Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Task Force”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 379 records · Page 21

Recommendations for the NASA Avionics program for the 1980's

NASA is examining the merits of a significant expansion of its avionics, controls, and human factors technology program for the 1980's. The rationale for an expanded program is related to two factors. One factor is related to a utilization of recent and anticipated significant advances in microelectronics. The second factor is the need to develop new concepts in avionics and control systems for more efficient aircraft operation and better utilization of extremely limited airport capacity. Substantial benefits could be realized in three major categories, including improved aircraft efficiency, improved flight operations, and improved/extended operational capability. The NASA Avionics, Controls, and Human Factors Technology Plan is the report of a task force of agency personnel working in close cooperation with industry, DOD, and FAA. Attention is given to the NASA role, aircraft controls, crew station technology, flight management, integration and interfacing, commercial transports, general aviation, rotorcraft, V/STOL, and high performance aircraft.

Spitzer, C. R.↗

Implementation of LANDSAT technology in the Commonwealth of Virginia

A brief history of events which led to the formal implementation of LANDSAT technology in Virginia is outlined. The concept of the Commonwealth Data Base (CDB) is explained as it is perceived by the users and the systems development task force. Furthermore, the CDB organization which was established to implement the CDB concept in Virginia is covered.

Sahaydak, E.↗

Transformations of software design and code may lead to reduced errors

The capability of programmers and non-programmers to specify problem solutions by developing example-solutions and also for the programmers by writing computer programs was investigated; each method of specification was accomplished at various levels of problem complexity. The level of difficulty of each problem was reflected by the number of steps needed by the user to develop a solution. Machine processing of the user inputs permitted inferences to be developed about the algorithms required to solve a particular problem. The interactive feedback of processing results led users to a more precise definition of the desired solution. Two participant groups (programmers and bookkeepers/accountants) working with three levels of problem complexity and three levels of processor complexity were used. The experimental task employed required specification of a logic for solution of a Navy task force problem.

Connelly, E. M.↗

The application of remote sensing to resource management and environmental quality programs in Kansas

The activities of the Kansas Applied Remote Sensing (KARS) Program during the period April 1, 1982 through Marsh 31, 1983 are described. The most important work revolved around the Kansas Interagency Task Force on Applied Remote Sensing and its efforts to establish an operational service oriented remote sensing program in Kansas state government. Concomitant with this work was the upgrading of KARS capabilities to process data for state agencies through the vehicle of a low cost digital data processing system. The KARS Program continued to take an active role in irrigation mapping. KARS is now integrating data acquired through analysis of LANDSAT into geographic information systems designed for evaluating groundwater resources. KARS also continues to work at the national level on the national inventory of state natural resources information systems.

Barr, B. G.↗

Study to encourage and facilitate industrial investment and involvement in space

A simple and efficient means to alert the Director, Space Station Commercialization Task Force (DSCTF) and the equivalent director of a permanent office for the same function, to actions required to assure comprehensive support of the NASA objectives for commercial uses of space during the annual budget cycle is described.

Wilson, J. E.↗

Commercial use of space - The space business era

Progress and avenues being explored by NASA to hasten the commercialization of space are described. A task force has recommended that the effort begin at once, that bureaucratic barriers to commercial space activities be removed, and that a partnership between government and industry be seriously explored. The government role is to establish links with private industry, invest in high-leverage technologies and space facilities which will be attractive to commercial ventures, and contribute to commercial enterprises where risks are high and significant economic benefits can be foreseen. The government/industry relationship can be legally evinced by MOUs, joint endeavor agreements, technical exchange agreements and industrial guest investigator arrangements. The Space Station is the first step in that it allows Americans to live and work in space. It is expected that international participation in Space Station development and utilization will accelerate the space business era.

Griffin, G. D.↗

STS flight experiments data base

In response to a request of the Space Station Task Force, a data base has been developed, utilizing experiment definitions from all NASA Centers, with emphasis on candidate STS flight experiments that relate to the development and operation of initial and growth versions of a Space Station. Experiments are also included for Shuttle enhancement, for servicing and operations of advanced vehicles such as OMV and OTV, for generic technology such as large structures, control and pointing, heat rejection, for life sciences and for physical sciences and applications. Criteria for selection activity are defined.

Brantley, L. W., Jr.↗

Processes and process development in Taiwan

Silicon material research in the Republic of China (ROC) parallels its development in the electronic industry. A brief outline of the historical development in ROC silicon material research is given. Emphasis is placed on the recent Silane Project managed by the National Science Council, ROC, including project objectives, task forces, and recent accomplishments. An introduction is also given to industrialization of the key technologies developed in this project.

Hwang, H. L.↗

Space station power system

It is pointed out that space station planning at NASA began when NASA was created in 1958. However, the initiation of the program for a lunar landing delayed the implementation of plans for a space station. The utility of a space station was finally demonstrated with Skylab, which was launched in 1972. In May 1982, the Space Station Task Force was established to provide focus and direction for space station planning activities. The present paper provides a description of the planning activities, giving particular attention to the power system. The initial space station will be required to supply 75 kW of continuous electrical power, 60 kW for the customer and 15 kW for space station needs. Possible alternative energy sources for the space station include solar planar or concentrator arrays of either silicon or gallium arsenide.

Forestieri, A. F.↗

Architecture of permanent presence

A summary of recommendations of the Concept Development Group of the NASA Space Station Task Force is given. The recommendations address the principal technical issues related to Space Station architecture, with emphasis given to design geometry. Line drawings of the four Space Station candidate geometries are provided, including: a planar geometry; a streamline geometry; a delta; and the 'power tower' concept.

Speaker, E. E.↗

Space station program operations - Making it work

The Space Station Program (SSP) will consist, in part, of a permanently orbiting facility composed of a mix of manned and unmanned elements. To insure that such a facility will be an operationally viable and productive one, capable of performing a myriad of assigned missions, special attention must be given to the following operational disciplines during the design and development of the SSP systems and subsystems: (1) Automation/Autonomy, (2) Customer Interfaces/Operations, (3) Habitability/Crew Productivity, (4) Maintainability, and (5) Logistics. In order to properly address these disciplines, from an operations point of view, the Director of the Space Station Task Force (SSTF) formed the Operations Working Group (OWG) in July 1982, and chartered this group to develop the top level operational technical and management-approach philosophies and requirements for the SSP. This paper attempts to summarize the results and conclusions reached by the OWG after an 18 month intensive study effort.

Parker, G. R.↗

Science in space with the Space Station

The potential of the Space Station as a versatile scientific laboratory is discussed, reviewing plans under consideration by the NASA Task Force on Scientific Uses of the Space Station. The special advantages offered by the Station for expanding the scope of 'space science' beyond astrophysics, geophysics, and terrestrial remote sensing are stressed. Topics examined include the advantages of a manned presence, the scientific value and cost effectiveness of smaller, more quickly performable experiments, improved communications for ground control of Station experiments, the international nature of the Station, the need for more scientist astronauts for the Station crew, Station on-orbit maintenance and repair services for coorbiting platforms, and the need for Shuttle testing of proposed Station laboratory equipment and procedures.

Banks, Peter M.↗

Assessment of mixed fleet potential for space station launch and assembly

Reductions in expected STS flight rates of the Space Shuttle since the 51-L accident raise concerns about the ability of available launch capacity to meet both payload-to-orbit and crew rotation requirements for the Space Station. In addition, it is believed that some phases of Station build-up could be expedited using unmanned launch systems with significantly greater lift capacity than the STS. Examined is the potential use of expendable launch vehicles (ELVs), yet-to-be-developed unmanned shuttle-derived vehicles (SDVs), and international launch vehicles for meeting overall launch requirements to meet Space Station program objectives as defined by the 1986 Critical Evaluation Task Force (CETF). The study concludes that use of non-STS transportation can help meet several important program objectives as well as reduce the total number of STS flights. It also finds, however, that reduction of Space Station-dedicated STS flights below 8 per year forces a reduction in Station crew size assuming the CETF 90 day crew stay time baseline and seriously impairs scientific utilization of the Station.

Deryder, L. J.↗

Space station heavy lift launch vehicle utilization

The use of Heavy Lift Launch Vehicles (HLLVs) for Space Station assembly, logistics. and resupply is explored. Potential HLLVs, including those based on the Titan, and Shuttle-derived vehicles (SDV), are discussed. The baseline Critical Evaluation Task Force (CETF) Space Station assembly sequence is described and compared with assembly options made possible through the use of HLLVs. The issues of cost, dual compatibility with the Space Shuttle Space Transportation System (STS), co-manifesting of payloads with other science missions cargo return, and ground handling and launch facilities are also considered. The main advantage achieved by using HLLVs are simplification of assembly procedures, added resupply capability, and increased assured access to space. The major disadvantages are increased orbital flight operations complexity, higher logistics costs, and additional ground handling/launch facility requirements. Also, there will not be any improvement in return cargo capacity, nor any addition to crew transport capabilities. Finally, the dual STS/HLLV compatibility should be maintained to minimize program risk. HLLV and Orbital Maneuvering Vehicle design must parallel that of the Space Station.

Deryder, L. J.↗

Manned Mars mission accomodation by the evolutionary Space Station

It is shown that an unmanned launch capability of about 90 metric tons to the Space Station altitude and inclination is required to support the buildup of the manned Mars mission. The paper presents details of the assembly sequence including the analysis and conceptual design of additional truss and other facilities required at the Space Station. It is noted that the The Critical Evaluation Task Force configuration (dual keel) can evolve to accommodate the Mars space vehicle buildup.

Pritchard, E. Brian↗

Science on Space Station

Plans for space science activities on the International Space Station are reviewed from a NASA perspective. The present Station reference configuration is based on a dual-keel core unit (one habitation module and three laboratory modules supplied by NASA, ESA, and Japan) and provides for five attached systems (with up to four payloads each to be exposed to space) and several free-flying platforms (both polar orbiters and coorbiters). Particular attention is given to the space science aspects of the primary Station objectives defined by NASA (servicing and repair, platforms, pressurized modules, and attached payloads). Also discussed are the work of the Task Force on Scientific Uses of Space Station, the need for operational flexibility, the value of a continuous manned presence for experimental science, and the skills needed from the Station crew.

Black, David C.↗

Advanced Turboprop Project

At the direction of Congress, a task force headed by NASA was organized in 1975 to identify potential fuel saving concepts for aviation. The result was the Aircraft Energy Efficiency (ACEE) Program implemented in 1976. An important part of the program was the development of advanced turboprop technology for Mach 0.65 to 0.85 applications having the potential fuel saving of 30 to 50 percent relative to existing turbofan engines. A historical perspective is presented of the development and the accomplishments that brought the turboprop to successful flight tests in 1986 and 1987.

Hager, Roy D.↗

CETF Space Station payload pointing system design and analysis feasibility study

The expected pointing performance of an attached payload coupled to the Critical Evaluation Task Force Space Station via a payload pointing system (PPS) is determined. The PPS is a 3-axis gimbal which provides the capability for maintaining inertial pointing of a payload in the presence of disturbances associated with the Space Station environment. A system where the axes of rotation were offset from the payload center of mass (CM) by 10 in. in the Z axis was studied as well as a system having the payload CM offset by only 1 inch. There is a significant improvement in pointing performance when going from the 10 in. to the 1 in. gimbal offset.

Smagala, Tom↗