Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Task analysis”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 379 records · Page 21

Modeling Controller Tasks for Safety Analysis

As control systems become more complex, the use of automated control has increased. At the same time, the role of the human operator has changed from primary system controller to supervisor or monitor. Safe design of the human computer interaction becomes more difficult. In this paper, we present a visual task modeling language that can be used by system designers to model human-computer interactions. The visual models can be translated into SpecTRM-RL, a blackbox specification language for modeling the automated portion of the control system. The SpecTRM-RL suite of analysis tools allow the designer to perform formal and informal safety analyses on the task model in isolation or integrated with the rest of the modeled system.

Brown, Molly↗

Blade loss transient dynamics analysis, volume 1. Task 1: Survey and perspective

An analytical technique was developed to predict the behavior of a rotor system subjected to sudden unbalance. The technique is implemented in the Turbine Engine Transient Rotor Analysis (TETRA) computer program using the component element method. The analysis was particularly aimed toward blade-loss phenomena in gas turbine engines. A dual-rotor, casing, and pylon structure can be modeled by the computer program. Blade tip rubs, Coriolis forces, and mechanical clearances are included. The analytical system was verified by modeling and simulating actual test conditions for a rig test as well as a full-engine, blade-release demonstration.

Gallardo, V. C.↗

ASC ATDM Level 2 Milestone #5325: Asynchronous Many-Task Runtime System Analysis and Assessment for Next Generation Platforms

This report provides in-depth information and analysis to help create a technical road map for developing next-generation programming models and runtime systems that support Advanced Simulation and Computing (ASC) work- load requirements. The focus herein is on asynchronous many-task (AMT) model and runtime systems, which are of great interest in the context of "Oriascale7 computing, as they hold the promise to address key issues associated with future extreme-scale computer architectures. This report includes a thorough qualitative and quantitative examination of three best-of-class AIM] runtime systems – Charm-++, Legion, and Uintah, all of which are in use as part of the Centers. The studies focus on each of the runtimes' programmability , performance , and mutability . Through the experiments and analysis presented, several overarching Predictive Science Academic Alliance Program II (PSAAP-II) Asc findings emerge. From a performance perspective, AIV runtimes show tremendous potential for addressing extreme- scale challenges. Empirical studies show an AM runtime can mitigate performance heterogeneity inherent to the machine itself and that Message Passing Interface (MP1) and AM11runtimes perform comparably under balanced conditions. From a programmability and mutability perspective however, none of the runtimes in this study are currently ready for use in developing production-ready Sandia ASC applications. The report concludes by recommending a co- design path forward, wherein application, programming model, and runtime system developers work together to define requirements and solutions. Such a requirements-driven co-design approach benefits the community as a whole, with widespread community engagement mitigating risk for both application developers developers. and high-performance computing runtime systein

97 MATHEMATICS AND COMPUTING↗

Topological data analysis of task-based fMRI data from experiments on schizophrenia

We use methods from computational algebraic topology to study functional brain networks, in which nodes represent brain regions and weighted edges represent similarity of fMRI time series from each region. With these tools, which allow one to characterize topological invariants such as loops in high-dimensional data, we are able to gain understanding into low-dimensional structures in networks in a way that complements traditional approaches based on pairwise interactions. In the present paper, we analyze networks constructed from task-based fMRI data from schizophrenia patients, healthy controls, and healthy siblings of schizophrenia patients using persistent homology, which allows us to explore the persistence of topological structures such as loops at different scales in the networks. We use persistence landscapes, persistence images, and Betti curves to create output summaries from our persistent-homology calculations, and we study the persistence landscapes and images using k-means clustering and community detection. Based on our analysis of persistence landscapes, we find that the members of the sibling cohort have topological features (specifically, their 1-dimensional loops) that are distinct from the other two cohorts. From the persistence images, we are able to distinguish all three subject groups and to determine the brain regions in the loops (with four or more edges) that allow us to make these distinctions.

60 APPLIED LIFE SCIENCES↗

Scheduling Multiple Agents in a Persistent Monitoring Task Using Reachability Analysis

We consider the problem of controlling the dynamic state of each of a finite collection of targets distributed in physical space using a much smaller collection of mobile agents. Each agent can attend to no more than one target at a given time, thus agents must move between targets to control the collective state, implying that the states of each of the individual targets are only controlled intermittently. We assume that the state dynamics of each of the targets are given by a linear, time-invariant, controllable system, and develop conditions on the visiting schedules of the agents to ensure that the property of controllability is maintained in the face of the intermittent control. We then introduce constraints on the magnitude of the control input and a bounded disturbance into the target dynamics and develop a method to evaluate system performance under this scenario. Finally, we use this method to determine how the amount of time the agents spend at a given target, before switching to the next in its sequence, influences the control of the states of the entire collection of targets.

42 ENGINEERING↗

JT8D and JT9D jet engine performance improvement program. Task 1: Feasibility analysis

JT8D and JT9D component performance improvement concepts which have a high probability of incorporation into production engines were identified and ranked. An evaluation method based on airline payback period was developed for the purpose of identifying the most promising concepts. The method used available test data and analytical models along with conceptual/preliminary designs to predict the performance improvements, weight, installation characteristics, cost for new production and retrofit, maintenance cost, and qualitative characteristics of candidate concepts. These results were used to arrive at the concept payback period, which is the time required for an airline to recover the investment cost of concept implementation.

Gaffin, W. O.↗

CF6 jet engine performance improvement program. Task 1: Feasibility analysis

Technical and economic engine improvement concepts selected for subsequent development include: (1) fan improvement; (2) short core exhaust; (3) HP turbine aerodynamic improvement; (4) HP turbine roundness control; (5) HP turbine active clearance control; and (6) cabin air recirculation. The fuel savings for the selected engine modification concepts for the CF6 fleet are estimated.

Fasching, W. A.↗

Parametric study of prospective early commercial MHD power plants (PSPEC). General Electric Company, task 1: Parametric analysis

The performance and cost of moderate technology coal-fired open cycle MHD/steam power plant designs which can be expected to require a shorter development time and have a lower development cost than previously considered mature OCMHD/steam plants were determined. Three base cases were considered: an indirectly-fired high temperature air heater (HTAH) subsystem delivering air at 2700 F, fired by a state of the art atmospheric pressure gasifier, and the HTAH subsystem was deleted and oxygen enrichment was used to obtain requisite MHD combustion temperature. Coal pile to bus bar efficiencies in ease case 1 ranged from 41.4% to 42.9%, and cost of electricity (COE) was highest of the three base cases. For base case 2 the efficiency range was 42.0% to 45.6%, and COE was lowest. For base case 3 the efficiency range was 42.9% to 44.4%, and COE was intermediate. The best parametric cases in bases cases 2 and 3 are recommended for conceptual design. Eventual choice between these approaches is dependent on further evaluation of the tradeoffs among HTAH development risk, O2 plant integration, and further refinements of comparative costs.

Marston, C. H.↗

LSST system analysis and integration task for an advanced science and application space platform

To support the development of an advanced science and application space platform (ASASP) requirements of a representative set of payloads requiring large separation distances selected from the Science and Applications Space Platform data base. These payloads were a 100 meter diameter atmospheric gravity wave antenna, a 100 meter by 100 meter particle beam injection experiment, a 2 meter diameter, 18 meter long astrometric telescope, and a 15 meter diameter, 35 meter long large ambient deployable IR telescope. A low earth orbit at 500 km altitude and 56 deg inclination was selected as being the best compromise for meeting payload requirements. Platform subsystems were defined which would support the payload requirements and a physical platform concept was developed. Structural system requirements which included utilities accommodation, interface requirements, and platform strength and stiffness requirements were developed. An attitude control system concept was also described. The resultant ASASP concept was analyzed and technological developments deemed necessary in the area of large space systems were recommended.

Source record↗

Summary of LSST systems analysis and integration task for SPS flight test articles

The structural and equipment requirements for two solar power satellite (SPS) test articles are defined. The first SPS concept uses a hexagonal frame structure to stabilize the array of primary tension cables configured to support a Mills Cross antenna containing 17,925 subarrays composed of dipole radiating elements and solid state power amplifier modules. The second test article consists of a microwave antenna and its power source, a 20 by 200 m array of solar cell blankets, both of which are supported by the solar blanket array support structure. The test article structure, a ladder, is comprised of two longitudinal beams (215 m long) spaced 10 m apart and interconnected by six lateral beams. The system control module structure and bridge fitting provide bending and torsional stiffness, and supplement the in plane Vierendeel structure behavior. Mission descriptions, construction, and structure interfaces are addressed.

Greenberg, H. S.↗

Development of preliminary design concept for multifunction display and control system for Orbiter crew station. Task 3: Concept analysis

The access schema developed to access both individual switch functions as well as automated or semiautomated procedures for the orbital maneuvering system and electrical power and distribution and control system discussed and the operation of the system is described. Feasibility tests and analyses used to define display parameters and to select applicable hardware choices for use in such a system are presented and the results are discussed.

Spiger, R. J.↗

V/STOL propulsion control analysis: Phase 2, task 5-9

Typical V/STOL propulsion control requirements were derived for transition between vertical and horizontal flight using the General Electric RALS (Remote Augmented Lift System) concept. Steady-state operating requirements were defined for a typical Vertical-to-Horizontal transition and for a typical Horizontal-to-Vertical transition. Control mode requirements were established and multi-variable regulators developed for individual operating conditions. Proportional/Integral gain schedules were developed and were incorporated into a transition controller with capabilities for mode switching and manipulated variable reassignment. A non-linear component-level transient model of the engine was developed and utilized to provide a preliminary check-out of the controller logic. An inlet and nozzle effects model was developed for subsequent incorporation into the engine model and an aircraft model was developed for preliminary flight transition simulations. A condition monitoring development plan was developed and preliminary design requirements established. The Phase 1 long-range technology plan was refined and restructured toward the development of a real-time high fidelity transient model of a supersonic V/STOL propulsion system and controller for use in a piloted simulation program at NASA-Ames.

Source record↗

Space station integrated wall design and penetration damage control. Task 3: Theoretical analysis of penetration mechanics

The efforts to provide a penetration code called PEN4 version 10 is documented for calculation of projectile and target states for the impact of 2024-T3 aluminum, R sub B 90 1018 steel projectiles and icy meteoroids onto 2024-T3 aluminum plates at impact velocities from 0 to 16 km/s. PEN4 determines whether a plate is perforated by calculating the state of fragmentation of projectile and first plate. Depth of penetration into the second to n sup th plate by fragments resulting from first plate perforation is determined by multiple cratering. The results from applications are given.

Bjorkman, M. D.↗