Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “coordinated operation”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 379 records · Page 21

High Energy Physics Research at the Energy Frontier with the CMS Experiment

The physics analysis goals are to continue improving upon the search for the Higgs to dimuon decay using the CMS experiment at the LHC to further improve the Higgs coupling measurement with the additional data from LHC Run 3, and to explore searches for long-lived particles that reach the muon system of CMS using new Level-1 muon triggers the group is developing. An additional physics goal is to further develop the science case for a novel muonion collider. The experimental goals are to continue operational support of the CMS Endcap Muon Track Finder, a key component of the CMS Level-1 trigger system. The group also proposes to continue its leadership role in muon triggering for the HL-LHC upgrade through algorithm and electronics R&D. Finally, Acosta will continue as CMS Trigger Co-Coordinator responsible for the High Level Trigger system of CMS, lead the EMTF project, and serve as USCMS Trigger Operations Level-2 manager.

72 PHYSICS OF ELEMENTARY PARTICLES AND FIELDS↗

Hierarchical Distribution System Adaptive Restoration with Diverse Distributed Energy Resources

Distributed energy resources (DERs) can be utilized as alternative power sources for fast service recovery in cases of distribution system outages. However, the diverse characteristics and stochastic nature of DERs impose challenges on the optimal operation of di-verse resources during the restoration phase. Here, we introduce a hierarchical structure to coordinate distribution system entities and propose an adaptive restoration strategy to sustain a reliable power supply to outage loads in an unbalanced distribution system utilizing DERs. An efficient system reconfiguration model is developed to guarantee the radiality of restoration islands. The flexibility of DERs is evaluated by a novel method that focuses on the cumulative energy consumption, the superiority of which is also proven. Model predictive control (MPC) is adopted to enable the adjustment of system topology and DER operation strategies based on up-to-date data. The performance of the proposed restoration model is validated on a modified IEEE 123-bus test system. Moreover, the effectiveness of the proposed novel flexibility assessment and the MPC-based adaptive restoration strategy are verified through comparative studies.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Automated Signal Timing Plan Reconstruction Using High-Resolution Event-Based Controller Data for Digital Twins

Transportation digital twins are essential tools for evaluating emerging technologies such as connected and automated vehicles, adaptive traffic signal control, and mobility optimization strategies. Realistic digital twins require accurate emulation of real-world signal controllers and detailed signal timing plans. However, signal timing plans are often unavailable or difficult to access, forcing researchers and modelers to rely on assumed fixed timings or halt their analysis. To overcome this challenge, we present a method that directly estimates signal timing plan parameters using high-resolution, event-based data from traffic signal controllers. The proposed method extracts key parameters, including cycle length, offset, phase sequence, coordinated phases, phase-specific minimum and maximum green durations, vehicle extensions, and splits under coordination. A rule-based deterministic signal timing reconstruction algorithm based on traffic signal operation rules, such as those outlined in the Signal Timing Manual, is developed and validated. We evaluate this method, which uses high-resolution controller event logs and verified signal timing plans, on 94 signalized intersections in Nashville, Tennessee, demonstrating their ability to generate accurate, simulation-ready signal timing plans for tools such as SUMO and Vissim.

Saroj, Abhilasha [ORNL] (ORCID:0000000191178063)↗

Deep Reinforcement Learning for Microgrid Cost Optimization Considering Load Flexibility

This paper proposes a novel Soft-Actor-Critic (SAC) based Deep Reinforcement Learning (DRL) method for optimizing the cost of microgrid operation by leveraging load flexibility. The proposed SAC-DRL method is designed to coordinate the control of distributed energy resources (DERs) and flexible load, addressing practical energy billing formation by power distribution utilities. Key contributions include an innovative reward function to mitigate sparse reward challenges and a mixed control strategy for discrete and continuous variables, ensuring radial network topology and minimizing power loss. We evaluate the proposed method on the model of a real microgrid located in Southern California, U.S.. The SAC-DRL model is tested to demonstrate its efficacy in reducing grid dependence, optimizing resource use, and minimizing costs. The results highlight the potential of DRL in modern energy systems, offering a sustainable and economically efficient solution for energy management in microgrids.

deep reinforcement learning↗

Operation of Dual-T-Type Modular Multilevel Converter for Uninterrupted Power Supply Under Bridge Failures

Dual-T-type modular multilevel converter (DTMMC) is an alternative to the existing uninterrupted power supply (UPS) due to its advantage in flexible leg reusing, multiple power ports, and high operating efficiency. Here, in this article, a DTMMC-UPS, which has series configurations on both input/output ac sides, obtains high-voltage grid/load accessing interfaces is presented. In the described system, the fact that copies of T-type legs are employed makes semiconductor failure common to happen. Moreover, both the coupling between rectifier and inverter conversions and the confliction between intercell and inner-cell voltage balancing make fault-tolerant control a tough issue. In this article, the switch fault types are first clarified and diagnosed by the different impacts on normal operation. An improved voltage vector modulation is then deduced to facilitate the planning of proper primary switching patterns, to achieve rectifier side normal operation. The secondary alternated level-shifted pulsed-width modulation (LS-PWM) is also modified to achieve inverter side normal operation. The experiment results are supplied to verify the validity of the modulation-coordinated fault toleration strategy.

42 ENGINEERING↗

Collaborative Distribution System Restoration Planning and Real-Time Dispatch Considering Behind-the-Meter DERs

Modern distribution systems are becoming more resilient against power outages thanks to the flexible generation capacity provided by the increasing integration of distributed energy resources (DERs). Compared to utility-scale DERs, which can be directly controlled by system operators, small-scale, behind-the-meter DERs are much more difficult to coordinate despite being the vast majority. Two major obstacles to the implementation of DERs for service restoration are the coordination of behind-the-meter DERs and the management of uncertainty. In this paper, a novel distribution system restoration strategy is proposed to overcome these two obstacles. The flexibility of be-hind-the-meter DERs is quantified and integrated into the restoration planning models within a hierarchical structure. The model predictive control technique is employed to enable adaptive restoration planning solution adjustments to accommodate fault scenarios and forecast errors. Besides, real-time power dispatch models are proposed to maintain power balance using available DER capability. Comprehensive integration of adaptive restoration planning schemes and real-time dispatch results are achieved through a collaborative restoration framework. Finally, the effectiveness of the proposed restoration strategy is verified through a modified IEEE 123-bus system and a real-world utility system.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Online Optimization for Networked Distributed Energy Resources With Time-Coupling Constraints

This paper proposes a Lyapunov optimization-based online distributed (LOOD) algorithmic framework for active distribution networks (ADNs) with numerous photovoltaic inverters and inverter air conditionings (IACs). In the proposed scheme, ADNs can track an active power setpoint reference at the substation in response to transmission-level requests while concurrently minimizing the social utility loss and ensuring the security of voltages. Conventional distributed optimization methods are rarely feasible to track the optimal solutions in fast variable environments using a fine-grained sampling interval where the underlying optimization problem evolves with the iterations of the algorithms. In contrast, based on the framework of online convex optimization (OCO), the developed approach uses a distributed algebraic update to compute the next round decisions relying on the current feedback of measurements. Notably, the time-coupling constraints of IACs are decoupled for online implementation with Lyapunov optimization technique. An incentive scheme is tailored to coordinate the customer-owned assets in lieu of the direct control from network operators. Optimality and convergency are characterized analytically. Finally, we corroborate the proposed method on a modified version of 33-node test feeder. Benchmark tests show that the proposed method is computationally and economically efficient, and outperforming existing algorithms.

active distribution networks↗

Manatee County Clear Sky Assessment Process: Prioritizing Solar + Storage for Resilient Facilities & Communities

The Clear Sky Tampa Bay project was a 15-month collaborative research effort to support solar + storage deployment for community resilience in Florida. The Clear Sky Decision Support Toolkit is a collection of resources designed to support users in conducting solar + storage prioritization and feasibility screening assessments at critical facilities. The Tampa Bay Regional Planning Council worked with four local governments in the region to test and apply the Toolkit. This case study series describes how each partner government used the Toolkit and highlights key insights and lessons learned that other users could follow to replicate the process. Manatee County applied the Clear Sky Decision Support Toolkit to two of the county's critical facilities: Nolan Middle School, which serves as a special needs emergency shelter, and its Public Safety Complex (PSC), which houses critical services including emergency management, communications, and medical services, traffic control, and more. The PSC serves as the Emergency Operations Center during activation events. The Clear Sky assessment process improved interagency communication and coordination and informed siting decisions for a potential solar + storage system for the Manatee County PSC.

14 SOLAR ENERGY↗

Enabling Interconnected Science Workflows through an Adapter Approach

The INTERSECT Software framework project aims to create an open federated library that connects, coordinates, and controls systems in the scientific domain. It features the Adapter, a flexible and extensible interface inspired by the Adapter design pattern in object-oriented programming. By utilizing Adapters, the INTERSECT SDK enables effective communication and coordination within a diverse ecosystem of systems. This adaptability facilitates the execution of complex operations within the framework, promoting collaboration and efficient workflow management in scientific research. Additionally, the generalizability of Adapters and their patterns enhances their utility in other scientific software projects and challenges.

McGaha, Jesse↗

Selective Bidentate Coordination Reconstructs Residual PbI 2 to Homogenize Interfacial Energetics in Perovskite Solar Cells

Spatially heterogeneous interfacial energetics, often originating from residual lead iodide (PbI 2 ), represent a fundamental bottleneck to both the efficiency and operational stability of perovskite photovoltaics. Conventional PbI 2 passivation strategies based on monodentate ligands or highly polar solvents either interact weakly with PbI 2 or undesirably perturb the underlying three-dimensional perovskite lattice. Here, we report a diammonium bidentate strategy that selectively reconstructs residual PbI 2 into corner-sharing PbI 6 octahedra while preserving the bulk perovskite. Enabled by dual-site coordination, a newly designed thiophene-based bidentate ligand (MeXT) stabilizes PbI 6 units during passivation and establishes spatially homogeneous interfacial energetics. Perovskite solar cells incorporating MeXT achieve 26.19% power conversion efficiency and retain over 80% of their initial efficiency after 1000 h of continuous 1-sun illumination at 75 °C. This dual-anchor coordination passivation strategy establishes a general design principle for selectively treating residual PbI 2 and creating electronically coherent and operationally stable interfaces in perovskite photovoltaics.

ligands↗

TrustDER: Trusted, Private and Scalable Coordination of Distributed Energy Resources

In this project, the Stanford and SLAC Teams have developed a Trusted, Private and Scalable platform for coordinating Coordination of Distributed Energy Resources (TrustDER). This is a layered system that ensures private, trusted and scalable coordination and monitoring of DERs. It accommodates a variety of resources, such as solar generation, gensets and loads, with a particular focus on battery systems-based resources, as they are a transformational technology experiencing fast growth in adoption by large critical facilities. The platform can be used as standalone or added to existing aggregation systems to enable trust, privacy and resilience. TrustDER consists of layers that address each of the shortcomings of the existing state of the art. Each layer in the platform can operate independently but provides information to the layers above it to enable a novel form of overall coordination architecture. The project consists of several tasks, with each task dedicated to the design of each layer. Task 2 Resource Virtualization defined a software abstraction layer for distributed energy resources (DERs). The goal of this abstraction was to simplify the implementation of algorithms utilizing cooperation of DERs resources in a variety of use cases. Task 3 is on Secure ID for Asset Authentication. Identity Management Systems (IDMS) are a foundational infrastructure for interactions between entities (organizations, users, devices, and services). Secure ID is blockchain-based a distributed identity management system allowing (1) identity provisioning, (2) authentication, (3) authorization, and (4) identity data sharing for IoT-enabled assets on the electricity grid. In this project, the SLAC team focused on designing and testing Keymaker, a protocol for authenticating device identity managed by Secure ID. Task 5 Private and Safe Integration is focused on the design and evaluation of a DER cooperation scheme which allows for the aggregation of DERs without impacting network reliability. The approach is designed based on realistic assumptions regarding data availability, communication infrastructure limitations, and privacy. Task 6 Scalable Distributed Privacy for Information explored how virtualized batteries could be managed privately. Specifically, it examined the case in which a principal provides a partitioned battery to multiple clients. Task 7 Use Cases was to ensure that this technology was applied in relevant situations and scenarios. Primarily, this means that virtualization needed to be employed in a manner that either improved flexibility, bolstered security or privacy, or decreased costs.

25 ENERGY STORAGE↗

Faster-than-real-time Simulation with Demonstration for Resilient DER Integration

The US electric grid is facing operational, stability, and security challenges. Transmission system operators need some measure of visibility into distribution system renewable generation. Distribution system generation needs to support transmission system voltage. The grid is experiencing an expansion in measurement systems. How to take full advantage of this expansion and defend against attacks, both cyber and physical, poses additional challenges. The Faster-than-real-time Simulation with demonstration for Resilient DER Integration project set out to do the following: a. Flatten the voltage profile through the feeders and system for cost saving and voltage stabilization needs. b. Increase the amount of intermittent distributed energy resources (IDERs) that could be deployed on a utility feeder and provide 100% or more energy needed for the demands on that feeder, and c. based on an accurate model (Digital Twin) of the utilities system, be able to detect any abnormalities on the utilities distribution system. To manage the voltage and increase IDER penetration (a,b), Graph Trace Analysis is employed in a time-series, optimal power flow to coordinate the time-varying feedback control setpoints of a distribution feeder’s utility control devices. Under the coordinated control are a Load Tap Changing Transformer, a voltage regulator, and five switched capacitor banks. The feeder serves over 2000 customers, the feeder secondaries are modeled, and the feeder has 2.3 MW of PV generation, corresponding to a 17.4% penetration of PV generation. The feeder model has over 12,000 components, where every customer load bus and PV generator are modeled. The accuracy of the power flow solution is compared against historical meter voltage measurements, the improvement in conservation voltage reduction energy savings as a function of the coordinated control desired voltage profile is investigated, and the increase in PV penetration of the coordinated control over the existing control is presented. To achieve improved control performance while observing system operation constraints, bellwether Advanced Metering Infrastructure (AMI) voltage measurements are used to adjust the desired voltage profile used by the optimal power flow analysis. To detect and alleviate or negate attacks or failures on the distribution and transmission utility grids (c) the grid needs to be resilient and self-healing. In this project software was designed to do just that. At the center of the software is an Integrated System Model (ISM) that spans from transmission to secondary distribution. The ISM is employed in real-time abnormality detection, voltage stability forecasting, and multi-mode control. Testing results are presented for: 1—attacks on utility infrastructure; 2—energy savings from optimal control; 3—distribution system control response during a low voltage transmission system event; 4—cyber-attacks on PV inverters, where physical inverters are used in hard-ware-in-the-simulation-loop studies. Contributions of this work include real-time analysis that spans from three-phase transmission through secondary distribution; an approach for detecting abnormalities that employs measurements from three independent measurement systems; and a multi-mode distribution system control that responds to cyber-attacks, physical attacks, equipment failures, and transmission system needs.

Integrated System Model, Graph Trace Analysis, Adv↗

Layered Coordination Architecture for Resilient Restoration of Power Distribution Systems

The current practices for restoring critical services in the distribution system during a disaster, align with the traditional centralized ideology of distribution systems operations. A central processor evaluates the distribution system after a disruption and attains a restoration plan. However, the centralized operational paradigm is susceptible to single-point failures, requires full situational awareness of the distribution system, and poses scalability challenges for large multifeeder distribution systems. This motivates a distributed decision-making paradigm where multiple agents solve smaller subproblems and jointly coordinate their individual decisions to achieve the global/network-level objective. Toward this goal, we propose a layered architecture for distributed algorithms for resilience and a two-stage distributed algorithm for distribution system restoration. The proposed distributed decision-making framework enables the bottom-up restoration of the distribution system using all available resources, including distributed generation, while only requiring local awareness and limited communications with neighboring connected regions. The proposed framework is robust to single-point failures, enables autonomy using distributed algorithms, and had reduced computational cost compared to centralized optimization solutions.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Model-Free Dynamic Voltage Control of a Synchronous Generator-Based Microgrid

The main goal of this paper is to present a new dynamic voltage stability mechanism, based on model-free control (MFC), for effective control and coordination of synchronous generator (SG)-based reactive power resources in a microgrid setting. MFC has shown successful operation in various domains, and this paper presents its first use in the voltage stability of a power system. It is utilized as an online controller to achieve the dynamic voltage stability of a microgrid system under different disturbances and fault conditions. A 21-bus microgrid system fed by SG-based distributed energy resources (DERs) is considered as a use case study. The overall dynamic voltage stability of the microgrid system is investigated using time-domain dynamic simulations during emergency, hazard, and disaster events. Simulation results show that there are significant improvements and enhancements on the dynamic load bus voltage profiles of the microgrid system by the effective model-free control and coordination of the reactive power reserves of the SG-based DERs.

Hatipoglu, Kenan↗

Magnetic moments of A = 3 nuclei obtained from chiral effective field theory operators

Chiral effective field theory (χEFT) provides a framework for obtaining internucleon interactions in a systematically improvable fashion from first principles, while also providing for the derivation of consistent electroweak current operators. In this study, we apply consistently derived interactions and currents towards calculating the magnetic dipole moments of the A = 3 systems 3 H and 3 He. We focus here on LENPIC interactions obtained using semilocal coordinate-space (SCS) regularization. Starting from the momentum-space representation of the LENPIC χEFT vector current, we derive the SCS-regularized magnetic dipole operator up through next-to-next-to-leading order (N 2 LO). We then carry out no-core shell-model calculations for 3 H and 3 He systems using the SCS LENPIC interaction at N 2 LO in χEFT and evaluate the magnetic dipole moments obtained using the consistently derived one-nucleon and two-nucleon electromagnetic currents. As anticipated by prior results with χEFT currents, the current corrections through N 2 LO provide improved, but not yet complete, agreement with experiment for the 3 H and 3 He magnetic dipole moments.

73 NUCLEAR PHYSICS AND RADIATION PHYSICS↗

Investigating Mercury’s Environment with the Two-Spacecraft BepiColombo Mission

The ESA-JAXA BepiColombo mission will provide simultaneous measurements from two spacecraft, offering an unprecedented opportunity to investigate magnetospheric and exospheric dynamics at Mercury as well as their interactions with the solar wind, radiation, and interplanetary dust. Many scientific instruments onboard the two spacecraft will be completely, or partially devoted to study the near-space environment of Mercury as well as the complex processes that govern it. Many issues remain unsolved even after the MESSENGER mission that ended in 2015. The specific orbits of the two spacecraft, MPO and Mio, and the comprehensive scientific payload allow a wider range of scientific questions to be addressed than those that could be achieved by the individual instruments acting alone, or by previous missions. These joint observations are of key importance because many phenomena in Mercury’s environment are highly temporally and spatially variable. Finally, examples of possible coordinated observations are described in this article, analysing the required geometrical conditions, pointing, resolutions and operation timing of different BepiColombo instruments sensors.

79 ASTRONOMY AND ASTROPHYSICS↗

AQDrop Quantum Service (AQDrop) v1.0

AQDrop is a job management system designed to streamline access to the Advanced Quantum Testbed (AQT) at NERSC (National Energy Research Scientific Computing Center). It serves as a centralized middleware layer between researchers and quantum processing hardware. Key Features: AQDrop provides a FastAPI-based server backed by PostgreSQL for job submission, queue management, and role-based access control (members, operators, and administrators). Users submit Qiskit circuits via JSON payloads, which are queued, dispatched to the QPU through the Qubic API, and returned as measurement counts. A Python client library and web dashboard round out the interface options. Primary Use: Researchers submit quantum circuit jobs from a laptop or login node; an operator client executes those jobs on the AQT's physical QPU and returns results — all coordinated through the central API. Advantages: Compared to ad-hoc or direct hardware access, AQDrop adds structured queue management, auditable job-status tracking and OAuth2 authentication — reducing scheduling conflicts and unauthorized access. Its containerized deployment also improves reproducibility and scalability. Overall, AQDrop functions as a purpose-built quantum job broker tailored to NERSC's specific hardware and institutional access requirements.

Caplinger, Evan [Lawrence Berkeley National Labora↗

Regional Oscillation Source Localization: Implementation in the ESAMS Tool

In recent years, utilities have made great strides in the use of high-speed wide-area measurements collected from within their footprints. However, it is increasingly clear that analyses at wider scales are needed. On January 11, 2019 an oscillation with significant amplitude observable across the Eastern Interconnection persisted for approximately 18 minutes. The generator responsible for the oscillation was only identified after it tripped itself offline. This event, along with several other similar events, demonstrated the need for increased coordination among utilities to effectively mitigate system-wide oscillations and avoid unnecessary or detrimental operator actions. In response to this need, the Eastern Interconnection Situational Awareness Monitoring System (ESAMS) was upgraded to allow the region where an oscillation is originating to be identified. This report documents the algorithms developed for this task and describes how they were integrated into the ESAMS tool. Results from simulation- and measurement-based tests demonstrate the reliability of the approaches.

24 POWER TRANSMISSION AND DISTRIBUTION↗