At least 379 records · Page 21

Evaluating the potential of short-term instrument deployment to improve distributed wind resource assessment

Distributed wind projects, which are connected at the distribution level of an electricity system or in off-grid applications to serve specific or local energy needs, often rely solely on wind resource models to establish wind speed and energy generation expectations. Historically, anemometer loan programs have provided an affordable avenue for more accurate onsite wind resource assessment, and the lowering cost of lidar systems has shown similar advantages for more recent assessments. While a full 12 months of onsite wind measurement is the standard for correcting model-based long-term wind speed estimates for utility-scale wind farms, the time and capital investment involved in gathering onsite measurements must be reconciled with the energy needs and funding opportunities that drive expedient deployment of distributed wind projects. Much literature exists to quantify the performance of correcting long-term wind speed estimates with 1 or more years of observational data, but few studies explore the impacts of correcting with months-long observational periods. This study aims to answer the question of how short you can go in terms of the observational time period needed to make impactful improvements to model-based long-term wind speed estimates. Three algorithms, multivariable linear regression, adaptive regression splines, and regression trees, are evaluated for their skill at correcting long-term wind resource estimates from the European Centre for Medium-Range Weather Forecasts Reanalysis version 5 (ERA5) using months-long periods of observational data from 66 locations across the US. On average, correction with even 1 month of observations provides significant improvement over the baseline ERA5 wind speed estimates and produces median bias magnitudes and relative errors within 0.22 m s −1 and 4 percentage points of the median bias magnitudes and relative errors achieved using the standard 12 months of data for correction. However, in cases when the shortest observational periods (1 to 2 months) used for correction are not well correlated with the overlapping ERA5 reference, the resultant long-term wind speed errors are worse than those produced using ERA5 without correction. Summer months, which are characterized by weaker relative wind speeds and standard deviations for most of the evaluation sites, tend to produce the worst results for long-term correction using months-long observations. The three tested algorithms perform similarly for long-term wind speed bias; however, regression trees perform notably worse than multivariable linear regression and adaptive regression splines in terms of correlation when using 6 months or less of observational data for correction. Translating the analysis to wind energy, median relative errors in the capacity factor are on average within 10 % using 1 month of training. If the observation period used for correction is not well correlated with the reference data, however, misrepresentation of the observed capacity factor can be substantial. The risk associated with poor correlation between the observed and reference datasets decreases with increasing training period length. In the worst-correlation scenarios, the median capacity factor relative errors from using 1, 3, and 6 months are within 47 %, 26 %, and 16 %, respectively.

17 WIND ENERGY↗

Data for "Implications of Zoning Ordinances for Rural Utility-Scale Solar Deployment and Power System Decarbonization in the Great Lakes Region".

This dataset includes the Energy Zoning Database and geographic shapefiles used to identify suitable rural areas for utility-scale solar development. Additionally, it contains the input data required for the capacity expansion model, including information on existing electric generators and their associated costs, solar resource potential, and transmission infrastructure data. These datasets collectively support the analysis presented in the paper, ensuring a comprehensive assessment of zoning regulations, land suitability, and the economic and technical feasibility of solar deployment in rural areas.

Owusu-Obeng, Papa Yaw (ORCID:0000000334385183)↗

A Hands-On Curriculum for Training in HPC Cluster Deployment and Management

This paper presents the design, methodology, and outcomes of the High-Performance Computing Technologies (HPCT) course, a hands-on training program focused on the system-side of HPC cluster deployment and administration. Delivered as part of the Master in High Performance Computing (MHPC) program, the course introduces students to key concepts in cluster configuration, including networking, software stack provisioning, job scheduling, and monitoring. Initially taught in person, the course was transitioned to an online format during the COVID-19 pandemic. This shift led to the development of openly available instructional material and a flipped-classroom approach that continues to support both in-person and hybrid delivery. All course materials are publicly available at www.hpc.temple.edu/mhpc/hpc-technology/index.html. By documenting the structure, infrastructure, and evolution of HPCT, this paper offers a model for accessible HPC system training that supports workforce development in computational science.

Posada Correa, Fernando [ORNL] (ORCID:000000022565↗

Field Deployable Mirror Soiling Detection Based on Polarimetric Imaging

Heliostat mirror soiling is one of the significant factors for reduced optical efficiency of Concentrated Solar Power (CSP) fields. However, it remains challenging to determine the mirror soiling patterns across the large area of the CSP field. Here we propose a fast and field deployable inspection method to measure the heliostat mirror soiling levels based on polarization images in regular daylight settings without additional light sources. Under sunny and clear sky conditions, we have demonstrated accurate measurement of reflection efficiency (error ~1%) for mirrors with different soiling levels.

14 SOLAR ENERGY↗

Screening Tool for Equitable Adoption and Deployment of Solar (STEADy Solar)

The Screening Tool for Equitable Adoption and DeploYment of Solar (STEADy Solar) is a database and mapping tool designed to promoting clean energy investments for low-income communities across the United States. The tool indicates locations that may be eligible for the Investment Tax Credit bonus adders defined in the 2022 Inflation Reduction Act (IRA) and combines this information with demographics, social vulnerability, solar technical potential, solar economics (modeled net present value), and building counts by use-type. It can be used by states, municipalities, community-based organizations, developers, and researchers to identify sites where solar projects may be economical and where federal incentives may be available to support equitable adoption of solar. Specific values include: Areas eligible for the Energy Communities Tax Credit Bonus Program (including brownfield site counts) Areas eligible for the Low Income Communities Bonus Credit Program (including Tribal Lands, and covered affordable housing project counts) Areas categorized as disadvantaged by Justice40 Commercial and Residential Solar economics characterized by the Net Present Value and Simple Payback Period Total Population, Race, and Ethnicity Median Household Income, Poverty rate, Household Tenure Social Vulnerability Count of buildings, developable rooftop solar capacity (in kWdc) and estimated annual generation potential (in kWh) on four building types: Government General Services, Government Emergency Response, Grade Schools, and Colleges/Universities. The linked report describes the STEADy dataset metadata and presents high level insights from the data. The downloadable and formatted excel dataset makes it easy for users to gain insights for their locations. Supporting .csv and shapefiles provide users with the full data to run their own analyses on equitable solar siting.

14 SOLAR ENERGY↗

MN Solar Pathways: Solar Deployment Strategies-Modeling and Case Studies

As part of the Minnesota Solar Pathways project, funded in part by the Department of Energy’s Solar Energy Technologies Office, Clean Power Research (CPR) developed a Solar Deployment Strategies modeling tool to calculate the economic impacts and market incentives created by different solar portfolios and rate structures. CPR developed the tool using Minnesota-specific data and assumptions. The case studies described in this report provide insight into possible pathways toward the state goal of 10% solar, but the emphasis of the report is the demonstration of the tool in use cases that can be expanded and modified in future years as needs change.

14 SOLAR ENERGY↗

Exploring the Next Generation of Low-Carbon Technologies for Deployment on Contaminated Lands

Low-carbon energy technologies and industries can reduce or avoid pollution, create economic development benefits (e.g. job creation), enhance local tax revenues, and support supply chain businesses. Many communities have vacant or underutilized and contaminated land that presents an opportunity cost for the economy and a blight on neighborhoods. This paper identifies a research agenda and funding proposal to support the next generation of low carbon technologies to deploy on contaminated lands.

brownfield sites↗

Supporting Electric Vehicle Supply Equipment Deployment

The U.S. Department of Energy (DOE) Federal Energy Management Program (FEMP) helps federal agencies electrify their fleets and support the deployment of charging infrastructure. To assist agencies with the transition to zero-emission vehicles (ZEVs), including battery electric vehicles (BEVs) and plug-in hybrid electric vehicles (PHEVs), FEMP offers technical guidance on electric vehicle supply equipment (EVSE) installations and site-specific planning through on-site and virtual EVSE Tiger Teams.

ADVANCED PROPULSION SYSTEMS↗

Multicriterion Benefit Evaluation of Deploying New Battery Technology with Increased Capacity at a Generic Nuclear Power

Nuclear power plant (NPP) safety improvements are routinely made by plant licensees and regulators. Examples of plant improvements include accident-tolerant fuel, diverse and flexible coping strategies, passive cooling systems, and increased battery capacity. A combined use of these plant improvements could lead to plant designs with enhanced resilience, allowing NPPs to better cope with both internal and external hazards and keep the plant operating safely, efficiently, and economically. This paper focuses on increased battery capacity and evaluates the potential costs and benefits of deploying batteries with increased capacities at a generic boiling water reactor (BWR) NPP. A multicriterion benefit evaluation methodology is used for the cost-benefit analysis. Ten alternatives for extending battery capacity are developed, including nine alternatives to provide additional direct-current power and one alternative to provide additional alternating-current power. Potential benefits of reducing plant risk are quantified through incorporating the alternatives into loss-of-offsite-power scenarios of the generic BWR probabilistic risk assessment model. Potential costs of implementing the alternatives are qualitatively discussed and ranked. The alternatives are then compared based on their impacts on plant risk and economics.

99 GENERAL AND MISCELLANEOUS↗

Grid Interconnection and Renewables Deployment Related Air Quality and Human Health Benefits in Southeast Asia

The Association of Southeast Asian Nations (ASEAN) has increasingly focused on multilateral electricity trade, improved grid resiliency and modernization. These opportunities in the power sector have been studied through the ASEAN Interconnection Masterplan Studies, the most recent of which is the ASEAN Interconnection Masterplan Study III (AIMS III). AIMS III assessed four different scenarios of power system in the ASEAN countries that include a base scenario and three additional scenarios (called optimum RE, ASEAN RE, and High RE) considering different levels of deployment of renewable energy (RE) and cross-border generation and trade of electricity for three years (2025, 2030, 2040). In this work, we quantify the potential air quality and public health co-benefits of AIMS III scenarios. For a rapidly expanding, energy hungry region like SE Asia generation is power generation is expected to increase significantly. The AIMS III scenarios' capacity expansion modeling suggest that: 1) Generation nearly doubles from 2025 to 2040 in all four AIMS III scenarios; 2) Most of the increased generation is met by coal in all four AIMS III scenarios; 3) While renewables generation increases in all four AIMS III scenarios, the fraction of total generation (its share) generally decreases because of the much greater increase in non-renewable sources, mostly coal. Only in the High RE Target scenario do renewables represent a higher share in 2040 than in 2025, though even here it is at the expense of natural gas rather than coal; 4) As a result, emissions of gaseous and aerosol pollutants increase significantly in all scenarios. Because emissions increase in 2040 compared to 2025 for all four AIMS III scenarios, so do PM2.5 concentrations. Even for the High RE Target scenario (the scenario with highest share of renewable energy), compared to the Base scenario in 2025, in 2040 PM2.5 concentrations are higher. Compared to the Base scenario in the same years, the Optimum RE and ASEAN RE Target scenarios do not differ very much from the Base in terms of PM2.5 concentration. The High RE Target scenario, on the other hand, yields noticeably lower PM2.5 concentration. For example, in 2040 the population-weighted decrease in annual average PM2.5 concentration in the High RE Target scenario relative to the Base scenario is 0.5 ug m-3. Compared to the Base scenario in 2040, each of the alternative AIMS III scenarios is estimated to result in net reductions in power-sector air quality-related excess mortality in the ASEAN region. Yet there are a few countries for which the Optimum RE and ASEAN RE Target result in increases in PM2.5-related excess mortality (Thailand and Vietnam for the ASEAN RE Target scenario and Thailand for the Optimum RE scenario). However, for the High RE Target scenario, all countries benefit and find reductions in excess mortality resulting from the power sector scenarios modeled in AIMS III with regionwide mortality decreasing by 16,000 compared to the Base scenario in 2040. In summary, our analysis finds that changing power generation emissions is a crucial lever for improving public health in ASEAN member countries and provides a pathway for policymakers to make decision backed by a realistic power sector expansion and air quality analyses.

air quality↗

Pathways to Overcome Geothermal Deployment Barriers

Geothermal resources represent a vast domestic energy supply that can provide a fexible and reliable source of electricity as well as contribute to clean energy goals. In the United States, geothermal exploration and development are subject to numerous permits, authorizations, and other regulatory requirements at the federal, state, and local level. These are necessary to address potential environmental and resource impacts at geothermal project sites, but may act as barriers to geothermal deployment, slowing timelines and raising costs. The 2022 NREL report, Non-Technical Barriers to Geothermal Development in California and Nevada, presents fndings of a study on non-technical barriers that may infuence geothermal project development.

geothermal↗

Sustainability Criteria for Hydrogen Deployments

Hydrogen sustainability metrics that exist today are primarily limited to economic and environmental factors. While these are good, further research is needed to refine existing metrics and provide frameworks with which to consider other future, quantifiable metrics such as social metrics. This research, funded by Mission Innovation in collaboration with Department of State and the Department of Energy, will aim to expand sustainability framework considerations in a manner that can be accurately measured which will guide deployment of and investment in hydrogen supply chain infrastructure projects.

ENERGY PLANNING, POLICY, AND ECONOMY,HYDROGEN↗

Community Engagement Tips for EV Infrastructure Deployment

This Joint Office of Energy and Transportation help sheet provides tips for conducting community engagement to support electric vehicle (EV) infrastructure planning and deployment. This document is a tool and an informative resource to be used in conjunction with other guidance. It is not intended to set policy or establish or replace any standards under state or federal law applicable to public notice or community engagement.

ADVANCED PROPULSION SYSTEMS,ENERGY PLANNING, POLIC↗

Data and Tools for Exploring New Pumped Storage Hydropower Deployment Opportunities

Pumped storage hydropower (PSH) is a flexible energy storage technology with the potential to facilitate variable renewable energy integration into the decarbonized electric grid of the future. NREL is developing new data and tools to help understand opportunities for new PSH deployment, including nationwide resource assessment data, a bottom-up component-level cost model, and a lifecycle greenhouse gas emissions calculator. These datasets lay the foundation for better-informed grid planning decisions about how PSH fits into a future portfolio of generation, transmission, and storage assets.

CEM↗

Recent Developments in Deployment of CCS Projects in the Offshore Gulf of Mexico

In the last year, since the passage of the IRA, there have been over 100 new CCUS project announcements in the U.S. This presentation provides an overview of the recent Offshore Gulf of Mexico (GoM) CCS project announcements attributable to 45Q and improvements in project economics. It also examines how the remaining regulatory hurdles to potentially broader CCUS deployment in the Offshore GoM, are being addressed.

Zaremsky, Connie↗

Enhancing the EVI-X National Framework to Address Emerging Questions on Charging Infrastructure Deployment

As large national investments in EV charging continue to be made, this project seeks to improve the state-of-the-art in EV infrastructure analysis. New and improved quantitative analysis capabilities will position VTO to support EERE Leadership, assist the DOT/DOE Joint Office through timely analysis, and provide a strategy for the deployment of the national charging network. This project supports on-going development of NREL's EVI-X Suite of charging infrastructure analysis tools, including tools supporting large-scale network planning, local site design decisions, and comprehensive financial analysis. EVI-X development complements and leverages other VTO-funded efforts to ensure inputs to EVI-X and output produced by EVI-X are consistent with and well-integrated into the VTO portfolio (e.g., EV adoption scenarios from TEMPO, charging infrastructure design provided to EVs@Scale, etc.).

ADVANCED PROPULSION SYSTEMS,ENERGY PLANNING, POLIC↗