Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “cost model”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 379 records · Page 21

The Opportunity in Commercial Approaches for Future NASA Deep Space Exploration Elements

This work joins two events, showing the potential for commercial, public private partnerships, modeled on programs like COTS, to reduce the cost to NASA significantly for other required deep space exploration capabilities. These other capabilities include landers, stages and more. We mature the concept of costed baseball cards, adding cost estimates to NASAs space systems baseball cards.

cost modeling estimation↗

Active heat exchange system development for latent heat thermal energy storage

Active heat exchange concepts for use with thermal energy storage systems in the temperature range of 250 C to 350 C, using the heat of fusion of molten salts for storing thermal energy are described. Salt mixtures that freeze and melt in appropriate ranges are identified and are evaluated for physico-chemical, economic, corrosive and safety characteristics. Eight active heat exchange concepts for heat transfer during solidification are conceived and conceptually designed for use with selected storage media. The concepts are analyzed for their scalability, maintenance, safety, technological development and costs. A model for estimating and scaling storage system costs is developed and is used for economic evaluation of salt mixtures and heat exchange concepts for a large scale application. The importance of comparing salts and heat exchange concepts on a total system cost basis, rather than the component cost basis alone, is pointed out. The heat exchange concepts were sized and compared for 6.5 MPa/281 C steam conditions and a 1000 MW(t) heat rate for six hours. A cost sensitivity analysis for other design conditions is also carried out.

Lefrois, R. T.↗

Cost estimating methods for advanced space systems

Parametric cost estimating methods for space systems in the conceptual design phase are developed. The approach is to identify variables that drive cost such as weight, quantity, development culture, design inheritance, and time. The relationship between weight and cost is examined in detail. A theoretical model of cost is developed and tested statistically against a historical data base of major research and development programs. It is concluded that the technique presented is sound, but that it must be refined in order to produce acceptable cost estimates.

Cyr, Kelley↗

Markov reliability models for digital flight control systems

The reliability of digital flight control systems can often be accurately predicted using Markov chain models. The cost of numerical solution depends on a model's size and stiffness. Acyclic Markov models, a useful special case, are particularly amenable to efficient numerical solution. Even in the general case, instantaneous coverage approximation allows the reduction of some cyclic models to more readily solvable acyclic models. After considering the solution of single-phase models, the discussion is extended to phased-mission models. Phased-mission reliability models are classified based on the state restoration behavior that occurs between mission phases. As an economical approach for the solution of such models, the mean failure rate solution method is introduced. A numerical example is used to show the influence of fault-model parameters and interphase behavior on system unreliability.

Mcgough, John↗

A prediction model to forecast the cost impact from a break in the production schedule

The losses which are experienced after a break or stoppage in sequence of a production cycle portends an extremely complex situation and involves numerous variables, some of uncertain quantity and quality. There are no discrete formulas to define the losses during a gap in production. The techniques which are employed are therefore related to a prediction or forecast of the losses that take place, based on the conditions which exist in the production environment. Such parameters as learning curve slope, number of predecessor units, and length of time the production sequence is halted are utilized in formulating a prediction model. The pertinent current publications related to this subject are few in number, but are reviewed to provide an understanding of the problem. Example problems are illustrated together with appropriate trend curves to show the approach. Solved problems are also given to show the application of the models to actual cases or production breaks in the real world.

Delionback, L. M.↗

Cost Breakeven Analysis of Lunar ISRU for Human Lunar Surface Architectures

The return of humans to the lunar surface encompasses a range of possible architectures from brief Apollo-like sorties to long-term sustainment of human presence. Any architecture in this span requires propellant for the crew’s ascent from the lunar surface, as well as consumables to support their presence on the Moon. Oxygen and hydrogen are candidates for the propellant for the ascent vehicle due to their high specific impulse and potential for production from lunar resources and also constitute important consumables for the crew. Thus, the production of oxygen and/or hydrogen from lunar resources could significantly reduce the mass that must be sent from Earth to enable future human lunar missions. To assess the merits of using lunar resources, the costs associated with developing, producing, launching, operating, and maintaining those systems must be considered relative to the costs of delivering the needed resources from Earth. The demand for those resources depends upon the nature of the lunar mission, while the costs of both Earth-derived and lunar-derived resources depend on the performance requirements and technology capabilities associated with each approach. Thus, determining which approach is more cost efficient requires modeling the performance and cost of the associated systems as well as the range of possible architectures over which such a determination might apply. This research proposes a model that parametrically captures the factors influencing the relevant costs of providing propellant and crew consumables on the lunar surface from Earth and from the Moon. Two ISRU system models are assessed relative to propellant delivery from Earth. In this model, lunar ISRU breaks even with propellant delivery from Earth at high propellant demands and mission durations with multi-year ISRU system lifetimes; however, the costs of developing the necessary technologies to support a highly reliable and autonomous lunar ISRU system were not included.

ISRU↗

Parallel Load Balancing for Adaptive Unstructured Meshes

Mesh adaption is a powerful tool for efficient unstructured-grid computations but causes load imbalance among processors on a parallel machine. We describe a novel method to dynamically balance the processor workloads with a global view. Mesh question, repartitioning, processor assignment, and remapping are critical components of the framework that must be accomplished rapidly and efficiently so as not to cause a significant overhead to the numerical simulation. A data redistribution model will also be presented that predicts the remapping cost. This model is required to determine whether the gain from a balanced workload distribution offsets the cost of data movement. Results presented will demonstrate that this is an effective dynamic load balancing strategy which remains viable on a large number of processors.

Biswas, Rupak↗

Integrating O/S models during conceptual design, part 1

The University of Dayton is pleased to submit this report to the National Aeronautics and Space Administration (NASA), Langley Research Center, which integrates a set of models for determining operational capabilities and support requirements during the conceptual design of proposed space systems. This research provides for the integration of the reliability and maintainability (R&M) model, both new and existing simulation models, and existing operations and support (O&S) costing equations in arriving at a complete analysis methodology. Details concerning the R&M model and the O&S costing model may be found in previous reports accomplished under this grant (NASA Research Grant NAG1-1327). In the process of developing this comprehensive analysis approach, significant enhancements were made to the R&M model, updates to the O&S costing model were accomplished, and a new simulation model developed. This is the 1st part of a 3 part technical report.

Ebeling, Charles E.↗

Low cost tracking Navaids error model verification

Features and characteristics of the tracking navaids (Microwave Scanning Beam Landing System, Radar Altimeter, Tacan, rendezvous radar and one way Doppler extracter) were investigated. From the investigation, a set of specifications were developed for building equipment to verify the error model of the tracking navaids. Breadboard verification equipment (BVE) was built for the Microwave Scanning Beam Landing System and the radar altimeter. The breadboard verification equipment generates signals to the tracking navaids which simulate the space shuttles trajectory in the terminal area. The BVE simulates sources of navaids error by generating pseudorandom perturbations on the navaids signals. Differences between the trajectory value and the navaid derived values are taped and form the basis for the navaids error model.

Charych, A.↗

Space station WP-04 power system preliminary analysis and design document, volume 3

Rocketdyne plans to generate a system level specification for the Space Station Electric Power System (EPS) in order to facilitate the usage, accountability, and tracking of overall system level requirements. The origins and status of the verification planning effort are traced and an overview of the Space Station program interactions are provided. The work package level interfaces between the EPS and the other Space Station work packages are outlined. A trade study was performed to determine the peaking split between PV and SD, and specifically to compare the inherent total peaking capability with proportionally shared peaking. In order to determine EPS cost drivers for the previous submittal of DRO2, the life cycle cost (LCC) model was run to identify the more significant costs and the factors contributing to them.

Source record↗

Cost estimating methods for advanced space systems

NASA is responsible for developing much of the nation's future space technology. Cost estimates for new programs are required early in the planning process so that decisions can be made accurately. Because of the long lead times required to develop space hardware, the cost estimates are frequently required 10 to 15 years before the program delivers hardware. The system design in conceptual phases of a program is usually only vaguely defined and the technology used is so often state-of-the-art or beyond. These factors combine to make cost estimating for conceptual programs very challenging. This paper describes an effort to develop parametric cost estimating methods for space systems in the conceptual design phase. The approach is to identify variables that drive cost such as weight, quantity, development culture, design inheritance and time. The nature of the relationships between the driver variables and cost will be discussed. In particular, the relationship between weight and cost will be examined in detail. A theoretical model of cost will be developed and tested statistically against a historical database of major research and development projects.

Cyr, Kelley↗

Utilizing Expert Knowledge in Estimating Future STS Costs

A method of estimating the costs of future space transportation systems (STSs) involves classical activity-based cost (ABC) modeling combined with systematic utilization of the knowledge and opinions of experts to extend the process-flow knowledge of existing systems to systems that involve new materials and/or new architectures. The expert knowledge is particularly helpful in filling gaps that arise in computational models of processes because of inconsistencies in historical cost data. Heretofore, the costs of planned STSs have been estimated following a "top-down" approach that tends to force the architectures of new systems to incorporate process flows like those of the space shuttles. In this ABC-based method, one makes assumptions about the processes, but otherwise follows a "bottoms up" approach that does not force the new system architecture to incorporate a space-shuttle-like process flow. Prototype software has been developed to implement this method. Through further development of software, it should be possible to extend the method beyond the space program to almost any setting in which there is a need to estimate the costs of a new system and to extend the applicable knowledge base in order to make the estimate.

Fortner, David B.↗

A Robust Schema for Storing and Managing Machine Learning Data and Models

- Machine Learning (ML) has enabled models that can improve efficiency and decrease computational cost - ML models are crucial in enabling Integrated Computational Materials Engineering (ICME) - Large data sets require robust means of storing ML data and models

Brandon L. Hearley↗

Estimating Software-Development Costs With Greater Accuracy

COCOMOST is a computer program for use in estimating software development costs. The goal in the development of COCOMOST was to increase estimation accuracy in three ways: (1) develop a set of sensitivity software tools that return not only estimates of costs but also the estimation error; (2) using the sensitivity software tools, precisely define the quantities of data needed to adequately tune cost estimation models; and (3) build a repository of software-cost-estimation information that NASA managers can retrieve to improve the estimates of costs of developing software for their project. COCOMOST implements a methodology, called '2cee', in which a unique combination of well-known pre-existing data-mining and software-development- effort-estimation techniques are used to increase the accuracy of estimates. COCOMOST utilizes multiple models to analyze historical data pertaining to software-development projects and performs an exhaustive data-mining search over the space of model parameters to improve the performances of effort-estimation models. Thus, it is possible to both calibrate and generate estimates at the same time. COCOMOST is written in the C language for execution in the UNIX operating system.

Baker, Dan↗

Satellite broadcasting system study

The study to develop a system model and computer program representative of broadcasting satellite systems employing community-type receiving terminals is reported. The program provides a user-oriented tool for evaluating performance/cost tradeoffs, synthesizing minimum cost systems for a given set of system requirements, and performing sensitivity analyses to identify critical parameters and technology. The performance/ costing philosophy and what is meant by a minimum cost system is shown graphically. Topics discussed include: main line control program, ground segment model, space segment model, cost models and launch vehicle selection. Several examples of minimum cost systems resulting from the computer program are presented. A listing of the computer program is also included.

Source record↗