Emergency Power Supply System for Critical Infrastructures: Design and Large Scale Hardware Demonstration
Not Available
SEARCH · Engineering Papers
Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.
Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.
Not Available
Not Available
The rapid increase of renewable generation and its anticipated continued growth requires greater operational flexibility in modern power systems. Previous studies explored the addition of more flexible resources to improve system flexibility, but this may also be achieved at lower cost by enhancing existing power plants via flexibility retrofits. Potential flexibility upgrades to existing thermal plants include modifications that enable faster ramp rates, increase maximum load levels, decrease minimum load levels, and provide faster and lower cost startup operations. In this paper, we focus on improvements to existing natural gas combined cycle generators, and apply a unit commitment model to analyze the impact that each specific upgrade has on their operational dynamics and profitability from both the system perspective and from the asset owner perspective. We show that the value of each type of flexibility improvement varies depending on the capacity factor and usage pattern of the generator before the upgrade, and that the relative benefit of each type of flexibility varies. We demonstrate diminishing returns to increased flexibility when upgrading multiple generators simultaneously. Sensitivity tests for several shares of renewable generation, different generation mixes and different net load realizations confirm the generality of the results shown.
Representing complex systems as graphs enables use of mathematical tools to identify faults or predict failures. Graph nodes correspond to individual modules or subsystems, and edges link coupled system parts. ‘Probes’ measure the node outputs, monitoring the system health for unexpected behavior. Assuming one cannot probe every point, within a system, the fault correlates to a region—not necessarily the specific location. Bayesian networks trained to understand fault patterns can accurately identify the source. The diagnostic tool described aides debugging by pinpointing system failure causes. For predictive maintenance, probe data develop probability distribution functions describing subsystem mean time to failure. Unit lifetime can be estimated through these probability distributions. Two approaches include using Bayesian classifiers to infer the system failure source and developing maintenance schedules by treating systems as collections of random variables. When failure behavior does not follow a closed form function, use of similarity models is proposed.
This presentation provides an overview of the laboratory evaluation of federated, hierarchical controls for distribution power system management.
NASA's Goddard Earth Sciences Distributed Active Archive Center (GES DAAC) processes, stores and distributes earth science data from a variety of remote sensing satellites. End users of the data range from instrument scientists to global change and climate researchers to federal agencies and foreign governments. Many of these users apply data mining techniques to large volumes of data (up to 1 TB) received from the GES DAAC. However, rapid advances in processing power are enabling increases in data processing that are outpacing tape drive performance and network capacity. As a result, the proportion of data that can be distributed to users continues to decrease. As mitigation, we are migrating more data mining and mining preparation activities into the data center in order to reduce the data volume that needs to be distributed and to offer the users a more useful and manageable product. This migration of activities faces a number of technical and human-factor challenges. As data reduction and mining algorithms are normally quite specific to the user's research needs, the user's algorithm must be integrated virtually unchanged into the archive environment. Also, the archive itself is busy with everyday data archive and distribution activities and cannot be dedicated to, or even impacted by, the mining activities. Therefore, we schedule KDD 'campaigns' (similar to reprocessing campaigns), during which we schedule a wholesale retrieval of specific data products, offering users the opportunity to extract information from the data being retrieved during the campaign.
As part of the U.S. Department of Energy’s EVs@Scale initiative, the Next-Gen Profiles (NGP) project provides a comprehensive, data-driven analysis of electric vehicle (EV) and electric vehicle supply equipment (EVSE) operations across real-world fleet deployments. This paper presents findings from the NGP’s Fleet Utilization study, which investigates operational behavior and asset usage across seventeen EV fleets and two EVSE fleets, encompassing a wide range of vehicle types and use cases. Data collected from diverse sources—varying in format and temporal resolution—are first reformatted into a unified structure. From this harmonized dataset, a suite of rigorously defined performance metrics is calculated at an hourly cadence, enabling consistent cross-comparison of charging, routing, and other key operational behaviors. Amid rapidly increasing EV adoption and growing demands for energy-efficient fleet operations, the analysis reveals clear utilization trends—including diurnal and weekly activity cycles, differences in short versus long charging session dependencies, and route-specific energy usage patterns. These findings highlight the need for tailored infrastructure strategies and the deployment of advanced energy management systems, such as Distributed Energy Resource Management Systems (DERMS) and Site Energy Management Systems (SEMS), which can optimize charging schedules and mitigate peak loads. By leveraging anonymized, harmonized datasets and standardized metrics, this study offers critical insights into fleet behavior and performance, providing a foundation to improve operational efficiency, reduce costs, and enable the scalable deployment of electrified transportation.
AVIRIS is a facility consisting of a flight system, a ground data system, a calibration facility, and a full-time operations team. The facility was developed by JPL under funding from NASA. NASA also provides funding for operations and maintenance. The flight system is a whisk-broom imager that acquires data in 224 narrow, contiguous spectral bands covering the solar reflected portion of the electromagnetic spectrum. It is flown aboard the NASA high altitude ER-2 research aircraft. The ground data system is a facility dedicated to the processing and distribution of data acquired by AVIRIS. It operates year round at JPL. The calibration facility consists of a calibration laboratory at JPL and a suite of field instruments and procedures for performing inflight calibration of AVIRIS. A small team of engineers, technicians, and scientists supports a yearly operations schedule that includes 6 months of flight operations, 6 months of routine ground maintenance of the flight system, and year-round data processing and distribution. Details of the AVIRIS system, its performance history, and future plans are described.
We propose a software framework enabling a spacecraft in Earth orbit to schedule its own access to space communications services via ground stations and relay satellites. All operations are automated, without a human in the loop, allowing for highly responsive service to meet time-varying needs. We describe a modular software architecture allowing the framework to interface with the scheduling systems of several providers - both government and commercial. Specifically, we present the results of an experiment with Amazon Web Services (AWS) Ground Station, an operational commercial service provider. Proposed software executed scheduling of a ground station antenna with minimal lead time (less than 20 minutes before the start of a pass). During the contact AWS cloud infrastructure was used to demodulate, process, and distribute data products from an orbiting satellite. We believe this work demonstrates the framework's ability to interface with additional providers and potential to integrate more complex decision-making in the future to schedule optimal contacts.
Power system management is a process of guiding a power system towards the objective of continuous supply of electrical power to a set of loads. Spacecraft power system management requires planning and scheduling, since electrical power is a scarce resource in space. The automation of power system management for future spacecraft has been recognized as an important R&D goal. Several automation technologies have emerged including the use of expert systems for automating human problem solving capabilities such as rule based expert system for fault diagnosis and load scheduling. It is questionable whether current generation expert system technology is applicable for power system management in space. The objective of the ADEPTS (ADvanced Electrical Power management Techniques for Space systems) is to study new techniques for power management automation. These techniques involve integrating current expert system technology with that of parallel and distributed computing, as well as a distributed, object-oriented approach to software design. The focus of the current study is the integration of new procedures for automatically planning and scheduling loads with procedures for performing fault diagnosis and control. The objective is the concurrent execution of both sets of tasks on separate transputer processors, thus adding parallelism to the overall management process.
An application was developed to allow users to run and view the Numerical Propulsion System Simulation (NPSS) engine simulations from web browsers. Simulations were performed on multiple INFORMATION POWER GRID (IPG) test beds. The Common Object Request Broker Architecture (CORBA) was used for brokering data exchange among machines and IPG/Globus for job scheduling and remote process invocation. Web server scripting was performed by JavaServer Pages (JSP). This application has proven to be an effective and efficient way to couple heterogeneous distributed components.
While distributed computing infrastructures can provide infrastructure-level techniques for managing energy consumption, application-level energy consumption models have also been developed to support energy-efficient scheduling and resource provisioning algorithms. In this work, we analyze the accuracy of a widely-used application-level model that has been developed and used in the context of scientific workflow executions. To this end, we profile two production scientific workflows on a distributed platform instrumented with power meters. We then conduct an analysis of power and energy consumption measurements. This analysis shows that power consumption is not linearly related to CPU utilization and that I/O operations significantly impact power, and thus energy, consumption. We then propose a power consumption model that accounts for I/O operations, including the impact of waiting for these operations to complete, and for concurrent task executions on multi-socket, multi-core compute nodes. We implement our proposed model as part of a simulator that allows us to draw direct comparisons between real-world and modeled power and energy consumption. Here, we find that our model has high accuracy when compared to real-world executions. Furthermore, our model improves accuracy by about two orders of magnitude when compared to the traditional models used in the energy-efficient workflow scheduling literature.
A human-in-the-loop simulation was conducted that examined an approach to adjusting airport arrivals in such a way as to enable higher departure throughput while maintaining arrival throughput. This approach, referred to as Departure-Sensitive Arrival Spacing (DSAS), leverages the capabilities of the Terminal Sequencing and Spacing (TSS) system with an additional Decision Support Tool (DST) to assign more precise arrival spacing interval. This presentation will focus on the changes observed in the task distribution and control strategies among three Terminal Radar Approach Control (TRACON) controller participants and the workload associated with those changes across three conditions: Baseline, TSS, and DSAS. Results showed that the application of the DSTs in the TSS condition and those in the DSAS condition enabled a progressive reduction in the number of clearances issued and for the clearances to be issued earlier, further away from the airport. In doing so, there was also a greater use of speed control versus vectoring and altitude for schedule conformance in the TSS and DSAS conditions respectively and relative to Baseline. Workload also shifted in conjunction with the clearance distribution with an overall reduction across conditions. The changes in task and workload distribution enabled a shift from tactical to strategic control, which allowed for a more predictable and efficient delivery of arrivals.
This paper proposes a robust scheduling model for microgrids considering the stochastic unintentional islanding conditions. The proposed model minimizes the total operating cost of the microgrid by efficiently coordinating the supply of power from local distributed energy resources and the main grid. To capture the prevailing uncertainties in renewable generation and demand as well as unintentional islanding conditions, a two-stage adaptive robust optimization model is formulated to minimize the total operating cost under the worst realization of the modeled uncertainties. The column and constraint generation (C&CG) method is used to solve the problem in an iterative manner. The solution of the proposed scheduling model ensures robust microgrid operation in consideration of all possible realization of renewable generation, demand and unintentional islanding condition. Numerical simulations on a microgrid consisting of a wind turbine, a PV panel, a fuel cell, two micro-turbines, a diesel generator and a battery demonstrate the effectiveness of the proposed approach.
We describe the use of scenarios to develop and refine requirement tables for parts of the Earth Observing System Data and Information System (EOSDIS). The National Aeronautics and Space Administration (NASA) is developing EOSDIS as part of its Mission-To-Planet-Earth (MTPE) project to accept instrument/platform observation requests from end-user scientists, schedule and perform requested observations of the Earth from space, collect and process the observed data, and distribute data to scientists and archives. Current requirements for the system are managed with tools that allow developers to trace the relationships between requirements and other development artifacts, including other requirements. In addition, the user community (e.g., earth and atmospheric scientists), in conjunction with NASA, has generated scenarios describing the actions of EOSDIS subsystems in response to user requests and other system activities. As part of a research effort in verification and validation techniques, this paper describes our efforts to develop requirements tables from these scenarios for the EOSDIS Core System (ECS). The tables specify event-driven mode transitions based on techniques developed by the Naval Research Lab's (NRL) Software Cost Reduction (SCR) project. The SCR approach has proven effective in specifying requirements for large systems in an unambiguous, terse format that enhance identification of incomplete and inconsistent requirements. We describe development of SCR tables from user scenarios and identify the strengths and weaknesses of our approach in contrast to the requirements tracing approach. We also evaluate the capabilities of both approach to respond to the volatility of requirements in large, complex systems.
NASA's Orbiting Carbon Observatory (OCO) will make the first space-based measurements of atmospheric carbon dioxide (CO2) with the precision, resolution, and coverage needed to characterize the geographic distribution of CO2 sources and sinks and quantify their variability over the seasonal cycle. OCO is currently scheduled for launch in 2008. The observatory will carry a single instrument that incorporates three high-resolution grating spectrometers designed to measure the near-infrared absorption by CO2 and molecular oxygen (O2) in reflected sunlight. OCO will fly 12 minutes ahead of the EOS Aqua platform in the Earth Observing System (EOS) Afternoon Constellation (A-Train). The in-strument will collect 12 to 24 soundings per second as the Observatory moves along its orbit track on the day side of the Earth. A small sampling footprint (<3 km2 at nadir) was adopted to reduce biases in each sounding associated with clouds and aerosols and spatial variations in surface topography. A comprehensive ground-based validation program will be used to assess random errors and biases in the XCO2 product on regional to continental scales. Measurements collected by OCO will be assimilated with other environmental measurements to retrieve surface sources and sinks of CO2. This information could play an important role in monitoring the integrity of large scale CO2 sequestration projects.
One of the critical non-replaceable systems of a long-term manned orbital station is the propulsion system. Since the propulsion system operates beginning with the launch of station elements into orbit, its service life determines the service life of the station overall. Weighing almost a million pounds, the International Space Station (ISS) is about four times as large as the Russian space station Mir and about five times as large as the U.S. Skylab. Constructed over a span of more than a decade with the help of over 100 space flights, elements and modules of the ISS provide more research space than any spacecraft ever built. Originally envisaged for a service life of fifteen years, this Earth orbiting laboratory has been in orbit since 1998. Some elements that have been launched later in the assembly sequence were not yet built when the first elements were placed in orbit. Hence, some of the early modules that were launched at the inception of the program were already nearing the end of their design life when the ISS was finally ready and operational. To maximize the return on global investments on ISS, it is essential for the valuable research on ISS to continue as long as the station can be sustained safely in orbit. This paper describes the work performed to extend the service life of the ISS propulsion system. A system comprises of many components with varying failure rates. Reliability of a system is the probability that it will perform its intended function under encountered operating conditions, for a specified period of time. As we are interested in finding out how reliable a system would be in the future, reliability expressed as a function of time provides valuable insight. In a hypothetical bathtub shaped failure rate curve, the failure rate, defined as the number of failures per unit time that a currently healthy component will suffer in a given future time interval, decreases during infant-mortality period, stays nearly constant during the service life and increases at the end when the design service life ends and wear-out phase begins. However, the component failure rates do not remain constant over the entire cycle life. The failure rate depends on various factors such as design complexity, current age of the component, operating conditions, severity of environmental stress factors, etc. Development, qualification and acceptance test processes provide rigorous screening of components to weed out imperfections that might otherwise cause infant mortality failures. If sufficient samples are tested to failure, the failure time versus failure quantity can be analyzed statistically to develop a failure probability distribution function (PDF), a statistical model of the probability of failure versus time. Driven by cost and schedule constraints however, spacecraft components are generally not tested in large numbers. Uncertainties in failure rate and remaining life estimates increase when fewer units are tested. To account for this, spacecraft operators prefer to limit useful operations to a period shorter than the maximum demonstrated service life of the weakest component. Running each component to its failure to determine the maximum possible service life of a system can become overly expensive and impractical. Spacecraft operators therefore, specify the required service life and an acceptable factor of safety (FOS). The designers use these requirements to limit the life test duration. Midway through the design life, when benefits justify additional investments, supplementary life test may be performed to demonstrate the capability to safely extend the service life of the system. An innovative approach is required to evaluate the entire system, without having to go through an elaborate test program of propulsion system elements. Evaluating every component through a brute force test program would be a cost prohibitive and time consuming endeavor. ISS propulsion system components were designed and built decades ago. There are no representative ground test articles for some of the components. A 'test everything' approach would require manufacturing new test articles. The paper outlines some of the techniques used for selective testing, by way of cherry picking candidate components based on failure mode effects analysis, system level impacts, hazard analysis, etc. The type of testing required for extending the service life depends on the design and criticality of the component, failure modes and failure mechanisms, life cycle margin provided by the original certification, operational and environmental stresses encountered, etc. When specific failure mechanism being considered and the underlying relationship of that mode to the stresses provided in the test can be correlated by supporting analysis, time and effort required for conducting life extension testing can be significantly reduced. Exposure to corrosive propellants over long periods of time, for instance, lead to specific failure mechanisms in several components used in the propulsion system. Using Arrhenius model, which is tied to chemically dependent failure mechanisms such as corrosion or chemical reactions, it is possible to subject carefully selected test articles to accelerated life test. Arrhenius model reflects the proportional relationship between time to failure of a component and the exponential of the inverse of absolute temperature acting on the component. The acceleration factor is used to perform tests at higher stresses that allow direct correlation between the times to failure at a high test temperature to the temperatures to be expected in actual use. As long as the temperatures are such that new failure mechanisms are not introduced, this becomes a very useful method for testing to failure a relatively small sample of items for a much shorter amount of time. In this article, based on the example of the propulsion system of the first ISS module Zarya, theoretical approaches and practical activities of extending the service life of the propulsion system are reviewed with the goal of determining the maximum duration of its safe operation.
The Stratospheric Aerosol and Gas Experiment III (SAGE III) instrument - the fifth in a series of instruments developed for monitoring vertical distribution of aerosols, ozone, and other trace gases in the Earth's stratosphere and troposphere - is currently scheduled for delivery to the International Space Station (ISS) via the SpaceX Dragon vehicle in 2016. The Instrument Adapter Module (IAM), one of many SAGE III subsystems, continuously dissipates a considerable amount of thermal energy during mission operations. Although a portion of this energy is transferred via its large radiator surface area, the majority must be conductively transferred to the ExPRESS Payload Adapter (ExPA) to satisfy thermal mitigation requirements. The baseline IAM-ExPA mechanical interface did not afford the thermal conductance necessary to prevent the IAM from overheating in hot on-orbit cases, and high interfacial conductance was difficult to achieve given the large span between mechanical fasteners, less than stringent flatness specifications, and material usage constraints due to strict contamination requirements. This paper will examine the evolution of the IAM-ExPA thermal interface over the course of three design iterations and will include discussion on design challenges, material selection, testing successes and failures, and lessons learned.