Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “distributed resources”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 379 records · Page 21

International Cooperation of Payload Operations on the International Space Station

One of the primary goals of the International Space Station (ISS) is to provide an orbiting laboratory to be used to conduct scientific research and commercial products utilizing the unique environment of space. The ISS Program has united multiple nations into a coalition with the objective of developing and outfitting this orbiting laboratory and sharing in the utilization of the resources available. The primary objectives of the real- time integration of ISS payload operations are to ensure safe operations of payloads, to avoid mutual interference between payloads and onboard systems, to monitor the use of integrated station resources and to increase the total effectiveness of ISS. The ISS organizational architecture has provided for the distribution of operations planning and execution functions to the organizations with expertise to perform each function. Each IPP is responsible for the integration and operations of their payloads within their resource allocations and the safety requirements defined by the joint program. Another area of international cooperation is the sharing in the development and on- orbit utilization of unique payload facilities. An example of this cooperation is the Microgravity Science Glovebox. The hardware was developed by ESA and provided to NASA as part of a barter arrangement.

Melton, Tina↗

Avionics test bed development plan

The plan is for a facility for the early investigation and evaluation of new concepts for the control of large space structures, orbiter attached flex body experiments, and orbiter enhancements. This plan outlines a distributed data processing facility that will utilize the current JSC laboratory resources for the test bed development. The future studies required for implementation, the management system for project control, and the baseline system configuration are described.

Harris, L. H.↗

The Control Point Library Building System

The Earth Resources Observation System (EROS) Data Center in Sioux Falls, South Dakota distributes precision corrected Landsat MSS and RBV data. These data are derived from master data tapes produced by the Master Data Processor (MDP), NASA's system for computing and applying corrections to the data. Included in the MDP is the Control Point Library Building System (CPLBS), an interactive, menu-driven system which permits a user to build and maintain libraries of control points. The control points are required to achieve the high geometric accuracy desired in the output MSS and RBV data. This paper describes the processing performed by CPLBS, the accuracy of the system, and the host computer and special image viewing equipment employed.

Niblack, W.↗

Scheduling spacecraft operations

A prototype scheduling system named MAESTRO currently under development is being used to explore possible approaches to the spacecraft operations scheduling problem. Results indicate that the appropriate combination of heuristic and other techniques can provide an acceptable solution to the scheduling problem over a wide range of operational scenarios and management approaches. These can include centralized or distributed instrument or systems control, batch or incremental scheduling, scheduling loose resource envelopes or exact profiles, and scheduling with varying degrees of user intervention. Techniques used within MAESTRO to provide this flexibility and power include constraint propagation mechanisms, multiple asynchronous processes, prioritized transaction-based command management, resource opportunity calculation, user-alterable selection and placement mechanisms, and maintenance of multiple schedules and resource profiles. These techniques and scheduling complexities requiring them are discussed.

Britt, Daniel L.↗

Atlas of albedo and absorbed solar radiation derived from Nimbus 7 Earth radiation budget data set, November 1978 to October 1985

An atlas of monthly mean global contour maps of albedo and absorbed solar radiation is presented. This atlas contains 7 years of continuous data from November 1978 through October 1985. The data were retrieved from measurements made by the second Earth Radiation Budget (ERB) wide field-of-view instrument, which flew on the Nimbus 7 spacecraft in 1978. The deconvolution method used to produce these data is briefly discussed here so that the user may understand their generation and limitations. These geographical distributions of albedo and absorbed solar radiation are provided as a resource for researchers studying the radiation budget of the Earth. This atlas of albedo and absorbed solar radiation complements the atlases of outgoing longwave radiation by Bess and Smith, also based on the Nimbus 6 and 7 ERB data.

Smith, G. Louis↗

Orthorectified High Resolution Multispectral Imagery for Application to Change Detection and Analysis

The project team has outlined several technical objectives which will allow the companies to improve on their current capabilities. These include modifications to the imaging system, enabling it to operate more cost effectively and with greater ease of use, automation of the post-processing software to mosaic and orthorectify the image scenes collected, and the addition of radiometric calibration to greatly aid in the ability to perform accurate change detection. Business objectives include fine tuning of the market plan plus specification of future product requirements, expansion of sales activities (including identification of necessary additional resources required to meet stated revenue objectives), development of a product distribution plan, and implementation of a world wide sales effort.

Benkelman, Cody A.↗

Scheduling in the Face of Uncertain Resource Consumption and Utility

We discuss the problem of scheduling tasks that consume a resource with known capacity and where the tasks have varying utility. We consider problems in which the resource consumption and utility of each activity is described by probability distributions. In these circumstances, we would like to find schedules that exceed a lower bound on the expected utility when executed. We first show that while some of these problems are NP-complete, others are only NP-Hard. We then describe various heuristic search algorithms to solve these problems and their drawbacks. Finally, we present empirical results that characterize the behavior of these heuristics over a variety of problem classes.

Koga, Dennis↗

NASA's Space Science Programming Possibilities for Planetaria

The relationship between NASA and the planetarium community is an important one. Indeed, NASA's Office of Space Science has invested in a study of the Space Science Media Needs of Science Center Professionals. Some of the findings indicate a need for exposure to space science researchers, workshops for museum educators, 'canned' programs, and access to a speakers bureau. We will discuss some of the programs of NASA's Sun-Earth Connection Education Forum, distribute sample multimedia products, explain the role of NASA's Educator Resource Center, and review our contributions to NASA's Education and Public Outreach effort.

Adams, M. L.↗

Lunar Outpost Life Support Architecture Study Based on a High Mobility Exploration Scenario

As scenarios for lunar surface exploration and habitation continue to evolve within NASA s Constellation program, so must studies of optimal life support system architectures and technologies. This paper presents results of a life support architecture study based on a 2009 NASA scenario known as Scenario 12. Scenario 12 represents a consolidation of ideas from earlier NASA scenarios and includes an outpost near the Lunar South Pole comprised of three larger fixed surface elements and four attached pressurized rovers. The scenario places a high emphasis on surface mobility, with planning assuming that all four crewmembers spend roughly 50% of the time away from the outpost on 3-14 day excursions in two of the pressurized rovers. Some of the larger elements can also be mobilized for longer duration excursions. This emphasis on mobility poses a significant challenge for a regenerative life support system in terms of cost-effective waste collection and resource recovery across multiple elements, including rovers with very constrained infrastructure resources. The current study considers pressurized rovers as part of a distributed outpost life support architecture in both stand-alone and integrated configurations. A range of architectures are examined reflecting different levels of closure and distributed functionality. Different lander propellant scavenging options are also considered involving either initial conversion of residual oxygen and hydrogen propellants to water or initial direct oxygen scavenging. Monte Carlo simulations are used to assess the sensitivity of results to volatile high-impact mission variables, including the quantity of residual lander propellants available for scavenging, the fraction of crew time away from the outpost on excursions, total extravehicular activity hours, and habitat leakage. Architectures are evaluated by estimating surpluses or deficits of water and oxygen per 180-day mission and differences in fixed and 10-year-total equivalent system mass (ESM) relative to a reference case. Results are presented based on current assumptions for Scenario 12 and based on Monte Carlo simulations with assumed probability distributions for the high-impact mission variables. The calculated probability of no water or oxygen resupply from Monte Carlo simulations provides a quantitative measure of system robustness that can be used for cost/benefit analyses to identify leading architecture candidates. Areas of technology improvement that are likely to have a significant impact are also suggested.

Lange, Kevin E.↗

Development of a “Nature Run” for Observing System Simulation Experiments (OSSEs) for Snow Mission Development

Snow is a fundamental component of global and regional water budgets, particularly in mountainous areas and regions downstream that rely on snowmelt for water resources. Land surface models (LSMs) are commonly used to develop spatially distributed estimates of snow water equivalent (SWE) and runoff. However, LSMs are limited by uncertainties in model physics and parameters, among other factors. In this study, we describe the use of model calibration tools to improve snow simulations within the Noah-MP LSM as the first step in an observing system simulation experiment (OSSE). Noah-MP is calibrated against the University of Arizona (UA) SWE product over a western Colorado domain. With spatially varying calibrated parameters, we run calibrated and default Noah-MP simulations for water years 2010–20. By evaluating both simulations against the UA dataset, we show that calibration decreases domain averaged temporal RMSE and bias for snow depth from 0.15 to 0.13 m and from −0.036 to −0.0023 m, respectively, and improves the timing of snow ablation. Increased snow simulation performance also improves estimates of model-simulated runoff in four of six study basins, though only one has statistically significant improvement. Spatially distributed Noah-MP snow parameters perform better than default uniform values. We demonstrate that calibrating variables related to snow albedo calculations and rain–snow partitioning, among other processes, is a necessary step for creating a nature run that reasonably approximates true snow conditions for the OSSEs. Additionally, the inclusion of a snowfall scaling term can address biases in precipitation from meteorological forcing datasets, further improving the utility of LSMs for generating reliable spatiotemporal estimates of snow.

Melissa L. Wrzesien↗

Transformation of OODT CAS to Perform Larger Tasks

A computer program denoted OODT CAS has been transformed to enable performance of larger tasks that involve greatly increased data volumes and increasingly intensive processing of data on heterogeneous, geographically dispersed computers. Prior to the transformation, OODT CAS (also alternatively denoted, simply, 'CAS') [wherein 'OODT' signifies 'Object-Oriented Data Technology' and 'CAS' signifies 'Catalog and Archive Service'] was a proven software component used to manage scientific data from spaceflight missions. In the transformation, CAS was split into two separate components representing its canonical capabilities: file management and workflow management. In addition, CAS was augmented by addition of a resource-management component. This third component enables CAS to manage heterogeneous computing by use of diverse resources, including high-performance clusters of computers, commodity computing hardware, and grid computing infrastructures. CAS is now more easily maintainable, evolvable, and reusable. These components can be used separately or, taking advantage of synergies, can be used together. Other elements of the transformation included addition of a separate Web presentation layer that supports distribution of data products via Really Simple Syndication (RSS) feeds, and provision for full Resource Description Framework (RDF) exports of metadata.

Mattmann, Chris↗

Eastern Washington Disasters: Integrating NASA Earth Observations to Analyze Spatiotemporal Distributions of Lightning-Caused Wildfires in Eastern Washington

According to the Washington Department of Natural Resources, roughly 36% of large fires in the state since 2010 were caused by lightning. General trends also show a greater increase in the number of lightning-ignited fires over the last three decades. The NASA DEVELOP Eastern Washington Disasters team partnered with The Nature Conservancy’s Washington Chapter to analyze the relationship between lightning strikes and wildfire events in Eastern Washington, with an emphasis on Kittitas and Yakima Counties. Using the International Space Station Lightning Imaging Sensor, the Landsat 5 Thematic Mapper and Landsat 8 Operational Land Imager vegetation moisture index, and Washington Department of Natural Resources historical fire data, the team generated a lightning-caused fire vulnerability index for 2001-2019. Climatology maps of lightning, wildfire, and vegetation moisture of the study area, along with an Esri ArcGIS StoryMap, further communicated project findings. The project results demonstrated that spatiotemporal patterns of lightning-ignited wildfires in Eastern Washington can be useful to inform land management practices and better predict areas that may be more vulnerable to these events.

Disasters↗

Eastern Washington Disasters: Integrating NASA Earth Observations to Analyze Spatiotemporal Distributions of Lightning-Caused Wildfires in Eastern Washington

According to the Washington Department of Natural Resources, roughly 36% of large fires in the statesince 2010 were caused by lightning. General trends also show a greater increase in the number of lightning-ignited fires over the last three decades. The NASA DEVELOP Eastern Washington Disasters team partnered with The Nature Conservancy’s Washington Chapter to analyze the relationship between lightning strikes and wildfire events in Eastern Washington, with an emphasis on Kittitas and Yakima Counties. Using the International Space Station Lightning Imaging Sensor, the Landsat 5 Thematic Mapper and Landsat 8 Operational Land Imager vegetation moisture index, and Washington Department of Natural Resources historical fire data, the team generated a lightning-caused fire vulnerability index for 2001-2019. Climatology maps of lightning, wildfire, and vegetation moisture of the study area, along with an Esri ArcGIS StoryMap, further communicated project findings. The project results demonstrated that spatiotemporal patterns of lightning-ignited wildfires in Eastern Washington can be useful to inform land management practices and better predict areas that may be more vulnerable to these events.

Disasters↗

Uncrewed Lunar Surface Operations and Support Activities

Sustained human presence on the surface of the Moon and future missions to Mars require increased independence from surface crews and Earth-based mission control to operate efficiently, safely, and reliably. The time for surface crews to perform tasks will be limited. Extravehicular activities by surface personnel are burdensome and time-consuming, even when a continuous human presence on the surface occurs. Identifying and balancing human/automation roles and tasks and infusing automation and autonomy practices early in a system’s lifecycle will be essential to achieve mission objectives. Among these objectives are attaining a sustained human presence, improving performance and mission effectiveness, reducing operations and maintenance (O&M) costs, and ensuring operations that are robust to communication delays. To achieve these objectives, an operational shift toward increased automation and autonomy with less reliance on humans is needed. Uncrewed lunar surface operations and support activities occur when surface crews are not present or are independent of surface crew timeline activities requiring no surface crew oversight or intervention. These uncrewed surface opportunities can also be planned to minimize crew workload that avoids routine maintenance and support tasks, thus maximizing crew exploration time. Uncrewed preparations such as staging and prepositioning equipment and materials before the crew arrives could improve crew task efficiency. Additional opportunities exist to conduct uncrewed science, exploration, and utilization. Uncrewed surface architecture functions can include science and exploration; habitation; launch and landing support; surface communication and navigation; surface power generation and distribution; human surface mobility; lifting, handling, manipulating; excavation, construction, and site preparation; logistics management; maintenance and repair; surface resource utilization; integrated site operations and shared support services (e.g., site scheduling/prioritization, dust mitigation/contamination control, and surface safety). Early robotic lunar surface campaigns will provide information on the availability of resources, such as oxygen and water, and demonstrate surface-based technologies. After the Artemis III human lunar return mission, a series of landers will deliver surface systems, cargo, supplies, science packages, spare parts, and commodities. A balance of crewed and uncrewed surface operations will enable a sustained lunar surface presence at the South Pole of the Moon at a site that will be known as the Artemis Base Camp (ABC). It is envisioned that base camp operations on and around the Moon will then help prepare for the mission durations and activities needed to support the first human mission to Mars. Before long-duration crew missions to the base camp can occur, the necessary surface infrastructure will be pre-deployed and verified operational. Surface assets will be teleoperated and remotely managed from Earth. Additionally, robotic and short-duration crewed missions to the ABC will ensure the site’s merit to achieve long-term science objectives, availability of usable resources, and that terrain, seasonal variations, and illumination conditions are acceptable. ABC will consist of different areas where specific functions and services are rendered, including: • Launch and Landing Area • Habitation Area • Power Production Area • Resource Areas Launch and Landing Area—The launch and landing area will support associated functions for the arrival and departure of vehicles, such as crewed landing and ascent and uncrewed cargo deliveries and offloading. It will evolve from an unimproved site at the beginning of the exploration campaign to a more sustainable landing and launch area that can support repeated arrivals and departures. Initial uncrewed Lunar Terrain Vehicle (LTV) surface operations may include emplacement of navigation beacons and communication equipment, real-time video and photography of landing/liftoff events, and element repositioning, such as portable utility power (PUP) (applicable for other landed assets at other areas). Site preparations, such as surface leveling, soil compaction, and berm/path construction, may be needed for a more sustainable launch and landing area capable of accommodating vehicles that are increasingly more reusable and reduce the effects of plume surface interactions and ejecta impacts on nearby surface assets. During the ABC missions, cargo and logistics will be delivered to the lunar surface via robotic cargo landers before the crew arrives. These shipments, which can arrive in pressurized logistics carriers, will deliver the logistics necessary to support a crewed mission and include items such as food, water, equipment spares, etc. Providing the capability to retrieve, offload, and transport the logistics closer to the ABC site before the arrival of the crew will increase the overall efficiency of crew operations once they arrive. In the sustained phase of exploration, other supporting services may be needed, such as lander propellant servicing, surface power services, commodity refreshes, and additional inspection, maintenance, and repair capabilities, to sustain a cadence of extended personnel stays and cargo arrivals and departures. Habitation Area—Uncrewed support to surface habitation could involve supporting activation and pre-entry operations of the habitat while the crew is in orbit at the Gateway outpost preparing for a surface landing. Surface Habitat (SH) uncrewed operations may include bringing the cabin environment to a habitable temperature and air mix and activating other critical crew support systems. Potential crop production uncrewed tasks in the SH could also include autonomous watering and tending. Additionally, when the crew departs, the SH enters dormancy for the long period of uncrewed operation. A logistical staging area could also be collocated near the SH. If so, staging operations for crew supplies, waste re-location, and recycling operations may be opportunities for uncrewed operations. Power Production Area—The Fission Surface Power (FSP) element and its supporting distribution equipment provide power to surface elements as needed across the ABC to supplement day-to-day operations and survive lunar nights. Uncrewed support of this power system includes any initial LTV-assisted deployments of cables and other distributed equipment, associated electrical connections, and system testing and activation operations. Robotically performing some inspections, maintenance, or repair tasks on the power distribution equipment could reduce the surface crew workload. Resource Area— Uncrewed resource prospecting, mapping, and characterizing possible resource sites is likely to be time-consuming and represents an opportunity for uncrewed operations between crewed missions. Uncrewed mobile equipment operations will be needed in the extreme environments of permanently shadowed locations where resource extractions occur. As In-Situ Resource Utilization (ISRU) pilot plant operations begin, uncrewed surface support activities with available mobile and portable assets (LTV, PUP, etc.) will better support these operations. Any produced commodities can be stored at a centralized storage location for future use. Also associated with these operations is the use of mobile robotic excavators for resource acquisition and robotic/autonomous regolith processing. The waste tailings generated during excavation and regolith processing would also need to be transported and deposited at a dedicated location. Surface assets will continue operating between crew visits to maintain surface capabilities, conduct lunar surface science, technology demonstrations, and public outreach opportunities. Additionally, certain sustaining tasks that would consume valuable crew time could be performed before crew arrival, or after their departure. This capability may offer more affordable options to construct, activate, test, and maintain a broad set of surface assets. Telerobotically operated human surface mobility systems, such as the LTV and Pressurized Rover (PR), can be utilized for various tasks. Surface environmental conditions pose a distinct challenge for all these activities. Surface illumination and localized shadows are one such factor. Night-survival operations could consist of thermal management, battery pre-charging, and load shedding. Some surface systems may hibernate through the night and then awake and continue nominal operations. Uncrewed mobile assets may use a more adaptive approach to optimize their power and operations; one method is to follow the sunlight. Night-survival operations may be initiated remotely by teleoperation, automated, or accomplished by supervised autonomous operation. The ability to pre-deploy and control remote assets in orbit or on Mars before the arrival of the mission crew is a key capability that can be simulated on the moon. The base camp provides a venue where these advanced operational concepts, technologies, and autonomous methods and techniques, including the incorporation of time delays to simulate Earth-Mars latency can be replicated to help buy down future Mars mission risks. This paper will examine the evolution of uncrewed lunar surface operations and support activities. It will also discuss the lunar surface environmental conditions (thermal, lighting, terrain, topography, communications) along with the challenges they pose on uncrewed surface operations, and the performance of these activities with limited to minimal human interaction and/or teleoperation. Since lunar missions include Mars mission analogs, such investigation provides the framework for future uncrewed Mars mission support.

Mark E Lewis↗

SPS Energy Conversion Power Management Workshop

Energy technology concerning photovoltaic conversion, solar thermal conversion systems, and electrical power distribution processing is discussed. The manufacturing processes involving solar cells and solar array production are summarized. Resource issues concerning gallium arsenides and silicon alternatives are reported. Collector structures for solar construction are described and estimates in their service life, failure rates, and capabilities are presented. Theories of advanced thermal power cycles are summarized. Power distribution system configurations and processing components are presented.

Source record↗

Program Management Tool

The Program Management Tool (PMT) is a comprehensive, Web-enabled business intelligence software tool for assisting program and project managers within NASA enterprises in gathering, comprehending, and disseminating information on the progress of their programs and projects. The PMT provides planning and management support for implementing NASA programmatic and project management processes and requirements. It provides an online environment for program and line management to develop, communicate, and manage their programs, projects, and tasks in a comprehensive tool suite. The information managed by use of the PMT can include monthly reports as well as data on goals, deliverables, milestones, business processes, personnel, task plans, monthly reports, and budgetary allocations. The PMT provides an intuitive and enhanced Web interface to automate the tedious process of gathering and sharing monthly progress reports, task plans, financial data, and other information on project resources based on technical, schedule, budget, and management criteria and merits. The PMT is consistent with the latest Web standards and software practices, including the use of Extensible Markup Language (XML) for exchanging data and the WebDAV (Web Distributed Authoring and Versioning) protocol for collaborative management of documents. The PMT provides graphical displays of resource allocations in the form of bar and pie charts using Microsoft Excel Visual Basic for Application (VBA) libraries. The PMT has an extensible architecture that enables integration of PMT with other strategic-information software systems, including, for example, the Erasmus reporting system, now part of the NASA Integrated Enterprise Management Program (IEMP) tool suite, at NASA Marshall Space Flight Center (MSFC). The PMT data architecture provides automated and extensive software interfaces and reports to various strategic information systems to eliminate duplicative human entries and minimize data integrity issues among various NASA systems that impact schedules and planning.

Gawadiak, Yuri↗

A Simple XML Producer-Consumer Protocol

There are many different projects from government, academia, and industry that provide services for delivering events in distributed environments. The problem with these event services is that they are not general enough to support all uses and they speak different protocols so that they cannot interoperate. We require such interoperability when we, for example, wish to analyze the performance of an application in a distributed environment. Such an analysis might require performance information from the application, computer systems, networks, and scientific instruments. In this work we propose and evaluate a standard XML-based protocol for the transmission of events in distributed systems. One recent trend in government and academic research is the development and deployment of computational grids. Computational grids are large-scale distributed systems that typically consist of high-performance compute, storage, and networking resources. Examples of such computational grids are the DOE Science Grid, the NASA Information Power Grid (IPG), and the NSF Partnerships for Advanced Computing Infrastructure (PACIs). The major effort to deploy these grids is in the area of developing the software services to allow users to execute applications on these large and diverse sets of resources. These services include security, execution of remote applications, managing remote data, access to information about resources and services, and so on. There are several toolkits for providing these services such as Globus, Legion, and Condor. As part of these efforts to develop computational grids, the Global Grid Forum is working to standardize the protocols and APIs used by various grid services. This standardization will allow interoperability between the client and server software of the toolkits that are providing the grid services. The goal of the Performance Working Group of the Grid Forum is to standardize protocols and representations related to the storage and distribution of performance data. These standard protocols and representations must support tasks such as profiling parallel applications, monitoring the status of computers and networks, and monitoring the performance of services provided by a computational grid. This paper describes a proposed protocol and data representation for the exchange of events in a distributed system. The protocol exchanges messages formatted in XML and it can be layered atop any low-level communication protocol such as TCP or UDP Further, we describe Java and C++ implementations of this protocol and discuss their performance. The next section will provide some further background information. Section 3 describes the main communication patterns of our protocol. Section 4 describes how we represent events and related information using XML. Section 5 describes our protocol and Section 6 discusses the performance of two implementations of the protocol. Finally, an appendix provides the XML Schema definition of our protocol and event information.

Smith, Warren↗

The NAS Computational Aerosciences Archive

In order to further the state-of-the-art in computational aerosciences (CAS) technology, researchers must be able to gather and understand existing work in the field. One aspect of this information gathering is studying published work available in scientific journals and conference proceedings. However, current scientific publications are very limited in the type and amount of information that they can disseminate. Information is typically restricted to text, a few images, and a bibliography list. Additional information that might be useful to the researcher, such as additional visual results, referenced papers, and datasets, are not available. New forms of electronic publication, such as the World Wide Web (WWW), limit publication size only by available disk space and data transmission bandwidth, both of which are improving rapidly. The Numerical Aerodynamic Simulation (NAS) Systems Division at NASA Ames Research Center is in the process of creating an archive of CAS information on the WWW. This archive will be based on the large amount of information produced by researchers associated with the NAS facility. The archive will contain technical summaries and reports of research performed on NAS supercomputers, visual results (images, animations, visualization system scripts), datasets, and any other supporting meta-information. This information will be available via the WWW through the NAS homepage, located at http://www.nas.nasa.gov/, fully indexed for searching. The main components of the archive are technical summaries and reports, visual results, and datasets. Technical summaries are gathered every year by researchers who have been allotted resources on NAS supercomputers. These summaries, together with supporting visual results and references, are browsable by interested researchers. Referenced papers made available by researchers can be accessed through hypertext links. Technical reports are in-depth accounts of tools and applications research projects performed by NAS staff members and collaborators. Visual results, which may be available in the form of images, animations, and/or visualization scripts, are generated by researchers with respect to a certain research project, depicting dataset features that were determined important by the investigating researcher. For example, script files for visualization systems (e.g. FAST, PLOT3D, AVS) are provided to create visualizations on the user's local workstation to elucidate the key points of the numerical study. Users can then interact with the data starting where the investigator left off. Datasets are intended to give researchers an opportunity to understand previous work, 'mine' solutions for new information (for example, have you ever read a paper thinking "I wonder what the helicity density looks like?"), compare new techniques with older results, collaborate with remote colleagues, and perform validation. Supporting meta-information associated with the research projects is also important to provide additional context for research projects. This may include information such as the software used in the simulation (e.g. grid generators, flow solvers, visualization). In addition to serving the CAS research community, the information archive will also be helpful to students, visualization system developers and researchers, and management. Students (of any age) can use the data to study fluid dynamics, compare results from different flow solvers, learn about meshing techniques, etc., leading to better informed individuals. For these users it is particularly important that visualization be integrated into dataset archives. Visualization researchers can use dataset archives to test algorithms and techniques, leading to better visualization systems, Management can use the data to figure what is really going on behind the viewgraphs. All users will benefit from fast, easy, and convenient access to CFD datasets. The CAS information archive hopes to serve as a useful resource to those interested in computational sciences. At present, only information that may be distributed internationally is made available via the archive. Studies are underway to determine security requirements and solutions to make additional information available. By providing access to the archive via the WWW, the process of information gathering can be more productive and fruitful due to ease of access and ability to manage many different types of information. As the archive grows, additional resources from outside NAS will be added, providing a dynamic source of research results.

Miceli, Kristina D.↗