Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Steam Generator”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 379 records · Page 21

Systems and methods for photothermal material

Chinese ink is applied on various materials and stabilized by atomic layer deposition to fabricate solar steam generation devices. The encapsulated ink has excellent photothermal properties and evaporation efficiency under simulated sunlight, holding great promise in solar evaporation device applications.

Yang, Hao-Cheng↗

U.S. High Temperature Materials Highlights

U.S. GIF VHTR work is continuing on graphite qualification, Alloy 617 regulatory issues beyond the Code space, Alloy 800H weldments, and ASME Codes and Standards R&D is still considering both pebble bed and prismatic and steam generator and heat exchanger U.S. DOE Advanced Reactor Demonstration Program (ARDP) Two U.S.-based teams were selected to demonstrate advanced nuclear reactors in the United States that can be operational by 2027 One of the teams is X-energy (Rockville, MD) which will demonstrate a modular gas-cooled reactor design (Xe-100) with four 80 MWe, TRISO fuel, pebble bed reactors A number of U.S.-based teams were selected to design and develop safe and affordable reactor technologies that can be licensed and deployed over the next 10 to 14 years (Risk Reduction) One of the teams is BWXT Advanced Technologies, LLC which will develop a commercially viable transportable microreactor with the design focused on using TRISO fuel particles and silicon carbide (SiC) matrix A number of U.S.-based teams were selected to assist the progression of advanced reactor designs in their earliest phases (Advanced Reactor Concepts-20) One of the teams is Massachusetts Institute of Technology which will mature the Modular Integrated Gas-Cooled High Temperature Reactor (MIGHTR) concept with a horizontal compact design from a pre-conceptual stage to a conceptual stage to support commercialization

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Non-Nuclear Test Facility Development to Support Verification and Validation Needs

This study focuses on developing a non-nuclear test facility to help meet the verification and validation (V&V) requirements of a water-cooled small modular reactor (SMR) system. The scaling analysis necessary for reactor system experimentation and assessment model V&V considers various reactor system accident scenarios such as main steam line break (MSLB), steam generator tube rupture (SGTR), and containment condensation and heat transfer. The goal is to identify key physics based phenomena of interest (POI), specific figures of merit (FOMs), and the state of knowledge (SOK) by employing phenomena identification and ranking table (PIRT) studies. Important physics phenomena such as heat transfer, fluid dynamics, structural integrity, and material selection must be addressed when scaling a thermal-hydraulics system. Alongside these considerations, modifications to the facility may be needed to align the scaled system with the available footprint (height and space) of the facility. These modifications may include infrastructure upgrades, changes to the piping layout, implementation of safety measures, and installation of new instrumentation and control systems. The test facility aims to provide a scaled-down version of prototypic facilities for comprehensive V&V activities by overcoming these challenges and making the necessary modifications. This approach minimizes scaling distortion, simulates prototypic plant conditions, and accurately models accident event progressions. Thus, the facility will be capable of adequately modeling a scaled SMR system to support the design, development and licensing needs.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

German HTR phase out - experience and remaining challenges - 18659

For more than 50 years the pebble bed High Temperature Reactor (HTR) is under development in Germany. Forschungszentrum Juelich, Aachen University, but also industrial companies and other organizations are, respectively were involved in this task, which was for about two decades something like a national showcase. More than ten years before the German decision to shut down all nuclear power plants in Germany there was a strong decrease in the interest on HTR-related activities. Reasons might be the lack of competitiveness of HTRs for electricity production only in a well-developed grid, the bad performance of the German demonstration plant THTR and the rapid increase of the general German Angst. Most of the ongoing HTR activities will come to an end in a relatively short time. Last experimental projects cover the graphite dust behavior. The analytical work is focused on the further development of the HTR Code Package (HCP). In this paper, the German experience, remaining challenges and lessons learned will be addressed. Especially aspects such as fuel fabrication and qualification, the performance of AVR and THTR, the HTR-Modul concept, economic aspects of HTR, the competition and/or complementarities to LWR, the statement of inherent HTR safety and the development of large components for turbine, steam generator, blower and bearings will be presented. (authors)

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

High Temperature Test Facility At Scale Testing, Validation, and Demonstration

Theses slides will be used to brief the Tribal DOE and Council Chairman for the project listed below. The High Temperature Test Facility (HTTF) is a demonstration-scale high temperature electrolysis (HTE) system that provides the ability to produce, process, store, and dispense electrolytically produced hydrogen. The system will be designed to accommodate electrolysis systems from various industry partners. The HTTF will be supplied up to 10 MW of power for electrolysis at 5 separate test article locations, each up to 2MW. The system will include post-processing and compression, storage, and capabilities to provide hydrogen for consumption by future end users. The HTTF will also provide the ability to test and demonstrate an HTE system in a configuration that would simulate the use of a nuclear generated steam supply for the high temperature heat source. The HTTF will be located at the Central Facilities Area (CFA) adjacent to CFA-686 on the INL site, 45 miles west of Idaho Falls.

08 HYDROGEN↗

Technology Feasibility of High-Temperature Heat Pumps for Industrial Drying Process in the US

High-temperature heat pumps are a prospective technology for electrifying and decarbonizing industrial drying processes. This study investigates the technological potential of HTHPs in replacing fossil-fuel burners or steam boilers in industrial spray dryers. The performance of HTHPs with three configurations was investigated, including high high-temperature heat pump boosted with an electric air heater, a steam-generating high-temperature heat pump with multi-stage mechanical vapor compressions, and transcritical high-temperature heat pumps. R1336mzz(Z) is used as the refrigerant in both subcritical and transcritical high-temperature heat pumps, and R717 is used as the working fluid in the mechanical vapor recompression and the heat transfer fluids. Thermodynamic models are built to evaluate the energy efficiency of HTHPs. A case study was carried out on an industrial spray dryer integrated with a waste heat recuperator, where the HTHPs are used to recover precooled air with a dew point of 40℃ and supply heat for drying air at 200℃. For a high-temperature heat pump boosted with an electric air heater, a higher system-level COP is achieved with a high supply temperature from high-temperature heat pump. For a high-temperature heat pump with mechanical vapor recompressions, larger temperature drops in the flashing tank provide higher heat capacities but almost constant values of the coefficient of performance. For a transcritical high-temperature heat pump, an optimum discharge pressure exists for the temperature profiles within the gas cooler and the coefficient of performance. The transcritical high-temperature heat pump provides the best energy efficiency among the three configurations. The theoretical results prove the technical feasibility of high-temperature heat pumps in industrial air-drying applications. .

Wang, Pengtao↗

Nuclear Safety [Vol. 30, No. 3, July-September 1989]

Nuclear Safety is a review journal that covers significant developments in the field of nuclear safety. Its scope includes the analysis and control of hazards associated with nuclear energy, operations involving fissionable materials, and the products of nuclear fission and their effects on the environment. Primary emphasis is on safety in reactor design, construction, and operation; however, the safety aspects of the entire fuel cycle, including fuel fabrication, spent-fuel processing, nuclear waste disposal, handling of radioisotopes, and environmental effects of these operations, are also treated. Table of Contents for this issue follows. GENERAL SAFETY CONSIDERATIONS: 325 Safety of Framatome Advanced Nuclear Steam Supply Systems Designs by J. A. Charles and D. Lange, 333 Book Review of Nuclear Accidents: Intervention Levels for the Protection of the Public by H. B. Piper; ACCIDENT ANALYSIS: 335 Living PRA Computer Systems by S. C. Dinsmore and H.-P. Balfanz, 343 Summary of ICAP Assessments of RELAP5/MOD2 by W. E. Driskell and R. G. Hanson; CONTROL AND INSTRUMENTATION: 352 Thermal Performance Monitoring System at Maanshan Nuclear Power Plant by H.-J. Chao, Y.-P. Lin, G.-H. Jou, L.-Y. Liao, and Y.-B. Chen; DESIGN FEATURES: 358 Warning Systems for Nuclear Power Plant Emergencies by J. H. Sorensen and D. S. Mileti; WASTE AND SPENT FUEL MANAGEMENT: 371 Activities Related to Waste Management Compiled by E G. Silver; OPERATING EXPERIENCES: 382 Steam Generator Tube Performance: Experience with Water-Cooled Nuclear Power Reactors During 1985 by O. S. Tatone and R. L. Tapping, 400 Systems Interaction Analyses: Concepts and Techniques (Part II) by M. D. Muhlheim and G. A. Murphy, 413 Reactor Shutdown Experience Compiled by J. W. Cletcher, 416 Operating U.S. Power Reactors Compiled by E G. Silver; RECENT DEVELOPMENTS: 440 General Administrative Activities Compiled by E G. Silver, 460 Reports, Standards, and Safety Guides by D. S. Queener, 466 Status of Power-Reactor Licensing Activities Compiled by E G. Silver, 470 Proposed Rule Changes as of Mar. 31, 1989; ANNOUNCEMENTS: 334 Proceedings Published, 351 CEC Seminar on Methods and Codes for Assessing the Off-Site Consequences of Nuclear Accidents, 357 Short Course on Multiphase Flow and Heat Transfer: Bases and Applications in A: The Nuclear Power Industry B: The Process Industries, 357 International Conference on Probabilistic Safety Assessment and Management, 478 International Topical Meeting on the Safety, Status, and Future of Non-Commercial Reactors and Irradiation Facilities, 475 The Authors.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Evaluation of Machine Learning Models for Automated Data Analysis in In-Service Nuclear Power Plant Inspections

The commercial nuclear power industry is facing a potential shortage of certified nondestructive evaluation (NDE) analysts to meet future in-service inspection demands. Automated data analysis (ADA) currently supports human inspectors in tasks such as eddy current evaluations for steam generator examinations. Machine learning (ML) systems are nearing the capability to pass performance demonstration tests for ultrasonic testing (UT) inspections of reactor pressure vessel upper head penetrations in nuclear power plants (NPPs). Current research and development is focused on assisted analysis (AA) of ADA versus fully automated examinations. This presentation will cover assessment of ML flaw detection on dissimilar metal weld (DMW) piping joints.

36 MATERIALS SCIENCE↗

Benchmarking MCNP models to support gamma irradiation experiments

Seismic isolators and damping devices have been used for 30+ years to reduce seismic forces and deployed in 10,000+ structures, including bridges, buildings, and mission-critical infrastructure. Studies have shown that seismic isolation of nuclear power plants can reduce the seismic risk by several orders of magnitude and substantially reduce the overnight capital cost. Advanced reactor developers are considering seismic isolation as an integral design feature in their reactor design. It can either be deployed at the building level, isolating the entire reactor building, or at the component level, isolating individual pieces of safety-class equipment, such as a reactor vessel or a steam generator. For equipment isolation, located close to the reactor vessel, the seismic isolators and/or damping devices may be exposed to gamma and neutron radiation, with a possible effect on their mechanical properties which would affect the response of the isolated equipment under earthquake shaking. The Department of Energy, as part of its Nuclear Energy University Program (NEUP), in collaboration with the Idaho National Laboratory (INL), is funding a project at the University at Buffalo (UB) to investigate the effect of gamma radiation on the mechanical properties of various seismic protective devices. (When isolating equipment, the seismic protective devices will be located outside the reactor vessel where the neutron exposure will be insignificant.

22 - GENERAL STUDIES OF NUCLEAR REACTORS↗

Assessment of Reactor BN-350 Impact on the Environment During Its Operation Period

Fast neutron reactor BN-350 was designed for dual purposes: steam production and plutonium generation. The steam produced in the reactor was used to generate electricity (150 MW) and desalination of seawater (up to 120 000 tons/day). The BN-350 reactor began operating in July 1973 with a design lifetime of 20 years. After the end of the reactor design lifetime in July 1993, its further operation was managed on the basis of annual decisions taken to extend the operating life for one year. The reactor was in downtime beginning in December 1998 and on 22 April 1999 the RK Government Resolution no. 456 'About decommissioning of the BN-350 reactor in Aktau, Mangistau region' was adopted. Thus, the total actual reactor operational period was more than 25 years. In the framework of work under the approved 'Plan of priority measures for decommissioning of the BN-350 reactor in Aktau', the specialists of the Institute of Nuclear Physics (INP) and the Mangystau Nuclear Power Complex performed a radiation survey of the plant area, the sanitary protection zone and reactor BN-350 monitoring area. (authors)

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Advanced low-cost intermetallic coatings for molten salt pump impeller. Final report

1.0 INTRODUCTION The use of solar energy to produce steam for the generation of electricity is an established technology, with multiple designs for concentrating solar power (CSP) steam generators available commercially and a number of such units currently operating. As part of the effort to improve the overall efficiency of this technology, designers have developed thermal energy storage (TES) mechanisms that employ molten salt to capture a portion of the solar energy available during the day-time hours and make that energy available for steam generation during periods when the sun’s energy is not available. In current TES systems, nitrate salts are used extensively as the medium of energy exchange. However, due to the chemical instability of these salts at temperatures above 600ºC, they are not being considered for use in the next more efficient generation of CSP plants, in which the energy exchange fluids will be required to operate in the range 600ºC to 800ºC. At these higher temperatures, molten chloride salts, such as KCl-MgCl2, are viewed as promising alternatives to the nitrate salts, but, of course, these chloride-based salts are highly corrosive to the engineering alloys commonly used in the construction of pressure vessels, heat exchangers, pumps and piping at high temperatures. Hence, a solution to the problem of material degradation is essential if the next generation of CSP plants is to be commercially viable (Ref 1). In order to effectively address the problem of molten chloride salt corrosion at high temperatures (≥ 750ºC) and thereby to reduce the cost of molten salt tanks and related apparatus, various options have been considered, with one of the most promising being an innovative coatings system developed and applied onto low alloy ferritic or austenitic stainless material. Development of such a coating system would reduce the capital costs of thermal energy storage (TES) and increase the overall efficiency of the concentrating solar power (CSP) system. Although high strength nickel base alloys are well suited for many high temperature applications, they have significant limitations when exposed to molten chloride salt conditions and they are very expensive. Monolithic materials such as the austenitic stainless steels (e.g., SS310 and SS347) and the more common nickel base alloys (e.g., IN625 and IN800H) have exhibited high corrosion rates in molten chloride salt environments (Ref1). Molten salt corrosion of IN625 in salts containing chlorides showed a catastrophic corrosion rate of 1.111”/year at 800ºC (Ref1). Hence, an innovative coatings solution to mitigate molten chloride salt corrosion is needed. Of the many coating techniques available in the market, no one technique appears to be capable of producing effective protection from molten salt corrosion at a relatively low cost. There are thermal spray coating techniques, in particular the twin wire-arc technology, that are attractive when considering the coating of large molten salt tanks because the coatings application rate is high, the overall application cost is low and repairs to the coating can readily be made either in the shop or in the field. However, the twin wire arc coating materials currently available in the market have certain inherent limitations, including porosity and mechanical bonding to the substrate, which limit their effectiveness in providing protection against molten chloride salt corrosion at high temperatures. What is required is an approach that combines the economy and versatility of thermal spray wire-arc technology with the superior resistance of advanced alloys to effectively combat molten chloride salt corrosion at elevated temperatures. Applied Thermal Coatings, Inc. (ATC) has investigated an innovative coatings technology to produce dual layer cermet/ceramic coatings that will be dense and impervious to any corrosive molten salts/fluids, thereby resisting the effects of molten salt corrosion. Development of coatings using this technology will make it possible to fabricate the molten salt systems using a relatively low-cost base material, which will reduce the overall cost of the power generating system and enhance the commercial viability of solar power. 2.0 PROJECT OVERVIEW Of the coating technologies available for the production of a cost-effective method of protection from the effects of high-temperature chloride attack, there are two that offer specific advantages for the CSP/TES application, particularly when used in a way that effectively complements the strengths of each coating method. The first of these is electroless nickel plating, through which a nickel-rich layer is produced on the surface of a component through chemical reduction. The second coating technology is aluminizing, in which aluminum is diffused into the surface of a component and, depending on the composition of the substrate, aluminides are formed. The objective of this project has been to demonstrate the feasibility of a low- cost coating for the protection of pump impellers used for the inductive transport of molten salts. Initial interest focused on an inter-metallic nickel aluminide coating and subsequently, for economic reasons, consideration also was given to a coating composed of iron aluminides. Applying such coatings to low alloy or austenitic stainless-steel substrates will provide the superior resistance to molten chloride salt corrosion and blade tip erosion that normally can be achieved only through the use of more highly alloyed – and, therefore, more expensive - nickel-base materials and it will do so at a substantially lower cost. The coating systems evaluated were designed to take advantage either of the combined strengths of the electroless nickel plating process and the aluminizing process to produce a nickel-aluminide intermetallic coating or to rely solely on the aluminizing process to produce, in conjunction with iron from the substrate, a protective layer consisting of iron aluminides. With respect to the nickel aluminide protection, this has been achieved by first depositing a layer of nickel-rich alloy onto an austenitic stainless substrate using the electroless nickel plating process and then aluminizing the nickel- coated surface to produce the nickel aluminide coating. With respect to the iron aluminide protection, this has been achieved by aluminizing bare austenitic stainless steel. Testing has supported the conclusion that the developed coatings will resist attack by molten chloride salts at high temperatures (550°C to 750°C) and have sufficient hardness to resist blade tip erosion.The steps taken to develop either a low-cost intermetallic nickel aluminide coating using electroless nickel plating and aluminizing or a low-cost iron aluminide coating using aluminizing only, and to demonstrate the quality of the coatings and their effectiveness against molten chloride salt corrosion and erosion at high temperatures (≤ 750ºC) have been as follows: 1. Design of the optimum electroless nickel plating and aluminizing mixtures using advanced thermodynamic analysis; 2. Development of processing parameters for the electroless nickel plating and aluminizing processes, to be used either together or separately; 3. Production of specimens coated using the designated electroless nickel plating process; 4. Production of samples with intermetallic nickel aluminide coating or iron aluminide coating; 5. Investigation of the performance of the intermetallic nickel aluminide coating and the iron aluminide coating when subjected to molten chloride salts corrosion at high temperatures (≥ 750ºC); and, 6. Metallurgical characterization of the microstructure of the coatings, both prior to and after exposure to molten salt environments at elevated temperatures.

14 SOLAR ENERGY↗

Thermodynamic assessment of an electrically-enhanced thermochemical hydrogen production (EETHP) concept for renewable hydrogen generation

A novel concept for coupling a thermochemical cycle with an electrochemical separation device for the generation of hydrogen from steam is reported and a thermodynamic analysis of the system is presented. In a conventional thermochemical cycle, an oxygen carrier material is thermally reduced, cooled, and then reoxidized in steam thereby generating hydrogen. However, this process often requires high temperatures (>1700 K) and/or low oxygen partial pressures (<0.001 atm) in order to meet thermodynamic requirements. Such extreme conditions can adversely affect the stability of the reactive oxides, reactor materials, and system efficiency. In our proposed technology, we seek to decrease the required reduction temperature by several hundred degrees Kelvin by relaxing the requirement for spontaneous oxidation reaction at atmospheric pressure. This is accomplished by incorporating a proton-conducting membrane (PCM) to separate hydrogen produced at equilibrium concentrations from reactant steam. We also suggest the use of mixed ionic-electronic conducting (MIEC) oxygen carrier materials that reduce through a continuum of oxidation states at lower temperatures (~1200 °C). In conclusion, this concept allows the generation of a high-quality hydrogen stream while avoiding the challenging high temperatures/low partial pressures required in conventional water-splitting reaction schemes.

08 HYDROGEN↗

Microfabricated rankine cycle steam turbine for power generation and methods of making the same

In accordance with the present invention, an integrated micro steam turbine power plant on-a-chip has been provided. The integrated micro steam turbine power plant on-a-chip of the present invention comprises a miniature electric power generation system fabricated using silicon microfabrication technology and lithographic patterning. The present invention converts heat to electricity by implementing a thermodynamic power cycle on a chip. The steam turbine power plant on-a-chip generally comprises a turbine, a pump, an electric generator, an evaporator, and a condenser. The turbine is formed by a rotatable, disk-shaped rotor having a plurality of rotor blades disposed thereon and a plurality of stator blades. The plurality of stator blades are interdigitated with the plurality of rotor blades to form the turbine. The generator is driven by the turbine and converts mechanical energy into electrical energy.

Frechette, Luc↗

250 kWth Pilot Testing in Support of a 10 MWe Coal-Direct Chemical Looping Demonstration Feasibility Study

The Coal-Direct Chemical Looping (CDCL) process is emerging as a promising technology capable of high efficiency for producing electricity with low cost for carbon capture. In the CDCL process, coal is fully combusted to form carbon dioxide (CO2) and water via reaction with Fe2O3-based oxygen-carrier particles in a moving-bed reducer reactor. During reaction with coal, the Fe2O3 is reduced to form a mixture of Fe and FeO. The reduced particles are then transported to the combustor reactor where they are re-oxidized with air. The oxidation of the Fe and FeO mixture generates heat that can be used to produce steam for power generation. Once the particles are fully regenerated, they are pneumatically recycled to the reducer reactor where another reduction-oxidation (Redox) cycle begins. The Babcock & Wilcox Company (B&W) and The Ohio State University (OSU) have been developing the CDCL technology based on iron-based metal oxide particles circulating in a moving-bed reducer coupled with an entrained-flow combustor. As part of a Phase I effort of a DOE-sponsored project, B&W identified scale-up technology gaps for the coal-direct chemical looping reactor process, most of which fall under the moving-bed reactor design and operation. However, after the Phase I research, B&W concluded that the CDCL technology has the potential of generating electricity while meeting the DOE goals of greater than 90% CO2 capture and less than 35% increase in levelized cost of electricity (LCOE). B&W then moved to a Phase II project to design, build and demonstrate the CDCL technology at a 250 kWth capacity. B&W finished the construction and commissioning of the pilot test facility in 2017. The approach used to design a 250 kWth pilot-scale CDCL facility to investigate the technology gaps is presented. Important lessons from the commissioning activities that would transfer to commercial plant start-up are also shared. The findings from the test program are being incorporated into a Pre-FEED study for a 10 MWe large pilot demonstration. Under a separately-funded heat integration project, B&W and OSU are developing a multiphase computational fluid dynamic model (MFIX) of the combustor to quantify heat transfer to embedded steam generation surface, utilizing pinch analysis (ASPEN Energy Analyzer) to identify potential improvements of the heat integration scheme, and developing an integrated dynamic model (ProTRAX) of the steam turbine coupled with the chemical looping process to identify potential start-up and transient operation issues. Under an advanced control system for optimizing operation, B&W is supporting OSU to install a rules-based optimizer (B&W’s FocalPoint) on their 25 kWt bench-scale facility on the OSU West Campus. Finally, B&W and OSU were recently selected to perform a Phase I Feasibility study to evaluate installation of the 10 MWe pilot at the Dover Power & Light Municipal Power Plant in Dover, Ohio. The feasibility study includes compiling an Environmental Information Volume and generating a cost estimate for the design, construction and commissioning of the plant as well as lining up commitments from potential project participants and funding contributors. Updates on each project will be presented. The status of the technology development will be discussed. We focus on the progress made to date towards closing the technology gaps under each project.

20 FOSSIL-FUELED POWER PLANTS↗

Update on Design of 10 MWe Iron-Based Coal Direct Chemical Looping Demonstration Plant

The Coal-Direct Chemical Looping (CDCL) process is emerging as a promising technology capable of high efficiency for producing electricity with low cost for carbon capture. In the CDCL process, coal is fully combusted to form carbon dioxide (CO2) and water via reaction with Fe2O3-based oxygen-carrier particles in a moving-bed reducer reactor. During reaction with coal, the Fe2O3 is reduced to form a mixture of Fe and FeO. The reduced particles are then transported to the combustor reactor where they are re-oxidized with air. The oxidation of the Fe and FeO mixture generates heat that can be used to produce steam for power generation. Once the particles are fully regenerated, they are pneumatically recycled to the reducer reactor where another reduction-oxidation (Redox) cycle begins. The Babcock & Wilcox Company (B&W) and The Ohio State University (OSU) have been developing the CDCL technology based on iron-based metal oxide particles circulating in a moving-bed reducer coupled with an entrained-flow combustor. As part of a Phase I effort of a DOE-sponsored project, B&W identified scale-up technology gaps for the coal-direct chemical looping reactor process, most of which fall under the moving-bed reactor design and operation. However, after the Phase I research, B&W concluded that the CDCL technology has the potential of generating electricity while meeting the DOE goals of greater than 90% CO2 capture and less than 35% increase in levelized cost of electricity (LCOE). B&W then moved to a Phase II project to design, build and demonstrate the CDCL technology at a 250 kWth capacity. B&W finished the construction and commissioning of the pilot test facility in 2017. The approach used to design a 250 kWth pilot-scale CDCL facility to investigate the technology gaps is presented. Important lessons from the commissioning activities that would transfer to commercial plant start-up are also shared. The findings from the test program are being incorporated into a Pre-FEED study for a 10 MWe large pilot demonstration. Under a separately-funded heat integration project, B&W and OSU are developing a multiphase computational fluid dynamic model (MFIX) of the combustor to quantify heat transfer to embedded steam generation surface, utilizing pinch analysis (ASPEN Energy Analyzer) to identify potential improvements of the heat integration scheme, and developing an integrated dynamic model (ProTRAX) of the steam turbine coupled with the chemical looping process to identify potential start-up and transient operation issues. Under an advanced control system for optimizing operation, B&W is supporting OSU to install a rules-based optimizer (B&W’s FocalPoint) on their 25 kWt bench-scale facility on the OSU West Campus. Finally, B&W and OSU were recently selected to perform a Phase I Feasibility study to evaluate installation of the 10 MWe pilot at the Dover Power & Light Municipal Power Plant in Dover, Ohio. The feasibility study includes compiling an Environmental Information Volume and generating a cost estimate for the design, construction and commissioning of the plant as well as lining up commitments from potential project participants and funding contributors. Updates on each project will be presented. The status of the technology development will be discussed. We focus on the progress made to date towards closing the technology gaps under each project.

20 FOSSIL-FUELED POWER PLANTS↗

Catalytic decomposition of methanol for onboard hydrogen generation

The steam reformation of an equimolar mixture of methanol and water on a copper chromite catalyst was studied at three furnace temperatures and at feed space velocities from 800 to 2600 per hour. The hydrogen space velocity could be related to the reactor temperature by the equation Sv = A exp (-omega T), where A and omega are constants determined for each value of alpha and T is temperature. At a methanol conversion of 0.87 and a reactor temperature of 589 K, the extrapolated value of the hydrogen space velocity was 9400 per hour. This velocity was used to estimate the size of an onboard hydrogen reactor for automotive applications. Such a reactor would need only about 0.8 liter of catalyst to produce 7630 STP liters (1.5 lb) of hydrogen per hour. This quantity of catalyst would fit into nine tubes 17.8 centimeters along and 2.54 centimeters in inside diameter, which is smaller than most mufflers. The reactor products would contain 12 to 13 percent more chemical energy than the incoming methanol and water.

Brabbs, T.↗

Small solar thermal electric power plants with early commercial potential

Cost-effective small solar thermal electric power plants (1- to 10-MW nominal size) offer an attractive way of helping the world meet its future energy needs. The paper describes the characteristics of a conceptual near-term plant (about 1 MW) and a potential 1990 commercial version. The basic system concept is one in which steam is generated using two-axis tracking, parabolic dish, and point-focusing collectors. The steam is transported through low-loss piping to a central steam turbine generator unit where it is converted to electricity. The plants have no energy storage and their output power level varies with the solar insolation level. This system concept, which is firmly based on state-of-the-art technology, is projected to offer one of the fastest paths for U.S. commercialization of solar thermal electric power plants through moderate technology advances and mass production.

Jones, H. E.↗

Field Validation of Thermoelectric Generation System at Holcim Cement Plant in Alpena, Michigan

Executive Summary Project Background The Industrial Technology Validation (ITV) program aims to identify and demonstrate the performance of new, emerging, and underutilized energy-saving technologies in the industrial sector to help inform decisions to help accelerate their commercialization and deployment, as well as to help make industries more competitive. This ITV demonstration evaluated a thermoelectric generation (TEG) technology at a cement plant, aiming to reduce energy demand in the cement industry. A median cement plant consumes 5.73 million British thermal units per ton of clinker production (resulting in 0.838 metric tons of carbon dioxide [CO₂] emissions per ton of clinker) (Boyd and Zhang 2011, EPA 2021), equivalent to approximately 6.9 trillion British thermal units (TBtu) per year in energy consumption at a cement plant producing 3,300 tons of clinker per day.¹ Collaborating with Holcim, Advanced Thermovoltaic Systems (ATS) developed and deployed a pilot-scale thermoelectric power system to efficiently capture and convert waste heat to electricity. The system leverages the Seebeck effect to convert temperature differences on two sides of semiconductor cartridges into electrical power (ScienceDirect, n.d.). This generation is realized with minimal moving parts compared to existing waste-heat-to-generation solutions and allows capture from heat sources with temperatures as low as 150°C. This project aimed to validate a scalable solution applicable for capturing medium-temperature waste heat, including ambient losses from other high-temperature processes, and high-temperature sources less suitable for other waste-heat-to-power solutions. By recovering this otherwise wasted heat, this project intends to validate improvements to overall process efficiency through reduction in purchased electricity, thereby reducing operational costs while enhancing resiliency and competitiveness. Description and Scope This study evaluated the performance of a TEG system from ATS as a solution to convert waste heat into useful power at a Holcim cement plant in Alpena, Michigan. This plant is a fully integrated cement plant that has been operating since 1907. The facility operates continuously (24/7/365) with approximately 250 employees and five long dry kilns, yielding a total production capacity of 7,852 tons of cement per day (EPA 2023). Currently, the Alpena plant uses waste heat boilers to convert waste heat from the exhaust of each kiln into steam, which drives steam turbine generators. The ATS TEG is being evaluated for its potential to supplement the steam turbines by capturing the remaining lower grade heat. This technology is also being considered for other Holcim plants where steam turbines are not a viable option. ATS installed a pilot-scale TEG unit with an array of 582 individual thermoelectric semiconductor cartridges, of which 573 were operational. The cartridges are sandwiched between 48 hot plates and 49 cold plates. Each cartridge is designed to generate 20 watts (W) of gross power at a hot-side temperature of 240°C and cold-side temperature of 20°C. As such, the total gross generation capacity of the installed system is 11.5 kilowatts (kW) at design conditions. The system configuration for the evaluation was designed to prioritize convenience of installation and minimize disruption to production at the site, while ensuring that the heat required can be obtained for evaluating the TEG system at various operational conditions. To accomplish this, a portion of the steam supplied to Alpena’s steam turbine generation system was diverted to be used as the heat source for the TEG system, while water was supplied to the cold side of the system from nearby Lake Huron. This configuration was designed for the evaluation of the pilot-scale system to assess the performance at different conditions. A commercial-scale system will likely vary from the pilot system depending on typical configurations, including both scale and application. Future commercial applications of the ATS system would involve integrating the system into the exhaust from kiln preheaters, clinker coolers, or radiant heat capture from kiln shells for the heat source. For the cold source, a range of cooling solutions can be considered, including a mechanical cooling system, depending on the location and the application. To increase the generation capacity for commercial applications, the technology provider is working toward developing a commercial-scale TEG system, which would combine multiple TEG units (each similar in design to the pilot system) together. The scope of this evaluation includes the pilot-scale TEG system and all impacted equipment including pumps, controllers, and power handling equipment. Study Objectives The evaluation's goal was to assess the potential of the ATS TEG system to generate useful electrical power by capturing waste heat from cement production kilns. The objectives of this study are to evaluate and verify the following claims made by ATS regarding the pilot-scale system installed at the Holcim Alpena plant. The following design parameters and claims are also outlined in Table ES- 1 and Table ES- 2: • Gross Power: The thermoelectric system converts heat into power to create gross power, the total measured power generated by the system. The 573 active cartridge pilot-scale system is expected to generate 11.5 kW of gross power at the designed hot-side temperature of 240°C and cold-side temperature of 20°C. Power production is dependent on the temperature difference between the heat source (ultimately from the waste heat) and cold temperature supply source. • Net Power: The net power is the total usable power provided to the site by the TEG system after deducting parasitic power loads from the gross generated power. Supplementary equipment is required to operate the TEG system including pumps, controllers, and, in certain anticipated applications, mechanical cooling, which introduce parasitic loads to system operation. After deducting the parasitic loads from the gross power generation, ATS anticipates achieving a net power generation of 7.5 kW from the pilot-scale system. • Thermal Efficiency: The thermal efficiency is the percent of the total heat transferred to the TEG system that is converted to gross power. Historically, TEGs have a thermal efficiency of 2%–5% (DOE 2008). Prior industrial-scale TEG systems, such as the E1 TEG offered by Alphabet Energy, operated at an efficiency of 2.5% (Lamonica, 2014). ATS anticipates achieving an average efficiency of 4.8% or higher in converting heat energy to usable electricity. • Cartridge Performance: The TEG system comprises 573 active individual semiconductor cartridges, each of which generates a portion of the total power. Cartridge optimization and selection is an important design consideration for potential future TEG system design performance. Therefore, understanding the distribution of gross power and efficiency within the pilot system is vital to understanding what is achievable. At a design hot-side temperature of 240°C and cold-side temperature of 20°C, ATS anticipates a cartridge performance of 20 W of gross power per cartridge at an efficiency of 4.8% per cartridge. In addition to evaluating the claimed performance of the TEG pilot-scale unit, the study estimated the potential annual impacts of a scaled-up commercial system used to capture kiln waste heat over annual operations. The evaluation estimated the gross and net annual electric generation achievable by capturing heat from the two proposed tap-in points: the kiln exhaust and the clinker cooler exhaust; see Section 2.1 for details. Two use cases were examined: • Holcim Alpena: The Holcim Alpena site consists of long dry kilns with superheater boilers, which differs from the rest of Holcim’s cement plant portfolio and results in lower waste heat temperatures. The study estimates gross and net annual generation using the superheater boiler exhaust and clinker cooler exhaust, based on 2023 operational data. • Typical Installation: Common cement plants have preheater kilns with higher exhaust temperatures than Holcim Alpena across a range of production rates. The study estimates gross and net annual generation using the preheater exhaust and clinker cooler exhaust, with a sensitivity analysis to account for the typical range of preheater exhaust temperatures, clinker cooler exhaust temperatures, and clinker production rates. Methodology The evaluation methodology followed a measurement and verification (M&V) strategy based on the International Performance Measurement and Verification Protocol Option B through comprehensive measurements and analyses of the affected systems. Evaluation data was collected from March 9 to March 11, 2024, the test period of the pilot TEG system. During the test period, in coordination with the ITV team, the ATS team adjusted system operations to capture the range of variability expected for each of the variables pertinent to performance of the system. The methodology consisted of two parts: evaluating the performance of the pilot unit's TEG system and estimating the annual TEG impact in terms of gross and net power based on a given waste heat profile. First, the evaluation of the thermoelectric generation performance of the pilot unit relative to the claims was performed by analyzing the collected test data. Gross power of the pilot TEG system was directly measured. Net power was determined by deducting the measured parasitic power from the gross power. The gross power generation was compared to heat transferred to the system by the working fluid (which was heated by steam generated from the kiln waste heat) to calculate the thermal efficiency achieved by the system. Performance of individual semiconductor cartridges within the pilot array was also assessed in terms of measured gross cartridge power and calculated cartridge thermal efficiency. The second part of the evaluation estimated the annual TEG impacts in terms of gross power and net power (calculated from the difference between gross power and parasitic power). This analysis comprised development of mathematical regression models for gross power and parasitic power, with assessment of each model’s goodness-of-fit characteristics to ensure satisfaction of statistical requirements. The models predicted the gross power generation, the parasitic load based on the temperature difference between the hot working fluid and the cold-side fluid (cold water from Lake Huron) entering the system, the volumetric flow rate of the cold-side fluid at the inlet, and the volumetric flow rate of the hot working fluid at the inlet. The annual impact analysis considered a theoretical commercial-scale system sized to capture the available waste heat at a cement plant, consisting of linked pilot-scale units that receive heat from a theoretical gas-to-working-fluid heat exchanger. To estimate annual impacts at the Alpena plant, the gross power and parasitic power regression models were applied to the arrays in the theoretical commercial-scale system. The heat supplied to the unit was calculated based on the kiln run time, annual production, kiln exhaust waste heat, and clinker cooler waste heat derived from 2023 Holcim Alpena kiln operational data. Net power impacts were calculated by deducting the resulting parasitic power from the estimated gross power. Inputs for the model were generated from a combination of hourly data, assumed design considerations for TEG system scale-up from the pilot-scale unit, and assumptions regarding TEG system operations. This analysis was then used as the basis for estimating annual impacts of typical TEG installation at cement plants, by applying sensitivity analyses to key kiln operational characteristics including kiln preheater exhaust temperatures, cooler clinker exhaust temperatures, and plant daily production rates across a range of expected values. Project Results/Findings Table ES- 2 and Table ES- 2 provide a summary of the operating conditions and evaluation results compared to the stated claims from the technology provider. Key takeaways include: • Gross Power: The peak gross power achieved during the testing period was 10.0 kW, compared to the 11.5 kW expected for 573 active cartridges. The claimed gross power was associated with a target hot side of 240°C; however, the system only received a maximum hot-side mean plate temperature of 212°C during the testing period. • Net Power: The pilot-scale unit exceeded the claims for net power, achieving a peak of 7.7 kW net compared to a claim of 7.5 kW. One factor contributing to the higher achieved net power is the relatively high water pressure available through Lake Huron. The pilot TEG system did not require cold-side pumps during the test, whereas most installations would. This reduced the parasitic loads on the system, ultimately contributing to higher net power relative to the gross power. • Thermal Efficiency: The pilot-scale unit outperformed the claimed efficiency, achieving a peak system efficiency of 5.0% thermal efficiency compared to the stated 4.8%. • Cartridge Performance: To compare cartridge performance against claims, the study focused on the third day of testing, which aimed for conditions closest to the design specifications, with a hot side of 240°C and cold-side exit temperature of 6.4°–30°C. On this day, the mean gross power observed in the cartridges within the TEG array was 18.1 W/cartridge, and the peak performance was 34.7 W/cartridge. The estimated mean cartridge efficiency was 5.2%, and the estimated efficiency at peak gross cartridge power was 10%. The regression models developed for gross power generation and parasitic loads were used to estimate the generation impact for given heat input to the TEG from the working fluid (captured from the waste heat) and from the cold loop (Lake Huron) on an hourly basis for a year of operation. Based on this analysis, installation of a commercial-scale TEG system at the Holcim cement plant in Alpena, Michigan, with a waste heat exchanger of 0.85 effectiveness, would generate up to 391 kW of net power, translating to between 920,000 and 1,800,000 kilowatt-hours (kWh) in net electricity per year. Based on typical grid emissions for Alpena, this would avoid estimated net emissions by 752 metric tons of CO₂ annually.² The sensitivity analysis estimated that typical TEG system installations at cement plants could generate an average of 56–1,040 kW of net power, or between 488,000 and 9,110,000 kWh of net energy. This generation potential is most significantly affected by plant production rates and also influenced by preheater and clinker cooler exhaust temperatures. Applying the national average emission rate, typical commercial-scale installations at Holcim plants are projected to avoid between 182 and 3,401 metric tons of CO₂ annually per site. Table ES- 3 shows a summary of the estimated annual impacts.³ While parasitic loads are significant and vary by application, this analysis assumed the use of heating loop pumps and access to Lake Huron as a cold sink. This setup assumed no need for cooling loop pumps due to the available water pressure at the test site. Applications that require cooling towers or additional equipment are likely to experience higher parasitic loads. Therefore, the study’s estimates are most applicable to scenarios with similar parasitic load configurations—namely, access to a high-pressure cold sink. Applicability to other locations may be limited, as differing conditions could necessitate additional pumps and cooling systems, potentially impacting performance significantly.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗