Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “cost model”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 379 records · Page 21

Xenia Spacecraft Study Addendum: Spacecraft Cost Estimate

This slide presentation reviews the Xenia spacecraft cost estimates as an addendum for the Xenia Spacecraft study. The NASA/Air Force Cost model (NAFCPOM) was used to derive the cost estimates that are expressed in 2009 dollars.

Hill, Spencer↗

Economic Analysis of a Novel Thermal Energy Storage System Using Solid Particles for Grid Electricity Storage: Preprint

As renewable power generation becomes the mainstream new-built energy source, energy storage will become an indispensable need to complement the uncertainty of renewable resources to firm the power supply. When phasing out fossil-fuel power plants to meet the carbon neutral utility target in the midcentury around the world, large capacity of energy storage will be needed to provide reliable grid power. The integration of renewable power and storage to support future carbon-free utility has several significant and positive impacts including expanding the renewable generation into the grid, improving the peak-load response, and balancing the electricity supply and demand. Long-duration energy storage (10–100 hours duration) can potentially complement the reduction of fossil-fuel baseload generation that otherwise would risk grid security when a large portion of grid power comes from variable renewable sources. Current energy storage methods based on pumped storage hydropower or batteries have many limitations. Thermal energy storage (TES) has unique advantages in scale and siting flexibility to provide grid-scale storage capacity. A particle-based TES system has promising cost and performance for the future growing energy storage needs. This paper introduces the system and components required for the particle TES to be technically and economically competitive. A technoeconomic analysis based on preliminary component designs and performance shows that the particle TES integrated with an efficient air-Brayton combined cycle power system can provide power for several days by low-cost, high-performance storage cycles. It addresses grid storage needs by enabling large-scale grid integration of intermittent renewables like wind and solar, thereby increasing their grid value. The design specifications and cost estimations of major components in a commercial scale system are presented in this paper. The cost model provides insights for further development and cost comparison with competing technologies.

27 ARPA - Advanced Research Projects Agency-Energy↗

Data and Tools for Exploring New Pumped Storage Hydropower Deployment Opportunities

Pumped storage hydropower (PSH) is a flexible energy storage technology with the potential to facilitate variable renewable energy integration into the decarbonized electric grid of the future. NREL is developing new data and tools to help understand opportunities for new PSH deployment, including nationwide resource assessment data, a bottom-up component-level cost model, and a lifecycle greenhouse gas emissions calculator. These datasets lay the foundation for better-informed grid planning decisions about how PSH fits into a future portfolio of generation, transmission, and storage assets.

CEM↗

Economic competitiveness of pultruded fiber composites for wind turbine applications

Pultrusion manufacturing of fiber reinforced polymers has been shown to yield some of the highest mechanical properties for unidirectional composites, having a high degree of fiber alignment with consistent performance. Pultrusions offer a low-cost manufacturing approach for producing unidirectional composites with a constant cross-section and are used in many applications, including spar caps of wind turbine blades. However, as an intermediate processing step for wind blades, the additional cost of manufacturing pultrusions must be accompanied by sufficient increases in mechanical performance and system benefits. Wind turbine blades are manufactured using vacuum-assisted resin transfer molding with infused unidirectional fiberglass or carbon pultrusions for the spar cap. Infused fiberglass composites are among the most cost-effective structural materials available and replacing this material in the cost-driven wind industry has proven challenging, where infused fiberglass spar caps are still the predominant material system in use. To evaluate alternative material systems in a pultruded composite form, it is necessary to understand the costs for this additional manufacturing step which are shown to add 33%–55% on top of the material costs. A pultrusion cost model has been developed and used to quantify cost sensitivities to various processing parameters. The mechanical performance for pultruded composites is improved versus resin-infusion manufacturing with a 17% increase in design strength at a constant fiber volume fraction, but also enables higher achievable fiber volume fractions. The cost-specific mechanical performance is compared as a function of processing parameters for pultruded composites to identify the opportunities for alternative material and manufacturing approaches for wind turbine spar caps. Finally, four materials are compared in a representative wind turbine blade model to assess the performance of pultruded carbon fiber systems and pultruded fiberglass relative to infused fiberglass, where the pultruded systems produce lower weight blades with various cost distinctions.

42 ENGINEERING↗

Methods for Assessing Opportunities for Ring Dam Pumped Storage Hydropower

There is growing interest in new pumped storage hydropower (PSH) deployment to provide a range of grid flexibility, reliability, and resiliency services under an evolving and uncertain future power sector. The National Laboratory of the Rockies develops open PSH resource assessment and cost modeling tools to help evaluate PSH deployment opportunities, and this report describes expansions to those tools to consider an additional PSH system configuration - ring-dam reservoirs built on flat topographical features that are constructed from roller-compacted concrete material. This reservoir type is common among current PSH proposals and requires new methods to identify sites with this reservoir geometry throughout the United States and characterize the associated dam cost. Cost characterization for ring dam reservoirs required collecting historical dam cost data for earthen, rockfill, and roller-compacted concrete dams and regressing equations that relate costs between alternative materials. The ring dam site identification algorithm follows a 5-step procedure to identify circular geometry reservoirs. Once ring dam reservoirs are identified, they are then paired with potential dry-gully reservoirs, and the full set of potential paired reservoirs is cost-optimized to produce a least-cost set of potential PSH sites with no overlapping reservoirs. The resulting analysis found 1,663 ring-dam to dry-gully systems in the contiguous United States that are lower cost than any overlapping dry-gully to dry-gully systems, 29 in Alaska, and none in Hawaii or Puerto Rico. These systems constitute 1.5 TW of capacity in the contiguous United States and nearly 29 GW in Alaska, demonstrating that under suitable topography and head, ring-dam systems can provide cost-effective PSH opportunities. The greatest density of these opportunities are found in the intermountain west where there are mesas and flat land at bases of mountain ranges, but continued work could incorporate additional site characteristics or consider more complex reservoir shapes to find additional PSH deployment opportunities.

13 HYDRO ENERGY↗

The Potential for Helicopter Passenger Service in Major Urban Areas

An interurban helicopter cost model having the capability of selecting an efficient helicopter network for a given city in terms of service and total operating costs was developed. This model which is based upon the relationship between total and direct operating costs and the number of block hours of helicopter operation is compiled in terms of a computer program which simulates the operation of an intracity helicopter fleet over a given network. When applied to specific urban areas, the model produces results in terms of a break-even air passenger market penetration rate, which is the percent of the air travelers in each of those areas that must patronize the helicopter network to make it break even commercially. A total of twenty major metropolitan areas are analyzed and are ranked initially according to cost per seat mile and then according to break-even penetration rate.

Dajani, J. S.↗

Insights into Methodologies and Operational Details of Resource Adequacy Assessment: A Case Study with Application to a Broader Flexibility Framework

Assessing and maintaining resource adequacy (RA) is a core pillar of power systems. However, recent changes in the physical makeup of these systems and the conditions under which these systems must operate have yielded a renewed interest in the methods, metrics, and assumptions that underpin RA assessments. In this paper, we systematically explore a wide range of RA modeling dimensions, including: the objective function and level of operational detail in the underlying model formulation; the quantity (look-ahead) and quality (accuracy) of data that is available for making operational decisions within those models; and the physical configuration of solar photovoltaics (PV) with battery storage hybrid resources. We apply a set of probabilistic RA tools and production cost modeling tools to a realistic test system based loosely on a future Electric Reliability Council of Texas power system dominated by solar PV resources. Under the assumptions of our system and models, we find that multi-stage probabilistic assessments may provide a more robust evaluation of RA by capturing a wider range of operational and system interactions, but this comes at a computational cost of 1-2 orders of magnitude longer run time depending on the specific configuration. In addition, the information on thermal generator availability impacts RA performance by an order of magnitude more than solar resource forecasts, which is driven by the comparatively larger magnitude of thermal outages than solar forecast errors within our test system. Lastly, the flexibility provided by hybrid and other resources can help reduce system load-shedding event frequencies and enable the system to be more robust to inaccurate forecast information, and alternative hybrid inverter sizes can impact RA levels by 1-2 orders of magnitude. Our results point to the importance of a broader flexibility framework to describe the interaction between (1) flexibility "supply" from both physical resource capabilities and operational constraints considered in the modeling, and (2) flexibility "demand" from forecast errors, thermal generator outages, and other sources of uncertainty, as well as their RA impacts. Results are likely sensitive to the system buildout explored; future work could consider additional system configurations and conditions.

ENERGY PLANNING, POLICY, AND ECONOMY,POWER TRANSMI↗

Impact of Glen Canyon Generation Loss

Colorado River Basin hydropower generation has faced challenges due to droughts and ecological and social water requirements. Specifically, Glen Canyon hydropower generation fluctuates substantially with recent extreme weather trends. Further, the western grid evolves with higher wind and solar share, and Glen Canyon hydropower's contribution to grid flexibility services is essential. The Western Area Power Administration (WAPA) markets and schedules electricity production at GCD, and the loss of this power could have significant financial consequences for the WAPA Colorado River Storage Project's (CRSP) Office because it may need to purchase relatively large amounts of energy to serve its firm electrical obligations. In addition, GCD provides grid reliability services for the WAPA Colorado-Missouri (WACM) balancing authority (BA). Both WAPA and DOE's Water & Power Technology Office (WPTO) are interested in researching how these drier hydrological conditions will impact federal electrical energy production, the Western Electricity Coordinating Council (WECC) power grid, and the value of hydropower in the face of lower production. We study multiple hydrologic and power grid scenarios to understand the grid impacts of the loss of Glen Canyon generation. The study uses a production cost model, water resources planning models, water-centric grid models, and various data analytic techniques. The study progress presentation discusses the selection of probable CRSP' hydropower scenarios and power grid scenarios to understand the impacts of Glen Canyon generation, which includes technologies that compensate the Glen Canyon energy and ancillary services contributions, transmission availability, and energy local marginal prices at interested grid locations of WAPA operation.

droughts↗

Exploring the Grid Value of Offshore Wind Energy in Oregon

The significant offshore wind energy potential of Oregon faces several challenges, including a power grid which was not developed for the purpose of transmitting energy from the ocean. The grid impacts of the energy resource are considered through the lenses of (i) resource complementarity with Variable Renewable Energy resources; (ii) correlations with load profiles from the four balancing authorities with territory in Oregon; and (iii) spatial value to regional and coastal grids as represented through a production cost model of the Western Interconnection. The capacity implications of the interactions between offshore wind and the historical east-to-west power flows of the region are discussed. The existing system is shown to accommodate more than two gigawatts of offshore wind interconnections with minimal curtailment. Through three gigawatts of interconnection, transmission flows indicate a reduction of coastal and statewide energy imports as well as minimal statewide energy exports.

17 WIND ENERGY↗

Design, processing and testing of LSI arrays: Hybrid microelectronics task

Mathematical cost factors were generated for both hybrid microcircuit and printed wiring board packaging methods. A mathematical cost model was created for analysis of microcircuit fabrication costs. The costing factors were refined and reduced to formulae for computerization. Efficient methods were investigated for low cost packaging of LSI devices as a function of density and reliability. Technical problem areas such as wafer bumping, inner/outer leading bonding, testing on tape, and tape processing, were investigated.

Himmel, R. P.↗

Strawman Optical Reception Development Antenna (SORDA)

A strawman design of a ground-based station for receiving optical communications from deep space is presented. This strawman will serve as a basis for further study and design refinement. The recommendation to build rather than to use an existing facility is explained. Parameters of the design were selected to postulate a workable system, starting with a 10 m diameter, hexagonally segmented, f/0.5 primary mirror. The effects of variations of design parameters on performance and cost are discussed. Some design formulas are included. An electro-optical functional block diagram is presented and discussed. Cost calculations are based on a previous cost model for the hardware or on typical construction costs per unit area for several types of facilities. Other cost factors are included in the usual way for Construction of Facilities. The ratio of high and low reasonable values was less than a factor of 2, with a best estimate of under $16,000,000.

Kerr, E. L.↗

Methodology for evaluating modular assembly of large space platforms

This paper presents a methodology for analytically comparing approaches to modular assembly of large space platforms. the methodology combines a physical model of the modules, a life-cycle cost model, and a risk model to capture influential trade-offs.

in-space construction↗

ASCoT 3: Nonlinear Principal Components Analysis and Uncertainty Quantification in Early Concept Spacecraft Flight Software Cost Estimation

For mission planners and evaluators alike, value in cost models comes from a mean or median prediction, an understanding of the uncertainty on that prediction, and an understanding of model performance. Here we apply advanced statistical and machine learning methods to spacecraft flight software cost, effort, and SLOC estimation, and present the results in the latest version of the Analogy Software Cost Tool (ASCoT). We present in- and out-of-sample performance metrics for our models, each of which incorporate some amount of epistemic uncertainty. ASCoT, hosted on the One NASA Cost Engineering (ONCE) database via the Online NASA Space Estimation Tool (ONSET), was first showcased in 2016 as a number of analogy-based models and methods (kNN and Clustering) to support early project formulation. This ASCoT update improves upon the previous analogic methods by incorporating uncertainty in the data transformations. In particular, we use a Nonlinear Principal Components Analysis (NLPCA) to deal with ordinal data.

Robotic Spacecraft↗

Review of a Draft - Avoiding the Impossible: Re-focusing a Non-Feasible Mission 2-Hrs into a 3-Day Engineering Session

Concurrent engineering offers a great many benefits to engineers and mission designers throughout the world of aerospace. The only downside of concurrent engineering, and this is somewhat unavoidable, is that you don’t know the results of a design session until the end when it is completed. Usually, this is not a problem – you wouldn’t start building a spacecraft before the design is finished. However, within mass and cost constrained systems, you may end up with a final design that although technically sound – is not feasible due to mass or cost limits. Employing in-session mass and cost models with flexible inputs that refine their estimates and variance as more detailed information comes in throughout a design session allows major design changes to be made when the probability of breaching a mass or cost cap exceeds a threshold level. This enables mission designers to re-focus the study, and avoid spending 3-days with 15 engineers designing a non-feasible mission. By understanding key correlations and nested relationships within mass or cost, and specifically mass or cost allocations per mission element by mission type, it’s possible to get flexible-input, statistically based mass and cost estimates very early in the design process. Baseline models are seeded using mission characteristics and general parameters (outer planetary orbiter-probe mission, $500M cost cap for example) to provide a rough estimate of the expected mass or cost. As information gets solidified during the session, it gets added to the model and the estimates are updated. Continuing the orbiter-probe mission example, modeling probe heat shield cost as a percent of total probe cost, and probe cost as a percent of total flight system cost, and total flight system cost as a percent of total mission cost allows a design team to roll-up solidified information to estimate the probability of fitting within a mass or cost constraint early in a concurrent design session. When only the heat shield cost is known, the variance of the final estimate is higher, whereas when the full probe gets defined, naturally, the variance of the estimate decreases. A methodology, model, verification and demo implementation for cost limit breach are presented.

Hihn, Jairus M.↗

Operational Probabilistic Tools for Solar Uncertainty (OPTSUN) (Final Project Report for DOE Solar Forecasting II Project)

Increasing levels of solar PV can challenge system operations and may require novel methods to operate the power system reliably and efficiently. Power system operating plans generally use deterministic forecasts, in which the variable energy resources are represented by the expected value for each interval of the decision horizon. Probabilistic forecasts are relatively new but have the potential to address the shortfalls of deterministic forecasts. However, understanding how best to use such forecasts is still a key gap in industry and was the focus of this project. The project had three workstreams. In a forecasting workstream, improvements were made to baseline probabilistic forecasts using a number of new approaches such as machine learning methods and improved input data. In a design workstream, advanced simulation tools used these forecasts to investigate newly proposed reserve determination methods. Lastly, in a demonstration workstream a scheduling management platform (SMP) was developed to leverage probabilistic forecasts in a modular and customizable manner. In order to study the benefits that could be accrued, the project team collaborated with three utility partners (Duke Energy, Southern Company and Hawaiian Electric) to deliver improved probabilistic forecasts for each region and to model each region in case studies using advanced production cost modeling tools. Different methods to determine operating reserve requirements from probabilistic forecasts were developed, simulated, and tested across each region. The benefits of using these newly proposed methods varied by utility, but, in general, using probabilistic forecasts as well as historical data to set the reserve requirements seems to improve reliability related results, with less risk of reserve or supply shortfalls. The cost implications were not always straightforward; in some cases the new methods could show a reduction in expected operating costs, but often the increase in reserves associated with better risk mitigation using probabilistic forecasts could result in an increase in operating costs in the simulations. The SMP tool was developed to process probabilistic forecasts from their initial receipt through to scheduling decisions. This open-source tool consists of several modules for scenario development, reserve requirements calculation, and visualization. The SMP tool was demonstrated to a wide range of operators and stakeholders at all three utilities and further improved based on their feedback. The tool will be available on www.epri.com/optsun. The proposed probabilistic information-based reserve determination approaches have the potential to be implemented by different regions to ensure an economic and reliable power system operation on power systems integrating increasing levels of variable renewable resources. The innovative yet practical methods developed in this project demonstrated tangible benefits from using probabilistic forecasts beyond just study-based assessments to include three unique balancing areas. The demonstrated benefits across the multiple utility environments, are expected to provide system operators in all regions the confidence required and a platform to adopt the new forecasting and operating methods.

14 SOLAR ENERGY↗