Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “deployable”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 379 records · Page 21

If We Build Them, They Will Run: Automated HPC Apps Deployment and Profiling with eBPF in Cloud

The high performance computing (HPC) community is in a period of transition. The rise of AI/ML coupled with a changing landscape of resources deems portability a new metric of performance, and methods to move between on-premises and cloud environments and assess compatibility are paramount. Here we design and test a strategy for bridging the gap between traditional HPC and Kubernetes environments – first containerizing applications, providing automated orchestration to run studies, and packaging the setup with automated means to assess performance using low overhead eXtended Berkeley Packet Filter (eBPF) programs. We first assess different designs for eBPF collection, demonstrating a tradeoff between number of programs deployed on a node and overhead added. We develop 5 low overhead eBPF programs that combine with streaming ML models to assess CPU, futex, TCP, shared memory, and file access across four different builds of an HPC application for CPU and GPU. We use eBPF data to generate insights into the possible underlying etiology of scaling issues. We then assess compatibility of a well-known benchmark, HPCG, across matrices of micro-architectures and optimization levels (217 containers across 24 instance types and over 7500 runs). We provide to the community 30 applications to deploy in our automated setup and perform a scaling study from 4 to a maximum of 256 nodes for both CPU and GPU applications. Finally, we use our gained knowledge about performance to generate compatibility artifacts that are used by a newly developed Kubernetes controller to intelligently select instance type based on optimizing a figure of merit. Along with insights to scaling in this environment with a collection of applications and templates to work from, we provide an overall strategy for approaching HPC application deployment and image selection based on compatibility in cloud.

Computer science↗

Seismoacoustic Signatures Observed During a Long-Term Deployment of Infrasound Sensors at the Nevada National Security Site

Earthquakes have repeatedly been shown to produce inaudible acoustic signals (<20 Hz), otherwise known as infrasound. These signals can propagate hundreds to thousands of kilometers and still be detected by ground-based infrasound arrays depending on the source strength, distance between source and receiver, and atmospheric conditions. Another type of signal arrival at infrasound arrays is the seismic induced motion of the sensor itself, or ground-motion-induced sensor noise. Measured acoustic and seismic waves produced by earthquakes can provide insight into properties of the earthquake such as magnitude, depth, and focal mechanism, as well as information about the local lithology and atmospheric conditions. Large earthquakes that produce strong acoustic signals detected at distances greater than 100 km are the most commonly studied; however, more recent studies have found that smaller magnitude earthquakes ($M$ w <2.0) can be detected at short ranges. In that vein, this study will investigate the ability for a long-term deployment of infrasound sensors (deployed as part of the Source Physics Experiments [SPE] from 2014 to 2020) to detect both seismic and infrasonic signals from earthquakes at local ranges (<50 km). Methods used include a combination of spectral analysis and automated array processing, supported by U.S. Geological Survey earthquake bulletins. Further, this investigation revealed no clear acoustic detections for short range earthquakes. However, secondary infrasound from an $M$ w 7.1 earthquake over 200 km away was detected. Important insights were also made regarding the performance of the SPE networks including detections of other acoustic sources such as bolides and rocket launches. Finally, evaluation of the infrasound arrays is performed to provide insight into optimal deployments for targeting earthquake infrasound.

58 GEOSCIENCES↗

Rapid and Temporary Deployment of Fiber-Optic Arrays to Measure Surface Chemical Explosion Series with Distributed Acoustic Sensing

Rapid and temporary distributed acoustic sensing (DAS) deployments are crucial for accurately capturing the seismic wavefield following major events, such as earthquakes, or in anticipation of known events of interest, such as chemical explosions. We provide an overview of two DAS campaigns conducted in May and October 2024 to record the seismoacoustic waves generated by two series of surface chemical explosions in New Mexico, United States, involving 1- and 10-ton trinitrotoluene-equivalent charges. In both campaigns, we deployed approximately 2 km of fiber-optic cables in a dry riverbed, about 12 km east of the explosion sites. For the October campaign, seven geophones and two anemometers were collocated with the fiber. We describe the field deployments and present preliminary results from the recorded signals. Specifically, we cross analyze the data recorded in May and October, validate the DAS data with geophone measurements, and highlight the benefits of burying fibers to reduce wind noise and improve signal-to-noise ratios. This study demonstrates the potential of DAS to record the seismoacoustic waves generated by surface chemical explosions of varying sizes at distances of approximately 10 km from the source.

58 GEOSCIENCES↗

EPICS Deployment at Fermilab

Fermilab has traditionally not been an EPICS house, as such expertise in EPICS is limited and scattered. However, PIP-II will be using EPICS for its control system. Furthermore, when PIP-II is operating, it must to interface with the existing, though modernized (see ACORN) legacy control system. We have developed and deployed a software pipeline that addresses these needs and presents to developers a tested and robust software framework, including template IOCs from which new developers can quickly gain experience. In this presentation, we will discuss the motivation for this work, the implementation of a continuous integration/continuous deployment pipeline, testing, template IOCs, and the deployment of user applications. We will also discuss how this is used with the current PIP-II teststand and lessons learned.

43 PARTICLE ACCELERATORS↗

Hydraulic Hybrid Parcel Delivery Truck Deployment, Testing & Demonstration

Although hydraulic hybrid systems have shown promise over the last few years, commercial deployment of these systems has primarily been limited to Class 8 refuse trucks. In 2005, the Hybrid Truck Users Forum initiated the Parcel Delivery Working Group including the largest parcel delivery fleets in North America. The goal of the working group was to evaluate and accelerate commercialization of hydraulic hybrid technology for parcel delivery vehicles. FedEx Ground, Purolator and United Parcel Service (UPS) took delivery of the world’s first commercially available hydraulic hybrid parcel delivery trucks in early 2012. The vehicle chassis includes a Parker Hannifin hydraulic hybrid drive system, integrated and assembled by Freightliner Custom Chassis Corp., with a body installed by Morgan Olson. With funding from the U.S. Department of Energy, CALSTART and its project partners assessed the performance, reliability, maintainability and fleet acceptance of three pre-production Class 6 hydraulic hybrid parcel delivery vehicles using information and data from in-use data collection and on-road testing. This document reports on the deployment of these vehicles operated by FedEx Ground, Purolator and UPS. The results presented provide a comprehensive overview of the performance of commercial hydraulic hybrid vehicles in parcel delivery applications. This project also informs fleets and manufacturers on the overall performance of hydraulic hybrid vehicles, provides insights on how the technology can be both improved and more effectively used. The key findings and recommendations of this project fall into four major categories: Performance, Fleet deployment, Maintenance, and Business case. Hydraulic hybrid technology is relatively new to the market, as commercial vehicles have been introduced only in the past few years in refuse and parcel delivery applications. Successful demonstration could pave the way for additional purchases of hydraulic hybrid vehicles throughout the trucking industry. By providing unbiased, third-party assessment of this “hybrid without batteries” technology, this report offers relevant, timely and valuable information to the industry.

33 ADVANCED PROPULSION SYSTEMS↗

GrayQb TM Single-Faced Version 2 (SF2) Hanford Plutonium Reclamation Facility (PRF) deployment report

The Savannah River National Laboratory (SRNL) in partnership with CH2M Plateau Remediation Company (CHPRC) deployed the GrayQb TM SF2 radiation imaging device at the Hanford Plutonium Reclamation Facility (PRF) to assist in the radiological characterization of the canyon. The deployment goal was to locate radiological contamination hot spots in the PRF canyon, where pencil tanks were removed and decontamination/debris removal operations are on-going, to support the CHPRC facility decontamination and decommissioning (D&D) effort. The PRF canyon D&D effort supports completion of the CHPRC Plutonium Finishing Plant Decommissioning Project. The GrayQb TM SF2 (Single Faced Version 2) is a non-destructive examination device developed by SRNL to generate radiation contour maps showing source locations and relative radiological levels present in the area under examination. The Hanford PRF GrayQbTM Deployment was sponsored by CH2M Plateau Remediation Company (CHPRC) through the DOE Richland Operations Office, Inter-Entity Work Order (IEWO), DOE-RL IEWO- M0SR900210.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Impacts of Federal Tax Credit Extensions on Renewable Deployment and Power Sector Emissions

Federal tax credits for renewable energy (RE) have served as one of the primary financial incentives for RE deployment over the last two decades in the United States. In December 2015, the wind power production tax credit and solar investment tax credits were extended for five years as part of the Consolidated Appropriations Act of 2016. This report explores the impact that these tax credit extensions might have on future RE capacity deployment and power sector carbon dioxide (CO2) emissions. The analysis examines the impacts of the tax credit extensions under two distinct natural gas price futures as natural gas prices have been key factors in influencing the economic competitiveness of new RE development. The analysis finds that, in both natural gas price futures, RE tax credit extensions can spur RE capacity investments at least through the early 2020s and can help lower emissions from the U.S. electricity system. More specifically, the RE tax credit extensions are estimated to drive a net peak increase of 48-53 GW in installed RE capacity in the early 2020s -- longer term impacts are less certain. In the longer term after the tax credits ramp down, greater RE capacity is driven by a combination of assumed RE cost declines, rising fossil fuel prices, and other clean energy policies such as the Clean Power Plan. The tax credit extension-driven acceleration in RE capacity development can reduce fossil fuel-based generation and lower electric sector CO2 emissions. Cumulative emissions reductions over a 15-year period (spanning 2016-2030) as a result of the tax credit extensions are estimated to range from 540 to 1420 million metric tonnes CO2. These findings suggest that tax credit extensions can have a measurable impact on future RE deployment and electric sector CO2 emissions under a range of natural gas price futures.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

How well could existing sensors detect the deployment of a solar radiation management (SRM) geoengineering effort?

While the stated reason for asking this question is “to understand better our ability to warn policy makers in the unlikely event of an unanticipated SRM geoengineering deployment or large-scale field experiment”, my colleagues and I felt that motives would be important context because the scale of any meaningful SRM deployment would be so large that covert deployment seems impossible. However, several motives emerged that suggest a less-than-global effort might be important.

47 OTHER INSTRUMENTATION↗

Installed Cost Benchmarks and Deployment Barriers for Residential Solar Photovoltaics with Energy Storage: Q1 2016

In this report, we fill a gap in the existing knowledge about PV-plus-storage system costs and value by providing detailed component- and system-level installed cost benchmarks for residential systems. We also examine other barriers to increased deployment of PV-plus-storage systems in the residential sector. The results are meant to help technology manufacturers, installers, and other stakeholders identify cost-reduction opportunities and inform decision makers about regulatory, policy, and market characteristics that impede solar plus storage deployment. In addition, our periodic cost benchmarks will document progress in cost reductions over time. To analyze costs for PV-plus-storage systems deployed in the first quarter of 2016, we adapt the National Renewable Energy Laboratory's component- and system-level cost-modeling methods for standalone PV. In general, we attempt to model best-in-class installation techniques and business operations from an installed-cost perspective. In addition to our original analysis, model development, and review of published literature, we derive inputs for our model and validate our draft results via interviews with industry and subject-matter experts. One challenge to analyzing the costs of PV-plus-storage systems is choosing an appropriate cost metric. Unlike standalone PV, energy storage lacks universally accepted cost metrics, such as dollars per watt of installed capacity and lifetime levelized cost of energy. We explain the difficulty of arriving at a standard approach for reporting storage costs and then provide the rationale for using the total installed costs of a standard PV-plus-storage system as our primary metric, rather than using a system-size-normalized metric.

14 SOLAR ENERGY↗

Level-2 Milestone 6007: Sierra Early Delivery System Deployed to Secret Restricted Network

This report documents the delivery and installation of Shark, a CORAL Sierra early delivery system deployed on the LLNL SRD network. Early ASC program users have run codes on the machine in support of application porting for the final Sierra system which will be deployed at LLNL in CY2018. In addition to the SRD resource, Shark, unclassified resources, Rzmanta and Ray, have been deployed on the LLNL Restricted Zone and Collaboration Zone networks in support of application readiness for the Sierra platform.

97 MATHEMATICS AND COMPUTING↗

White Paper on Dish Stirling Technology: Path Toward Commercial Deployment

Dish Stirling energy systems have been developed for distributed and large-scale utility deployment. This report summarizes the state of the technology in a joint project between Stirling Energy Systems, Sandia National Laboratories, and the Department of Energy in 2011. It then lays out a feasible path to large scale deployment, including development needs and anticipated cost reduction paths that will make a viable deployment product.

14 SOLAR ENERGY↗

Technologies to Reactors: Enabling Accelerated Deployment of Nuclear Energy Systems Workshop Report

Nuclear energy provides almost 20% of the electric power in the United States, producing power with high availability while accounting for 63% of our carbon-free energy production. While we have the capacity to expand this clean power source within the United States, we have not built any advanced reactor plant designs in our rapidly evolving electricity generation market, where cost is a major driver. With construction cost and plant safety being major elements of cost for new nuclear, advanced reactor technologies could provide lower cost, safer, carbon-free, grid-resilient energy sources for the US electricity grid. When the current fleet of nuclear reactors was originally designed, many of today’s science and technology (S&T) advances were not available. Today these advances show great promise for transforming our national approach to nuclear reactor design. Other industries are capitalizing on rapid innovations in materials, manufacturing, sensors and control systems, and high-fidelity modeling and simulation (M&S), along with data analytics to provide lower costs in manufacturing and extended ranges of operations. In the nuclear industry, these innovations can translate into similar benefits as well as rapid design and qualification of advanced nuclear fuels. Effectively implementing these types of innovations could position American expert leadership to compete more fully in the international nuclear energy market. In July of 2018, the US Department of Energy (DOE) Office of Nuclear Energy sponsored a workshop to address these possibilities: “Technologies to Reactors: Enabling Accelerated Deployment of Nuclear Energy Systems.” Workshop participants explored how modern and emerging S&T can be used to transform the approach to nuclear reactor design, licensing, and operation to accelerate deployment of advanced nuclear energy systems. More than 80 experts from federal agencies, academia, and industry participated in the workshop to develop consensus on priority technology directions (PTDs) and recommend technology and deployment initiatives to explore and demonstrate key benefits for the nuclear community.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Transactive Energy Systems Research, Development and Deployment Roadmap

The GWAC transactive energy roadmap outlines a vision and path forward to achieve deployment of transactive energy systems at scale as an operational element of the electric power system to facilitate the integration of distributed energy resources and dynamic end-uses such as connected buildings. It also considers the application of transactive energy systems for the coordination and control for end-uses, for example, in managing energy in buildings and campuses. The roadmap considers drivers of change, triggers for transactive energy system deployment, and required infrastructure for deployment at scale. Gaps in technology and infrastructure that may require investment are identified. The roadmap captures potential changes over time (Stages) and organizes them by business and technical Tracks. Within each Track it also groups potential changes into Swim Lanes that identify what it is that we hope to see, what it takes for this to occur, what we see as a result, and what these features do to add value.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Modeling Photovoltaics Innovation and Deployment Dynamics

PV’s historically rapid cost reduction is exceptional among technologies. Further cost reductions could play a major role in increasing deployment in the future. To enable such cost reductions, new modeling frameworks are needed to understand the determinants of innovation in PV. In this project, we study the mechanisms driving PV module and system cost reductions, delving deeply into the specific technological innovations that have occurred in the past and the policies that encouraged them, and also opportunities for future cost reduction and widespread deployment. The project contributes new fundamental insight on the determinants of technological innovation by developing novel methods and insights that are generalizable and can therefore be applied to other technologies. The results will allow policy makers, engineers, and other stakeholders to better prioritize their efforts and investments in the future. The project is organized around four journal articles as described below. The first article [1] identifies ‘low-level’ (e.g. conversion efficiency improvement) and ‘high- level’ (e.g. R&D efforts) mechanisms of cost reduction in PV systems (Tasks 1-4). This work builds on a previous DOE grant, where we developed a framework for technological innovation leading to PV module cost reduction [2]. We advance a method to disentangle the contributions of physical (‘hardware’) and non-physical (‘soft technology’) changes. Our results uncover reasons behind the relatively slow evolution of soft technology and can inform new innovation approaches to these technologies. The second article [3] identifies specific engineering or institutional innovations that enabled the low-level mechanisms of cost reduction in PV module and balance-of-systems (BOS) (Tasks 5, 9, 10). We identify 85 innovations and connect them to the cost variables they affected. By developing an innovations typology, this study shows the differences between the types of innovations affecting PV modules and BOS components. Finally, by analyzing the industry origins of innovations, this study also finds that PV was well-positioned within an ecosystem of continuously advancing technologies. The third article [4] studies prospective cost reduction opportunities (Task 10). We explore how design approaches that emphasize standardization and automation, such as plug-and-play PV systems, can create cost reduction opportunities by reducing interactions and speeding up activities with high process costs. We show that this can lead to cost reduction in cost components with the most untapped opportunity for improvement such as installation labor, overhead, electrical BOS, and customer acquisition. The fourth article [5] analyzes how various policies supporting PV deployment and R&D contributed to PV’s cost improvement by enabling high-level mechanisms, specific innovations, and ultimately low-level mechanisms of cost reduction (Tasks 8, 13, 14). We investigate examples from different countries and connect these policies to quantifiable cost change mechanisms. Our study sheds light on the roles that different nations played over time, through a diverse set of policy approaches.

14 SOLAR ENERGY↗

Storage Futures Study: The Four Phases of Storage Deployment: A Framework for the Expanding Role of Storage in the U.S. Power System

This report is one in a series of NREL’s Storage Futures Study (SFS) publications. The SFS is a multiyear research project that explores the role and impact of energy storage in the evolution and operation of the U.S. power sector. The SFS is designed to examine the potential impact of energy storage technology advancement on the deployment of utility-scale storage and the adoption of distributed storage, and the implications for future power system infrastructure investment and operations. The research findings and supporting data will be published as a series of publications. The table on the next page lists the planned publications and specific research topics they will examine under the SFS. This report, the first in the SFS series, explores the roles and opportunities for new, cost-competitive stationary energy storage with a conceptual framework based on four phases of current and potential future storage deployment, and presents a value proposition for energy storage that could result in substantial new cost-effective deployments. This conceptual framework provides a broader context for consideration of the later reports in the series, including the detailed results of the modeling and analysis of power system evolution scenarios and their operational implications

25 ENERGY STORAGE↗

FTS3: Data Movement Service in containers deployed in OKD [Slides]

The File Transfer Service (FTS3) is a data movement service developed at CERN which is used to distribute the majority of the Large Hadron Collider's data across the Worldwide LHC Computing Grid (WLCG) infrastructure. At Fermilab, we have deployed a couple of FTS3 instances for Intensity Frontier experiments (e.g. DUNE) to transfer data in America and Europe, using a container-based strategy. During this talk, we are going to present the two different configurations currently running at Fermilab, comparing and contrasting a Docker-based OKD deployment against a traditional RPM-based deployment and giving an overview of the possible issues encountered. In addition, we discuss our method of certificate management and maintenance utilizing Kubernetes cronjobs.

97 MATHEMATICS AND COMPUTING↗

Less-Than-Lethal Quick Deploy Inflatable Hall/Door Barrier: VISTA Feasibility Study

Physical protection of public buildings has long been a concern of police and security services where a balance of facility security and personnel safety is vital. Due to the nature of public spaces, the use of permanently installed and deploy-on-demand physical barrier systems must be safe for the legitimate occupants and visitors of that space. Such systems must seek to mitigate the personal and organizational consequences of unintentionally seriously injuring or killing an innocent bystander by slamming a heavy, rigid, and quick-deploying barrier into place. Consideration and implementation of less-than-lethal technologies is necessary to reduce risk to visitors and building personnel. One potential barrier solution is a fast-acting, high-strength, composite airbag barrier system for doorways and hallways to quickly deploy a less-than-lethal barrier at entry points as well as isolate intruders who have already gained access. This system is envisioned to be stored within an architecturally attractive selectively frangible shell that could be permanently installed at a facility or installed in remote or temporary locations as dictated by risk. The system would be designed to be activated remotely (hardwired or wireless) from a Central Alarm Station (CAS) or other secure location.

42 ENGINEERING↗

Best Practice for the Commercial Deployment of Carbon Dioxide Geologic Storage: Adaptive Management Approach

The Plains CO 2 Reduction (PCOR) Partnership is one of seven regional partnerships formed as part of the U.S. Department of Energy’s National Energy Technology Laboratory Regional Carbon Sequestration Partnerships (RCSP) Initiative. The RCSP Initiative is focused on the safe and long-term storage of CO 2 to support the commercial deployment of carbon capture and storage (CCS). To that end, the PCOR Partnership has spent over 10 years developing, testing, and validating the best methods and technologies to conduct the geologic storage of CO 2 (hereafter referred to as CO 2 storage). Through this effort, the PCOR Partnership has formalized an adaptive management approach (AMA) for the commercial development of CO 2 storage projects. The use of this approach, which draws upon the collective experience and lessons learned from the PCOR Partnership, represents best practice for advancing CO 2 storage projects toward commercial deployment. At the heart of the AMA are four technical elements necessary for any successful CO 2 storage project: 1) site characterization; 2) modeling and simulation; 3) risk assessment; and 4) monitoring, verification, and accounting (MVA). Each of these elements plays a key role in gathering and assessing site-specific data that provide a fundamental understanding of the storage complex and its performance. While each of the four technical elements can provide useful data independently, integrating them through the AMA yields a streamlined, fit-for-purpose strategy for the commercial deployment of CO 2 storage. Key to this integration and resulting best practice are feedback loops that allow the results of each element to serve as inputs to the others. Each iteration of the AMA creates an improved understanding of the storage complex and thus more targeted and efficient applications of the technical elements. For the purpose of establishing an adaptive management framework, hard lines have been drawn between the technical elements of the AMA. However, in practice, the rapid and seamless interaction between the elements can blur these lines. For example, to aid in the analysis and interpretation of site characterization data, a static geocellular model is often required. While this model development is part of the technical element, modeling and simulation, it is an integral part of the site characterization effort. Likewise, much of the monitoring data collected as part of the MVA technical element can be used to inform site characterization. This back-and-forth flow of data and use of models between the technical elements continues throughout the project.

54 ENVIRONMENTAL SCIENCES↗