Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Staging Building”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 379 records · Page 21

Ares Launch Vehicles Overview

Since 2005, the Ares Projects have been building the nation s next generation of crew and cargo launch vehicles. As part of the Constellation Program, the Ares vehicles will enable astronauts in the Orion crew exploration vehicle and Altair lunar lander to reach the Moon and beyond. These vehicles draw upon hardware and experienced developed over 50 years of exploration, while also incorporating technology and management practices from today. Ares is concentrating on building the Ares I crew launch vehicle to ensure America s continued ability to send crews to the International Space Station. Progress has been made on design, fabrication, and testing for the first stage, upper stage, upper stage engine, and integrated vehicle. This presentation will provide an overview of the Ares launch vehicles architecture, milestone progress, and top project risks.

Vanhooser, Teresa↗

Technology Infusion Challenges from a Decision Support Perspective

In a restricted science budget environment and increasingly numerous required technology developments, the technology investment decisions within NASA are objectively more and more difficult to make such that the end results are satisfying the technical objectives and all the organizational constraints. Under these conditions it is rationally desirable to build an investment portfolio, which has the highest possible technology infusion rate. Arguably the path to infusion is subject to many influencing factors, but here only the challenges associated with the very initial stages are addressed: defining the needs and the subsequent investment decision-support process. It is conceivable that decision consistency and possibly its quality suffer when the decision-making process has limited or no traceability. This paper presents a structured decision-support framework aiming to provide traceable, auditable, infusion- driven recommendations towards a selection process in which these recommendations are used as reference points in further discussions among stakeholders. In this framework addressing well-defined requirements, different measures of success can be defined based on traceability to specific selection criteria. As a direct result, even by using simplified decision models the likelihood of infusion can be probed and consequently improved.

Adumitroaie, V.↗

Gaseous By-Product of Thermal Vacuum Processing of Lunar Highland Simulant

Scientists at Kennedy Space Center are advancing technologies to achieve oxygen extraction on the Lunar surface. One such technology is Molten Regolith Electrolysis (MRE) in which regolith simulant is melted under high temperatures to perform oxygen extraction through electrolysis of the melt pool. A study was conducted to understand the molten formation and proper-ties of Lunar Highlands Simulants (LHS-1) under high vacuum environments ranging between 10-6 Torr. These studies include investigating the regolith melt behavior and by-product gas analysis systems to prepare for pilot plant development and operations. The off-gassing rates and pressure build-up, gaseous compounds, and material compatibility may be a risk to MRE systems. The KSC findings are reported here for inclusion into future mis-sion architecture and operational planning. The four stages of the experiment were vacuum, resistive heating, regolith melt and gas detection. The regolith mass of 70 g was melted in a 40 cm tall x 50 cm diameter vacuum chamber at temperature increase rate 47 ℃ /min and ramp rate of 1 ampere/3 min up to an 18-amp maximum. The test is conducted for about 60 minutes and the constituent gases produced during heating of regolith is monitored with a re-sidual gas analyzer. During the molten formation, primary off-gassing volatiles included water vapor (18 amu), a peak at 44 amu (FeO2 – expected), and atomic oxygen (16 amu), among a series of other compounds that could create compatibility issues such as magnesium, chlorine, and silicon oxide. These results add to the knowledge required for successful oxygen extraction on the moon.

Molten Regolith Electrolysis↗

Remote Plant Food Production Capability X-Hab

As human space exploration expands to long-duration missions, plant production capability serves as a solution to reduce the mass of consumables necessary to support human metabolic requirements and promote positive crew psychological health. A capability to remotely grow plants for a long-duration space mission could allow crops to be produced before a crew arrives at a staged habitat and could enable plant health to be maintained through remote operation with minimal local crew support. The University of Colorado Boulder was awarded a grant in the summer of 2012 to build a system capable of remote plant production as part of the NASA and National Space Grant Foundation eXploration Habitat (X-Hab) 2013 Academic Innovation Challenge. This report is presented as a review of the Robotic Gardening System that was designed and developed to meet the requirements outlined in the challenge. Each subsystem of the Robotic Gardening System is presented in detail. Included in this report are the design methodologies used, lessons learned throughout the design and development processes, and options or ideas for continued development and future upgrades. In addition to being a review of the Robotic Gardening System and its subsystems, this document is meant to aid with the continued development of this system in conjunction with other projects, such as team member Heather Hava’s NASA Space Technology Research Fellowship (NSTRF) work, X-Hab 2013-14 Plants Anywhere: Growing Plants in Free Habitat Spaces, and Dr. Nikolaus Correll’s NASA Early Career Professionals Fellowship.

Daniel Zukowski↗

CHALLENGES IN THE DEVELOPMENT OF THE ELECTROREFINING PROCESS AT Y-12

In order to ensure future capabilities of the Y-12 site as older buildings retire, a new process was developed, the Metal Purification Process. The purpose of this new process is to provide a simpler and more efficient uranium metal purification that the previous multi-staged, complex chemical processes. The basis for this technology currently exists in the US DOE complex, but it has not been utilized on a large scale for uranium at higher enrichments. The system requires larger-geometry vessels and furnaces in order to meet the through-put requirements. The crux of the process is the electrorefining cell, consisting of several concentric liners and an unfavorable geometry cylindrical crucible. Within the crucible, a molten Li-CL-KCL-UCL3 salt electrolyte is present. ‘Dirty’ metal is placed into a loading basket and loaded into an electrorefining cell. Here, the metal reacts into the molten salt within the cell to form UCL3, while ‘clean’ metal simultaneously plates out from the salt electrolyte in the form of metal dendrites. These dendrites are then collected and removed from the cell. After removal from the cell, the dendrites are taken to a furnace to remove adhered salts. Then, the salt-free dendrites are moved to a separate furnace for consolidation into the final product form. The development of the Criticality Safety Evaluation for this complex system brought with it many NCS Challenges and lessons learned. These challenges include: design decisions for ensuring subcriticalty in the electrorefining cell during abnormal conditions, the interface of the main glovebox system with auxiliary systems such as the purification system and designated storage, implementation of mass tracking, and concerns from production and operation regarding the movement of material within the system.

36 MATERIALS SCIENCE↗

Improving Predictions Under Uncertainty of Material Plasma Device Operations

Understanding the properties of materials when exposed to various plasma temperatures and fluxes is essential to the building and operating of fusion reactors. The Material Plasma Exposure eXperiment (MPEX) is an instrument currently being developed by the Department of Energy (DOE) for this purpose. MPEX is expected to come online in stages over the next five years. Proto-MPEX, the predecessor to MPEX, operated from 2014 to 2021, and was designed to understand the generation of plasma temperatures and fluxes at orders of magnitude below what will be obtained by MPEX. This work uses the recently developed stochastic neural network (SNN), a machine learning technique capable of operating under uncertainty to provide a surrogate model for the Proto-MPEX device. We demonstrate that SNN outperforms Bayesian neural network (BNN), a standard in the field of machine learning with uncertainty. The development of a robust surrogate of the Proto-MPEX will aid in the commissioning and operation of the MPEX device.

Archibald, Rick↗

Data-Based Resilience Enhancement Strategies for Electric-Gas Systems Against Sequential Extreme Weather Events

Some extreme weather events, such as the hurricane, pass through an area sequentially and thus are called sequential extreme weather events (SEWEs). This paper proposes a data-based robust optimization (RO) model to enhance the resilience of the integrated electricity and gas system (IEGS) against SEWEs. Specifically, the SEWE strikes the IEGS sequentially. After each attack, the system state is adjusted immediately to minimize the maximized expected system cost caused by the SEWE. The attack-defense procedures are repeated alternatively during the SEWE. Preventive measures, hardening, are made in advance to reduce the impact of sequential attacks. The entire process is formulated as a multi-period RO model. Furthermore, it is proved that the most effective resilience enhancement strategies for this model are the same as those for a two-stage RO model, which can be solved by the nested column-and-constraint generation (C&CG) algorithm. In addition, the property of SEWEs, sequentially endangering limited regions of the IEGS, is incorporated to build a data-based uncertainty set and reduce its conservativeness. Simulation results on two IEGSs validate the effectiveness of the proposed model.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Evaluation of Low Environmental Impact Distributed Scroll Booster Technology for Supermarket Refrigeration

A distributed scroll booster refrigeration system is proposed as an alternative for current refrigeration systems used in supermarket applications. The distributed scroll booster system is configured to enable the use of low-pressure refrigerants such as R-1234yf, which has a global warming potential (GWP) of less than 1, in a cycle configuration that employs a two-stage compression process. This scroll booster system is comprised of medium-temperature compressors (high stage) coupled with low-temperature compressors (low stage). This two-stage system architecture allows both low-temperature and medium-temperature refrigerated display cases to be integrated in the same system. By design, this system reduces the refrigerant charge, produces higher efficiencies (two-stage compression), uses existing components minimizing cost impact, and will be able to use ultra-low GWP class A2L (low toxicity and low flammability) refrigerants such as R-1234yf when standards and building codes are updated (expected by 2025).

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Efficient Evaluation and Optimization of Structural Reliability

Use of approximations for calculating the structural failure probability under uncertainties is a necessary aspect. But efficient use of suitable approximations at different stages of reliability prediction and design makes this valuable tool practical for many large scale structures. This research addresses the modern approximation concepts and their utility in structural reliability estimation. Emphasis is placed on building higher order approximations using intervening variables to closely represent the nonlinear limit state functions. Several test problems with highly nonlinear performance functions are used to demonstrate the accuracy of the proposed method. Many of the structural problems are modeled and simulated using the finite element methods (FEM) for obtaining a detailed structural response. FEM is a computationally intensive numerical procedure with a large number of degrees of freedom. With an increase in the complexity of the structural model and the multidisciplinary nature of analyses, the number of limit states and their computation increases very significantly. The requirement of frequent repetitive analysis of the structure hinders the utility of any tool and discourages that approach from being used. One particular tool which faces this difficulty is the computation of the structural reliability under parametric uncertainties.

Grandhi, Ramana V.↗

Updates in Developing a Prototype Science Pipeline and Full-Volume, Global Hyperspectral Synthetic Data Sets for NASA’s Earth System Observatory’s Upcoming Surface, Biology and Geology Mission

The Surface Biology and Geology (SBG) mission recently passed mission confirmation review and has entered phase A – design and development. SBG will acquire high resolution solar-reflected spectroscopy and thermal infrared observations at a data rate of ~2.5 TB/day and generate products at ~40 TB/day. Given that the per-day volume is greater than NASA’s total extant airborne hyperspectral data collection, collecting, processing, disseminating, and exploiting the SBG data present new challenges. To meet these challenges, we have developed a prototype science pipeline and a full-volume global hyperspectral synthetic data set to help prepare for SBG’s flight (see poster GC42D-0730). Our science pipeline is based on the science processing technology developed for NASA’s Kepler and TESS planet-hunting missions. The pipeline infrastructure, Ziggy, provides a scalable architecture for robust, repeatable, and replicable science and application products that can be run on a range of systems from a laptop to the cloud or a supercomputer. Ziggy is compliant with NASA Procedural Requirement (NPR) 7150.2C, is at a technical readiness level (TRL) of 7 and has been released to github.com/nasa/ziggy. We integrated Ziggy with EO-1/Hyperion workflows to build a prototype pipeline and ingested the 17-year mission archive that provides globally sampled visible through shortwave infrared spectra that are representative of SBG data types and volumes. We fully implemented the first stage and processed the entire 55 TB Hyperion data set from the raw data (Level 0) to top-of-the-atmosphere radiance (Level 1R). We are currently evaluating the ISOFIT atmospheric correction module to convert the L1R data to surface reflectance (Level 2) before reprocessing the full data set to L2. Crosschecks are being performed with RadCalNet as well as with coincident observations by AVIRIS. We are also investigating modern methods for georectifying the Hyperion scenes. Finally, we describe an analysis of the cost to conduct forward processing and reprocessing campaigns for SBG on HECC with dedicated compute and storage resources using the resurrected Hyperion pipeline as a proxy for full-volume SBG data. The analysis demonstrates that SBG L0 data can be processed to L2 on HECC with full reprocessing campaigns every two years for ~$2.6M over a 7-year lifespan. Moreover, 69% of the system capacity would be available for other activities, possibly enabling future open-source science activities, including algorithm development, L3+ processing, .etc.

ESD↗

Distributed, Intelligent Edge-Sensing for a Smarter Grid

The electric grid is undergoing major transformations and developments resulting in unprecedented levels of volatility, uncertainty, and stress on grid infrastructure. Smart sensors and methods aiding in advanced visibility and situational awareness are key for tackling these issues. In this work, a decentralized architecture is proposed, where sensing, local computation and control capability are embedded in the edge devices, communicating with a set of trusted 'data mules' in a 'delay-tolerant' manner, while functioning autonomously. This system has been designed and implemented as an overall platform – called Global Asset Monitoring, Management and Analytics (GAMMA) Platform intended to provide the backbone for a global array of sensors and actuators. Further, as a building block for advanced current sensing solutions, a smart, low-cost ‘clip-on’ current sensor based on PCB-embedded Rogowski coil has been developed. The sensor hosts a novel signal conditioning stage allowing an 'auto-tuning' feature, resulting in a universal current sensor design for measuring a wide range of currents, including faults for smart grid applications. Finally, the research proposes a method to instrument and monitor key parameters for the most common electric utility asset – the pole-top distribution transformer. The work done in this research enables scalable, edge-intelligent sensing solutions for monitoring grid infrastructure, allowing utility operators to gain advanced visibility in an economical way.

Kulkarni, Shreyas Bhalchandra↗

WIPP Safety Significant Confinement Ventilation System (SSCVS) Quality Assurance Program - 20237

Construction and major equipment fabrication are underway for a new ventilation exhaust system at the Waste Isolation Pilot Plant (WIPP). The new system will provide continuous HEPA filtration of the exhaust from the WIPP underground while meeting the ventilation demands for expanded waste emplacement and mining operations over the next 40 years. The SSCVS project has proceeded with the awarding of CD-3A for Long Lead Procurements followed by CD-2/3 approval for the construction of the facilities. The SSCVS project team made the decision to increase the quality oversight throughout the complete project per the Project Quality Assurance Plan (PQAP) such that it can ensure the final products meet applicable NQA-1 requirements and general quality requirements, and that the project will proceed to operations without significant delays due to post installation quality concerns. The PQAP was established prior to approval of the project at the CD-2/3 milestone. The SSCVS project has 2 major long lead procurements which commenced with the awarding of CD-3A. These procurements include the HEPA filter housing assemblies and the Exhaust Fans. There are 22 HEPA filter assemblies for the SSCVS, which are designated Safety Significant for pressure boundary confinement, per the approved PDSA. The exhaust fans also have Safety Significant components to maintain the pressure confinement boundary. NWP made the decision to install resident Quality Inspectors at the fabrication facilities to ensure the documentation for each fabricated unit meets all the QA requirements as defined in the respective contract documents. For the construction of the SSCVS Salt Reduction Building (SRB) and New Filter Building (NFB), dedicated, on-site quality inspectors have been utilized to ensure that all work being performed will comply with quality requirements and the Special Inspections as defined in IBC-2015. At each stage of inspection, hold points are placed into the work packages to ensure NWP QA personnel are present to inspect and verify the installations are in accordance with the design specifications, codes and standards. With this level of oversight, NWP anticipates that the level of quality related issues, as seen on multiple other DOE complex site projects, will be avoided and that the commissioning, start-up and hot operations will progress in a timely fashion, as all documentation will be in place and approved prior to initiation of these activities. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Voxel carving–based 3D reconstruction of sorghum identifies genetic determinants of light interception efficiency

Changes in canopy architecture traits have been shown to contribute to yield increases. Optimizing both light interception and light interception efficiency of agricultural crop canopies will be essential to meeting the growing food needs. Canopy architecture is inherently three-dimensional (3D), but many approaches to measuring canopy architecture component traits treat the canopy as a two-dimensional (2D) structure to make large scale measurement, selective breeding, and gene identification logistically feasible. We develop a high throughput voxel carving strategy to reconstruct 3D representations of sorghum from a small number of RGB photos. Our approach builds on the voxel carving algorithm to allow for fully automatic reconstruction of hundreds of plants. It was employed to generate 3D reconstructions of individual plants within a sorghum association population at the late vegetative stage of development. Light interception parameters estimated from these reconstructions enabled the identification of known and previously unreported loci controlling light interception efficiency in sorghum. The approach is generalizable and scalable, and it enables 3D reconstructions from existing plant high throughput phenotyping datasets. We also propose a set of best practices to increase 3D reconstructions’ accuracy.

3D plant reconstruction↗

Artificial Intelligence for Data Center Operations (AI Ops)

HPC data centers such as the one at NREL's ESIF will increasingly need to rely on automation to keep pace with exascale growth in compute capability and to manage and optimize the data center environment and facility resources. Artificial intelligence (AI) and machine learning (ML) approaches provide the means to improve HPC data center efficiency (energy, operational, and managerial efficiency) and resiliency by learning historical trends and training models to operate on real-time data collected from both IT and facilities sources. The goal of coupled improvement of data center resiliency and energy efficiency through automated data collection and AI has led to a multi-year, multi-staged collaboration between NREL and Hewlett-Packard Enterprise's Advanced Technology Group, referred to as Artificial Intelligence for Data Center Operations (AIOps). The extended efforts within the AIOps project include a common goal of building capabilities for an advanced smart facility and demonstration of data collection and AI modeling techniques in the ESIF data center.

97 MATHEMATICS AND COMPUTING↗

How the Modular Construction Industry Is Changing the Construction Workforce [Slides]

564,000 - that's the number of construction workers the United States lacked in 2023. This is not a new or unfamiliar problem, but high interest rates, housing shortages, and an aging workforce are amplifying the pressure to build faster and recruit new talent. Panelized and modular construction are often touted as a solution to this workforce challenge and have seen year over year increases in market share. While research confirms industrialized construction can increase building efficiencies, researchers at the National Renewable Energy Laboratory (NREL), RMI, Washington State University, Dodge Construction Network and Guidehouse were curious how workers are being impacted both on construction sites, at factories, and all the stages in between.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Preparing Lamellae from Vitreous Biological Samples using a Dual-Beam Scanning Electron Microscope for Cryo-Electron Tomography

Presented here is a protocol for preparing cryo-lamellae from plunge-frozen grids of Plasmodium falciparum-infected human erythrocytes, which could easily be adapted for other biological samples. The basic principles for preparing samples, milling, and viewing lamellae are common to all instruments and the protocol can be followed as a general guide to on-grid cryo-lamella preparation for cryo-electron microscopy (cryoEM) and cryo-electron tomography (cryoET). Electron microscopy grids supporting the cells are plunge-frozen into liquid nitrogen-cooled liquid ethane using a manual or automated plunge freezer, then screened on a light microscope equipped with a cryo-stage. Frozen grids are transferred into a cryo-scanning electron microscope equipped with a focused ion beam (cryoFIB-SEM). Grids are routinely sputter coated prior to milling, which aids dispersal of charge build-up during milling. Alternatively, an e-beam rotary coater can be used to apply a layer of carbon-platinum to the grids, the exact thickness of which can be more precisely controlled. Once inside the cryoFIB-SEM an additional coating of an organoplatinum compound is applied to the surface of the grid via a gas injection system (GIS). This layer protects the front edge of the lamella as it is milled, the integrity of which is critical for achieving uniformly thin lamellae. Regions of interest are identified via SEM and milling is carried out in a step-wise fashion, reducing the current of the ion beam as the lamella reaches electron transparency, in order to avoid excessive heat generation. A grid with multiple lamellae is then transferred to a transmission electron microscope (TEM) under cryogenic conditions for tilt-series acquisition. A robust and contamination-free workflow for lamella preparation is an essential step for downstream techniques, including cellular cryoEM, cryoET, and sub-tomogram averaging. Development of these techniques, especially for lift-out and milling of high-pressure frozen samples, is of high-priority in the field.

59 BASIC BIOLOGICAL SCIENCES↗

The road plan model: Information model for planning road building activities

The general building contractor is presented with an information model as an approach for deriving a high-level work plan of construction activities applied to road building. Road construction activities are represented in a Road Plan Model (RPM), which is modeled in the ISO standard STEP/EXPRESS and adopts various concepts from the GARM notation. The integration with the preceding road design stage and the succeeding phase of resource scheduling is discussed within the framework of a Road Construction Model. Construction knowledge is applied to the road design and the terrain model of the surrounding road infrastructure for the instantiation of the RPM. Issues regarding the implementation of a road planner application supporting the RPM are discussed.

Azinhal, Rafaela K.↗

The Ares I-1 Flight Test--Paving the Road for the Ares I Crew Launch Vehicle

In accordance with the U.S. Vision for Space Exploration and the nation's desire to again send humans to explore beyond Earth orbit, NASA has been tasked to send human beings to the moon, Mars, and beyond. It has been 30 years since the United States last designed and built a human-rated launch vehicle. NASA is now building the Ares I crew launch vehicle, which will loft the Orion crew exploration vehicle into orbit, and the Ares V cargo launch vehicle, which will launch the Lunar Surface Access Module and Earth departure stage to rendezvous Orion for missions to the moon. NASA has marshaled unique resources from the government and private sectors to perform the technically and programmatically complex work of delivering astronauts to orbit early next decade, followed by heavy cargo late next decade. Our experiences with Saturn and the Shuttle have taught us the value of adhering to sound systems engineering, such as the "test as you fly" principle, while applying aerospace best practices and lessons learned. If we are to fly humans safely aboard a launch vehicle, we must employ a variety of methodologies to reduce the technical, schedule, and cost risks inherent in the complex business of space transportation. During the Saturn development effort, NASA conducted multiple demonstration and verification flight tests to prove technology in its operating environment before relying upon it for human spaceflight. Less testing on the integrated Shuttle system did not reduce cost or schedule. NASA plans a progressive series of demonstration (ascent), verification (orbital), and mission flight tests to supplement ground research and high-altitude subsystem testing with real-world data, factoring the results of each test into the next one. In this way, sophisticated analytical models and tools, many of which were not available during Saturn and Shuttle, will be calibrated and we will gain confidence in their predictions, as we gain hands-on experience in operating the first of two new launch vehicle systems. The Ares I-1 flight test vehicle (FTV) will incorporate a mix of flight and mockup hardware, reflecting a configuration similar in mass, weight, and shape (outer mold line or OML) to the operational vehicle. It will be powered by a four-segment reusable solid rocket booster (RSRB), which is currently in Shuttle inventory, and will be modified to include a fifth, inert segment that makes it approximately the same size and weight as the five segment RSRB, which will be available for the second flight test in 2012. The Ares I-1 vehicle configuration is shown. Each test flight has specific objectives appropriate to the design analysis cycle in progress. The Ares I-1 demonstration test, slated for April 2009, gives NASA its first opportunity to gather critical data about the flight dynamics of the integrated launch vehicle stack, understand how to control its roll during flight, and other characterize the severe stage separation environment that the upper stage will experience during future operational flights. NASA also will begin the process of modifying the launch infrastructure and fine-tuning ground and mission operational scenarios, as NASA transitions from the Shuttle to the Ares/Orion system.

Davis, Stephan R.↗