Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “contractors”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 379 records · Page 21

Expedited Walkdowns and Preparation of Cost Estimates for Decontamination and Demolition of Excess Facilities - 20335

Lawrence Livermore National Security, LLC (LLNS) is the prime contractor responsible for managing and operating Lawrence Livermore National Laboratory (LLNL). The mission of the LLNL is to strengthen security of the United States through development and application of world-class science and technology to enhance the nation's defense, reduce the global threat from terrorism and weapons of mass destruction, and respond with vision, quality, integrity, and technical excellence to scientific issues of national importance. To accomplish its mission, LLNL must plan and manage its campus space and facilities to optimize use of its relatively small one-square-mile footprint. LLNL currently has numerous excess facilities that require decontamination and demolition (D and D). The LLNL Legacy Facility Program is responsible for stewardship and risk reduction programs to effectively manage these excess assets at LLNL. The Legacy Facility Program identified 10 excess facilities at LLNL that were candidates for demolition based on risks from further degradation of the facilities, potential exposure to hazardous materials, or need for removal to make way for new program facilities. The buildings range from a structure built in 1943 to serve as a US Navy drill hall during World War II, to a facility that provided neutrons to study material properties for the fusion energy program. The National Nuclear Security Administration (NNSA) appropriated FY19 funding for the development of Class 3 estimates for these 10 excess facilities that would be used to develop a Program Management Plan for funding consideration. Class 3 estimates are not conceptual, nor overly detailed, but adequate to be used for budget and appropriation purposes. Using existing strategic sourcing agreements, LLNL was able to organize a team of senior subject matter experts (SMEs) with diverse technical backgrounds across the Department of Energy (DOE) Complex to complete extensive process knowledge (PK) reviews and walk-downs of each excess facility and to deliver accurate and complete estimates under an expedited schedule (i.e., within eight weeks). To facilitate the expedited schedule, LLNL was fully prepared for the arrival of the JGMS team, which consisted of the following companies: J.G. Management Systems, Inc. (JGMS); Strata-G, LLC; and Michael Baker International. LLNL provided background and PK information on the excess facilities, pictures, supporting historical documentation, and radiological survey history as well as escorted access to the facilities. The JGMS team has previous experience supporting Program Management Plans for excess facilities at the Y-12 National Security Complex. The team mobilized to LLNL and performed the facility walk-downs from January 22-25, 2019. Using a methodical evaluation process, expertise, and experience, the team was able to deliver walk-down draft reports and estimates to LLNL before their February 8, 2019 deadline. LLNL then in turn reviewed, completed the estimates by adding waste management costs and other LLNL costs, and delivered the estimates to NNSA by February 15, 2019. The completed final reports, including draft D and D estimates, were delivered to LLNL before their March 6, 2019 deadline. The work was successfully completed ahead of the expedited schedule required by LLNL, resulting in a commendation from the client. This paper describes how the partnership and collaboration as a fully integrated team comprised of the prime contractor, LLNS, and the JGMS team successfully met the needs of the US government, resulting in the performance of expedited site walk-downs, the development of summary evaluation reports, and the preparation of draft Class 3 estimates and preliminary schedules for the D and D of 10 excess facilities at LLNL. The efforts of the team will enable the D and D of the first excess facility in the 2020-2021 time frame. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

A Perspective on the Successes of the NNSS Underground Test Area (UGTA) Activity - 20221

Between 1951 and 1992, 828 underground nuclear tests were performed at the Nevada National Security Site (NNSS). Underground testing was done in five major testing areas, which included (1) Frenchman Flat, (2) Rainier Mesa/Shoshone Mountain, (3) Yucca Flat/Climax Mine (4) Central Pahute Mesa, and (5) Western Pahute Mesa. About one third of the underground tests were detonated near, at or below the water table, and thus radioactive contamination was introduced to the groundwater system. The U.S. Department of Energy's Underground Test Area (UGTA) Activity was established in the late 1990's to address the fate and movement of residual radioactivity in groundwater, and characterize the risk that it may pose to NNSS workers and the offsite public. It has accomplished this goal through a process of iterative groundwater sampling and numerical groundwater flow and transport modeling, and long-term monitoring. The UGTA Activity draws on the expertise of scientists in the fields of geology, hydrology, radiochemistry, and risk assessment from the U.S. DOE staff, the lead contractor (currently Navarro) and many other organizations, in cooperation with the governing regulatory body, the State of Nevada's Division of Environmental Protection (NDEP). Los Alamos National Laboratory (LANL) is one of the participating research organizations involved with the UGTA Activity. Under the direction of DOE and the lead contractor, LANL's role in UGTA has evolved over time from an initial focus on geologic characterization, to conducting field and laboratory experiments, and finally to its current role of providing modeling and geochemistry expertise to characterize the rates and directions of groundwater and radionuclide movement. In its current role, LANL has either developed or provided the numerical tools for developing flow and transport models in each of the four major testing areas. In addition, LANL has provided an independent assessment of future groundwater flow and transport behavior through the analysis of naturally-occurring geochemical and isotopic tracers in groundwater. The five major testing areas are now in different stages of investigation or closure: (1) Frenchman Flat is in its fifth year of post closure modeling; (2) The Rainier Mesa/Shoshone Mountain Closure Report has been submitted to NDEP and is awaiting approval; (3) The Yucca Flat/Climax Mine Closure Report is under development; and (4) Central and (5) Western Pahute Mesa is still undergoing investigation and flow and transport model development. The success of the UGTA Activity in reaching or approaching closure in three of the five major testing areas is primarily due to the DoE's focus on regulatory closure requirements, but also is in part attributable to a rigorous internal review process and the involvement of NDEP and Nye County water professionals as participants and observers in the reviews. County and state involvement in the internal review process has promoted trust that the U.S. DOE is deeply committed to ensuring the present and future safely of NNSS workers and the surrounding communities. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Infrastructure and DFLAW Support at Hanford - 20443

Manhattan Project era infrastructure systems are degrading at an accelerated pace across the Department of Energy's (DOE) Environmental Management complex. Revitalizing, rejuvenating and right-sizing these systems to ensure reliability for ongoing cleanup missions is a major focus at the 580-square- mile Hanford Site in southeast Washington State. The push to complete construction, commissioning, startup, and operation of facilities and systems in the Direct-Feed Low-Activity Waste (DFLAW) program at Hanford by 2023 requires considerable coordination among site contractors and a significant investment in infrastructure. The passage of time also poses a challenge. It has been about 75 years since facilities were first operated at the site, and approximately 40 years of plutonium production created a legacy of unidentified active and abandoned underground obstacles and waste sites that must be avoided when building and upgrading the infrastructure. Converting infrastructure systems originally built to support plutonium production from the 1940's to the 1980's and upgrading those systems to optimize technology is an ever-changing balance of funding profiles, available resources and execution strategies. The DOE Richland Operations Office (RL) has long recognized the need for increased investment in Hanford Site infrastructure to support the future processing of approximately 56 million gallons of waste currently stored in large underground tanks. When DFLAW is fully operational, safe and reliable infrastructure systems will be needed to ensure continuity of operations around the clock, 365 days a year. These include roadways, water, power, sewer, information technology systems and facilities. To ensure the readiness of Hanford's infrastructure to support treating tank waste in the next three years, 15 projects were identified with a combined value of $133.8 million. Through calendar year 2019, 7 infrastructure projects have been substantially completed and the remaining 8 projects, with a remaining value of $103.8 million, are scheduled to be completed by December 2023. RL and its site services/infrastructure contractor, Mission Support Alliance (MSA), regularly evaluate the needs of the DFLAW program and other Hanford Site missions to ensure the highest priority systems are addressed. In addition to a fast-approaching deadline for round-the-clock treatment operations, RL and MSA face another significant infrastructure challenge. As cleanup is being completed in a 220-square-mile area called the River Corridor, most of the cleanup operations going forward will occur in a 20-square-mile area in the center of the Hanford Site, known as the Central Plateau. Infrastructure systems are becoming more congested in an already overcrowded area. This paper/presentation will outline some of the challenges Hanford faces while executing infrastructure reliability projects. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

On the Road to Achieving Safety Excellence at the Idaho Cleanup Project: The Initial Challenges, Solutions, and Positive Results of Striving to be the Best and Safest in the DOE Complex - 20518

When Fluor Idaho, LLC (Fluor Idaho) assumed the Idaho Cleanup Project Core contract (ICP Core) in mid-2016, it inherited the successful multi-faceted, employee-owned safety programs of two prior contractors supporting cleanup operations at the Idaho National Laboratory Site. Fluor Idaho incorporated the best of both safety programs along with Fluor Corporate's 106-year legacy of safety initiatives and successes. Fluor Idaho integrated the separate programs and cultures under a One Fluor approach - one project, one mission, One Fluor. Job changes, management changes, and procedures, processes, and system changes presented multiple challenges. Those challenges combined with the severe Winter of 2016/2017 resulted in numerous slips, trips, and falls first aids and reportable injuries. The road to safety excellence started off bumpy and stayed that way for some time. Since then, Fluor Idaho has successfully implemented several key initiatives including employee engagement; management engagement and time in the field; communications improvements; safety culture sustainment; injury/illness prevention; organizational learning; and DOE Voluntary Protection Program (VPP) readiness and preparation. Management became more engaged by making more workplace visits and increasing their supervision of 'life critical work' or complex activities. Additional training became mandatory for first-line supervisors and front-line workers. Most recently, Fluor Idaho increased its injury and illness prevention initiatives extensively. In the last year, things have turned around in a dramatic way. This shift is directly attributable to the significant number of initiatives launched in late 2017 and 2018. These initiatives addressed safety performance in the five key areas of the DOE VPP and promoted sustainability of the company's safety culture. The five key areas are: management leadership, employee involvement, work-site analysis, hazard prevention and control, and safety and health training. Employees and managers alike recommitted to making safety the highest value. The result of this laser-like focus on safety and accident and injury prevention is that injuries and first aids are a fraction of what they were. During FY 2019, employees worked more than 4.2 million hours without a serious injury or lost work-day and 1 million hours without a recordable injury. Fluor Idaho is proud of its safety trend. The company invested significant resources in improving its safety record, and that investment is paying off. Other contractors in the DOE Complex can learn and benefit from this discussion of the challenges Fluor Idaho faced, as well as its innovative safety initiatives that are producing results that are being recognized by our U.S. Department of Energy (DOE) customer. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Key Design Trades for a Near-term Lunar Fission Surface Power System

NASA and DOE have been developing concepts for lunar and Mars Fission Surface Power (FSP) systems for decades and have considered many different technologies and system variations. In 2023, three contractor teams completed Phase 1 conceptual design studies on a 40 kWe lunar FSP system in response to a modest set of NASA requirements and goals. A government team consisting of NASA Glenn Research Center (GRC), Los Alamos National Laboratory (LANL), and Idaho National Laboratory (INL) was formed to develop an independent design approach that adhered to the same requirements and goals posed to the contractor teams. GRC provided expertise, analysis, and design decisions for the power conversion, heat rejection, power management & distribution (PMAD), and mission integration. LANL and INL provided expertise, analysis, and design decisions for the reactor and shielding. The goal of the government study was to develop representative concepts that could be used in NASA architecture studies, guide government technology investments, and inform Phase 2 requirements definition. This paper provides a summary of the key technology options, system-level trades, and mission-level concept-of-operations.

99 - GENERAL AND MISCELLANEOUS↗

Resources for Homeowners: Home Efficiency Upgrades

A fact sheet to support small business building contractors in communicating with homeowners about potential benefits of home efficiency strategies and suggestions for navigating home upgrades. This work was developed under the Building Business Network (B-Biz) program, which aims to improve adoption of high-performance building technology solutions by collaborating with organizations that support small business contractors that provide and service high-performance building technologies.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Enhancing the ATR Primary Coolant System: A 3D Modeling Approach

The project consisted in system inspections to the ATR Primary Coolant System involving welds, fittings, motors, pumps, flanges, and heat exchangers to enhance Inservice Inspection program as required by DOE orders. NOTE: This article is to be published as "DOE & DOE Contractors Only" in the OPEXShare application, which means it will be available for viewing to DOE & DOE Contractor registered users only. This article can also be used by CAES for their training and safety meetings.

42 - ENGINEERING↗

SPC-70734 Rev 1 MARVEL Primary Coolant System (PCS) Fill and Eutectic NaK Procurement

This specification contains the requirements for the filling the Microreactor Applications Research Validation and Evaluation (MARVEL) reactor Primary Coolant System (PCS) with eutectic sodium-potassium (NaK). The subcontractor will design and fabricate a NaK filling system (referred to herein as the PCS Fill System), the requisite volume of high purity NaK, and perform filling operations in conjunction with the Contractor Operations. The MARVEL reactor system will be operated by the Contractor, and the PCS fill system will be operated by Subcontractor personnel.

21 - SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLAN↗

SPC-70692 Rev 0 MARVEL B4C Powder Specification

A. Idaho National Laboratory (INL) is developing a microreactor to produce electrical power utilizing a small nuclear core and Stirling engines under the Microreactor Application Research Validation and Evaluation (MARVEL) program. This procurement specification defines the requirements for procurement of the B4C Powder. B. Any conflict between this specification and referenced Codes and Standards, or any supplementary specifications in the procurement documents requires written clarification from the Contractor prior to proceeding with any work. Any deviation from the procurement documents requires approval by the Contractor with the change request process.

21 - SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLAN↗

SPC-70702 Rev 0 Zircaloy-4 Debris Shields for Use in MARVEL Build to Print Fabrication Specification

A. Idaho National Laboratory (INL) is developing a microreactor to produce electrical power utilizing a small nuclear core and Stirling engines under the Microreactor Application Research Validation and Evaluation (MARVEL) program. This procurement specification defines the requirements for fabrication of the Zircaloy-4 debris shields. B. Any conflict between this specification and referenced Codes and Standards, or any supplementary specifications in the procurement documents requires written clarification from the Contractor prior to proceeding with any work. Any deviation from the procurement documents requires approval by the Contractor with the change request process.

21 - SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLAN↗

SPC-70773 Rev 0 MARVEL Central Insurance Absorber Gray Rod Build to Print Specification

A. Idaho National Laboratory (INL) is developing a microreactor to produce electrical power utilizing a small nuclear core and Stirling engines under the Microreactor Application Research Validation and Evaluation (MARVEL) program. This procurement specification defines the requirements for fabrication of the Central Insurance Absorber Structure (CIAS) Gray Rod (Hafnium). B. Any conflict between this specification and referenced Codes and Standards, or any supplementary specifications in the procurement documents requires written clarification from the Contractor prior to proceeding with any work. Any deviation from the procurement documents requires approval by the Contractor with the change request process.

21 - SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLAN↗

SPC-70774 Rev 0 MARVEL Black Rod B4C Pellets Print Fabrication Specification

A. Idaho National Laboratory (INL) is developing a microreactor to produce electrical power utilizing a small nuclear core and Stirling engines under the Microreactor Application Research Validation and Evaluation (MARVEL) program. This procurement specification defines the requirements for fabrication of the MARVEL Black Rod B4C pellets. B. Any conflict between this specification and referenced Codes and Standards, or any supplementary specifications in the procurement documents requires written clarification from the Contractor prior to proceeding with any work. Any deviation from the procurement documents requires approval by the Contractor with the change request process.

21 - SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLAN↗

SPC-70796 Rev 2 MetCar M-312 Bearings Procurement Specification

A. Idaho National Laboratory (INL) is developing a microreactor to produce electrical power utilizing a small nuclear core under the Microreactor Application Research Validation and Evaluation (MARVEL) program. This procurement specification defines the requirements for fabrication of the MARVEL MetCar M-312 bearings. B. Any conflict between this specification and referenced Codes and Standards, or any supplementary specifications in the procurement documents requires written clarification from the Contractor prior to proceeding with any work. Any deviation from the procurement documents requires approval by the Contractor with the change request process.

21 - SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLAN↗

SPC-70808 Rev 0 AL-30 Secondary Support Standoff Blocks Build to Print Fabrication for Use in MARVEL

A. Idaho National Laboratory (INL) is developing a microreactor to produce electrical power utilizing a small nuclear core and Stirling engines under the Microreactor Application Research Validation and Evaluation (MARVEL) program. This procurement specification defines the requirements for fabrication of the MARVEL AL-30 Secondary Support Standoff Blocks manufactured by Zircar. The design requires twelve blocks; however, the requested quantity shall be 16 to account for required testing after receipt of materials. B. Any conflict between this specification and referenced Codes and Standards, or any supplementary specifications in the procurement documents requires written clarification from the Contractor prior to proceeding with any work. Any deviation from the procurement documents requires approval by the Contractor with the change request process.

21 - SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLAN↗

SPC-71260 Rev 0 MARVEL Heat Extraction Subsystem Secondary Coolant Equipment (SCE) Design/Build

A. The Microreactor Applications Research Validation and Evaluation (MARVEL) reactor will offer experimental capabilities that are not currently available at DOE’s national laboratories. Idaho National Laboratory (INL), operated for the U.S. Department of Energy (DOE) by Battelle Energy Alliance, LLC (BEA) (Contractor hereafter) is procuring services for the design, analysis, fabrication, testing and delivery of a Secondary Coolant Equipment system (SCE). This specification contains the requirements for design, analysis, fabrication, testing and delivery of the SCE as described herein. The MARVEL reactor is a microreactor which uses eutectic sodium-potassium alloy (NaK) as a primary coolant. The primary coolant is circulated through four primary loops by natural convection of the coolant. In each loop is a closed well which will accommodate an intermediate heat exchanger (IHX) for extracting heat from the loop. These wells will be referred to in this specification as the “IHX wells.” It is intended for the IHX containment to also be filled with NaK. The MARVEL design team has determined that a Heat Extraction System (HES) using pumped NaK will be used to extract heat from the IHXs and deliver it to a downstream system for power generation or alternate process heat users. This Heat Extraction System will enable MARVEL operations including the ability to test, demonstrate, and address issues related to installation, startup, and operations. In addition, it will allow down-stream utilization of process heat for various uses. The objective of this specification is to develop the final design for the HES Secondary Coolant Equipment system (SCE) that will be used as the core of the HES. This system provides control of the NaK circulation between the MARVEL reactor and the subsequent process heat utilization systems. It does not include design of the Intermediate Heat Exchangers and piping inside the T-REXc pit in which the reactor is located. B. The MARVEL microreactor will be installed in the Transient Reactor Test Facility (TREAT) building in the Transient Reactor Test (TREAT) Micro-Reactor Experiment Cell (T-REXc) C. An INL Subcontractor has developed a conceptual design for this system per SPC-71145, referred to in that specification as the Process Heat Extraction System. SPC-71260 is based on the pumped NaK loop concept developed under SPC-71145. D. The SCE system design and (as option scope) fabrication shall be provided by the awardee of the subcontract (Subcontractor hereafter) pertaining to this Specification. Prior to shipment, the SCE will be fabricated, assembled, and tested at the Subcontractor’s facility. After successful completion of acceptance testing, the SCE and associated equipment will be shipped to the Materials and Fuels Complex (MFC) at the INL (Contractor’s Facility hereafter) to be installed by others in TREAT/T-REXc.

21 - SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLAN↗

SPC-2772 Rev 2 General Build to Print Fabrication Specification for Nuclear Use Items

This specification is for use with Safety Significant structures, systems, and components. The scope is for build to print fabrication including, but not limited to, machining, forming, welding, cutting, assembling, etc. Specific scope and associated requirements will be identified in drawings and/or additional procurement documents. ASME B31 fabrication is not included in the scope of this specification. Any conflict between this specification and referenced Codes and Standards, or any supplementary specifications in the procurement documents requires written clarification from the Contractor prior to proceeding with any work. Any deviation from the procurement documents requires approval by the Contractor with the change request process.

21 - SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLAN↗

SPC-70486 Rev 0 Stirling Engine Prototype Performance Specification

Idaho National Laboratory (INL) is developing a small microreactor to produce electrical power utilizing a small nuclear core and Stirling engines under the Microreactor Application Research Validation and Evaluation (MARVEL) program. The purpose of this performance specification is to define requirements to build and test the Stirling Engine prototype, including interfacing with Kinnetech in the development/test of the engines. This specification includes prototyping components only and are not for use in the reactor. Prototype testing is a preliminary test to be conducted with conceptual equipment from which a final design will be developed. The results of the testing defined herein will not be used as a qualification test. The Stirling Engines have an engine controller module (QEC). Currently, the QEC doesn’t have a means to stop the engine. An analog controlled engine braking system must be developed and tested with the engine prototype. Any conflict between this specification and any supplementary specifications in the procurement documents requires written clarification from the Contractor prior to proceeding with any work. Any deviation from the procurement documents requires approval by the Contractor with the change request process.

21 - SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLAN↗

SPC-70525 Rev 2 Beryllium Metal Procurement Specification

Idaho National Laboratory (INL) is developing a microreactor to produce electrical power utilizing a small nuclear core under the Microreactor Application Research Validation and Evaluation (MARVEL) program. Key to this design are neutron reflector components constructed of Beryllium Metal (S-65) which is a structural grade of hot-pressed beryllium block. MARVEL will be located at the Transient Reactor Test (TREAT) facility. Any conflict between this specification and referenced Codes and Standards, or any supplementary specifications in the procurement documents requires written clarification from the Contractor prior to proceeding with any work. Any deviation from the procurement documents requires approval by the Contractor with the change request process.

21 - SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLAN↗