds Unit 1. The systems were demonstrated over a 6-week period during typical operation. Sensor measurements of deposit thickness were validated during the demonstration and subsequently leveraged to determine sensor-based boiler cleaning strategies. These strategies have the benefit of reduced thermal stresses on boiler tubes from over-cleaning and improved boiler water management. At the end of the project, continued development of the sensor technology was carried out at PacifiCorp’s Hunter Station. REI leveraged the permanent installation of the mMPMS in Unit 3 made possible by DOE funding on a separate program. The work at Hunter Plant focused on application of machine learning and artificial intelligence-based models for integration of sensor signals into control and optimization of Hunter Unit 3 processes.

Advanced Sensors, Corrosion, Ash Deposition, Optim↗

Carbon emission responsive building control: A case study with an all-electric residential community in a cold climate

In the United States, buildings account for 35% of total energy-related carbon dioxide emissions, making them important contributors to decarbonization. Carbon intensities in the power grid are time-varying and can fluctuate significantly within hours, so shifting building loads in response to the carbon intensities can reduce a building’s operational carbon emissions. This paper presents a rule-based carbon responsive control framework that controls the setpoints of thermostatically controlled loads responding to the grid’s carbon emission signals in real time. Based on this framework, four controllers are proposed with different combinations of carbon accounting methods and control rules. To evaluate their performance, we performed simulation studies using models of a 27-home, all-electric, net zero energy residential community located in Basalt, Colorado, United States. The carbon intensity data of four future years from the Cambium data set are adopted to account for the evolving resource mix in the power grid. Various performance metrics, including energy consumption, carbon emission, energy cost, and thermal discomfort, were used to evaluate the performance of the controllers. Sensitivity analysis was also conducted to determine how the control thresholds and intervals affect the controllers’ performance. Simulation results indicate that the carbon responsive controllers can reduce the homes’ annual carbon emissions by 6.0% to 20.5%. However, the energy consumption increased by 0.9% to 6.7%, except in one scenario where it decreased by 2.2%. Compared to the baseline, the change in energy cost was between –2.9% and 3.4%, and thermal discomfort was also maintained within an acceptable range. The little impact on energy cost and thermal discomfort indicates there are no potential roadblocks for customer acceptance when rolling out the controllers in utility programs.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

A digital twin platform for building performance monitoring and optimization: Performance simulation and case studies

Advancements in sensor technology, data analytics, affordable compute, and communication infrastructure have paved the way for Digital Twin technology in optimizing building operations and controls. This study presents the development of an open and interoperable web-based Digital Twin platform for integrating diverse data streams and facilitating effective user interactions. The platform utilizes modern technologies for the web framework and time-series data management, ensuring scalability and responsiveness. The backend supports seamless integration of diverse data sources and emulators, incorporating data from building sensors and meters, external weather Application Programming Interfaces, and advanced EnergyPlus simulation models of the building and its energy systems including the Distributed Energy Resources that are formulated in Functional Mockup Units. A simulation case study was conducted with FlexLab, a test facility on Lawrence Berkeley National Laboratory campus. The case study includes normal operations, Distributed Energy Resource integration, and power outage scenarios, to illustrate the Digital Twin’s ability to provide critical insights into energy performance and thermal resilience. The results demonstrated the platform’s potential as a decision-support tool for optimizing building energy performance and enhancing resilience against extreme weather events. Future work will focus on deploying the Digital Twin platform to a real building for field validation, extending its capabilities to cover more scenarios such as bidirectional Electric Vehicle interactions, and enhancing user engagement.

EnergyPlus↗

Control and Optimization of Energy Storage System in Power Distribution System

The widespread adoption of electric vehicles (EVs) and transportation electrification is encumbered by two chief barriers: i) the limited driving range of EVs in the market today and ii) inadequate fast-charging infrastructure for long-distance trips. Extreme fast charging (XFC) technology can recharge EVs in less than 10 minutes for 200 miles range. Firstly, a novel robust optimization-based mixed integer linear programming model is proposed to size a battery energy storage system (BESS) and PV system in an XFCS. In this part, it is assumed that the sizing and location of the XFCS are known. Secondly, the aforesaid assumption is relaxed, and a strategic multi-period coordinated planning model is proposed to optimally site and size BESS-assisted charging stations in a highway transportation network and PV systems in a power distribution network by considering the coupling between both networks. Optimal operation and control of BESS-assisted EV charging stations are vital to alleviate the adverse impact of extreme fast charging of EVs on the host power network. A joint solution is proposed to mitigate the steady state and transient impact of extremefast charging of EVs and ensure grid-friendly integration of XFCSs with the host grid. Lastly, to make the operation of the XFCS cost-effective, a multi-layered energy management framework is proposed for the XFCS by considering forecast uncertainties, monthly demand charges reduction, and BESS degradation.

24 POWER TRANSMISSION AND DISTRIBUTION↗